PERU:INVESTMENT
OPPORTUNITIES
PORTFOLIO
2018-2020
50 PROJECTS
Estimated investment:
USD 11.15 billion*
*It does not include projects whose amounts have
not yet been determined.
Telecommunications 3%USD 359
Education 3%USD 329
Transport 40%USD 4,432Salaverryawarded
Irrigation 4%USD 399
Energy 8%USD 920
Water and sanitation 9%USD 1,096
Health 10%USD 1,122
Mining 23%USD 2,500
Michiquillay awarded
50
CHALLENGES 201818 PROJECTS - USD 3,841 Million
*Amount to be determined.
TRANSPORT
AMOUNT: USD 229 M
MINING
AMOUNT: USD2,500 M
o Salaverry’s Port Terminal - Awarded
o Áncash, Arequipa, Huánuco, La Libertad,
Pasco and San Martín broadband
o Titicaca WWTP
o Michiquillay Mining Project - Awarded
o Colca Mining Project*
o Jalaoca Mining Project*
o Massive Use of Natural Gas
o Carabayllo transmission line
o Trujillo Substation Compensator
ENERGY
AMOUNT: USD 490 M
TELECOMMUNICATIONS
AMOUNT: USD 359 M
WATER AND SANITATION
AMOUNT: USD 263 M
Project Portfolio2
CHALLENGES 2019 - 202032 PROJECTS - USD 7,315 Million
TRANSPORT
AMOUNT: USD 4,203 M
o Huancayo – Huancavelica Railway
o Marcona’s Port Terminal
o Chimbote’s Port Terminal
o Peripheral Ring Road
o New road concessions
o Water Reinforcement of Ica
o Main Works
o Huancayo, Tambo and Chilca WWTP
o Puerto Maldonado WWTP
WATER AND SANITATION
AMOUNT: USD 832 M
EDUCATION
AMOUNT: USD 329 M
IRRIGATION
AMOUNT: USD 399 M
Project Portfolio2
*Amount to be determined.
o Integrated Gas Transport
System – South of the Country*
o Other projects
ENERGY
AMOUNT: USD 430 M
o Tingo María - Aguaytía 220 kV Link
o La Niña - Piura 500 kV Link
o Pariñas - Nueva Tumbes 220 kV Link
HEALTH
AMOUNT: USD 1,122 M
o ESSALUD Chimbote
o ESSALUD Piura
o Other projects
o Schools at risk (CER, by its Spanish initials)
o High-performance schools (COAR, by its Spanish initials)
o Other projects
LONGITUDINAL SIERRA HIGHWAY. SECTION 4
Objective: To provide for improvement and rehabilitation works (117 km), initial
periodic maintenance (503 km) and maintenance and operation of approximately
970 km of the Longitudinal Sierra Highway, a major national road connecting 12
departments across the entire Andes
Responsible body: Ministry of Transport and Communications
Modality: Co-financed government initiative
Investment amount (w/o. VAT): USD 464 million
Concession term: 25 years
Area of influence: Junín, Huancavelica, Ayacucho, Apurímac and Ica
Estimated award date: 1st Semester 2019
HUANCAYO – HUANCAVELICARAILWAY
Objective: Comprehensive rehabilitation of the Huancayo-Huancavelica railroad
comprises the design, finance, works execution, acquisition of rolling materials,
operation and maintenance
Responsible body: Ministry of Transport and Communications
Modality: Co-financed government initiative
Investment amount (w/o. VAT): USD 235 million
Concession term: 30 years
Area of influence: Junín and Huancavelica
Maximum date to present qualification credentials: January 2019
Estimated award date: 1st Semester 2019
For futher information: www.proinversion.gob.pe/fhh
NEW PORT TERMINAL OFSAN JUAN DE MARCONA
Objective: Design, finance, build, operate and maintain and new port terminal of
public use, providing specialize services of storage and load of concentrates of iron
and copper, as well as the supplies of mining production
Responsible body: Ministry of Transport and Communications - National Port
Authority
Modality: Self-financed unsolicited proposal
Investment amount (w/o. VAT): USD 582 million
Concession term: 30 years
Area of influence : Regions of Ica, Ayacucho, north area of Arequipa, Apurímac
and Cusco
Estimated award date: 2nd Semester 2019
INTERNATIONAL NORTH HIGHWAY Objective: To develop road infrastructure that includes the concession of the North
Pan-American Highway Sullana - Tumbes - La Paz International Bridge Detour
Sector, as well as the granting of a concession for the design, construction, operation
and maintenance of the road connecting the cities of Sullana, Talara, Los Órganos,
Máncora, Zorritos, Tumbes, Zarumilla up to the La Paz International Bridge
Responsible body: Ministry of Transport and Communications
Modality: Co-financed Unsolicited Proposal
Investment amount (w/o VAT): USD 763 million
Concession term: 25 years
Area of Influence: Tumbes and Piura
Estimated award date: To be defined
PERIPHERAL RING ROAD Objective: To build a 33.2 km long beltway from “200 miles Circle” to
“Circunvalación Avenue”
Responsible body: Ministry of Transport and Communications
Modality: Co-financed Unsolicited Proposal
Investment amount (w/o. VAT): USD 2 049 million
Concession term: 30 years
Area of influence: Lima and Callao
Estimated award date: To be defined
BROAD BAND FOR THE COMPREHENSIVE CONNECTIVITY AND SOCIAL DEVELOPMENT IN ÁNCASH, AREQUIPA, HUÁNUCO, LA LIBERTAD, PASCO AND SAN MARTIN
Objective: To increase access to telecommunications services, through:
(i) the expansion of broadband carrier networks to district capitals, and (ii)
providing access networks to services for the benefit of 2, 007 rural areas
Responsible body: Ministry of Transport and Communications/FITEL
Modality: Asset transfer project
Investment amount (w/o. VAT): USD 359 million
Concession term: 12 years
Area of influence: Ancash, Arequipa, Huánuco, La Libertad, Pasco and San
Martín
Estimated award date: 2nd Semester 2018
COLCA MINING PROJECT Objective: Deposit of a copper - gold porphyry project spanning 14,100 hectares.
Two important mineralized zones have been identified, surrounded by other
important properties with clear mining potential. Further drilling would define the
deposit’s potential and size.
Responsible body: Ministry of Energy and Mines
Modality: Asset transfer project
Investment amount (w/o. VAT): To be determined
Concession term: To be determined
Area of influence: Apurímac department and Cusco
Maximum date to present qualification credentials: August 2018
Estimated award date: 2nd Semester 2018
For further information www.proinversion.gob.pe/mineras
JALAOCA MINING PROJECT Objective: Cu-Au porphyry-skarn and Cu-Mo porphyry deposit. Mining area covering
a surface area of 6400 hectares. Four important mineralized zones have been
identified. The potential and size of the deposit will be defined with drilling works
Responsible body: Ministry of Energy and Mines
Modality: Asset transfer project
Investment amount (w/o. VAT): To be determined
Concession term: To be determined
Area of influence: Apurímac department
Maximum date to present qualification credentials: June 2018
Estimated award date: 2nd Semester 2018
For further information www.proinversion.gob.pe/mineras
REPOWERING TO 1000 MVA OF THE CARABAYLLO - CHIMBOTE - TRUJILLO 500 KV TL AND VARIABLE REACTIVE COMPENSATOR (SVC OR SIMILAR) +400/-150 MVAR IN 500 KV TRUJILLO SUBSTATION
Objective: The project consists of the design, financing, construction, operation
and maintenance of a repowering of a 500 kV transmission line section in the mid
north of the country and a Variable Reactive compensation equipment at the Trujillo
substation. These investments will reinforce the transmission system in 500 kV of
the National Interconnected Electric System (SEIN, by its Spanish initials)
Responsible body: Ministry of Energy and Mines
Modality: Self-Financed government initiative
Investment amount (w/o VAT): USD 90 million
Concession term : 30 years plus the construction period (33 months)
Area of influence: Lima, Ancash and La Libertad
Estimated award date: 2nd Semester 2018
LA NIÑA – PIURA 500 KV LINK, SUBSTATIONS, LINES AND ASSOCIATED EXTENSIONS
Objective: The project is configured with a 500 kV transmission line that
connects La Niña substation with the future Piura Nueva substation with an
approximate length of 87 km. A new substation called Piura Nueva will be
constructed. In order to reinforce the transmission systems in 220 kV, the new
substation will be equipped with transforming equipment in 220 kV
Responsible body: Ministry of Energy and Mines
Modality: Self-financed government initiative
Investment amount (w/o VAT): USD 132 million
Concession term : To be determined
Area of influence: Piura
Estimated award date: 1st Semester 2019
PARIÑAS - NUEVA TUMBES 220 KV LINK, SUBSTATIONS, LINES AND ASSOCIATED EXTENSIONS
Objective: The project envisages the construction of the following infrastructure:
• Transmission line in 220 kV Pariñas - Nueva Tumbes (158 km in
single-circuit line)
• Branching of transmission line in220 kV L-2280-Nueva Tumbes
• Nueva Tumbes substation
• Extension of a cell in Pariñas substation for the exit to the Nueva
Tumbes substation
Responsible body: Ministry of Energy and Mines
Modality: Self-financed government initiative
Investment amount (w/o VAT): USD 47.3 million
Concession term : To be determined
Area of Influence: Tumbes
Estimated award date: 1st Semester 2019
TINGO MARÍA – AGUAYTÍA 220 KV LINK, SUBSTATIONS, LINES AND ASSOCIATED EXTENSIONS
Objective: The 220 kV transmission line Tingo María Nueva – Aguaytía
(73 km) begins in the projected Tingo María Nueva substation, located in the
District of Rupa-Rupa, Province of Leoncio Prado, Department of Huánuco and
reaches the Aguaytía Substation, property of Aguaytía Energy, located in the
District of Aguaytía, Province of Padre Abad, Department of Ucayali. These
investment will reinforce the transmission system in the eastern area of the
country
Responsible body: Ministry of Energy and Mines
Modality: Self-financed government initiative
Investment amount (w/o VAT): USD 20.4 million
Concession term : To be determined
Area of influence: Huánuco and Ucayali
Estimated award date: 1st Semester 2019
NUEVA CARHUAQUERO 220 KW SUBSTATION, CHINCHA NUEVA 220/60 KW SUBSTATION, NAZCA NUEVA 220/60 KW SUBSTATION, AND VARIABLE REACTIVE COMPENSATOR (SCV OR SIMILAR) + 400 / -100 MVAR AT THE SAN JUAN 220 KW SUBSTATION.
Objective: The purpose of the projects is to grant the concession for the
design, financing, construction, operation and maintenance of Substations
(Switchyard) that will facilitate the maneuvers of the lines in the Chiclayo and
Cajamarca area in the north of the country and Ica; as well as allowing greater
reliability in the energy supply in the department of Lima
Responsible body: Ministry of Energy and Mines
Modality: Self-financed government initiative
Investment amount (w/o VAT): USD 66.02 million
Concession term : To be determined
Area of influence: Cajamarca, Lambayeque, Lima and Ica
Estimated award date: 1st Semester 2019
500 KV PIURA NUEVA - FRONTERASUBSTATION TRANSMISSION LINE
Objective: The Comprehensive Peru-Ecuador Interconnection Project includes
the construction of a 500 kW Transmission Line that will link the Chorrillos
Substation in Ecuador with the La Niña Substation in Peru (The Line). The Line
includes the construction of two new midway substations: Pasaje Substation in
Ecuador and Piura Nueva Substation in Peru.
Responsible body: Ministry of Energy and Mines
Modality: Co-financed government initiative
Investment amount (w/o VAT): USD 144 million
Concession term : To be determined
Area of influence: Tumbes and Piura
Estimated award date: 2nd Semester 2019
MODERNIZATION OF ELECTRONOROESTE S.A., THE REGIONAL ELECTRICITY PUBLIC SERVICE COMPANY .
Objective: Management revamping of ELECTRONOROESTE S.A., through
the acquisition of new shares in order to provide a better service to customers
in its area of influence. ELECTRONOROESTE S.A. is the company in charge
of the distribution and commercialization of electric energy within the area of its
concessions in the regions of Piura and Tumbes. Servicing over 405,586
clients.
Responsible body: Ministry of Energy and Mines
Modality: Unsolicited Proposal – Asset transfer project and / or under the
framework of D. Leg. 674
Investment amount (w/o VAT): To be determined
Area of influence: Tumbes and Piura
Estimated award date: 2nd Semester 2019
NEW LA PLANICIE SUBSTATION Objective: The New Substation Project La Planicie is intended to satisfy the
electricity demand of the urban area of the city of Lima, providing greater safety
to the energy supply.
Responsible body: Ministry of Energy and Mines
Modality: Self-financed government initiative
Investment amount (w/o VAT): USD 20 million
Concession term : To be determined
Area of influence: Lima
Estimated award date: To be defined
MASSIVE USE OF NATURAL GAS. CENTRAL AND SOUTHERN PERU
Objective: To design, finance, build, operate and maintain natural gas
distribution pipeline networks in seven (7) regions of Peru´s Center and South,
and their transfer to the Peruvian State at the end of the concession period
Responsible body: Ministry of Energy and Mines
Modality: Self-financed government initiative
Investment amount (w/o VAT): USD 400 million
Concession term: 32 years
Area of Influence: Ucayali, Junín, Huancavelica, Ayacucho, Apurímac,
Cusco and Puno
Estimated award date: 2nd Semester 2018
INTEGRATED GAS TRANSPORT SYSTEM SOUTHERN AREA OF THE COUNTRY
Objective: The project comprises the development of an infrastructure to transport
natural gas and liquids of natural gas, which will have as its starting point Cusco
(Malvinas), and will pass through the regions of Arequipa and Moquegua, which is
part of the energy policy of the sector that will contribute to the development of the
country.
Responsible body: Ministry of Energy and Mines
Modality: Co-financed government initiative
Investment amount (w/o VAT): To be established
Area of influence: Southern Peru
Estimated award date: 2nd Semester of 2020
WASTEWATER TREATMENT SYSTEM. LAKE TITICACA BASIN
Objective: To design a solution for the treatment and final disposal of municipal
wastewater in the Lake Titicaca basin, in Puno.
Responsible body: Ministry of Housing, Construction and Sanitation
Modality: Co-financed unsolicited proposal
Investment amount (w/o VAT): USD 263 million
Concession term: 30 years
Area of influence: Puno
Estimated award date: 2nd Semester of 2018
For further information www.proinversion.gob.pe/titicaca
HEADWATERS AND PIPELINE WORKS FOR LIMA´S POTABLE WATER SUPPLY
Objective: Design, financing, construction, operation and maintenance of the following new works:
o Expansion of Pomacocha and Huallacocha
Bajo dams (approx. 90 MMC);
o Trans-Andean tunnel (10 km);
o Potable water plant Huachipa II (5 m3/s);
o Complementary reservoirs (137 000 m3)
o South Branch (40 km) including
7 reservoirs
Responsible body: Ministry of Housing, Construction and Sanitation
Modality: Self-financed government initiative
Estimated investment: USD 720 million
Concession term: 30 years
Area of influence: Junín and Lima
Estimated award date: 1st Semester of 2019
o Interconnections lines (90km)
o O&M of the existing following works:
o Huachipa Intake
o Huachipa Plant (5m3/s)
o North Branch (27 km)
including 4 reservoirs
PUERTO MALDONADO WASTEWATER TREATMENT PLANT
Objective: Financing, construction, operation and maintenance of:
i) WWTP Chapajal of 234,71 L/s type RAFA + trickling filters
ii) Installation of 9 primary wastewater pipes
iii) Construction of 6 pumping chambers with their corresponding supply line
iv) Effluents will be discharged into Tambopata river
Responsible body: Ministry of Housing, Construction and Sanitation
Modality: Co-financed government initiative
Investment amount (w/o. VAT): USD 22.5 million
Concession term: To be determined
Area of influence: The city of Puerto Maldonado, District and Province of
Tambopata located in the Region of Madre de Dios.
Estimated award date: 2nd Semester of 2019
WASTEWATER TREATMENT PLANT OF HUANCAYO, EL TAMBO AND CHILCA
Objective: To propose a new layout of 6 collectors, the construction of 4
wastewater pumping stations and a 80 700 m3/H wastewater treatment plant
(WWTP) with an average flow of reused water. It will provide a proper wastewater
treatment through bacterial beds, meeting the requirements set forth in the current
regulations
Responsible body: Ministry of Housing, Construction and Sanitation
Modality: Co-financed Unsolicited Proposal
Investment Amount (w/o VAT): USD 90 million
Concession term: To be determined
Area of influence: Junín
Estimated award date: 1st Semester of 2019
Objective: The projects consist of the design, construction, equipment,
operation and maintenance of supplementary services (gray coats) of Highly
Specialized Hospitals for the Social Security System of Peru (ESSALUD); one
will be located in the department of Piura and the other in Ancash
Responsible body: ESSALUD
Modality: Co-financed government initiative
Investment Amount (w/o VAT): USD 254 million
Concession term: 17 years (operation and maintenance)
Area of influence: Piura and Chimbote
Estimated award date: 2nd Semester 2019
TWO NEW HIGH COMPLEXITY HOSPITAL (ESSALUD)
Objective: Private initiative to provide collection services, transportation,
treatment and disposal of hospital solid waste from the health facilities of the
MINSA in Lima Metropolitana (375 health facilities of which 352 are category I,
5 category II and 18 category III ). It includes the construction, operation and
maintenance of facilities for the treatment of bio-contaminated and special
solid waste.
Responsible body: Ministry of Health
Modality: Co-financed Unsolicited Proposal
Investment Amount (w/o VAT): USD 36 million
Concession term: 20 years
Area of influence: Lima Metropolitana
Estimated award date: 2nd Semester 2019
SOLID HOSPITAL WASTE MANAGEMENT. MINISTRY OF HEALTH
Objective: The project consists in improving the provision of health services of
the Hipolito Unanue National Hospital, located in the district of El Agustino
(Lima), for this the project proposes the construction of a new hospital and the
integral equipment, as well as the maintenance and the operation of general
services (non-hospital – gray coats).
Responsible body: Ministry of Health
Modality: Co-financed Unsolicited Proposal
Investment Amount (w/o VAT): USD 250.20 million
Concession term: 18 years (includes period of construction, equipment,
operation and maintenance –gray coats)
Area of influence: Lima Metropolitana
Estimated award date: 1st Semester 2020
HIPÓLITO UNANUE NATIONAL HOSPITAL
Objective: The project consists of improving the provision of health services at
Hospital of Huaycan, located in the district of Ate Vitarte (Lima), for which the
project proposes the construction of a new hospital and the intervention in
health facilities of the first level of health. attention and integral equipment, as
well as maintenance and operation of general services (non-hospital – gray
coats).
Responsible body: Ministry of Health
Modality: Co-financed Unsolicited Proposal
Investment Amount (w/o VAT): USD 119.60 million
Concession term: 20 years (includes period of construction, equipment,
operation and maintenance – gray coats)
Area of influence: Lima Metropolitana
Estimated award date: 1st Semester 2020
HUAYCÁN HOSPITAL
Objective: The Project is aimed at closing the infrastructure gap and the
population access gap to specialized health services, through the
construction and integral equipment as well as the maintenance and
operation of the general services of a new hospital of high complexity located
in the district of Piura and the improvement of the hospital located in Sullana.
Responsible body: Regional Government of Piura
Modality: Co-financed Unsolicited Proposal
Investment Amount (w/o VAT): USD 160 million
Concession term: 25 years (includes period of construction, equipment,
operation and maintenance – gray coats)
Area of influence: Piura
Estimated award date: 2nd Semester 2019
SPECIALIZED HEALTH SERVICES IN PIURA DISTRICT HOSPITAL. RESIZING OF HEALTH SERVICES AT SULLANA LEVEL III SUPPORT HOSPITAL
Objective: The Project contemplates the design and construction of a new
hospital and the integral equipment, as well as the maintenance and operation
of the general services (non-hospital – gray coats).
Responsible body: Ministry of Health
Modality: Co-financed Unsolicited Proposal
Investment Amount (w/o VAT): USD 186 million
Concession term: 18 years (includes period of construction, equipment,
operation and maintenance)
Area of influence: Lima Metropolitana
Estimated award date: 1st Semester 2020
CAYETANOHEREDIA HOSPITAL
Objective: The Project consists of designing, building, maintaining and
operating the Central Military Hospital; and arises due to the need for
members of the Army to have a state-of-the-art hospital considering the most
innovative topics in certifications such as LEED 2009, leadership in energy
and sustainable design.
Responsible body: Ministry of Defense
Modality: Co-financed Unsolicited Proposal
Investment Amount (w/o VAT): USD 116 million
Concession term: 30 years (includes period of construction, equipment,
operation and maintenance –gray coats)
Area of influence: Lima
Estimated award date: 2nd Semester 2020
NEW ARMY HOSPITAL
Objective: Concession for the construction, equipment, operation of
complementary services and maintenance of infrastructure, furniture and
equipment of 14 educational institutions.
Responsible body: Ministry of Education
Modality: Co-financed Unsolicited Proposal
Investment Amount (w/o VAT): USD 85 million
Concession term: 25 years
Area of influence: Districts of Ate and San Juan de Lurigancho in Lima
Estimated award date: 1st Semester 2020
SCHOOL FACILITIES AT RISK: ATE
- SAN JUAN DE LURIGANCHO
Objective: Concession for the construction, equipment, operation of
complementary services and maintenance of infrastructure, furniture and
equipment of 9 educational institutions.
Responsible body: Ministry of Education
Modality: Co-financed Unsolicited Proposal
Investment Amount (w/o VAT): USD 60.84 million
Concession term: 25 years
Area of influence: Districts of Comas and San Martin de Porres in Lima
Estimated award date: 1st Semester 2020
SCHOOL FACILITIES AT RISK:
COMAS – SAN MARTÍN DE
PORRES
Objective: Concession for the construction, equipment, operation of
complementary services and maintenance of infrastructure, furniture and
equipment of 5 educational institutions.
Responsible body: Ministry of Education
Modality: Co-financed Unsolicited Proposal
Investment Amount (w/o VAT): USD 17 million
Concession term: 19 years
Area of influence: District of Villa María del Triunfo in Lima
Estimated award date: 1st Semester 2020
SCHOOL FACILITIES AT RISK :
VILLA MARÍA DEL TRIUNFO
Objective: Concession for the construction, equipment, operation of
complementary services and maintenance of infrastructure, furniture and
equipment of 13 educational institutions.
Responsible body: Ministry of Education
Modality: Co-financed Unsolicited Proposal
Investment Amount (w/o VAT): USD 80 million
Concession term: 20 years
Area of influence: Districts of Villa El Salvador and San Juan de Miraflores in
Lima
Estimated award date: 1st Semester 2020
SCHOOL FACILITIES AT RISK :
LIMA METROPOLITANA
Objective: 21-year concession for the construction, implementation,
maintenance and operation of 4 high-performance schools (COAR) in the regions
of Junín, Pasco, Huancavelica and Cusco.
Responsible body: Ministry of Education
Modality: Co-financed Unsolicited Proposal
Investment Amount (w/o VAT): USD 86 million
Concession term: 21 years
Area of influence: Junin, Pasco, Huancavelica and Cusco.
Estimated award date: 1st Semester 2020
HIGH-PERFORMANCE SCHOOLS :
CENTER REGION
Objective: Concession for a period of 20 years, including building a dam on the
Carhuancho River, the Carhuancho-Choclococha canal, a dam on the Ica River,
and the Pisco-Pampas River to Villacurí diversion to irrigate the Ica Valley, and
the Lanchas and Villacurí pampas.
Responsible body: Ministry of Agriculture
Modality: Co-financed Unsolicited Proposal
Investment Amount (w/o VAT): USD 399 million
Area of influence: Ica
Estimated award date: 1st Semester 2020
WATERWORKS. ICA VALLEY