Download - Placement Presentation - Steven Panayiotou
Industrial Placement Year
Steve PanayiotouFacilities & Central Maintenance Undergraduate
1. Vauxhall Motors Introduction
2. Luton Plant
3. Key Work Contributions
4. Community Contributions
5. Skill Development
Agenda
• Vauxhall Motors was founded in 1857 as a pump and marine engine manufacturer
• In 1903 Vauxhall Motors went on to manufacture vehicles.
• There are two Vauxhall Motors manufacturing facilities in the UK.
• Ellesmere Port and Luton.
• We have a build target of 80,000 vans each year.
Vauxhall Motors Introduction
1. Press Shop
2. Body Shop
3. Electroplating Operation (ELPO)
4. Paint Shop
5. General Assembly
Luton Plant
•Energy Reporting• Initial Daily Energy Report• Improvements to Daily Energy Report• Daily Energy Issues Report
Key Work Contributions
MONDAY TUESDAY WEDNESDAY THURSDAY FRIDAY MONDAY TUESDAY WEDNESDAY THURSDAY FRIDAY MONDAY TUESDAY WEDNESDAY THURSDAY FRIDAY MONDAY TUESDAY WEDNESDAY THURSDAY FRIDAY MONDAY TUESDAY WEDNESDAY THURSDAY FRIDAY MONDAY TUESDAY WEDNESDAY THURSDAY FRIDAY MONDAY TUESDAY WEDNESDAY THURSDAY FRIDAY MONDAY TUESDAY WEDNESDAY THURSDAY FRIDAY MONDAY TUESDAY WEDNESDAY THURSDAYCelsius Celsius Celsius Celsius Celsius Celsius Celsius Celsius Celsius Celsius Celsius Celsius Celsius Celsius Celsius Celsius Celsius Celsius Celsius Celsius Celsius Celsius Celsius Celsius Celsius Celsius Celsius Celsius Celsius Celsius Celsius Celsius Celsius Celsius Celsius Celsius Celsius Celsius Celsius Celsius Celsius Celsius Celsius Celsius
02/05/2016 03/05/2016 04/05/2016 05/05/2016 06/05/2016 09/05/2016 10/05/2016 11/05/2016 12/05/2016 13/05/2016 16/05/2016 17/05/2016 18/05/2016 19/05/2016 20/05/2016 23/05/2016 24/05/2016 25/05/2016 26/05/2016 27/05/2016 30/05/2016 31/05/2016 01/06/2016 02/06/2016 03/06/2016 06/06/2016 07/06/2016 08/06/2016 09/06/2016 10/06/2016 13/06/2016 14/06/2016 15/06/2016 16/06/2016 17/06/2016 20/06/2015 21/06/2015 22/06/2015 23/06/2015 24/06/2015 27/06/2016 28/06/2016 29/06/2016 30/06/2016Air Temp Air Temp Air Temp Air Temp Air Temp Air Temp Air Temp Air Temp Air Temp Air Temp Air Temp Air Temp Air Temp Air Temp Air Temp Air Temp Air Temp Air Temp Air Temp Air Temp Air Temp Air Temp Air Temp Air Temp Air Temp Air Temp Air Temp Air Temp Air Temp Air Temp Air Temp Air Temp Air Temp Air Temp Air Temp Air Temp Air Temp Air Temp Air Temp Air Temp Air Temp Air Temp Air Temp Air Temp
7 6 7 7 10 6 6 11 10 11 6 6 11 10 11 12 9 7 9 10 10 12 12 13 8 13 13 16 14 14 13 12 13 12 12 15 14 14 168 6 6 6 10 6 6 11 10 10 6 6 11 10 10 11 8 6 9 10 10 11 12 13 8 11 11 15 13 14 11 12 12 12 12 15 14 14 169 5 6 6 9 6 6 11 10 10 6 6 11 10 10 11 8 7 8 10 11 11 12 12 8 11 11 15 13 13 11 12 12 11 11 15 14 13 149 5 4 6 9 6 6 11 10 10 6 6 11 10 10 10 7 7 8 9 11 11 12 12 8 11 11 14 12 13 11 12 11 10 11 15 13 13 159 5 5 7 9 6 6 11 10 10 6 6 11 10 10 10 7 7 7 9 11 10 12 12 8 11 11 13 12 12 11 12 10 11 11 15 13 13 1510 5 6 7 8 6 6 11 10 10 6 6 11 10 10 9 7 7 8 9 12 10 12 11 8 10 10 15 11 13 10 13 11 11 10 15 13 13 1511 6 7 7 10 6 6 11 10 10 6 6 11 10.5 10 8 6 7 8 10 12 10 11 11 8 11 11 15 11 13 11 13 12 11 11 15 13 14 1513 8 9 8 10 7 7 11 10 10 7 7 11 10.5 10.5 9 8 8 9 11 13 10 12 12 8 13 13 16 12 13 13 13 12 12 11 15 14 14 1614 9 11 10 12 8 8 11 10 10 8 8.5 11 10.5 10.5 10 10 8 10 13 13 11 12 12 9 13 13 17 12 14 13 13 13 12 12 15 15 15 1614 11 13 12 14 10 10 11 10 11 10 10 11 10.5 11 11 11 9 11 14 14 11 12 13 8 14 14 18 13 14 14 14 13 13 13 14 15 16 1715 12 14 14 15 11 12 11 11 11 11 12 11.5 11 11 13 13 10 12 16 14 12 13 13 9 15 15 19 14 15 15 15 14 14 13 15 16 17 1816 12 14 15 17 13 15 12 12 12 13 15 12 12 12 14 13 11 13 17 15 12 14 14 9 16 16 20 16 16 16 16 15 15 14 15 17 17 1917 13 15 16 18 13 16 12 12 13 13.5 16 12 12 13 15 14 11 14 18 16 12 14 14 10 18 18 21 17 17 18 18 16 15 15 15 18 18 1917 13 16 17 19 14 17 12 13 14 14 17 12.5 13 14 16 15 12 15 19 16 13 15 14 10 20 20 21 18 18 20 19 16 16 16 16 19 18 2017 14 16 18 19 14 17 13 14 16 14.5 17 13 14 16 17 16 12 16 19 16 13 15 15 11 21 21 23 19 18 21 19 17 17 16 17 19 19 2017 14 15 17 20 15 17 13 15 16 15 17 13 15 16 16 15 13 16 19 16 13 15 15 12 21 21 22 20 19 21 18 17 17 16 17 19 20 2116 14 15 17 19 15 17 14 16 16 15 17 14 16 16 16 15 13 18 20 15 13 16 15 12 22 22 22 20 20 22 18 17 18 17 18 20 20 2116 13 15 16 19 14 16 14 17 15 14 16 14 17 15 16 14 13 17 19 15 14 16 15 13 22 22 22 21 19 22 17 16 17 16 18 19 21 2215 13 13 15 19 13 15 13 16 14 13 15 13 16 14 15 13 13 16 18 14 13 16 14 13 21 21 21 20 18 21 17 16 17 16 19 19 20 2114 11 12 14 18 12 14 12 15 13 12 14 12 15.5 13 15 11 12 16 17 14 13 15 13 13 20 20 20 19 17 20 16 16 16 15 18 18 20 2010 10 10 13 17 11 13 12 15 13 11 13 12 15 13 14 10 12 15 16 13 13 14 12 13 19 19 19 18 16 19 15 15 15 14 17 17 19 199 8 9 12 15 10 12 11 13 12 10 12 11 13 12 12 9 11 14 15 12 13 14 12 13 18 18 17 17 15 18 14 14 14 13 16 16 18 188 8 8 11 14 9 11 11 12 12 9 11 11 12 12 11 8 10 12 13 11 12 13 11 13 17 17 16 16 14 17 14 13 13 12 16 16 17 178 7 7 10 13 8 11 11 12 12 8 11 11 12 12 10 7 10 11 12 11 12 13 10 12 16 16 15 15 14 16 14 12 12 11 15 15 16 16
12 °C 10 °C 11 °C 12 °C 14 °C 10 °C 11 °C 12 °C 12 °C 12 °C 10 °C 11 °C 12 °C 12 °C 12 °C 13 °C 11 °C 10 °C 12 °C 14 °C 13 °C 12 °C 13 °C 13 °C 10 °C 16 °C 16 °C 18 °C 16 °C 15 °C 16 °C 15 °C 14 °C 14 °C 13 °C 16 °C 16 °C 17 °C 18 °C #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0!
June - Average (-°C)Week 23Week 22 Week 24 Week 25 Week 26
Key Work Contributions•Energy Reporting & Monitoring
• Weekend Audit Table• Hourly Temperature Data• Energy Forecasting
•Energy Strategy 2016 Onwards• Engagement• Delivery• Reporting and Monitoring• Technology and Opportunities
Key Work Contributions
Key Work ContributionsHigh Bay LED Lighting
Replace High Watt Sodium Lamps – 476W EachInstall 1698 LED Lamps: 100W - 150W EachInvestment = £580,000Annual Saving = £215,000 per yearROI = 2.75 years
• Low Bay LED Lighting• Replacement of 6ft fluorescent light tubes in G.A to LED
tubes:• FREE!! 130 tube trial• If successful fit tubes to all low level lighting• Status: Awaiting trial sample
Easy Fit Tubes – Plug and Play
Key Work Contributions
• Plant Wide Energy Awareness Campaign• Energy Branding Communication• Engagement with Workforce• Energy Saving Awareness• Energy Competition
Key Work Contributions
• Red X Project:• LH B Pillar Upper to Lower Trim Panel Gap• Defect found on all Combi Vans• Always on Block Side• Implemented Solution• A strip of seal was trialled along the side of
the pillar • This eliminated all GCA defects
Key Work Contributions
ZOOM
!ZO
OM!
• Health and Safety Campaign• Spot the Hazard • Eye Safety Presentation• Present 82 times over 2 days
Key Work Contributions
Community Contributions• Apprentice Week
• Training• Health and Safety• Race
Community Contributions• Vans R Us
• 7XR Activity• Assist participants during the building
activity
#4 Washer M8 OD17 12 off #1 Floor plate 1 off
#5 Washer M6 OD14 10 off #2 Wheels 1 off
#6 Washer M6 OD12 5 off #3 Wheels 1 off
#20 Plate LH 1 off #13 L tube 1 off
#21 Surpressor 1 off #23 Exhaust 1 off
#7 Nut M6 8 off #19 Plate RH 1 off
#8 Nut M8 6 off #22 Bracket 2 off
#10 Bolt6mm x 50mm 3 off #25
Rubber Bush 2 off
#11 Bolt6mm x 40mm
2 off #16Spacer B (20mm)
2 off
#12 Bolt8mm x 40mm 6 off #14
Insulator Bracket 2 off
#24 Bolt 6mm x 60mm
1 off #17 Spacer C (15mm)
4 off
#15 3 offSpacer A (20mm)
Skill Development
•Transferable
• Health and Safety
• Confidence and Communication
• Motivation and Discipline
• Planning and Prioritising
• Technical
• Data Analysis
• Energy Efficiency
• Manufacture
• Complex Problem
Solving
Any questions?
Steve PanayiotouFacilities & Central Maintenance Undergraduate
Thanks For Listening