![Page 1: PRE-SAD SAFETY MEETING AGENDA CEBAF Center Auditorium Thursday, 12 Aug 2010 1:30 – 2:45 p.m. Introduction Safety Data/Trends W. Oren 5 Min. Hand Safety/Safety](https://reader038.vdocument.in/reader038/viewer/2022110304/551c1cfd550346b24f8b59d0/html5/thumbnails/1.jpg)
PRE-SAD SAFETY MEETING AGENDA
CEBAF Center AuditoriumThursday, 12 Aug 2010
1:30 – 2:45 p.m.
IntroductionSafety Data/Trends
W. Oren 5 Min.
Hand Safety/Safety Handouts S. Chandler 10 Min.
Work Planning Update H. Fanning 5 Min
Work Observations W. Oren 7 Min.
RadCon D. Hamlette 8 Min
Scheduled Activities
Facilities
Accelerator
Physics
FEL
R. Sprouse
R. Michaud
B. Manzlak
J. Coleman
10 Min.
5 Min.
5 Min.
5 Min.
Closing W. Oren 2 Min.
![Page 2: PRE-SAD SAFETY MEETING AGENDA CEBAF Center Auditorium Thursday, 12 Aug 2010 1:30 – 2:45 p.m. Introduction Safety Data/Trends W. Oren 5 Min. Hand Safety/Safety](https://reader038.vdocument.in/reader038/viewer/2022110304/551c1cfd550346b24f8b59d0/html5/thumbnails/2.jpg)
PRE-SAD SAFETY MEETINGSafety Data/Trends
WILL OREN12 August 2010
![Page 3: PRE-SAD SAFETY MEETING AGENDA CEBAF Center Auditorium Thursday, 12 Aug 2010 1:30 – 2:45 p.m. Introduction Safety Data/Trends W. Oren 5 Min. Hand Safety/Safety](https://reader038.vdocument.in/reader038/viewer/2022110304/551c1cfd550346b24f8b59d0/html5/thumbnails/3.jpg)
Analysis of Reported Events, Year to Year
• 11 medical reports in Q310; four involved Construction subcontractors• 5 ORPS/CAIRS in Q310
• 3 ORPS reports (Test Lab Basement flooding, 12GeV Temporary Electrical Line Strike, Failure of Manual Surveillance in Hall A)
• 2 CAIRS reports (Forehead laceration with stitches, Infection from splinter)
3
Medical Cases Notable Events ORPS/CAIRS0
10
20
30
40
50
2924
6
41
26
18
JLab Reported Events
Jul08-Jun09Jul09-Jun10
![Page 4: PRE-SAD SAFETY MEETING AGENDA CEBAF Center Auditorium Thursday, 12 Aug 2010 1:30 – 2:45 p.m. Introduction Safety Data/Trends W. Oren 5 Min. Hand Safety/Safety](https://reader038.vdocument.in/reader038/viewer/2022110304/551c1cfd550346b24f8b59d0/html5/thumbnails/4.jpg)
Recordable Injuries FY 2009 - 2010Date Injury Causal Factor
1/5/2009Subcontractor employee in the CC kitchen received a 1st degree burn to their hand when they accidently touched a cooking surface.
Situational Awareness /LTA supervision – employee had returned from X-mas break and it was her last workday before retiring.
7/13/2009
Employee was stung twice by a yellow jacket. Environment
Employee did not report the sting until the day after the incident, after seeing her personal physician instead of OCCMED. Feedback was that the incident did not seem related to her work.
7/16/2009Employee was struck in eye by insect while walking past the first of two AC blower units.
Environment
Design of AC compressor unit
11/19/2009Employee was testing a circuit board when the 15v regulator (IC chip) exploded and a piece of the plastic hit him in his left eye
Work Planning – determination of PPE requirements
Design of equipment
1/22/2010Employee was moving cinder blocks with gloves on, one of the blocks slipped and pinched his left ring finger between another cinder block
Work Planning - Manual handling, employee pre-existing condition, and the large quantity of blocks (1000+) presented many opportunities for a dropped block and the resultant risks – pinch/crush injury.
3/15/2010Subcontractor employee was undoing the straps around equipment when the pieces shifted and pushed against his foot this caused him to jump off ledge, fracturing ankle.
Work Planning
Situational Awareness
4/13/2010Employee was leaning into a cavity bake oven to inspect a fitting at the bottom of the cabinet's interior, and hit his head on the shelf.
Situational Awareness
Design
7 Recordable Injuries in last 18 months• 3 related to Work Planning + 2 related to Situational Awareness
Work planning training under development Planning starts with Job Walk Down
• 2 related to Environment (Insects, recent heat related)
4
![Page 5: PRE-SAD SAFETY MEETING AGENDA CEBAF Center Auditorium Thursday, 12 Aug 2010 1:30 – 2:45 p.m. Introduction Safety Data/Trends W. Oren 5 Min. Hand Safety/Safety](https://reader038.vdocument.in/reader038/viewer/2022110304/551c1cfd550346b24f8b59d0/html5/thumbnails/5.jpg)
JLab Injuries FY09-10 – Body Part
4
FingerHand
ArmHead
EyeBack
AnkleFoot
Leg
Neck0
5
10
15
20
25
• 11 medical reports in Q310; four involved Construction subcontractors
• 3 insect bites• 4 abrasions (wood splinter, fall on stairway, 2 hand/finger injuries)• 3 facial lacerations (tool kickback)• 1 foreign body in eye
![Page 6: PRE-SAD SAFETY MEETING AGENDA CEBAF Center Auditorium Thursday, 12 Aug 2010 1:30 – 2:45 p.m. Introduction Safety Data/Trends W. Oren 5 Min. Hand Safety/Safety](https://reader038.vdocument.in/reader038/viewer/2022110304/551c1cfd550346b24f8b59d0/html5/thumbnails/6.jpg)
HAND SAFETY
SMITTY CHANDLER
![Page 7: PRE-SAD SAFETY MEETING AGENDA CEBAF Center Auditorium Thursday, 12 Aug 2010 1:30 – 2:45 p.m. Introduction Safety Data/Trends W. Oren 5 Min. Hand Safety/Safety](https://reader038.vdocument.in/reader038/viewer/2022110304/551c1cfd550346b24f8b59d0/html5/thumbnails/7.jpg)
Hand Safety
• Hand Safety Program Rationale and History
• JLab Experience
• Safety Controls
![Page 8: PRE-SAD SAFETY MEETING AGENDA CEBAF Center Auditorium Thursday, 12 Aug 2010 1:30 – 2:45 p.m. Introduction Safety Data/Trends W. Oren 5 Min. Hand Safety/Safety](https://reader038.vdocument.in/reader038/viewer/2022110304/551c1cfd550346b24f8b59d0/html5/thumbnails/8.jpg)
Hand Safety• Rationale and History
• JLab Experience
• Safety Controls
![Page 9: PRE-SAD SAFETY MEETING AGENDA CEBAF Center Auditorium Thursday, 12 Aug 2010 1:30 – 2:45 p.m. Introduction Safety Data/Trends W. Oren 5 Min. Hand Safety/Safety](https://reader038.vdocument.in/reader038/viewer/2022110304/551c1cfd550346b24f8b59d0/html5/thumbnails/9.jpg)
Rationale and History
• Will noted high incidence of hand injuries and requested training for Engineering.
• Hand safety meetings were held with Machine Shop, Alignment and Magnet, Installation and Vacuum, and Cryo.
• Bob May is currently creating online module.
• Today’s comments are a brief introduction to that, more comprehensive, module.
![Page 10: PRE-SAD SAFETY MEETING AGENDA CEBAF Center Auditorium Thursday, 12 Aug 2010 1:30 – 2:45 p.m. Introduction Safety Data/Trends W. Oren 5 Min. Hand Safety/Safety](https://reader038.vdocument.in/reader038/viewer/2022110304/551c1cfd550346b24f8b59d0/html5/thumbnails/10.jpg)
Hand Safety• Rationale and History
• JLab Experience
• Safety Controls
![Page 11: PRE-SAD SAFETY MEETING AGENDA CEBAF Center Auditorium Thursday, 12 Aug 2010 1:30 – 2:45 p.m. Introduction Safety Data/Trends W. Oren 5 Min. Hand Safety/Safety](https://reader038.vdocument.in/reader038/viewer/2022110304/551c1cfd550346b24f8b59d0/html5/thumbnails/11.jpg)
Five Years of Hand Injuries• Total: 38• Site:
– Wrist: excluded– Proximal hand: 2– Digits:
• 1st: 9• 2nd: 4• 3rd: 11• 4th: 7• 5th: 5
![Page 12: PRE-SAD SAFETY MEETING AGENDA CEBAF Center Auditorium Thursday, 12 Aug 2010 1:30 – 2:45 p.m. Introduction Safety Data/Trends W. Oren 5 Min. Hand Safety/Safety](https://reader038.vdocument.in/reader038/viewer/2022110304/551c1cfd550346b24f8b59d0/html5/thumbnails/12.jpg)
Five Years of Hand Injuries• Type of injury
– Laceration: 21– Contusion: 6– Abrasion: 2– Foreign body: 2– Sprain: 2– Fracture: 2– Puncture: 1– Amputation: 1– Burn: 1
• Cumulative trauma: 0
![Page 13: PRE-SAD SAFETY MEETING AGENDA CEBAF Center Auditorium Thursday, 12 Aug 2010 1:30 – 2:45 p.m. Introduction Safety Data/Trends W. Oren 5 Min. Hand Safety/Safety](https://reader038.vdocument.in/reader038/viewer/2022110304/551c1cfd550346b24f8b59d0/html5/thumbnails/13.jpg)
How to be an Ergonomist• Option A: Earn a MS degree in human factors
engineering.
• Option B: Memorize two things.
1. The formula for torque.
2. Minimize force, angle and frequency.
• Safety controls are derived from these two.
![Page 14: PRE-SAD SAFETY MEETING AGENDA CEBAF Center Auditorium Thursday, 12 Aug 2010 1:30 – 2:45 p.m. Introduction Safety Data/Trends W. Oren 5 Min. Hand Safety/Safety](https://reader038.vdocument.in/reader038/viewer/2022110304/551c1cfd550346b24f8b59d0/html5/thumbnails/14.jpg)
Hand Safety• Rationale for Training
• JLab Experience
• Safety Controls
![Page 15: PRE-SAD SAFETY MEETING AGENDA CEBAF Center Auditorium Thursday, 12 Aug 2010 1:30 – 2:45 p.m. Introduction Safety Data/Trends W. Oren 5 Min. Hand Safety/Safety](https://reader038.vdocument.in/reader038/viewer/2022110304/551c1cfd550346b24f8b59d0/html5/thumbnails/15.jpg)
Hierarchy of Safety Controls• Engineered
– Air bags– Machine guards
• Work practice– Speed limits– Lock out/tag out
• Administrative– License restriction– Job rotation
• PPE– Motorcycle helmets– Gloves
![Page 16: PRE-SAD SAFETY MEETING AGENDA CEBAF Center Auditorium Thursday, 12 Aug 2010 1:30 – 2:45 p.m. Introduction Safety Data/Trends W. Oren 5 Min. Hand Safety/Safety](https://reader038.vdocument.in/reader038/viewer/2022110304/551c1cfd550346b24f8b59d0/html5/thumbnails/16.jpg)
Perfect Engineered Controls
• Make injury impossible
• Don’t interfere with work
• Don’t cause new hazard
• Ponder your engineered controls
![Page 17: PRE-SAD SAFETY MEETING AGENDA CEBAF Center Auditorium Thursday, 12 Aug 2010 1:30 – 2:45 p.m. Introduction Safety Data/Trends W. Oren 5 Min. Hand Safety/Safety](https://reader038.vdocument.in/reader038/viewer/2022110304/551c1cfd550346b24f8b59d0/html5/thumbnails/17.jpg)
Work Practice Controls
• Necessary evils caused by inadequate engineered controls.
• Effectiveness depends on work group subculture.
• Two categories:
– Clear. Many important specific procedures.
– Fuzzy. Primarily relate to one’s general approach.
![Page 18: PRE-SAD SAFETY MEETING AGENDA CEBAF Center Auditorium Thursday, 12 Aug 2010 1:30 – 2:45 p.m. Introduction Safety Data/Trends W. Oren 5 Min. Hand Safety/Safety](https://reader038.vdocument.in/reader038/viewer/2022110304/551c1cfd550346b24f8b59d0/html5/thumbnails/18.jpg)
Fuzzy “Work Practice Controls”• Tempting to use in accident investigations.
– “Pay more attention,” and “be more careful.”• Can be the most difficult but most effective work practice
controls.• My favorites:
– Think about hazard avoidance before you begin the task. The golden opportunity for safety is before you begin.• Once the task begins, you focus on task completion
more than hazard avoidance.• Especially important for protecting the off hand because
once the task begins, you focus on the on hand.– Learn to see.
• No conscious perception without directed attention.• Train your brain at home too. Don’t rely on flipping on the safety
switch when you come to work.
![Page 19: PRE-SAD SAFETY MEETING AGENDA CEBAF Center Auditorium Thursday, 12 Aug 2010 1:30 – 2:45 p.m. Introduction Safety Data/Trends W. Oren 5 Min. Hand Safety/Safety](https://reader038.vdocument.in/reader038/viewer/2022110304/551c1cfd550346b24f8b59d0/html5/thumbnails/19.jpg)
Administrative Controls• Employee selection
– Staff members are stable experts.
– Beware of complacency from favorable experience.
• Work restrictions
– Tell Smitty if you need them.
• Job rotation
– Benefit: Can help by improving concentration and distributing physical stresses.
– Risk: Expertise in the task can be diluted.
![Page 20: PRE-SAD SAFETY MEETING AGENDA CEBAF Center Auditorium Thursday, 12 Aug 2010 1:30 – 2:45 p.m. Introduction Safety Data/Trends W. Oren 5 Min. Hand Safety/Safety](https://reader038.vdocument.in/reader038/viewer/2022110304/551c1cfd550346b24f8b59d0/html5/thumbnails/20.jpg)
PPE• In hand safety, there’s an understandable obsession
with gloves.
• Know the downsides:– Decrease dexterity– Decrease grip strength by 1/3– Increase fatigue– Excellent fit is difficult
• Three sizes of gloves• Many sizes of hands
• Ask for ESH&Q advice regarding glove selection if needed.
![Page 21: PRE-SAD SAFETY MEETING AGENDA CEBAF Center Auditorium Thursday, 12 Aug 2010 1:30 – 2:45 p.m. Introduction Safety Data/Trends W. Oren 5 Min. Hand Safety/Safety](https://reader038.vdocument.in/reader038/viewer/2022110304/551c1cfd550346b24f8b59d0/html5/thumbnails/21.jpg)
Could Gloves Have Prevented?• Type of injury
– Laceration: 21. Perhaps 20?– Contusion: 6. Perhaps 2?– Abrasion: 2. Perhaps 2?– Foreign body: 2. Perhaps 2?– Sprain: 2. Perhaps 0?– Fracture: 2. Perhaps 0?– Puncture: 1. Perhaps 1?– Amputation: 1. Perhaps 0?– Burn: 1. Perhaps 1?
• Total: Perhaps 28 of 38 hand injuries could have been prevented by proper gloves.
![Page 22: PRE-SAD SAFETY MEETING AGENDA CEBAF Center Auditorium Thursday, 12 Aug 2010 1:30 – 2:45 p.m. Introduction Safety Data/Trends W. Oren 5 Min. Hand Safety/Safety](https://reader038.vdocument.in/reader038/viewer/2022110304/551c1cfd550346b24f8b59d0/html5/thumbnails/22.jpg)
Parting Advice
• Take hand safety very seriously. Hand injuries are among the most prevalent and important safety challenges at the Lab.
• Spread the gospel. Remember that both positive and negative attitudes about safety culture are contagious.
• Organize your thinking about safety controls. Think about ongoing opportunities for enhanced engineered, work practice, and administrative controls and PPE.
![Page 23: PRE-SAD SAFETY MEETING AGENDA CEBAF Center Auditorium Thursday, 12 Aug 2010 1:30 – 2:45 p.m. Introduction Safety Data/Trends W. Oren 5 Min. Hand Safety/Safety](https://reader038.vdocument.in/reader038/viewer/2022110304/551c1cfd550346b24f8b59d0/html5/thumbnails/23.jpg)
A Successful SAD with theWork Planning, Control, and
Authorization Process
Harry Fanning
![Page 24: PRE-SAD SAFETY MEETING AGENDA CEBAF Center Auditorium Thursday, 12 Aug 2010 1:30 – 2:45 p.m. Introduction Safety Data/Trends W. Oren 5 Min. Hand Safety/Safety](https://reader038.vdocument.in/reader038/viewer/2022110304/551c1cfd550346b24f8b59d0/html5/thumbnails/24.jpg)
Summary of Work Planning Process– Perform preliminary planning for assigned tasks. – Review lessons learned and promote continuous improvement.– Utilize task lists as appropriate.
– Analyze hazards.– Ensure adequate and appropriate training according to Jefferson
Lab’s standards of training (check EJTA).
– Use an approved Work Control Document (WCD) if required. (WCDs are found in section 3310 of the ES&H Manual)
– Monitor work during performance and re-evaluate the scope of work and Task Hazard Analysis (THA) if appropriate. (ES&H 3330)
– Solicit and provide feedback for future reference.– Adequately document any lessons learned.
These are the 5 Core Functions of ISMS
![Page 25: PRE-SAD SAFETY MEETING AGENDA CEBAF Center Auditorium Thursday, 12 Aug 2010 1:30 – 2:45 p.m. Introduction Safety Data/Trends W. Oren 5 Min. Hand Safety/Safety](https://reader038.vdocument.in/reader038/viewer/2022110304/551c1cfd550346b24f8b59d0/html5/thumbnails/25.jpg)
ATLis WCD• Remember that an ATLis entry does not
constitute a WCD (ATLis is a work planning tool)• However, an ATLis entry for tasks with pre-
mitigated Risk Codes > 2 should include as attachments:– OSP or TOSP, and– THA, or
• If the applicable WCDs are not attached to the ATLis entry, the specific WCDs should be referenced within the ATLis description for ease of evaluation
![Page 26: PRE-SAD SAFETY MEETING AGENDA CEBAF Center Auditorium Thursday, 12 Aug 2010 1:30 – 2:45 p.m. Introduction Safety Data/Trends W. Oren 5 Min. Hand Safety/Safety](https://reader038.vdocument.in/reader038/viewer/2022110304/551c1cfd550346b24f8b59d0/html5/thumbnails/26.jpg)
Jefferson Lab Safety
Observation Program
WILL OREN
![Page 27: PRE-SAD SAFETY MEETING AGENDA CEBAF Center Auditorium Thursday, 12 Aug 2010 1:30 – 2:45 p.m. Introduction Safety Data/Trends W. Oren 5 Min. Hand Safety/Safety](https://reader038.vdocument.in/reader038/viewer/2022110304/551c1cfd550346b24f8b59d0/html5/thumbnails/27.jpg)
Safety is a core business value, integral to the very existence of the lab
“STOP”
The Jefferson Lab Safety Observation Program helps managers establish and maintain safety culture through a system of seeing and talking with people about safety.
It demonstrates that...
![Page 28: PRE-SAD SAFETY MEETING AGENDA CEBAF Center Auditorium Thursday, 12 Aug 2010 1:30 – 2:45 p.m. Introduction Safety Data/Trends W. Oren 5 Min. Hand Safety/Safety](https://reader038.vdocument.in/reader038/viewer/2022110304/551c1cfd550346b24f8b59d0/html5/thumbnails/28.jpg)
All safety incidents are preventable• Management must
• demonstrate a continuous emphasis and clarity around safety expectations
• show a passion for ZERO injuries, illnesses, and incidents
Fundamental Premise
![Page 29: PRE-SAD SAFETY MEETING AGENDA CEBAF Center Auditorium Thursday, 12 Aug 2010 1:30 – 2:45 p.m. Introduction Safety Data/Trends W. Oren 5 Min. Hand Safety/Safety](https://reader038.vdocument.in/reader038/viewer/2022110304/551c1cfd550346b24f8b59d0/html5/thumbnails/29.jpg)
The Safety Observation Program helps managers demonstrate commitment to employees by:• Demonstrating a desire to preserve and protect their
organization’s most valuable resource – its employees
• Being visible to your employees and lead as you desire others to do
• Continuous emphasis and clarity around safety expectations – shows a passion for ZERO injuries, illnesses, and incidents
Why Safety Observations?
![Page 30: PRE-SAD SAFETY MEETING AGENDA CEBAF Center Auditorium Thursday, 12 Aug 2010 1:30 – 2:45 p.m. Introduction Safety Data/Trends W. Oren 5 Min. Hand Safety/Safety](https://reader038.vdocument.in/reader038/viewer/2022110304/551c1cfd550346b24f8b59d0/html5/thumbnails/30.jpg)
Why Safety Observations?
Observations allow you to mentor and teach/pass along your experiences and expectations.
Safety Observations help employees demonstrate commitment to safety.
• Employees become an active part of building a safety culture – safety culture is not sustainable without this step!
• It can have a direct effect on their physical well-being.
![Page 31: PRE-SAD SAFETY MEETING AGENDA CEBAF Center Auditorium Thursday, 12 Aug 2010 1:30 – 2:45 p.m. Introduction Safety Data/Trends W. Oren 5 Min. Hand Safety/Safety](https://reader038.vdocument.in/reader038/viewer/2022110304/551c1cfd550346b24f8b59d0/html5/thumbnails/31.jpg)
Copyright © 2004 E.I. du Pont de Nemours and Company. STOP™ and the STOP™ logo are trademarks of E.I. du Pont de Nemours and Company.
![Page 32: PRE-SAD SAFETY MEETING AGENDA CEBAF Center Auditorium Thursday, 12 Aug 2010 1:30 – 2:45 p.m. Introduction Safety Data/Trends W. Oren 5 Min. Hand Safety/Safety](https://reader038.vdocument.in/reader038/viewer/2022110304/551c1cfd550346b24f8b59d0/html5/thumbnails/32.jpg)
![Page 33: PRE-SAD SAFETY MEETING AGENDA CEBAF Center Auditorium Thursday, 12 Aug 2010 1:30 – 2:45 p.m. Introduction Safety Data/Trends W. Oren 5 Min. Hand Safety/Safety](https://reader038.vdocument.in/reader038/viewer/2022110304/551c1cfd550346b24f8b59d0/html5/thumbnails/33.jpg)
What Could Happen If?
![Page 34: PRE-SAD SAFETY MEETING AGENDA CEBAF Center Auditorium Thursday, 12 Aug 2010 1:30 – 2:45 p.m. Introduction Safety Data/Trends W. Oren 5 Min. Hand Safety/Safety](https://reader038.vdocument.in/reader038/viewer/2022110304/551c1cfd550346b24f8b59d0/html5/thumbnails/34.jpg)
CATEGORY ITEMS• Traffic - heavy trucks• Parking - marked areas• Reporting damaged equipment
• Traffic - heavy trucks• Parking - marked areas• Reporting damaged equipment
• Work planning & walk thru•Off hours work - coordinate with supervisor and those effected
•Training - new employees, escorts
• Work planning & walk thru• Off hours work - coordinate with
supervisor and those effected• Training - new employees, escorts
• Weather - heat, hurricanes• Construction activities
• Weather - heat, hurricanes• Construction activities
Reactions of People
Positions of People
Personal ProtectiveEquipment
• Housekeeping • Trash removal process• Tire punctures
• Housekeeping • Trash removal process• Tire punctures
OrderlinessStandards
Conditions
• Walking on site
• Walking on site• Situational awareness
Safety glasses, weld shields, safety shoes
• Situational awarenessSafety glasses, weld shields, safety shoes
Procedures
![Page 35: PRE-SAD SAFETY MEETING AGENDA CEBAF Center Auditorium Thursday, 12 Aug 2010 1:30 – 2:45 p.m. Introduction Safety Data/Trends W. Oren 5 Min. Hand Safety/Safety](https://reader038.vdocument.in/reader038/viewer/2022110304/551c1cfd550346b24f8b59d0/html5/thumbnails/35.jpg)
ZERO INJURIES&
OCCUPATIONAL ILLNESSES
OUR GOAL:
![Page 36: PRE-SAD SAFETY MEETING AGENDA CEBAF Center Auditorium Thursday, 12 Aug 2010 1:30 – 2:45 p.m. Introduction Safety Data/Trends W. Oren 5 Min. Hand Safety/Safety](https://reader038.vdocument.in/reader038/viewer/2022110304/551c1cfd550346b24f8b59d0/html5/thumbnails/36.jpg)
SUMMER “SAD” Radiological Highlights
David Hamlette
RADCON Field OPS Coordinator
August 12, 2010
![Page 37: PRE-SAD SAFETY MEETING AGENDA CEBAF Center Auditorium Thursday, 12 Aug 2010 1:30 – 2:45 p.m. Introduction Safety Data/Trends W. Oren 5 Min. Hand Safety/Safety](https://reader038.vdocument.in/reader038/viewer/2022110304/551c1cfd550346b24f8b59d0/html5/thumbnails/37.jpg)
Kudos!!(We’ve been Watching)
The RCD would like to take this opportunity to recognize a few individuals that were observed going the extra mile to insure radiological safety: “See something-Say something” award
• Calvin Mealer• Jerry Nines
“ALARA teamwork” award• Ed Folts & Hall A Technicians
“ALARA-n-Action” award• Alan Gavalya• Greg Marble
![Page 38: PRE-SAD SAFETY MEETING AGENDA CEBAF Center Auditorium Thursday, 12 Aug 2010 1:30 – 2:45 p.m. Introduction Safety Data/Trends W. Oren 5 Min. Hand Safety/Safety](https://reader038.vdocument.in/reader038/viewer/2022110304/551c1cfd550346b24f8b59d0/html5/thumbnails/38.jpg)
Release of Materials• Very busy down…all items coming out of beam enclosures
require RadCon survey PRIOR to removal(be mindful of tool bags and equipment carts when performing repairs/replacements)
• RCT’s perform site rounds at least twice daily to support work efforts
• RadCon is responsible for surveying and bringing up items from N&S Linacs, BSY.
Things to remember….
![Page 39: PRE-SAD SAFETY MEETING AGENDA CEBAF Center Auditorium Thursday, 12 Aug 2010 1:30 – 2:45 p.m. Introduction Safety Data/Trends W. Oren 5 Min. Hand Safety/Safety](https://reader038.vdocument.in/reader038/viewer/2022110304/551c1cfd550346b24f8b59d0/html5/thumbnails/39.jpg)
Hardware removal
Removal of beamline components require RadCon NotificationWorking in Radiation Areas can require more than just notification!
Things to remember….
Working in Radiation Areas
![Page 40: PRE-SAD SAFETY MEETING AGENDA CEBAF Center Auditorium Thursday, 12 Aug 2010 1:30 – 2:45 p.m. Introduction Safety Data/Trends W. Oren 5 Min. Hand Safety/Safety](https://reader038.vdocument.in/reader038/viewer/2022110304/551c1cfd550346b24f8b59d0/html5/thumbnails/40.jpg)
Working in Hall A&CEquipment Racks
Moving “Radioactive Materials”
Disassembly of “RAM”
Coordinate work with RadCon!!
![Page 41: PRE-SAD SAFETY MEETING AGENDA CEBAF Center Auditorium Thursday, 12 Aug 2010 1:30 – 2:45 p.m. Introduction Safety Data/Trends W. Oren 5 Min. Hand Safety/Safety](https://reader038.vdocument.in/reader038/viewer/2022110304/551c1cfd550346b24f8b59d0/html5/thumbnails/41.jpg)
…but for nowDisposing of Metals
• Accelerator Enclosure Metals Cleared by RadCon (Indisinguishable From Background) Can Be throw in the regular trash
• Still!!no recycling of metals that have been in any accelerator enclosure
• They should have a “Do Not Recycle” sticker affixed to them( if large enough)
• Items can still be stored until moratorium lifted.
“Moratorium- Madness… Light @ the end of the tunnel”
![Page 42: PRE-SAD SAFETY MEETING AGENDA CEBAF Center Auditorium Thursday, 12 Aug 2010 1:30 – 2:45 p.m. Introduction Safety Data/Trends W. Oren 5 Min. Hand Safety/Safety](https://reader038.vdocument.in/reader038/viewer/2022110304/551c1cfd550346b24f8b59d0/html5/thumbnails/42.jpg)
“UPGRADES”• New Laydown Area(RAM, Radwaste,
Moratorium metals)• New ARM’s SRWP dealing with High Rad Watch• New on-line dosimetry management system• New RadCon Trainer – Maya Keller(Sorry Keith) • New RCT – Adam Hartberger (Field Operations
support). • New rad waste containers
![Page 43: PRE-SAD SAFETY MEETING AGENDA CEBAF Center Auditorium Thursday, 12 Aug 2010 1:30 – 2:45 p.m. Introduction Safety Data/Trends W. Oren 5 Min. Hand Safety/Safety](https://reader038.vdocument.in/reader038/viewer/2022110304/551c1cfd550346b24f8b59d0/html5/thumbnails/43.jpg)
RAD WORKER “GOOD PRACTICE”
• Review the GARWP• When in doubt call the RadCon cell phone
876-1743 “If you see something…. Say
Something!!!”
![Page 44: PRE-SAD SAFETY MEETING AGENDA CEBAF Center Auditorium Thursday, 12 Aug 2010 1:30 – 2:45 p.m. Introduction Safety Data/Trends W. Oren 5 Min. Hand Safety/Safety](https://reader038.vdocument.in/reader038/viewer/2022110304/551c1cfd550346b24f8b59d0/html5/thumbnails/44.jpg)
Facilities Management & Logistics
SAD Activities
RUSTY SPROUSE
![Page 45: PRE-SAD SAFETY MEETING AGENDA CEBAF Center Auditorium Thursday, 12 Aug 2010 1:30 – 2:45 p.m. Introduction Safety Data/Trends W. Oren 5 Min. Hand Safety/Safety](https://reader038.vdocument.in/reader038/viewer/2022110304/551c1cfd550346b24f8b59d0/html5/thumbnails/45.jpg)
Power OutagesProject Area DurationDatesTEDF Generator Hookup 2 days 8-13 to 8-14N&S Access Bldg Addition N Loop Switching 8-16 to 8-23N&S Access Bldg Addition SWBD SA2 4 hours 8-16 to 8-23N&S Access Bldg Addition NAP3 8 hours 8-16 to 8-23
12 GeV - North LINACSWBD NL3 - Affects Bldg 89 and E1 1 day 16-Aug
TEDF Generator Disconnect 2 days 8-20 to 8-22N&S LINAC Power Upgrade N Loop Switching 8-23 to 9-8N&S LINAC Power Upgrade NLP3 & SLP1 1 day 8-23 to 9-8
N&S LINAC Power UpgradeSB W2 Affects Physics Storage Bldg and MEB2 2 days 8-23 to 9-8
N&S LINAC Power Upgrade S Loop Switching 8-23 to 9-8Accelerator Site 40 MVA Substation 7-9 AM 25-AugCHL Addition Power ESR 480 V power 8 hours 25-AugCHL Addition Power ESR 4160 V power 2-3 days TBD
![Page 46: PRE-SAD SAFETY MEETING AGENDA CEBAF Center Auditorium Thursday, 12 Aug 2010 1:30 – 2:45 p.m. Introduction Safety Data/Trends W. Oren 5 Min. Hand Safety/Safety](https://reader038.vdocument.in/reader038/viewer/2022110304/551c1cfd550346b24f8b59d0/html5/thumbnails/46.jpg)
Construction ActivitiesTEDF• Removal of South Test Lab Wall• Power Outage• Generator
Locations (SURA closedtoday thru next week)
• New 4” gas main to Test Lab
(Potential will close Onnes at Jefferson)
• New Accelerator Site Gate
![Page 47: PRE-SAD SAFETY MEETING AGENDA CEBAF Center Auditorium Thursday, 12 Aug 2010 1:30 – 2:45 p.m. Introduction Safety Data/Trends W. Oren 5 Min. Hand Safety/Safety](https://reader038.vdocument.in/reader038/viewer/2022110304/551c1cfd550346b24f8b59d0/html5/thumbnails/47.jpg)
SEG Block Move • Dates: Week of 16 Aug 10 • Duration: 3 weeks
![Page 48: PRE-SAD SAFETY MEETING AGENDA CEBAF Center Auditorium Thursday, 12 Aug 2010 1:30 – 2:45 p.m. Introduction Safety Data/Trends W. Oren 5 Min. Hand Safety/Safety](https://reader038.vdocument.in/reader038/viewer/2022110304/551c1cfd550346b24f8b59d0/html5/thumbnails/48.jpg)
Experimental Staging BuildingPaving starting 23 Aug 2010
CHL Utilities
Removal 30,000 liter dewerCrane operations behind CHL
N/S Linac PowerN. Linac Road Closure – 1 Week TBD
4 KW ESR
Construction Activities
![Page 49: PRE-SAD SAFETY MEETING AGENDA CEBAF Center Auditorium Thursday, 12 Aug 2010 1:30 – 2:45 p.m. Introduction Safety Data/Trends W. Oren 5 Min. Hand Safety/Safety](https://reader038.vdocument.in/reader038/viewer/2022110304/551c1cfd550346b24f8b59d0/html5/thumbnails/49.jpg)
Construction Activities During ShutdownWest ARC LCW
• Dates: 13 Aug—7 Sept 10
• West Arc closed to other work
• Road closure on 11 -13 Aug to stage materials
![Page 50: PRE-SAD SAFETY MEETING AGENDA CEBAF Center Auditorium Thursday, 12 Aug 2010 1:30 – 2:45 p.m. Introduction Safety Data/Trends W. Oren 5 Min. Hand Safety/Safety](https://reader038.vdocument.in/reader038/viewer/2022110304/551c1cfd550346b24f8b59d0/html5/thumbnails/50.jpg)
Refuse and Recycling
Dumpsters
Open Tuesday &Friday 9-10amFor additional access contact:
Refuse (Trash) – Mike Lewellen at Ext. 7169 or 7400Recyclables (Wood paper, cardboard, & plastic) – Mike Lewellen at Ext. 7169 or 7400Bulk Storage and Scrap Metals – Joan Holloway Ext 7348 or Lamont Williams Ext. 6270Hazard Waste – Jennifer Williams at Ext. 7882 or Bret Lewis at Ext. 6254Material Handling Equipment – Manny Nevarez Ext 7406 or Brandon Holland Ext. 7378
![Page 51: PRE-SAD SAFETY MEETING AGENDA CEBAF Center Auditorium Thursday, 12 Aug 2010 1:30 – 2:45 p.m. Introduction Safety Data/Trends W. Oren 5 Min. Hand Safety/Safety](https://reader038.vdocument.in/reader038/viewer/2022110304/551c1cfd550346b24f8b59d0/html5/thumbnails/51.jpg)
CEBAF Summer SAD Briefing
Randy MichaudDeputy Group Leader, Operability
August 12, 2010
![Page 52: PRE-SAD SAFETY MEETING AGENDA CEBAF Center Auditorium Thursday, 12 Aug 2010 1:30 – 2:45 p.m. Introduction Safety Data/Trends W. Oren 5 Min. Hand Safety/Safety](https://reader038.vdocument.in/reader038/viewer/2022110304/551c1cfd550346b24f8b59d0/html5/thumbnails/52.jpg)
Work Guidance• Walk the job with your work crew before starting.
Initial conditions may require reworking your plan
• Beware of Scope Creep – stop and reassess
• Report suspected or known damages to equipment
• Housekeeping? Clean up daily
• Update your ATLis tasks Use the Post information to elog feature
![Page 53: PRE-SAD SAFETY MEETING AGENDA CEBAF Center Auditorium Thursday, 12 Aug 2010 1:30 – 2:45 p.m. Introduction Safety Data/Trends W. Oren 5 Min. Hand Safety/Safety](https://reader038.vdocument.in/reader038/viewer/2022110304/551c1cfd550346b24f8b59d0/html5/thumbnails/53.jpg)
Make comments
Hit Submit & Log
Pick a logbook
Make your entry
The Comment goes to the LOGBOOK of your choice-AND-
becomes part of the ATLis task history!
![Page 54: PRE-SAD SAFETY MEETING AGENDA CEBAF Center Auditorium Thursday, 12 Aug 2010 1:30 – 2:45 p.m. Introduction Safety Data/Trends W. Oren 5 Min. Hand Safety/Safety](https://reader038.vdocument.in/reader038/viewer/2022110304/551c1cfd550346b24f8b59d0/html5/thumbnails/54.jpg)
Daily 0800 Meetings? Yes
ATLis Work Maps? Yes
Major Tasks?
![Page 55: PRE-SAD SAFETY MEETING AGENDA CEBAF Center Auditorium Thursday, 12 Aug 2010 1:30 – 2:45 p.m. Introduction Safety Data/Trends W. Oren 5 Min. Hand Safety/Safety](https://reader038.vdocument.in/reader038/viewer/2022110304/551c1cfd550346b24f8b59d0/html5/thumbnails/55.jpg)
SAD Starts 0800 Friday the 13th
Tunnel Access ~0930 (after Rad surveys)WArc Tunnel – LCW piping installation
Construction Area: Keep OutInjector Gun HV increased for Qweak run2L15 Cryomodule installation & commissioningHelium processingW1 CAMAC to VME conversionPenetration work in support of 12GeV projectMany power / air conditioner outagesPM? All SystemsPSS CertificationRecoveryRestorationHot Check OutPhysics Starts Monday September 27th
![Page 56: PRE-SAD SAFETY MEETING AGENDA CEBAF Center Auditorium Thursday, 12 Aug 2010 1:30 – 2:45 p.m. Introduction Safety Data/Trends W. Oren 5 Min. Hand Safety/Safety](https://reader038.vdocument.in/reader038/viewer/2022110304/551c1cfd550346b24f8b59d0/html5/thumbnails/56.jpg)
Cryomodule Installation 2L15
W1 CAMAC to VME Conversion
LCW Piping Installation
Power Outages
![Page 57: PRE-SAD SAFETY MEETING AGENDA CEBAF Center Auditorium Thursday, 12 Aug 2010 1:30 – 2:45 p.m. Introduction Safety Data/Trends W. Oren 5 Min. Hand Safety/Safety](https://reader038.vdocument.in/reader038/viewer/2022110304/551c1cfd550346b24f8b59d0/html5/thumbnails/57.jpg)
Reminder…
PSS CertificationSeptember 2-10
![Page 58: PRE-SAD SAFETY MEETING AGENDA CEBAF Center Auditorium Thursday, 12 Aug 2010 1:30 – 2:45 p.m. Introduction Safety Data/Trends W. Oren 5 Min. Hand Safety/Safety](https://reader038.vdocument.in/reader038/viewer/2022110304/551c1cfd550346b24f8b59d0/html5/thumbnails/58.jpg)
Find the SAD Calendar athttp://opsntsrv.acc.jlab.org/ops/Operability_Files/SAD_calendar/SAD_calendar.htmor from the link in the electronic logbook (elog)
![Page 59: PRE-SAD SAFETY MEETING AGENDA CEBAF Center Auditorium Thursday, 12 Aug 2010 1:30 – 2:45 p.m. Introduction Safety Data/Trends W. Oren 5 Min. Hand Safety/Safety](https://reader038.vdocument.in/reader038/viewer/2022110304/551c1cfd550346b24f8b59d0/html5/thumbnails/59.jpg)
Look out for each other…
WORK SAFE!CEBAF Summer’10 SAD
Questions?Comments?Concerns?
Steve Suhring x7670Randy Michaud x7416
![Page 60: PRE-SAD SAFETY MEETING AGENDA CEBAF Center Auditorium Thursday, 12 Aug 2010 1:30 – 2:45 p.m. Introduction Safety Data/Trends W. Oren 5 Min. Hand Safety/Safety](https://reader038.vdocument.in/reader038/viewer/2022110304/551c1cfd550346b24f8b59d0/html5/thumbnails/60.jpg)
Summer 2010Working in the Experimental Halls
Scheduled Accelerator Down
Environment, Health & Safety
Bert Manzlak
![Page 61: PRE-SAD SAFETY MEETING AGENDA CEBAF Center Auditorium Thursday, 12 Aug 2010 1:30 – 2:45 p.m. Introduction Safety Data/Trends W. Oren 5 Min. Hand Safety/Safety](https://reader038.vdocument.in/reader038/viewer/2022110304/551c1cfd550346b24f8b59d0/html5/thumbnails/61.jpg)
Prior to Working in the Experimental Halls
• Plan work in advance with the appropriate Hall Work Coordinator (ATLis, HAList, HBList, HCList)
• Supervisors shall conduct a Task Hazard Analysis
– outlined in the Jefferson Lab Environment Health and Safety Manual Chapter 3210 Work Planning, Controls and Authorization
• Supervisors must verify that they and the people they supervise have the required and up to date training
![Page 62: PRE-SAD SAFETY MEETING AGENDA CEBAF Center Auditorium Thursday, 12 Aug 2010 1:30 – 2:45 p.m. Introduction Safety Data/Trends W. Oren 5 Min. Hand Safety/Safety](https://reader038.vdocument.in/reader038/viewer/2022110304/551c1cfd550346b24f8b59d0/html5/thumbnails/62.jpg)
• Review information on Hall specific EH&S bulletin board, located at the entrance to the hall from the Counting House lower level / labyrinth
• Review specific work control documents and assess and gather necessary personal protective equipment
– Radiation Work Permits, Temporary Operational Safety Procedures, Standard Operational Procedures
– PPE examples: Hall B – hard hat required
Hall B and C: No open toed shoes/sandals
• Communicate with Hall specific Work Coordinator/Area Safety Warden (daily during a multiday task)
Prior to Working in the Experimental Halls (cont.)
![Page 63: PRE-SAD SAFETY MEETING AGENDA CEBAF Center Auditorium Thursday, 12 Aug 2010 1:30 – 2:45 p.m. Introduction Safety Data/Trends W. Oren 5 Min. Hand Safety/Safety](https://reader038.vdocument.in/reader038/viewer/2022110304/551c1cfd550346b24f8b59d0/html5/thumbnails/63.jpg)
Physics Division Experimental HallWork Coordinators and Area Safety Wardens
Extension
Hall AEd Folts
Jack Segal*
7857
7242
Hall BDoug Tilles
George Jacobs*
7857
7115
Hall CWalter Kellner
Andy Kenyon*
5512
7555
* Alternate
![Page 64: PRE-SAD SAFETY MEETING AGENDA CEBAF Center Auditorium Thursday, 12 Aug 2010 1:30 – 2:45 p.m. Introduction Safety Data/Trends W. Oren 5 Min. Hand Safety/Safety](https://reader038.vdocument.in/reader038/viewer/2022110304/551c1cfd550346b24f8b59d0/html5/thumbnails/64.jpg)
Minimum JLab EH&S Training for Working in the Experimental Halls
SAF 100 EH&S Orientation
SAF 801 Radiation Work I
SAF 103 Oxygen Deficiency Hazard
Plus Hall Specific EH&S Awareness
All four trainings required for unescorted access with exception: undergraduate students shall be escorted for their first three months.
Hall Training Contacts
SAF 110 Hall A J. LeRose [email protected]
SAF 111 Hall B A. Deur [email protected]
SAF 112 Hall C J. Beaufait [email protected]
![Page 65: PRE-SAD SAFETY MEETING AGENDA CEBAF Center Auditorium Thursday, 12 Aug 2010 1:30 – 2:45 p.m. Introduction Safety Data/Trends W. Oren 5 Min. Hand Safety/Safety](https://reader038.vdocument.in/reader038/viewer/2022110304/551c1cfd550346b24f8b59d0/html5/thumbnails/65.jpg)
If you have Environmental, Health, and/or Safety Questions, Issues/ Concerns in the Experimental Halls
• Contact your supervisor
• Contact area Safety Warden or Alternate
• Contact Physics Division
Ext.
Bert [email protected]
7556
Charles [email protected]
7608
Dennis [email protected]
7740
![Page 66: PRE-SAD SAFETY MEETING AGENDA CEBAF Center Auditorium Thursday, 12 Aug 2010 1:30 – 2:45 p.m. Introduction Safety Data/Trends W. Oren 5 Min. Hand Safety/Safety](https://reader038.vdocument.in/reader038/viewer/2022110304/551c1cfd550346b24f8b59d0/html5/thumbnails/66.jpg)
Major Activities Scheduled
Hall A: Install the Deeply Virtual Compton Scattering
(DVCS) E07-007 and E08-025 experiments
Hall B: • Repairs to CEBAF Large Acceptance
Spectrometer(CLAS) Drift Chambers • Remove the FROzen Spin Target (FROST) recently used in
the g9 run and consists of several experiments; E02-112, E03-105,E04-102, E05-012 and E06-013
• Repairs to Hall base equipment Time of Flight detectors
• Remove prototype Cherenkov detector photomultiplier tubes
![Page 67: PRE-SAD SAFETY MEETING AGENDA CEBAF Center Auditorium Thursday, 12 Aug 2010 1:30 – 2:45 p.m. Introduction Safety Data/Trends W. Oren 5 Min. Hand Safety/Safety](https://reader038.vdocument.in/reader038/viewer/2022110304/551c1cfd550346b24f8b59d0/html5/thumbnails/67.jpg)
Major Activities Scheduled (cont.)
Hall B (Cont.):
• Stack Two Photon Exchange (TPE) shielding
• Install the Primakoff Experiment II (PrimEX II) Experiment E-08-023 : An updated High Precision Measurement of the Neutral Pion Lifetime via the Primakoff
Effect
![Page 68: PRE-SAD SAFETY MEETING AGENDA CEBAF Center Auditorium Thursday, 12 Aug 2010 1:30 – 2:45 p.m. Introduction Safety Data/Trends W. Oren 5 Min. Hand Safety/Safety](https://reader038.vdocument.in/reader038/viewer/2022110304/551c1cfd550346b24f8b59d0/html5/thumbnails/68.jpg)
Major Activities Scheduled
Hall C:
• Continue Qweak work
Experiment E 08-016 Q-weak: A Precision Test of the Standard Model and Determination of the Weak Charges of the Quarks through Parity-Violating Electron Scattering
• Move 300 or more shielding blocks
• Start disassembly of hall’s base equipment Short Orbital Spectrometer (SOS)
![Page 69: PRE-SAD SAFETY MEETING AGENDA CEBAF Center Auditorium Thursday, 12 Aug 2010 1:30 – 2:45 p.m. Introduction Safety Data/Trends W. Oren 5 Min. Hand Safety/Safety](https://reader038.vdocument.in/reader038/viewer/2022110304/551c1cfd550346b24f8b59d0/html5/thumbnails/69.jpg)
Additional Information• Report injuries
– 911 and 4444– Minor injuries, contact Medical Services
• Cross Divisional work activities are entered in ATLis.
• Utilize the buddy system
• All under graduate students shall be escorted for at least the first three months
• Know where you are at all time and exit routes
![Page 70: PRE-SAD SAFETY MEETING AGENDA CEBAF Center Auditorium Thursday, 12 Aug 2010 1:30 – 2:45 p.m. Introduction Safety Data/Trends W. Oren 5 Min. Hand Safety/Safety](https://reader038.vdocument.in/reader038/viewer/2022110304/551c1cfd550346b24f8b59d0/html5/thumbnails/70.jpg)
Additional Information (cont.)• Pay close attention to signs, alarms, and awareness
indicators while entering and while in the halls
• Do not exploit ambiguities or loop holes in rules
• Err on safe side and help correct issues
• Use your site wide EH&S resources• Always remember … you are paid everyday and ever
so strongly encouraged to work safely here at Jefferson Lab … do your part … and when necessary … STOP and ask for guidance … do this without hesitation … or … fear of retribution of any kind
![Page 71: PRE-SAD SAFETY MEETING AGENDA CEBAF Center Auditorium Thursday, 12 Aug 2010 1:30 – 2:45 p.m. Introduction Safety Data/Trends W. Oren 5 Min. Hand Safety/Safety](https://reader038.vdocument.in/reader038/viewer/2022110304/551c1cfd550346b24f8b59d0/html5/thumbnails/71.jpg)
FEL ACTIVITIES DURING SAD
JAMES COLEMAN
![Page 72: PRE-SAD SAFETY MEETING AGENDA CEBAF Center Auditorium Thursday, 12 Aug 2010 1:30 – 2:45 p.m. Introduction Safety Data/Trends W. Oren 5 Min. Hand Safety/Safety](https://reader038.vdocument.in/reader038/viewer/2022110304/551c1cfd550346b24f8b59d0/html5/thumbnails/72.jpg)
5/21/10 -8/13/10 FEL has been in a installation
period except for 1 week in June.
8/16/10 Begin Restoration, Systems Hot Checkout
8/17/10-10/1/10 FEL Operations (day shift)
UV Bypass Commissioning
The Plan
![Page 73: PRE-SAD SAFETY MEETING AGENDA CEBAF Center Auditorium Thursday, 12 Aug 2010 1:30 – 2:45 p.m. Introduction Safety Data/Trends W. Oren 5 Min. Hand Safety/Safety](https://reader038.vdocument.in/reader038/viewer/2022110304/551c1cfd550346b24f8b59d0/html5/thumbnails/73.jpg)
Exceptions to the Plan
• Scheduled Down/Maintenance Days
8/24- 8/26, 9/6, 9/10
• Subject to the construction schedule, the availability of Cryo, and LCW
![Page 74: PRE-SAD SAFETY MEETING AGENDA CEBAF Center Auditorium Thursday, 12 Aug 2010 1:30 – 2:45 p.m. Introduction Safety Data/Trends W. Oren 5 Min. Hand Safety/Safety](https://reader038.vdocument.in/reader038/viewer/2022110304/551c1cfd550346b24f8b59d0/html5/thumbnails/74.jpg)
Key Points
• FEL will be in operations as much as possible
• FEL Ops meeting – Monday through Friday, 8:30 a.m.
• All planned maintenance activities along with installation activities must have an approved FEList before effort can begin.
• During operations, all work and visitors must check-in with the Duty Officer.
![Page 75: PRE-SAD SAFETY MEETING AGENDA CEBAF Center Auditorium Thursday, 12 Aug 2010 1:30 – 2:45 p.m. Introduction Safety Data/Trends W. Oren 5 Min. Hand Safety/Safety](https://reader038.vdocument.in/reader038/viewer/2022110304/551c1cfd550346b24f8b59d0/html5/thumbnails/75.jpg)
Exterior Machine Status Indicators
Radcon and ODH Beacon Locations
![Page 76: PRE-SAD SAFETY MEETING AGENDA CEBAF Center Auditorium Thursday, 12 Aug 2010 1:30 – 2:45 p.m. Introduction Safety Data/Trends W. Oren 5 Min. Hand Safety/Safety](https://reader038.vdocument.in/reader038/viewer/2022110304/551c1cfd550346b24f8b59d0/html5/thumbnails/76.jpg)
Interior Machine Status Indicators Status of FEL
Radiation Boundary while machine is in Beam Permit
![Page 77: PRE-SAD SAFETY MEETING AGENDA CEBAF Center Auditorium Thursday, 12 Aug 2010 1:30 – 2:45 p.m. Introduction Safety Data/Trends W. Oren 5 Min. Hand Safety/Safety](https://reader038.vdocument.in/reader038/viewer/2022110304/551c1cfd550346b24f8b59d0/html5/thumbnails/77.jpg)
FEL Specific Hazard Awareness
FEL Facility Safety Awareness Document
![Page 78: PRE-SAD SAFETY MEETING AGENDA CEBAF Center Auditorium Thursday, 12 Aug 2010 1:30 – 2:45 p.m. Introduction Safety Data/Trends W. Oren 5 Min. Hand Safety/Safety](https://reader038.vdocument.in/reader038/viewer/2022110304/551c1cfd550346b24f8b59d0/html5/thumbnails/78.jpg)
User Lab Laser StatusUser Lab Status
ODH Beacon
User Lab ‘CRASH’ Switch
User Lab Entry Status
![Page 79: PRE-SAD SAFETY MEETING AGENDA CEBAF Center Auditorium Thursday, 12 Aug 2010 1:30 – 2:45 p.m. Introduction Safety Data/Trends W. Oren 5 Min. Hand Safety/Safety](https://reader038.vdocument.in/reader038/viewer/2022110304/551c1cfd550346b24f8b59d0/html5/thumbnails/79.jpg)
General Hazard Awareness
![Page 80: PRE-SAD SAFETY MEETING AGENDA CEBAF Center Auditorium Thursday, 12 Aug 2010 1:30 – 2:45 p.m. Introduction Safety Data/Trends W. Oren 5 Min. Hand Safety/Safety](https://reader038.vdocument.in/reader038/viewer/2022110304/551c1cfd550346b24f8b59d0/html5/thumbnails/80.jpg)
Bio- Hazard Awareness
Hazard
![Page 81: PRE-SAD SAFETY MEETING AGENDA CEBAF Center Auditorium Thursday, 12 Aug 2010 1:30 – 2:45 p.m. Introduction Safety Data/Trends W. Oren 5 Min. Hand Safety/Safety](https://reader038.vdocument.in/reader038/viewer/2022110304/551c1cfd550346b24f8b59d0/html5/thumbnails/81.jpg)
FEL Division Information
G. Neil A.D. 876-1775 (cell phone)
G. WilliamsDeputy AD
DSO7552
R. LeggOperations Coordinator 6133
J. Gubeli Laser Systems 7862
J. Coleman Accel. Systems 7312
J. Kortze Safety Warden 7468
M. Klopf User Lab Liaison 7534