![Page 1: PowerPoint Presentation · 2019. 3. 5. · Title: PowerPoint Presentation Created Date: 3/10/2009 5:03:32 PM](https://reader035.vdocument.in/reader035/viewer/2022071217/604a4a080d305968bd1f146f/html5/thumbnails/1.jpg)
UC MercedStudent Housing Phase 3
Regents Grounds & Buildings CommitteeSeptember 16, 2008
![Page 2: PowerPoint Presentation · 2019. 3. 5. · Title: PowerPoint Presentation Created Date: 3/10/2009 5:03:32 PM](https://reader035.vdocument.in/reader035/viewer/2022071217/604a4a080d305968bd1f146f/html5/thumbnails/2.jpg)
Site Location
Student Housing Phase 4
Valley Terraces Sierra
Terraces
Student Housing Phase 3
Dining Center
Recreation and Wellness Center
![Page 3: PowerPoint Presentation · 2019. 3. 5. · Title: PowerPoint Presentation Created Date: 3/10/2009 5:03:32 PM](https://reader035.vdocument.in/reader035/viewer/2022071217/604a4a080d305968bd1f146f/html5/thumbnails/3.jpg)
Program
84,130 OGSF
315 beds
$42 million total project budget
Occupancy Fall 2010• FY 10-11 enrollment projection: 4,000 students
• LRDP goal: house 50% of students on campus
• FY 10-11 housing capacity: 1,300-1,600 beds
• Providing housing for 30-40% of students
![Page 4: PowerPoint Presentation · 2019. 3. 5. · Title: PowerPoint Presentation Created Date: 3/10/2009 5:03:32 PM](https://reader035.vdocument.in/reader035/viewer/2022071217/604a4a080d305968bd1f146f/html5/thumbnails/4.jpg)
Neighborhood Context
Student Housing Phase 3 Site
Recreation and Wellness Center
Dining Center (need better photo)
Sierra Terraces
Valley Terraces
Dining Center
Housing
Activity areas
Infrastructure
Completed as of 2008
![Page 5: PowerPoint Presentation · 2019. 3. 5. · Title: PowerPoint Presentation Created Date: 3/10/2009 5:03:32 PM](https://reader035.vdocument.in/reader035/viewer/2022071217/604a4a080d305968bd1f146f/html5/thumbnails/5.jpg)
Design Principles
• Local materials• Stucco• Metal• Glass• Concrete
• Simple forms derived from region
• Sustainable systems expressed • Urban form• Architecture• Building details• Landscape
• Programs that engage the street• Arcades/porticos at entries• Public uses at the ground level• Multiple entries
• Colors born of the landscape
![Page 6: PowerPoint Presentation · 2019. 3. 5. · Title: PowerPoint Presentation Created Date: 3/10/2009 5:03:32 PM](https://reader035.vdocument.in/reader035/viewer/2022071217/604a4a080d305968bd1f146f/html5/thumbnails/6.jpg)
Site Plan
Housing Phase 4
Housing Phase 3
Scholars Lane
Ranchers Road
North
![Page 7: PowerPoint Presentation · 2019. 3. 5. · Title: PowerPoint Presentation Created Date: 3/10/2009 5:03:32 PM](https://reader035.vdocument.in/reader035/viewer/2022071217/604a4a080d305968bd1f146f/html5/thumbnails/7.jpg)
Ground Plan
Lobby Entrance
Housing Phase 4Ranchers Road
Lobby Entrance
Courtyard
Scholars Lane
Lobby Lobby & Study Rooms
Student Activities & Meeting RoomsStudent Bedrooms
Student AffairsOffices
North
![Page 8: PowerPoint Presentation · 2019. 3. 5. · Title: PowerPoint Presentation Created Date: 3/10/2009 5:03:32 PM](https://reader035.vdocument.in/reader035/viewer/2022071217/604a4a080d305968bd1f146f/html5/thumbnails/8.jpg)
View From Southeast
![Page 9: PowerPoint Presentation · 2019. 3. 5. · Title: PowerPoint Presentation Created Date: 3/10/2009 5:03:32 PM](https://reader035.vdocument.in/reader035/viewer/2022071217/604a4a080d305968bd1f146f/html5/thumbnails/9.jpg)
Exterior Finishes
Metal Wall Panel, Typical
Low-E Glazing, Typical
Architectural Concrete
Exterior Cement Plaster
![Page 10: PowerPoint Presentation · 2019. 3. 5. · Title: PowerPoint Presentation Created Date: 3/10/2009 5:03:32 PM](https://reader035.vdocument.in/reader035/viewer/2022071217/604a4a080d305968bd1f146f/html5/thumbnails/10.jpg)
Section Through Paseo
Café-Convenience StoreDining-Study Hall
![Page 11: PowerPoint Presentation · 2019. 3. 5. · Title: PowerPoint Presentation Created Date: 3/10/2009 5:03:32 PM](https://reader035.vdocument.in/reader035/viewer/2022071217/604a4a080d305968bd1f146f/html5/thumbnails/11.jpg)
View From Courtyard
![Page 12: PowerPoint Presentation · 2019. 3. 5. · Title: PowerPoint Presentation Created Date: 3/10/2009 5:03:32 PM](https://reader035.vdocument.in/reader035/viewer/2022071217/604a4a080d305968bd1f146f/html5/thumbnails/12.jpg)
Sustainability
• Higher density development• 4 stories• 650 beds planned for site• 300 beds per acre
• LEED Silver Certification (at a minimum; Gold possible)• 42% or greater energy costs savings over 2005 Title 24• Local building materials with high recycled content and low VOCs• Daylighting• Maximize water efficiency in building and landscape
• Roof will be solar-panel ready for 10,000-square-foot array• Meet 25% of facility’s electrical power needs per year• Meet 65% of peak electrical demand
![Page 13: PowerPoint Presentation · 2019. 3. 5. · Title: PowerPoint Presentation Created Date: 3/10/2009 5:03:32 PM](https://reader035.vdocument.in/reader035/viewer/2022071217/604a4a080d305968bd1f146f/html5/thumbnails/13.jpg)
CEQA Compliance- Environmental Analysis
• Consistent with certified Long Range Development Plan EIR
• Smaller scope than analyzed in the LRDP EIR
• Addendum/Findings: Minor technical changes or additions toprevious EIR
![Page 14: PowerPoint Presentation · 2019. 3. 5. · Title: PowerPoint Presentation Created Date: 3/10/2009 5:03:32 PM](https://reader035.vdocument.in/reader035/viewer/2022071217/604a4a080d305968bd1f146f/html5/thumbnails/14.jpg)
Questions