WALL MTD.; TEMPERED HW
REMARKS
FLOOR MTD.; FLUSH VALVE
WATER CLOSET - ADA COMPLIANT
PLUMBING FIXTURE CONNECTION SCHEDULE
P-9
P-8
P-10
LAVATORY - ADA COMPLIANT
FIXTURE
OPEN NUMBER
P-6
P-1
MARK
1-1/4" 1/2"
4"
WASTE CW
1"
1/2"
-
HW
-
REMARKSMANUFACTURER - MODELMARK STORAGETYPE
WATER HEATER SCHEDULE
1/2" S/S1/2"
P-11
SINK 1-1/2"
GENERAL NOTES
1" FLOOR MTD.; FLUSH VALVE-
WATER CLOSET
P-2 4"
WALL MTD.; TEMPERED HW; MT. RIM 34" AFF
LAVATORY - STAND
P-7A
1-1/4" 1/2" 1/2"
1/2" ISLAND1/2"
P-13
SINK
P-14
1/2" 1/2"
P-15
WASHER 2"
P-16
P-3
P-4
1/2" SS I COMP ON LEGS, "A" DRAINBOARDS
P-12
LAUNDRY TUB
P-20
P-5
P-21
SINGLE WALL MTD.; MT. LOWER SPOUT 36" AFF - ADA
WATER COOLER 1-1/2" 1/2" -
10 GAL.ELEC.LOCHINVAR JRJ10KS 208V; 1 PHASE; 4.5 KW
WH-1 100 GAL.NAT. GASLOCHINVAR AWN-199-100-DF9
WH-S1LOCATIONS OF UTILITIES SHOWN ON PLANS ARE APPROXIMATE, VERIFY
OF ALL EXISTING SERVICES PRIOR TO INSTALLING ANY NEW PIPE.
CONTRACTOR SHALL VERIFY EXACT LOCATION, SIZE AND ELEVATION
WHICH SHOWN UNLESS OTHERWISE NOTED.
CEILING ON PLAN WHICH SHOWN UNLESS ONLESS OTHERWISE NOTED.
WHEREVER DISSIMILAR METALS ARE CONNECTED ON WATER LINES, A
ALL HORIZONTAL SANITARY PIPING IS RUN BELOW FLOOR ON PLAN
ALL HORIZONTAL GAS, AIR, WATER AND VENT PIPING SHALL BE RUN ABOVE
IN 18"x18"x6" THICK CONCRETE PAD. (J.R. SMITH 4258 OR EQUAL.)ALL OUTSIDE CLEANOUTS SHALL BE BROUGHT TO GRADE AND EMBEDDED
MECHANICAL, AND ELECTRICAL FEATURES OF BUILDING.COORDINATE ALL PIPE ROUTING TO AVOID CONFLICTS WITH STRUSTURAL,
ENDS SO THAT NO JOINTS OCCUR BELOW FLOOR.ALL WATER PIPING BELOW SLAB ON GRADE SHALL BE BENT UP AT
FINISH GRADE OR FINISH FLOOR UNLESS OTHERWISE NOTED.
ALL WALL HYDRANTS AND HOSE BIBBS SHALL BE MOUNTED 24" ABOVE
ALL WATER PIPING INSTALLED IN EXTERIOR WALLS SHALL BE LOCATED
ON THE INTERIOR SIDE OF THE EXTERIOR WALL INSULATION.
WITH LOCAL UTILITY PRIOR TO BIDDING.
NO VENT THRU ROOF IS TO BE LOCATED WITHIN 10 FEET OF
ANY BUILDING AIR INTAKES, PER CODE. COORDINATE WITH MECHANICAL
AND GENERAL CONTRACTORS.
DIELECTRIC UNION SHALL BE USED.
SHALL BE INSTALLED BELOW CEILING INSULATION.
DOMESTIC WATER PIPING LOCATED ABOVE THE CEILING,12.
10.
11.
9.
8.
7.
5.
6.
3.
4.
2.
1.
TRAPS, PRIMERS, INSTALLED IN ACCORDANCE WITH CODE AND LOCAL AUTHORITY.
ALL FIXTURES DIRECTLY CONNECTING TO SANITARY SEWER SHALL HAVE13.
SIZE IN ACCORDANCE WITH MANUFACTURER'S REQUIREMENTS.
PROVIDE SHOCK ARRESTORS AT ALL PLUMBING DROPS.14.
RECIRC PUMP/HP/EL- BLDG
-
RCP-B, 2/5HP
NAT. GASLOCHINVAR AWN-199-100-DF9
RCP MODEL NUMBER (ARMSTRONG) MOUNTING
FLOOR
FLOOR
SHELF-
E-24B 199CFH, 2 HTRS, 2 STORAGE
-
APPROVED EQUAL. PROVIDE START/STOP CONTACT FOR CONNECTION TO BMCS.
NOTE: PROVIDE B&G MODEL TC-1 AUTOMATIC TIMER AND AQ-3/4 AQUASTAT COMBINATION OR
P-22
SINGLE SKID
2 HTRSWITH 2TANKS
NOTE
COMMERCIAL: WITH SA; QUICK CONNECTS
ALL WETTED MATERIAL TO MEET FEDERAL LEAD FREE GUIDELINES.
THERMOSTATIC MIXER
80
INPUT
CFH
GAS EQUIPMENT SCHEDULE
SYMBOL
GFH-1 65
GFH-2
GFH-3
GFF-111
GFF-203
100 GAL.
P-7
SINGLE WALL MTD.; MT
WATER COOLER - ADA COMPLIANT 1-1/2" 1/2" -
1/2" FLOOR STANDING-ICEMAKER FS
1/2" SINGLE BOWL; S/S1/2"SINK BREAKROOM 1-1/2"
WALL MTD.; FLUSH VALVE, ADAURINAL - ADA COMPLIANT 3" 1" -
1/2" 1/2"SHOWER 2" BASIN WITH SHOWER CONTROLS
1/2" 1/2"
1/2" 1/2"SHOWER - ADA 2" BASIN WITH SHOWER CONTROLS - ADA
1/2" INTEGRAL SINGLE BOWL; INTERCEPTOR , FAUCET1/2"SINK 1-1/2"
P-24
1/2" 1/2"WASH MACH BOX 2" RESIDENTIAL
1-1/2"
1/2"1-1/2"
60
80
100
65
65
40
INLET
PRESS
OUTLET
PRESS
7"WC
REMARKS
REGULATOR
2PSI ROUGH AND CONNECT
7"WC2PSI ROUGH AND CONNECT
7"WC2PSI ROUGH AND CONNECT
7"WC2PSI ROUGH AND CONNECT
7"WC2PSI ROUGH AND CONNECT
7"WC2PSI ROUGH AND CONNECT
7"WC2PSI ROUGH AND CONNECT
7"WC2PSI ROUGH AND CONNECT
7"WC2PSI ROUGH AND CONNECT
PLUMBING SCHEDULES
1. PIPE LESS THAN 2 1/2" IN EQUIPMENT ROOMS MUST BE TRANSVERSLEY BRACED ON A MAXIMUM OF 15' CENTERS.
2. CONTRACTOR SHALL PROVIDE SIESMIC BRACING FOR CATEGORY D FOR MECHANICAL PIPING, INCLUDING PLUMBING AND FIRE PROTECTION.
3. CONTRACTOR SHALL SUBMIT DRAWING FROM SEISMIC RESTRAINT MANUFACTURER DETAILING HANGER TYPES AND LOCATIONS. DRAWING SHALL BE SEALED AND INSPECTED BY A PROFESSIONAL ENGINEER EMPLOYED BY THE SEISMIC RESTRAINT MANUFACTURER.
4. RIGID BRACING ONLY AS SPECIFIED IN SPECIFICATION SECTION 230593 WILL BE ALLOWED. SEISMIC ROPE SYSTEMS WILL NOT BE ALLOWED.
5. INSTALL BRACING PER MANUFACTURERS INSTRUCTIONS.
SEISMIC NOTES
WH-2
PLUMBING LEGEND
PIPE TURNING DOWN
PIPE TURNING UP
DOMESTIC HOT WATER RETURN - 120° F
UNION
TEE UP
TEE DOWN
EMERGENCY ROOF DRAIN
GAS LINE
VENT
DOMESTIC COLD WATER
DOMESTIC HOT WATER SUPPLY - 120° F
HOSE BIBB
WATER HAMMER ARRESTOR
HOT WATER SUPPLY - 140° F
SOIL, WASTE OR SANITARY SEWER
CLEANOUT - WALL TYPE
FLOOR DRAIN
BALL VALVE
BALANCE VALVE
ROOF DRAIN
P-TRAP
SHOWER DRAIN
CLEANOUT - PLUG TYPE
CLEANOUT - EXTERIOR
CAP ON END OF PIPE
BALL VALVE
CHECK VALVE
PLUMBING FIXTURE NUMBER
RISER NUMBER
GAS VALVE
PRESSURE REDUCING VALVE
TYPICAL
VENT STACK
BELOW FINISHED FLOOR
ABOVE
WASTE STACK
VENT THROUGH ROOF
HOT WATER RETURN
HOT WATER
GALLONS PER MINUTE
ABOVE FINISHED FLOOR
BACKFLOW PREVENTER
GALLONS PER HOUR
AFF
BFP
BFF
GPH
GPM
HW
HWR
TYP
VS
VTR
WS
ABV
WALL HYDRANT
120
140
ERD
HB
PLUMBING SPECIALTIES LEGEND
ACCESS PANELAP
FIXT. DESCRIPTION
WALL HYDRANT FREEZE PROOFWH
INTERIOR HOSE BIBBHB
FLOOR DRAINFD
TRAP PRIMERTP
NO.REMARKS
INSTALL DEEP SEAL TRAPSQUARE GRATE
INSTALL DEEP DEAL TRAP SEDIMENT WITH TRAP INSERT
RECESSED MOUNTED
SURFACE MOUNTED
PROSEAL ACCEPTABLE EQUAL
FLUSH TO WALL
CONDENSATE BOXCBPROVIDE OX BOX WITH TRAPPRIMER AND CONDENSATE FUNNEL
ROOF DRAINRD PROVIDE WITH CASTE IRON BODY, INSULATE, WITH DECK CLAMP
EMERGENCY ROOF DRAINERD
WHA
WH
P-#
FCO
WCO
RD
#
SPECIFICATIONS
JR SMITH 2005- P050 FLOOR DRAIN, COATED, CAST IRON BODYWITH BOTTOM OUTLET,TRAP PRIMER INSERT, MEMBRANECLAMP, ADJUSTABLE COLLAR, WITH SQUARE POLISHEDNICKLE-BRONZE GRATE.
JR SMITH 5609-QT NON-FREEZE NICKLE-BRONZE PLATED,QUARTER TURN S.S. BOX WITH HINGED LOCKING DOOR.
WOODFORD B26-CH, FLUSH MOUNTED WALL BOX, 3/4" HOSETHREADS AND VAC. BREAKER BACKFLOW PREVENTER, WHEELHANDLE.
J.R. SMITH QUAD CLOSE
ACORN 8292 ACCESS DOOR, TYPE 304 S.S., 10-1/2" X 8-1/4"OVERALL WITH CYLINDER LOCK AND KEYS.
SIOUX CHIEF OX BOX WITH FUNNEL FOR CONDENSATE.LOUVERED FRONT.
JR SMITH 1011-AL WITH 3" DAM. UNDERDECK CLAMP,STAINLESS STEEL GRAVEL GUARD. INSULATE BODY ANDPIPING.
JR SMITH 1011-AL WITH SUMP RECEIVER. UNDER DECKCLAMP, STAINLESS STEEL GRAVEL GUARD. INSULATE BODY,AND PIPING TO BELOW GRADE.
EMERGENCY ROOF DRAINERD
G GAS EQUIPMENT CONNECT
MEDIUM DUTY FLOOR DRAINMFD BUCKET SQUARE GRATE
JR SMITH 2230 MECHANICAL FLOOR DRAIN COATED CAST IRONBODY WITH BOTTOM OUTLET BUCKET 1/2" TRAP PRIMER,MEMBRANE CLAMP, ADJUSTABLE COLLAR, WITH SQUAREPOLISHED NICKLE-BRONZE GRATE.
P-17
P-18
P-19
P-25
RANGE GAS 120CFH, APPLIANCE BOX---
GFF-101
GFF-106
GFF-2W
GFF-2E
80
A AIR LINE
A AIR OUTLET/ DROP
1/2" 1/2"JANITOR'S RECEPTOR 1-1/2" -
GFH-4 65 7"WC2PSI ROUGH AND CONNECT
GFH-5 65 7"WC2PSI ROUGH AND CONNECT
SINK DECON
HOSE REEL (AIR)
AIR
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
3/4" - - - -
1/2" 1/2"1-1/2" SS DOUBLE BOWL, LESS DIVIDER
GFH-8 65 7"WC2PSI ROUGH AND CONNECT
OW OIL WASTE LINE
GFF-110 110 7"WC2PSI ROUGH AND CONNECT
7"WC2PSI ROUGH AND CONNECTGFF-206 80
TMV-B
G
FD
SD
TRENCH DRAINTD
SD SHOWER DRAININSTALL DEEP SEAL TRAPSQUARE GRATE
JR SMITH 2005- P050 FLOOR DRAIN, COATED, CAST IRON BODYWITH BOTTOM OUTLET, MEMBRANE CLAMP, ADJUSTABLECOLLAR, WITH SQUARE POLISHED NICKLE-BRONZE GRATE.
LAVATORY COUNTER MOUNTED1-1/4" 1/2" 1/2"-
SEE SPECIFICATIONS
---
2" BASIN WITH SHOWER CONTROLS - ADASHOWER - ADA
REFRIGERATOR PROVIDE REFRIGERATOR BOX--- 1/2"
J.R. SMITH ENVIROFLO 9930M CHANNELS WITH HEAVY DUTY H-20DUCTILE IRON GATE AND EDGE. PROVIDE SLOPING TO CATCHBASIN #9935 WITH STAINLESS STEEL BUCKET. CHEM CAULK 900ALL JOINTS. GRATE TO BE PAINTED BLACK. ZURN EQUAL.
Project Number :
BIRMINGHAM
TUSCALOOSA
JACKSON
NASHVILLE
www.edmondsengineering.com
(205) 988-2069
(205) 752-9915
(601) 362-6478
(615) 265-8071
EDMONDSTrusted Engineering Solutions
270
1 1s
t A
ven
ue
S, S
uit
e 1
00
|
B
irm
ing
ham
, AL
35
233
205
.879
.44
62
|
Te
l G
MC
NE
TW
OR
K.C
OM
dra
wn
by:
ISS
UE
D
AT
E
che
cke
d b
y:sh
ee
to
f
GO
OD
WY
NM
IL
LS
CA
WO
OD
A
B
C
D
E
F
G
H
J
K
1 2 3 4 5 6 7 8 9 10 11 12
1 2 3 4 5 6 7 8 9 10 11 12
A
B
C
D
E
F
G
H
J
K
BHM1601811/2
9/2
016
4:3
2:3
5 P
M
Wa
ldo
rp S
t. C
ullm
an
, AL
PL
UM
BIN
G -
SC
HE
DU
LE
S,
NO
TE
S,
LE
GE
ND
S,
&
DE
TA
ILS
P0
.01
JT
R/J
LC
CL
R
CU
LL
MA
N F
IRE
& R
ES
CU
E S
TA
TIO
N N
O. 3
GM
C #
A
BH
M15
00
26
8/3
1/2
016
CO
NT
RA
CT
DO
CS
4
5
No. 24747
W
AD
ES W
AR
T
T E
B AAL
A A
MNSEECI D
L
N E E RIGNE
PROFESSIONAL
8-31-16
5
5
5
4A
dd
en
du
m N
o. 4
9/1
9/2
016
5A
SD
#1
11/2
9/2
016
DETAIL of OIL/WATER SEPARATOR
6'7"
HR-1 H
OSE REEL
PROVIDE Q
UICK D
ISCONNECT
COORDINATE SIZE A
ND LOCATIO
N
WITH O
WNER
1"
PROVIDE Q
UICK D
ISCONNECT
COORDINATE W
ITH O
WNER
3/4"
PROVIDE 3/4
" BRASS
BALL VLA
VE GRAIN
GER
# 6GD14 TYP. B
LOW
DOWN VALVE
PROVIDE STRUCTU
RAL
SUPPORT TO STRUCTU
RESLO
PE AIRLINE TO LO
W POINT
DRAIN DOWNS
DRAIN DOWNS
STORAGE TANK
STORAGE TANK
GAS WATERHEATER
GAS WATERHEATER
FURNISH 120/1/60 (15AMP)DEDICATED GFI PLUG AND SWITCHLABEL SWITCH WITH EQUIPMENT TAGCOORDINATE WITH ELECTRICAL. INSTALLPER NFPA 70, NEC CLASS 1 WIRING.(TYP. EACH HEATER)
THERMOSTATIC MIXING VALVESEE WATER HEATER SCHEDULE TMV-B
ALARM BELLEACH UNIT
LOWVOLTAGEWIRING(TYP.)
NEUTRALIZATION KIT
(TYP. EACH HEATER)
HOUSEKEEPING PAD
FINISH FLOOR
SEE HVAC VENTINGAND COMB. AIR.(TYPICAL EACH HEATER)
CONCENTRIC VENT KITINSTALL PER MNF REQUIREMENTS(TYP. EACH HEATER)
PIPE RELIEF TO DRAIN(TYPICAL EACH UNIT)
ASME P&T RELIEF VALVE(TYP.) EACH UNIT
PIPE RELIEF TO DRAIN(TYP. EACH HEATER)
FLOW SWITCH AND RELIEF VALVE(TYP. EACH HEATER)
BUILDING CIRC. PUMP RCP-B
SEE SCHEDULE WATER HEATER SCHEDULE
(TYP. EACH HEATER)WATER HEATER CIRC. PUMP (FURNISHED BY MANUFACTURER)
1/12 HP, 115/1/60
GAS PRESSURE REGULATOR
INLET PRESSURE: 2 PSI
OUTLET PRESSURE: 14"WC
FLOW: 199 CFH
UNION AND BALL VALVE(TYP)
DIRT LEG
DIAL THERMOMETER
THERMOMETER
THERMOMETER
VACUUM BREAKER
EXPANSIONTANK
CHECK VALVE
SEE TYPICAL GASCONNECTION DETAIL
SEE CHART FOR MANIFOLD PIPE SIZINGSIZE PIPING PER MANUFACTURER'S INSTRUCTIONS
2" CW SUPPLY
UNIT AND STORAGE TANKTO BE A SKID MOUNTEDASSEMBLY WITH SINGLEPOINT CONNECTION.
SEE SCHEDULE FOR RECIRC PUMP SCHEDULE
(TYPICAL)
SEE SCHEDULE FOR REVERSE MANIFOLD PIPESIZING. MANIFOLD TO BE REVERSE PIPED AS REQUIREDBY MANUFACTURER.
2" 120°HW TO BUILDING
S2S1
WH2 WH1
3/4"3/4"
PROVIDE LOW VOLTAGE WIRING TO
BUILDING MANAGEMENT SYSTEM.
MONITOR FAILURES. (TYP. EACH
HEATER)
A
A
A
A
A
A
GG
140140140 140
140
140
140140
140
140
140140
140
140
140
140140140
1401
40
MODEL
NUMBER OF UNITS
2
200 1 1/2"
REQUIRED PIPE SIZES IN NPT
NO SCALE
NO SCALE
NO SCALE
NO SCALE
NO SCALE
NO SCALENO SCALENO SCALE
G
GENSET3500CFH
GAS GENERATOR CONNECTION:GAS COCK, STRAINERGAS PRESSURE REGULATOR 1- (7PSI-13"WC)PIPE ONE PIPE SIZE LARGER TO GENERATOR.REDUCE AT CONNECTION TO GENERATOR.
DIRT LEG
GAS METER:GENERATOR LOAD : 1850 AT 2PSI
LONGEST DISTANCE : 10FT
BUILDING LOAD: 3380CFHFUTURE BUILDING LOAD: 700CFHTOTAL LOAD: 4080CFH
CONTRACTOR TO COORDINATE WITH LOCALUTILITY TO PROVIDE GAS SERVICE ANDMETER SET. INCLUDE ALL FEES AND PERMITS
FLEXIBLE FUEL LINE
MANIFOLD SERVICEVALVE
G
4"
DETAIL OF GAS METER AT GENERATORNO SCALE
RUBBER ROOF SEALANT
GA
S E
QU
IPM
EN
T
SEDIMENT TRAP(DIRT LEG)
UNION(TYP.)
GAS PRESS REGINLET PRESS: 2PSIOUTLET PRESS: 7"WC
MANUAL GAS SHUTOFFVALVE UPSTREAM OF REG
GAS CONNECTIONNO SCALE
TO BUILDING
4"
PER MNF
1 1/2"
NO SCALE
OUTLET
CLEANOUT
VENT VENT
INLET
CLEANOUT
VENTSTORAGE COMPARTMENT
VENTVENT
12V TO CONTROL PANEL
VENT
VENT
FINISH FLOOR
110V
12V TO HIGH LEVEL SENSOR
ALARM/CONTROL PANEL
RESET BUTTON
HIGH LEVEL ALARM LIGHT
PROVIDE EXTENTION(S)AS ERQUIRED TO HAVE TOPFLUSH WITH FINISH FLOOR
G
LONGEST RUN: 350 FT
FIN. GRADE
4" PVC
FIN. FLOOR
SEAL OPENING
SEAL OPENING
VACUUM RELIEF VALVE
DIELECTRIC UNION (TYPICAL)
PROVIDE NEW 1 1/2"x1 1/2"x3/4"
24"x24"x3/4" THICK PLYWOOD1" TO HD
ANGLE FRAME & SUPPORT
WATER HEATER
PROVIDE NEW
SAFETY PAN
PROVIDE NEW
HOSE BIBB
ASME P&T RELIEF VALVE
AMTROL MODEL ST-5
EXPANSION TANK
CHECK VALVE
CW SUPPLY
HW RETURN
SUPPLYHW
CIRC. PUMP
AQUASTAT
THERMOMETER
TIMER
INTUMESCENT FIRESTOP SEALANT.
STRUCTURAL STEEL SQUARE TUBING
SHELTER EXTERIOR
SHELTER INTERIOR
SIZED TO ACCOMMENDATE PIPING.
STEEL PLATE SAME WIDTH AS
TUBING. WELD TO TUBING.
WELD SEAM AFTER
PIPING IS INSTALLED.
(MIN. 1/4" THICK) (MIN. 1/4" THICK)
PROVIDE TRAPEZE SUPPORT AT
END OF TUBING. USE UNISTRUT
AND 1/2" THREADED RODS.
6" WIDE X 1/4" THICK PLATE
(EACH SIDE OF TUBING)
NOTE:
1. PROVIDE ALL WELDED CONSTRUCTION.
1/2" ANCHOR BOLTS
(EACH SIDE OF TUBING)PIPING WITH INSULATION.
CONTINUOUS WELD, TOP
AND BOTTOM TO TUBING.
INTUMESCENT FIRESTOP SEALANT.
CONCRETE THRUST BLOCKCARRY BOTTOM TOUNDISTURBED EARTH
MECHANICAL JOINT
EL. OR TEE
NOTE:
USE THIS METHOD OF
BLOCKING OUTSIDE
OF BUILDING
WATER MAIN ORSPRINKLER MAIN
WATER MAIN ORSPRINKLER MAIN
BRACKET
3/4" TREATED PLYWOOD
BALL VALVE
1/2"CW
WATER FILTER
1/2" FILTERED CW
NC
ABOVE ICE MAKER ON WALL
1/2" FILTERED CW
MOUNT AS HIGH AS
POSSIBLE ABOVE FLOOR
DETAIL of WATER PIPING BELOW SLAB
DETAIL of PIPING at WATER HEATER - WHS1
DETAIL of 2" OR GREATER PIPING PENETRATION
THRU A STORM SHELTER PERIMETER WALL/ROOF
ICE MAKER FILTER DETAIL
PLUMBING DETAILS
DETAIL of PIPING at WATER HEATERS WH1, WH2 S1, S2 SIMILAR
CONCRETE THRUST BLOCK AT ALL
CHANGES OF WATER MAINS DETAILAIR OUTLET AT WALLDETAIL OF AIR LINE AT HOSE REEL
Project Number :
BIRMINGHAM
TUSCALOOSA
JACKSON
NASHVILLE
www.edmondsengineering.com
(205) 988-2069
(205) 752-9915
(601) 362-6478
(615) 265-8071
EDMONDSTrusted Engineering Solutions
270
1 1s
t A
ven
ue
S, S
uit
e 1
00
|
B
irm
ing
ham
, AL
35
233
205
.879
.44
62
|
Te
l G
MC
NE
TW
OR
K.C
OM
dra
wn
by:
ISS
UE
D
AT
E
che
cke
d b
y:sh
ee
to
f
GO
OD
WY
NM
IL
LS
CA
WO
OD
A
B
C
D
E
F
G
H
J
K
1 2 3 4 5 6 7 8 9 10 11 12
1 2 3 4 5 6 7 8 9 10 11 12
A
B
C
D
E
F
G
H
J
K
BHM1601811/2
9/2
016
4:3
2:3
6 P
M
Wa
ldo
rp S
t. C
ullm
an
, AL
PL
UM
BIN
G -
DE
TA
ILS
P0
.02
JT
R/J
LC
CL
R
CU
LL
MA
N F
IRE
& R
ES
CU
E S
TA
TIO
N N
O. 3
GM
C #
A
BH
M15
00
26
8/3
1/2
016
CO
NT
RA
CT
DO
CS
No. 24747
W
AD
ES W
AR
T
T E
B AAL
A A
MNSEECI D
L
N E E RIGNE
PROFESSIONAL
8-31-16
5
5A
SD
#1
11/2
9/2
016
CO
CO
CO
COP-5
P-6
FD
FD
SD
SD
FD
R1
P-1
P-2
P-4
P-5
P-2
CO
P-11
P-4
CO
COP-7A
P-7
R2
CO4" CO
P-2
P-5
4"
4"
4"
4"
4"
R3
R4
CO
CO
P-5
P-6
P-1
MFD
MFD
P-5
CO
P-2
FD
CO
P-2
CO
CO
P-5
CO
CO
P-7A
P-7A
4"
R5
4"
4"
3"
4"4"
4"
4"
4"
4"
3"
3"
3"
3"
3"
4"
2"
2"
CO
3"
3"
4" VSTR
4"
2"
3"
2"
2"
CO
4"
4"
3"
3"
4"
CO
MFDP-12
P-8
4"
R7
R8
4"
4"
FD
R10
MFD W/ B
UCKET
4"
4"
CO
CB
MFD
SD
P-2FD
P-27
CO
4" VSTR
4" SS D
N
4"
4"
R12
R13
MFD
3"
2"
SD
SDFD
FD
P-2
P-2
FDP-25
COCO
CO
CO
COP-17
3"
3"3"
2"
2"
2"
3"
4"
3"
4"
4"
4"
4"
4"
4"
WCO
4"
4"
4"
OW
OW
OW
CO
P-17
MFD
CO
2" VS U
P
2"
3"
2"
3"
2"
2"
2"
3"
FD
4" SS U
P
3" VS U
P
3"
2"
4"
3"
2"
2"
4"
COCO
P-18
2"
2" WS U
P
4"
4"
OW
OW
OW
OW
P-17
2"
2"
3"
2"
3"
3"
2"
2"
2"
2"
3"
2"
2"
2"
4"
2"
4"
3"
3"2"
2" 2"
2"
2"
2"
2"
P-2
4"
4"
4"
4"
3"
4"
R6
3"
2"
2" BELOW
GRADE
3"
2"
2"
3"
3"
CB
CB
CB
CB
CB
CB
CB
4"
4"
CO
4"
4"
2" VENT U
P
2" VENT BELOW
GRADE
4"
3"
R9
4"
4"
3"
3"
3"
CO2"
2"
2"
R11
CO
3"
2"
2"
4" VSTR
3"
3"
3"
3"
3"
2"
3"
3"
2"
2"
2" 2"
3"
2"
3"
3" WS U
P
3"4"
4"
2"
2"
2"
2"
2"
2"
2"
3"
4"4"
4"2"
4"
3"
3" VS D
N
3"
4" SS D
NCO3"
3"
2"
3"
P-27
P-27
WCO
FD
SD
3"
3"
3"
3"
MFD W/ B
UCKET
MFD W/ B
UCKET
MFD W/ B
UCKET
4" VENT
4" VENT
CO
MFDP-12
P-8
4"
CO
CO
2" VS U
P
2"
3"
2"
3"
2"
R6
3"
2"
2" BELOW
GRADE
3"
2"
2"
CO
P-5
4"
3"
P-2
3"
3" VSTR
4"
Project Number :
BIRMINGHAM
TUSCALOOSA
JACKSON
NASHVILLE
www.edmondsengineering.com
(205) 988-2069
(205) 752-9915
(601) 362-6478
(615) 265-8071
EDMONDSTrusted Engineering Solutions
270
1 1s
t A
ven
ue
S, S
uit
e 1
00
|
B
irm
ing
ham
, AL
35
233
205
.879
.44
62
|
Te
l G
MC
NE
TW
OR
K.C
OM
dra
wn
by:
ISS
UE
D
AT
E
che
cke
d b
y:sh
ee
to
f
GO
OD
WY
NM
IL
LS
CA
WO
OD
A
B
C
D
E
F
G
H
J
K
1 2 3 4 5 6 7 8 9 10 11 12
1 2 3 4 5 6 7 8 9 10 11 12
A
B
C
D
E
F
G
H
J
K
BHM1601811/2
9/2
016
4:3
2:3
6 P
M
Wa
ldo
rp S
t. C
ullm
an
, AL
PL
UM
BIN
G -
RIS
ER
S
P0
.04
JT
R/J
LC
CL
R
CU
LL
MA
N F
IRE
& R
ES
CU
E S
TA
TIO
N N
O. 3
GM
C #
A
BH
M15
00
26
8/3
1/2
016
CO
NT
RA
CT
DO
CS
5
No. 24747
W
AD
ES W
AR
T
T E
B AAL
A A
MNSEECI D
L
N E E RIGNE
PROFESSIONAL
8-31-16
5
1A
dd
en
du
m N
o. 1
9/9
/20
16
5A
SD
#1
11/2
9/2
016
APPARATUS
BAYS210
ADMIN ENTRY
LOBBY100
OFFICE
MANAGER101
CORRIDOR100A
CONFERENCE
ROOM104
FIRE CHIEF102
FIRE MARSHAL106
INSPECTOR108
EMS OFFICER110
FUTURE OFFICE112
POLICE
SUBSTATION114 TRAINING
EQUIPMENT
STOR112A
BREAK ROOM111
WC109
TRAINING
OFFICER107
TRAINING
ROOM116
MECH116C
WC116B
ADA WC116A
ELEC116D
FIRST AID116E
STOR116F
TECH116G
DECON211
ELEC214
ACCESSCORY
AREA210a
WC209A
MECH209C
WC205
WORKSTATIONS204
STOR209B
STATION
HOUSE LOBBY201
STATION CAPT
OFFICE202
TOWERSTAIR 1
DAY ROOM203
FILE STOR101A
MEN'S
RESTROOM105A
MEN'S
LOCKERS105
MECH115
ELEC113
WOMEN'S
LOCKERS103
PATIOSLAB
CORRIDOR100C
CORRIDOR100B
POLICE WC114A
JAN206A
STOR206B
MECH/STOR200A
GEAR ROOM208
VEST207
CORRIDOR200
STATION
HOUSESTAIR 2
JAN111A
F G HD
2
3
E
KITCHEN206
1
CBA
TANK STOR212
A0.2A0.1
1.1
1.5
1.8
2.3
MEDICAL
SUPPLY STOR109A
P-5 P-2
P-6
P-1WH-S1 ONSHELF
P-11P-7
P-7A
P-5
P-2
P-13
P-6P-5
P-2 P-1
P-4
P-2
P-5
P-15
P-8
P-12
P-6
P-5
P-2
P-7P-7A
P-2
P-5
WH-1 WH-2
FD
FD
FD
MFD
FD
FD FD
FD
OW
TRENCH
TRENCH
4"ø
CATCHBASIN (TYP)
4"VSTR
4"ø 4"ø
4"ø
4"ø4"ø
4"ø4"ø4"ø
4"ø
4"ø
4"ø
3" VS UP
4"ø
4"ø 4"ø
3" WS
MFD
PROVIDEISLANDVENTING
ST-2
ST-1
4"ø
4"ø
3"ø
4"ø
4"ø
4"ø
3"ø
4"ø
4"ø
3"ø
MFD
4"ø
MFD
MFD
3"ø
3"ø
R4
R3R2
R1
R5
R6
R7
R8
R9
MFD
4"ø
WH-2
WH-1
3" WS UP
MFD
MFD
3"ø
2"ø2"ø
2"ø 3"ø
4"ø
4" VSTR
4"ø
2"ø
3" VSTR
2"ø
3"ø
3"ø
2" BELOWGRADE
3" VS2" VS
2"ø2"ø
MFD
CO
COORDINATE WITHCIVIL TO PROVIDE 4"SANITARY WASTE
4"VS
2" VENTUP
2" VENT BELOWGRADE
COCO
4"ø
4"ø
3" WS,2" VS
2"ø
4"ø
P-17
2"ø 3"ø
4"ø
3" WS
CO
OW
OW
CO
P-18
COORDINATE WITH CIVIL TOPROVIDE 4" SANITARYINVERT -51.55 BFF
3"ø
4" SS UP
WCO
4"ø
4"ø
4"ø
2"ø
3" WS,2" VS
3"ø
2" VS UP
MFD
OIL INTERCEPTORSEE DETAIL
HIGH LEVELALARM
PROVIDE CONDUIT FORALARM WIRING
4"ø
4"ø4"ø
S
COORDINATE WITHCIVIL TO PROVIDE6" STORM AT 18"BELOW FF
P-14
CBCBCBCB
CB
CB CB CB
INVERT -36.5 BFFINVERT-42.75 BFF
IN JOISTSPACE
4"ø
3"ø
6" RL UP
6" STORM
4" WS, 2" VS
4" WS, 2" VS
4"ø2"ø
3"ø 3"ø
SD
SD
SD
3"øFLOOR ELEVATION IS1" BELOW MAIN LEVEL
P-20P-9
FS
3"ø2"ø
3" VS UP
1
1
WCO
P-23
P-23
4" WCO
S
WCO
WCO
2" VSTR
COORDINATELOCATION WITHEQUIPMENTTYPICAL
P-17
3" VSTR
P-2
P-5
4"ø 3"ø
Project Number :
BIRMINGHAM
TUSCALOOSA
JACKSON
NASHVILLE
www.edmondsengineering.com
(205) 988-2069
(205) 752-9915
(601) 362-6478
(615) 265-8071
EDMONDSTrusted Engineering Solutions
270
1 1s
t A
ven
ue
S, S
uit
e 1
00
|
B
irm
ing
ham
, AL
35
233
205
.879
.44
62
|
Te
l G
MC
NE
TW
OR
K.C
OM
dra
wn
by:
ISS
UE
D
AT
E
che
cke
d b
y:sh
ee
to
f
GO
OD
WY
NM
IL
LS
CA
WO
OD
A
B
C
D
E
F
G
H
J
K
1 2 3 4 5 6 7 8 9 10 11 12
1 2 3 4 5 6 7 8 9 10 11 12
A
B
C
D
E
F
G
H
J
K
BHM1601811/2
9/2
016
4:3
2:4
1 P
M
Wa
ldo
rp S
t. C
ullm
an
, AL
PL
UM
BIN
G -
LE
VE
L1
-
NO
N-P
RE
SS
UR
E P
IPIN
G
PL
AN
P1.
01
JT
R/J
LC
CL
R
CU
LL
MA
N F
IRE
& R
ES
CU
E S
TA
TIO
N N
O. 3
GM
C #
A
BH
M15
00
26
8/3
1/2
016
CO
NT
RA
CT
DO
CS
SCALE: 1/8" = 1'-0"
PLUMBING - LEVEL 1 - NON-PRESSURE PIPING PLAN1
DRAWING NOTES
(GENERAL) DRAWINGS ARE DIAGRAMATIC IN NATURE AND MAY NOT REPRESENT EXACTCONDITIONS REQUIRED FOR INSTALLATION OF PLUMBING SYSTEMS CONTRACTORSHALL COORDINATE ALL NEW WORK WITH ARCHITECTURAL PLANS AS WELL AS OTHERTRADES PRIOR TO FABRICATION OR INSTALLATION OF PLUMBING SYSTEMS OREQUIPMENT. FURNISH AND INSTALL ALL OFFSETS OR TRANSITIONS AS REQUIRED FORCOMPLETION OF WORK.
PLUMBING CONTRACTOR SHALL COORDINATE EXACT LOCATION OF PLUMBINGSYSTEM WITH ARCHITECTURAL PLANS, MECHANICAL SYSTEMS, FIRE PROTECTIONSYSTEMS ELECTRICAL SYSTEMS, CIVIL AND STRUCTURAL SYSTEMS.
PLUMBING SYSTEM CONTRACTOR SHALL FURNISH AND INSTALL COMPLETE.COORDINATE EXACT LOCATION OF ALL RATED OPENINGS WITH ARCHITECTURAL PLANS
1.
2.
3.
TRUE
NORTH
1 2" RECESS AT TECAZZO
NON-PRESSURE PIPING NOTES
4
5
No. 24747
W
AD
ES W
AR
T
T E
B AAL
A A
MNSEECI D
L
N E E RIGNE
PROFESSIONAL
8-31-16
5
1A
dd
en
du
m N
o. 1
9/9
/20
16
4A
dd
en
du
m N
o. 4
9/1
9/2
016
5A
SD
#1
11/2
9/2
016
VEST221
ELEC221B
STOR222CL
227
MECH221A
MECH
MEZZANINE230
ALCOVE 11220L
ALCOVE 12220M
ALCOVE 13220N
SLEEPING
LOFT220
ALCOVE 10220K
ALCOVE 9220J
BATHROOM226 MECH
225C
LAUNDRY225B
LOCKER ROOM225
BATHROOM225A
JAN225D
ALCOVE 16220R STOR
223
ALCOVE 15220Q
ALCOVE 14220P
ALCOVE 1220A
ALCOVE 2220B
ALCOVE 3220C
ALCOVE 4220D
ALCOVE 5220E
ALCOVE 6220F
ALCOVE 7220G
ALCOVE 8220H
F G HD
2
3
4
E
1
CBA
TOWERSTAIR 1
A0.2
1.1
1.5
1.8
2.3
P-22
P-2
P-15
P-25 P-26
P-2
P-2
P-15
P-15
MFD
FD
FD
4" SS DN
3"ø
FD
FD
4" VSTR
4" VENTDOWN
4" IN JOISTSPACE
4" WS
MFD
3" WS DN 2"ø
3"ø
P-17
4" VSTR
4"ø
3"ø
2"ø3"ø
2"ø
R11
R13
SD
SD
4"ø
3"øSD
3"ø3"ø
P-22
4"ø4" VSTR
3"WS/VS
4"SS DN
3"
4"2"WS/VS
3"VS DN
R12
P-22
3"VS
2" VSTR
Project Number :
BIRMINGHAM
TUSCALOOSA
JACKSON
NASHVILLE
www.edmondsengineering.com
(205) 988-2069
(205) 752-9915
(601) 362-6478
(615) 265-8071
EDMONDSTrusted Engineering Solutions
270
1 1s
t A
ven
ue
S, S
uit
e 1
00
|
B
irm
ing
ham
, AL
35
233
205
.879
.44
62
|
Te
l G
MC
NE
TW
OR
K.C
OM
dra
wn
by:
ISS
UE
D
AT
E
che
cke
d b
y:sh
ee
to
f
GO
OD
WY
NM
IL
LS
CA
WO
OD
A
B
C
D
E
F
G
H
J
K
1 2 3 4 5 6 7 8 9 10 11 12
1 2 3 4 5 6 7 8 9 10 11 12
A
B
C
D
E
F
G
H
J
K
BHM1601811/2
9/2
016
4:3
2:4
4 P
M
Wa
ldo
rp S
t. C
ullm
an
, AL
PL
UM
BIN
G -
LE
VE
L 2
& 3
-
NO
N-P
RE
SS
UR
E P
IPIN
G
PL
AN
P1.
02
JT
R/J
LC
CL
R
CU
LL
MA
N F
IRE
& R
ES
CU
E S
TA
TIO
N N
O. 3
GM
C #
A
BH
M15
00
26
8/3
1/2
016
CO
NT
RA
CT
DO
CS
SCALE: 1/8" = 1'-0"
PLUMBING - LEVEL 2 - NON-PRESSURE PIPING PLAN1
DRAWING NOTES
(GENERAL) DRAWINGS ARE DIAGRAMATIC IN NATURE AND MAY NOT REPRESENT EXACTCONDITIONS REQUIRED FOR INSTALLATION OF PLUMBING SYSTEMS CONTRACTORSHALL COORDINATE ALL NEW WORK WITH ARCHITECTURAL PLANS AS WELL AS OTHERTRADES PRIOR TO FABRICATION OR INSTALLATION OF PLUMBING SYSTEMS OREQUIPMENT. FURNISH AND INSTALL ALL OFFSETS OR TRANSITIONS AS REQUIRED FORCOMPLETION OF WORK.
PLUMBING CONTRACTOR SHALL COORDINATE EXACT LOCATION OF PLUMBINGSYSTEM WITH ARCHITECTURAL PLANS, MECHANICAL SYSTEMS, FIRE PROTECTIONSYSTEMS ELECTRICAL SYSTEMS, CIVIL AND STRUCTURAL SYSTEMS.
PLUMBING SYSTEM CONTRACTOR SHALL FURNISH AND INSTALL COMPLETE.COORDINATE EXACT LOCATION OF ALL RATED OPENINGS WITH ARCHITECTURAL PLANS
1.
2.
3.TRUE
NORTH
4
4
5
5
No. 24747
W
AD
ES W
AR
T
T E
B AAL
A A
MNSEECI D
L
N E E RIGNE
PROFESSIONAL
8-31-16
1A
dd
en
du
m N
o. 1
9/9
/20
16
4A
dd
en
du
m N
o. 4
9/1
9/2
016
5A
SD
#1
11/2
9/2
016
4" VSTR
4" VSTR
4" VSTR
4" VSTRS
6"
6"
6"
6" RL DN
6" RD
6" RD
SEE ARCH FOROVERFLOW SCUPPERS -SEE SHEET A3.01, 3.02
4" VSTR
2" VSTR
Project Number :
BIRMINGHAM
TUSCALOOSA
JACKSON
NASHVILLE
www.edmondsengineering.com
(205) 988-2069
(205) 752-9915
(601) 362-6478
(615) 265-8071
EDMONDSTrusted Engineering Solutions
270
1 1s
t A
ven
ue
S, S
uit
e 1
00
|
B
irm
ing
ham
, AL
35
233
205
.879
.44
62
|
Te
l G
MC
NE
TW
OR
K.C
OM
dra
wn
by:
ISS
UE
D
AT
E
che
cke
d b
y:sh
ee
to
f
GO
OD
WY
NM
IL
LS
CA
WO
OD
A
B
C
D
E
F
G
H
J
K
1 2 3 4 5 6 7 8 9 10 11 12
1 2 3 4 5 6 7 8 9 10 11 12
A
B
C
D
E
F
G
H
J
K
BHM1601811/2
9/2
016
4:3
2:4
5 P
M
Wa
ldo
rp S
t. C
ullm
an
, AL
PL
UM
BIN
G -
LE
VE
L 3
-
RO
OF
PL
AN
P1.
03
JT
R/J
LC
CL
R
CU
LL
MA
N F
IRE
& R
ES
CU
E S
TA
TIO
N N
O. 3
GM
C #
A
BH
M15
00
26
8/3
1/2
016
CO
NT
RA
CT
DO
CS
SCALE: 1/8" = 1'-0"
PLUMBING - LEVEL 3 - ROOF PLAN1DRAWING NOTES
(GENERAL) DRAWINGS ARE DIAGRAMATIC IN NATURE AND MAY NOT REPRESENT EXACTCONDITIONS REQUIRED FOR INSTALLATION OF PLUMBING SYSTEMS CONTRACTORSHALL COORDINATE ALL NEW WORK WITH ARCHITECTURAL PLANS AS WELL AS OTHERTRADES PRIOR TO FABRICATION OR INSTALLATION OF PLUMBING SYSTEMS OREQUIPMENT. FURNISH AND INSTALL ALL OFFSETS OR TRANSITIONS AS REQUIRED FORCOMPLETION OF WORK.
PLUMBING CONTRACTOR SHALL COORDINATE EXACT LOCATION OF PLUMBINGSYSTEM WITH ARCHITECTURAL PLANS, MECHANICAL SYSTEMS, FIRE PROTECTIONSYSTEMS ELECTRICAL SYSTEMS, CIVIL AND STRUCTURAL SYSTEMS.
PLUMBING SYSTEM CONTRACTOR SHALL FURNISH AND INSTALL COMPLETE.COORDINATE EXACT LOCATION OF ALL RATED OPENINGS WITH ARCHITECTURAL PLANS
1.
2.
3.
TRUE
NORTH
4
5
No. 24747
W
AD
ES W
AR
T
T E
B AAL
A A
MNSEECI D
L
N E E RIGNE
PROFESSIONAL
8-31-16
1A
dd
en
du
m N
o. 1
9/9
/20
16
2A
dd
en
du
m N
o. 2
9/1
3/2
016
4A
dd
en
du
m N
o. 4
9/1
9/2
016
5A
SD
#1
11/2
9/2
016
REF.REF.REF.
REF.
APPARATUS
BAYS210
ADMIN ENTRY
LOBBY100
OFFICE
MANAGER101
CORRIDOR100A
CONFERENCE
ROOM104
FIRE CHIEF102
FIRE MARSHAL106
INSPECTOR108
EMS OFFICER110
FUTURE OFFICE112
POLICE
SUBSTATION114 TRAINING
EQUIPMENT
STOR112A
BREAK ROOM111
WC109
TRAINING
OFFICER107
TRAINING
ROOM116
MECH116C
WC116B
ADA WC116A
ELEC116D
FIRST AID116E
STOR116F
TECH116G
DECON211
ELEC214
ACCESSCORY
AREA210a
WC209A
MECH209C
WC205
WORKSTATIONS204
STOR209B
STATION
HOUSE LOBBY201
STATION CAPT
OFFICE202
TOWERSTAIR 1
DAY ROOM203
FILE STOR101A
MEN'S
RESTROOM105A
MEN'S
LOCKERS105
MECH115
ELEC113
WOMEN'S
LOCKERS103
PATIOSLAB
CORRIDOR100C
CORRIDOR100B
POLICE WC114A
JAN206A
STOR206B
MECH/STOR200A
GEAR ROOM208
VEST207
CORRIDOR200
STATION
HOUSESTAIR 2
JAN111A
F G HD
2
3
E
KITCHEN206
1
CBA
TANK STOR212
A0.2A0.1
1.1
1.5
1.8
2.3
MEDICAL
SUPPLY STOR109A
MECH
P-5
P-2
P-6
P-1
P-11P-7
P-7A
P-17
P-5
P-2
P-13
P-14
P-6P-5
P-2 P-1P-4
P-2
P-5P-15
P-8
P-12
P-24
P-6
P-5
P-2
P-7 P-7A
P-2
P-5
FD W/INSERT
FD W/INSERT
FD W/INSERT
FD W/INSERT
FD W/INSERT
FD
COORDINATE WITH CIVIL
2" WATER ENTRYSEE DETAIL
HB
WH
WHTRUCK FILL
WHTRUCK FILL
WHTRUCK FILL
WHTRUCK FILL
COORDINATE WITHCIVIL TO PROVIDE 4"DOMESTIC WATERW/ TRACK FILL
A A A
G
G
G
IN JOIST SPACE 4" DOMESTICWATER ENTRYSEE DETAIL
A
2 2 2
2 2 2 2
1
1
1
1
A
A
WH-S1 SEEDETAIL
2"ø
AA
A
A
A A
A A
2"ø
1/2" CW,HW DN
1" CWDN
1" CWDN
1/2" CW,HW DN
3/4"ø
WH
3/4" CW DN
3/4"ø
1/2" CW,HW
3/4" CW,HW DN
1/2" CW,HW
3/4"ø
3/4"ø
1" CW1/2" HWDN
1"ø
1/2" CW,HW DN 1" CW DN
1/2" CW,HW DN
3/4"ø
1/2"ø
G G
2
P201
1/2"ø1/2"ø1/2" CW, HW DN
1/2"ø1/2"ø1/2"ø1/2"ø
2" CW,1/2" HWDN
3/4"ø3/4"ø
ALL FD'S & MFD'S TO HAVEDRAIN INSERTS
GAS METER SET
GENERATOR1850CFH
GAS GENERATORSEE DETAIL
PROVIDE GAS METERINLET PRESSURE: VERIFYOUTLET PRESSURE: 2 PSILONGEST RUN: 350FTFLOW: 4000 CFH
PROVIDE BULKFEEDAS DETAILED ON P002
1 1/2" TO BUILDING
G
G
G
1 1/2" GAS VAVLEAND REGULATOR
1 1/2"ø1 1/2"ø1 1/2"ø
G G
1"ø
3/4"ø
BELOWGRADE
3/4" CW,HW DN
1/2" CW,HW DN
MFD W/INSERT
1"ø
3/4"ø
G
65 CFH
65 CFH
GG
GGG
MFD W/INSERT
MFD W/INSERT
MFD W/INSERT
2"ø
2"ø
1"ø1"ø
3/4"ø3/4"ø
1/2"ø1/2"ø
1 1/2"ø 2"ø
1" CW
1/2" CWIN WALL
1/2"ø1/2"ø
G
1 1/2"ø
HIGH LIMITALARM
ALL AIR TO BE INSTALLEDTO BLOW OFF AT LOWPOINT DRAIN DOWNS
GFH-3GFH-2
GFH-1
GFH-5 GFH-6GFH-7
65 CFH
65 CFH 65 CFH65 CFH
3/4"ø3/4"ø
1" AIR DROPPOINT BLOWOFF
1"
1"
2"
2"
1"ø
2"ø1 1/2"ø
1"ø
1 1/2"ø
1"ø
1"ø
BALANCING VALVE
3/4" WATER
G
3/4" GAS
3/4"ø
3/4"ø
1"ø
2"ø2"ø
1"ø
GFF-111
G
1/2"ø
1"ø
2 1/2"ø1"ø
IN ATTIC
G
G
3/4"ø
1"ø
BALANCINGVALVE
3/4" AIR ANDGAS TOMECH 242SEE P2.02/2
3/4"ø
1" CW, 3/4"HW UP
GFF-20680 CFH
G2"
2"
1"TYPAIR DROP
1 1/2"
1/2" CW,HW UP
1/2" CW,HW UP
1/2" CW,HW UP
FD W/INSERT
2"ø
2"ø
2"ø 2"ø
1"ø1"ø
2 1/2"ø
4" CW UP
4"ø
P-18 P-20
P-9
P-23
G
GASRANGE120CFH
1/2"ø
P-25
3-P-25
HB W/ VALVETYPICAL
P-23
2 1/2" CW, 1" HW, 1"HW, 1 /2" GAS UP
IN CEILINGSPACESEE LEVEL 2 PLAN
INCEILINGSPACE
AIRCOMPRESSOR
1/2" CW,HW DN
P-2
P-5
1" CW, 1/2" HWDN IN WALL W/VALVES
1/2"ø1"ø
G
IN JOISTSPACE
MECH115
ELEC113
ST-1
G
MFD
REVERSE MANIFOLDPACKAGE
WH-1G
G
3/4"ø
GG
GFF-203
GFF-110
GFF-106
GFF-101
1"ø
2"ø
2"ø
3/4"ø
G
G
1"ø
3/4"ø
1/2"ø
1/2"ø
1/2"ø
RCP-BTMV-B
G
G
1"ø
MFD
MFD
MFD
ST-2
1/2"
1"
1"ø
Project Number :
BIRMINGHAM
TUSCALOOSA
JACKSON
NASHVILLE
www.edmondsengineering.com
(205) 988-2069
(205) 752-9915
(601) 362-6478
(615) 265-8071
EDMONDSTrusted Engineering Solutions
270
1 1s
t A
ven
ue
S, S
uit
e 1
00
|
B
irm
ing
ham
, AL
35
233
205
.879
.44
62
|
Te
l G
MC
NE
TW
OR
K.C
OM
dra
wn
by:
ISS
UE
D
AT
E
che
cke
d b
y:sh
ee
to
f
GO
OD
WY
NM
IL
LS
CA
WO
OD
A
B
C
D
E
F
G
H
J
K
1 2 3 4 5 6 7 8 9 10 11 12
1 2 3 4 5 6 7 8 9 10 11 12
A
B
C
D
E
F
G
H
J
K
BHM1601811/2
9/2
016
4:3
2:5
3 P
M
Wa
ldo
rp S
t. C
ullm
an
, AL
PL
UM
BIN
G -
LE
VE
L 1
-
PR
ES
SU
RE
PIP
ING
PL
AN
P2.0
1J
TR
/JL
C
CL
R
CU
LL
MA
N F
IRE
& R
ES
CU
E S
TA
TIO
N N
O. 3
GM
C #
A
BH
M15
00
26
8/3
1/2
016
CO
NT
RA
CT
DO
CS
SCALE: 1/8" = 1'-0"
PLUMBING - LEVEL 1 - PRESSURE PIPING PLAN1
1 COORDINATE LOCATION OF AIR HOSE REEL WITH FIRE EQUIPMENT.TERMINATE WITH 75FT OF 3/4" HOSE.
2 COORDINATE WITH OVER HEAD DOORS.
PRESSURE PIPING NOTES
SCALE: 1/4" = 1'-0"
PLUMBING - LEVEL 1 - PRESSURE ENLARGED PLAN2
DRAWING NOTES
(GENERAL) DRAWINGS ARE DIAGRAMATIC IN NATURE AND MAY NOT REPRESENT EXACTCONDITIONS REQUIRED FOR INSTALLATION OF PLUMBING SYSTEMS CONTRACTORSHALL COORDINATE ALL NEW WORK WITH ARCHITECTURAL PLANS AS WELL AS OTHERTRADES PRIOR TO FABRICATION OR INSTALLATION OF PLUMBING SYSTEMS OREQUIPMENT. FURNISH AND INSTALL ALL OFFSETS OR TRANSITIONS AS REQUIRED FORCOMPLETION OF WORK.
PLUMBING CONTRACTOR SHALL COORDINATE EXACT LOCATION OF PLUMBINGSYSTEM WITH ARCHITECTURAL PLANS, MECHANICAL SYSTEMS, FIRE PROTECTIONSYSTEMS ELECTRICAL SYSTEMS, CIVIL AND STRUCTURAL SYSTEMS.
PLUMBING SYSTEM CONTRACTOR SHALL COORDINATE FIRE SPRINKLER SYSTEM WITHDUCTWORK, ELECTRICAL, AND STRUCTURAL. SPACE ABOVE CEILING IS LIMITED ANDCAREFUL COORDINATION WITH OTHER TRADES IS REQUIRED.
PLUMBING SYSTEM CONTRACTOR SHALL FURNISH AND INSTALL COMPLETE.COORDINATE EXACT LOCATION OF ALL RATED OPENINGS WITH ARCHITECTURAL PLANS
1.
2.
3.
4.
TRUE
NORTH
TRUE
NORTH
No. 24747
W
AD
ES W
AR
T
T E
B AAL
A A
MNSEECI D
L
N E E RIGNE
PROFESSIONAL
8-31-16
5
5
1A
dd
en
du
m N
o. 1
9/9
/20
16
2A
dd
en
du
m N
o. 2
9/1
3/2
016
5A
SD
#1
11/2
9/2
016
VEST221
ELEC221B
STOR222CL
227
MECH221A
MECH
MEZZANINE230
ALCOVE 11220L
ALCOVE 12220M
ALCOVE 13220N
SLEEPING
LOFT220
ALCOVE 10220K
ALCOVE 9220J
BATHROOM226 MECH
225C
LAUNDRY225B
LOCKER ROOM225
BATHROOM225A
JAN225D
ALCOVE 16220R STOR
223
ALCOVE 15220Q
ALCOVE 14220P
ALCOVE 1220A
ALCOVE 2220B
ALCOVE 3220C
ALCOVE 4220D
ALCOVE 5220E
ALCOVE 6220F
ALCOVE 7220G
ALCOVE 8220H
F G HD
2
3
E
1
CBA
TOWERSTAIR 1
A0.2
1.8
2.3
P-22 P-2
P-15
P-20
P-2
P-2
P-13
P-13
P-22
P-22
MFD W/INSERT
FD
FD
FD W/ INSERTTYPICAL
1/2" CW, HW DN
1/2" CW, HW DN
1/2" CW, HW DN
ACCESS PANEL1" CW, 3/4" HW DN
1/2" CW, HW DN
3/4" CW DN
ALL FD'S & MFD'S TO HAVEDRAIN INSERTS
MFD W/TRAPINSERT
1" CW INWALL
2" CW DN W/ VALVE
HB
3/4" CWDN WITHVALVE
HB
1"ø
GFF-2W
GG
G
G
80 CFH
100 CFH
3/4"ø
1/2"ø
2 1/2" CW, 1" HW, 1"HWR, 1 1/2" GAS DN
Project Number :
BIRMINGHAM
TUSCALOOSA
JACKSON
NASHVILLE
www.edmondsengineering.com
(205) 988-2069
(205) 752-9915
(601) 362-6478
(615) 265-8071
EDMONDSTrusted Engineering Solutions
270
1 1s
t A
ven
ue
S, S
uit
e 1
00
|
B
irm
ing
ham
, AL
35
233
205
.879
.44
62
|
Te
l G
MC
NE
TW
OR
K.C
OM
dra
wn
by:
ISS
UE
D
AT
E
che
cke
d b
y:sh
ee
to
f
GO
OD
WY
NM
IL
LS
CA
WO
OD
A
B
C
D
E
F
G
H
J
K
1 2 3 4 5 6 7 8 9 10 11 12
1 2 3 4 5 6 7 8 9 10 11 12
A
B
C
D
E
F
G
H
J
K
BHM1601811/2
9/2
016
4:3
2:5
6 P
M
Wa
ldo
rp S
t. C
ullm
an
, AL
PL
UM
BIN
G -
LE
VE
L 2
& 3
-
PR
ES
SU
RE
PIP
ING
PL
AN
P2.0
2J
TR
/JL
C
CL
R
CU
LL
MA
N F
IRE
& R
ES
CU
E S
TA
TIO
N N
O. 3
GM
C #
A
BH
M15
00
26
8/3
1/2
016
CO
NT
RA
CT
DO
CS
SCALE: 1/8" = 1'-0"
PLUMBING - LEVEL 2 - PRESSURE PIPING PLAN1
DRAWING NOTES
(GENERAL) DRAWINGS ARE DIAGRAMATIC IN NATURE AND MAY NOT REPRESENT EXACTCONDITIONS REQUIRED FOR INSTALLATION OF PLUMBING SYSTEMS CONTRACTORSHALL COORDINATE ALL NEW WORK WITH ARCHITECTURAL PLANS AS WELL AS OTHERTRADES PRIOR TO FABRICATION OR INSTALLATION OF PLUMBING SYSTEMS OREQUIPMENT. FURNISH AND INSTALL ALL OFFSETS OR TRANSITIONS AS REQUIRED FORCOMPLETION OF WORK.
PLUMBING CONTRACTOR SHALL COORDINATE EXACT LOCATION OF PLUMBINGSYSTEM WITH ARCHITECTURAL PLANS, MECHANICAL SYSTEMS, FIRE PROTECTIONSYSTEMS ELECTRICAL SYSTEMS, CIVIL AND STRUCTURAL SYSTEMS.
PLUMBING SYSTEM CONTRACTOR SHALL COORDINATE FIRE SPRINKLER SYSTEM WITHDUCTWORK, ELECTRICAL, AND STRUCTURAL. SPACE ABOVE CEILING IS LIMITED ANDCAREFUL COORDINATION WITH OTHER TRADES IS REQUIRED.
PLUMBING SYSTEM CONTRACTOR SHALL FURNISH AND INSTALL COMPLETE.COORDINATE EXACT LOCATION OF ALL RATED OPENINGS WITH ARCHITECTURAL PLANS
1.
2.
3.
4.
TRUE
NORTH
5
5
No. 24747
W
AD
ES W
AR
T
T E
B AAL
A A
MNSEECI D
L
N E E RIGNE
PROFESSIONAL
8-31-16
1A
dd
en
du
m N
o. 1
9/9
/20
16
2A
dd
en
du
m N
o. 2
9/1
3/2
016
5A
SD
#1
11/2
9/2
016