Prepare Rcc Columns Vigyan Ashram, Pabal
![Page 2: Prepare rcc columns](https://reader034.vdocument.in/reader034/viewer/2022050920/54c88c2e4a7959cf7d8b456d/html5/thumbnails/2.jpg)
Use of material -
Cement Sand
gravel
WaterWooden plates
![Page 3: Prepare rcc columns](https://reader034.vdocument.in/reader034/viewer/2022050920/54c88c2e4a7959cf7d8b456d/html5/thumbnails/3.jpg)
8mm torshan bar(Tor iron bar) 6mm bar
interval of 1 “Binding tar
![Page 4: Prepare rcc columns](https://reader034.vdocument.in/reader034/viewer/2022050920/54c88c2e4a7959cf7d8b456d/html5/thumbnails/4.jpg)
Use of equipment & tools -
Khore
Palm bob Right angle
Claw hammer
Ghamela
![Page 5: Prepare rcc columns](https://reader034.vdocument.in/reader034/viewer/2022050920/54c88c2e4a7959cf7d8b456d/html5/thumbnails/5.jpg)
Gunny bag clothMeasuring tape
Trowels Hacksaw
Pliers
![Page 6: Prepare rcc columns](https://reader034.vdocument.in/reader034/viewer/2022050920/54c88c2e4a7959cf7d8b456d/html5/thumbnails/6.jpg)
Procedure :
3000 mm
600 mm
![Page 7: Prepare rcc columns](https://reader034.vdocument.in/reader034/viewer/2022050920/54c88c2e4a7959cf7d8b456d/html5/thumbnails/7.jpg)
150 x150 mm
Binding with Wires
![Page 8: Prepare rcc columns](https://reader034.vdocument.in/reader034/viewer/2022050920/54c88c2e4a7959cf7d8b456d/html5/thumbnails/8.jpg)
![Page 9: Prepare rcc columns](https://reader034.vdocument.in/reader034/viewer/2022050920/54c88c2e4a7959cf7d8b456d/html5/thumbnails/9.jpg)
![Page 10: Prepare rcc columns](https://reader034.vdocument.in/reader034/viewer/2022050920/54c88c2e4a7959cf7d8b456d/html5/thumbnails/10.jpg)
3000x150x150 mm
![Page 11: Prepare rcc columns](https://reader034.vdocument.in/reader034/viewer/2022050920/54c88c2e4a7959cf7d8b456d/html5/thumbnails/11.jpg)
6 mm ring frame
Welding machineHacksaw ra^D
saaMgaaDa saacaa 8mm torshan bar Rod size ra^D saaMgaaDa ra^D saaMgaaDa
Cutting Welding zovaNao
R.C.C. column
Taklao
saacaa
curing R.C.C. column
kaZNao
R.C.C. column
R.C.C. column
curing
Wet Gunny bag cloth 2 hrs.water Concrete
water
kaorDo imaEaNa
Cement
Sand
gravel
Flow Chart -
![Page 12: Prepare rcc columns](https://reader034.vdocument.in/reader034/viewer/2022050920/54c88c2e4a7959cf7d8b456d/html5/thumbnails/12.jpg)
Precautions : 1. Tor iron bar should be 10-15 cm. long than
column height.2. Square frame should be joined at an interval of
25mm. (1”)3. Square frame must be rectangular and must
be connected from outside of all 4 rod.4. Make all concrete required in one batch.5. Put some concrete in mould (wooden plates
connected in right angles to each other ).6. Weight for at least 2 hrs. start curing .