Plant & Equipment Visual Maintenance Board
HY-‐GRADE PRECAST CONCRETE St. Catharines, Ontario, Canada
![Page 2: Plant&Equipment VisualMaintenanceBoard](https://reader030.vdocument.in/reader030/viewer/2022013005/61cd8cc160f4915c19362669/html5/thumbnails/2.jpg)
What is a Visual Maintenance Board
• It is a board that has pictures of equipment and the manufacturing facility broken down into secNons.
• It is a common place for all equipment keys to hung.
• At a glance it’s stop light gauging visually shows the status of the plant and every piece of equipment in it.
![Page 3: Plant&Equipment VisualMaintenanceBoard](https://reader030.vdocument.in/reader030/viewer/2022013005/61cd8cc160f4915c19362669/html5/thumbnails/3.jpg)
What drove the idea?
-‐ Individuals were not always reporNng issues to the same person. -‐ calls were being made mulNple Nmes for the same issue. -‐ supervisors were told about the same issue from different people. -‐ “KEYS” – where or who has the keys? -‐ MulNple pieces of equipment, so exactly which one is it? -‐ small issues inside the plant were not being taken care of or not being reported.
![Page 4: Plant&Equipment VisualMaintenanceBoard](https://reader030.vdocument.in/reader030/viewer/2022013005/61cd8cc160f4915c19362669/html5/thumbnails/4.jpg)
HY-‐GRADE’S Maintenance Board
![Page 5: Plant&Equipment VisualMaintenanceBoard](https://reader030.vdocument.in/reader030/viewer/2022013005/61cd8cc160f4915c19362669/html5/thumbnails/5.jpg)
Why the need for Visual Maintenance?
• Stop light gauging • Red – Equipment failure and is inoperable. • Yellow -‐ operaNonal but requires maintenance ASAP. • Green – Good to go!
Status of the enNre plant at a glance
• Team Leaders and Supervisor can review and log areas and equipment in one area.
• Status of plant and equipment is visual to all EE’s. • Changing shi[ can see equipment status before entering the work area.
Centralized Maintenance
• Next to the picture of each piece of equipment is a hook to hang the keys.
• Standardized area for keys instead of having to search for them.
Key OrganizaNon
![Page 6: Plant&Equipment VisualMaintenanceBoard](https://reader030.vdocument.in/reader030/viewer/2022013005/61cd8cc160f4915c19362669/html5/thumbnails/6.jpg)
HY-‐GRADE’S Maintenance Board
![Page 7: Plant&Equipment VisualMaintenanceBoard](https://reader030.vdocument.in/reader030/viewer/2022013005/61cd8cc160f4915c19362669/html5/thumbnails/7.jpg)
Board Break Down
![Page 8: Plant&Equipment VisualMaintenanceBoard](https://reader030.vdocument.in/reader030/viewer/2022013005/61cd8cc160f4915c19362669/html5/thumbnails/8.jpg)
Board Break Down
![Page 9: Plant&Equipment VisualMaintenanceBoard](https://reader030.vdocument.in/reader030/viewer/2022013005/61cd8cc160f4915c19362669/html5/thumbnails/9.jpg)
Board Break Down
![Page 10: Plant&Equipment VisualMaintenanceBoard](https://reader030.vdocument.in/reader030/viewer/2022013005/61cd8cc160f4915c19362669/html5/thumbnails/10.jpg)
Board Break Down
![Page 11: Plant&Equipment VisualMaintenanceBoard](https://reader030.vdocument.in/reader030/viewer/2022013005/61cd8cc160f4915c19362669/html5/thumbnails/11.jpg)
Review & How to lay it out. -‐ Dry erase marker board. -‐ Break down the plant into secNons -‐ Take a picture of all equipment. -‐ Stop light gauges – red, yellow, green (ensure they can be reused over and over again) -‐ Hooks for keys -‐ Give each plant secNon and piece of equipment its own secNon. -‐ Very easy!