• Based on bilateral governmental negotiations between Moldova and Germany, November 2009
• Duration - 6 years: 1/2010 – 12/2015
• Main institutional counterparts: Ministry of Regional Development and Construction and Regional Development Agencies
• German contribution: EUR 17.9 million• Technical assistance – EUR 10.6 million• German Support for Investment – EUR 7.3 million
• Co-financing from Romanian Government – EUR 0.7 million• Co-financing from Swedish Government – EUR 5.5 million• Co-financing from European Union – EUR 5.0 million
Modernization of local public services in the Republic of Moldova
Pagina 3
• Improvement of local public services in the Republic of Moldova through support to regional
and local actors in adjusting local needs to regional and national priorities.
The overall goal of the project
Pagina 4
Intervention Area 1 – Local Public Services
Progress 1 June – 30 September 2014Priorities for 1 October – 31 December 2014
Modernization of local public services in the Republic of Moldova
Chişinău, 22 October 2014
Pagina 5
• Planned activities lead to achieving the Result of
Intervention Area 1:
Local Public Authorities effectively cooperate and manage improvements of local public services (water supply and sanitation, solid waste management and energy efficiency of public buildings) in the selected
communities in pilot Rayons.
Basic Assumption
Pagina 7
Efficient Local Public
Services
Support Model
A ComprehensiveApproach
… for enhancedsustainability
Efficient LocalPublic
Services
1. Integrated local
planning and programming
2. Improvement of cooperationbetween LPAs
3. Investmentsto optimize
infrastructure to provide
localpublic
services
4. Increasingcapacities of
LPAs and service
providers
5. Mobilization andawareness raising of the population
Pagina 8
Improvement of WSS services in Riscani Rayon
Improvement of WSS services in Cahul Rayon
Improvement of WSS services in Leova Rayon
Energy Efficiency of public buildings, Orhei rayon, Orhei Regional Hospital
Energy Efficient Street Lighting in Soroca Rayon
Improvement of Solid Waste Management services in Soldanesti,
Rezina and Floresti Rayons
Energy Efficiency of public buildings, Nisporeni rayon, Nisporeni Regional
Hospital
Harta sursă: MDRC
Pagina 9
Local planning and programming
Inter-municipal cooperation
InvestmentCapacity building
Community mobilization
0
5
10Situation by 30 Sep-tember 2014
WSS Cahul
Pagina 11
Local planning and programming
Inter-municipal cooperation
InvestmentCapacity building
Community mobilization
0
5
10Situation by 30 September 2014
WSS Riscani
Pagina 13
Local planning and programming
Inter-municipal cooperation
InvestmentCapacity building
Community mobilization
0
5
10
Situation by 30 Sep-tember 2014
WSS Leova
Pagina 15
Local planning and programming
Intercommunity cooperation
InvestmentCapacity development
Community mobilization
0
5
10
Situation by Sep-tember 30, 2014
SWM Soldanesti, Rezina
Pagina 17
Local planning and programming
Inter-municipal cooperation
InvestmentCapacity building
Community mobilization
0
5
10Situation by 30 September 2014
SWM Floresti
Pagina 19
Local planning and programming
Inter-municipal cooperation
InvestmentCapacity building
Community mobilization
0
5
10
Situation by 30 September 2014
EE Tatarauca Veche
Pagina 21
Local planning and programming
Inter-municipal cooperation
InvestmentCapacity building
Community mobilization
0
5
10
Situation by 30 Sep-tember 2014
EE Orhei
Pagina 23
Local planning and programming
Inter-municipal cooperation
InvestmentCapacity building
Community mobilization
0
5
10
Situation by 30 Sep-tember 2014
EE Nisporeni
Pagina 25
Overview of progress achieved within pilot projects in IA1 1 June to 30 September 2014
Progress level
July 1 - September 30
Estimating implementation level in % (2010-2015) 85% 25% 40% 45% 60%
WSS Progress level
Riscani July 1 - September 30
Estimating implementation level in % (2010-2015) 60% 10% 53% 35% 45%Progress level
July 1 - September 30
Estimating implementation level in % (2010-2015) 20% 0% 0% 0% 0%Progress level
July 1 - September 30
Estimating implementation level in % (2010-2015) 80% 80% 75% 60% 35%Progress level
July 1 - September 30
Estimating implementation level in % (2010-2015) 5% 80% 45% 35% 40%
4 4
N/A
3
WSS Leova3 N/A N/A N/A
2
3 2SWM Floresti
3
SWM Soldanesti and Rezina
3 3 3
3 3 2 3 2
CM
WSS Cahul3 2 2 3 3
Intervention Area/IA 1 Pilot Projects
LPP IMC INVM CB
Pagina 26
Overview of progress achieved in pilot projects of the IA1 1 June to 30 September 2014
Progress level
July 1 – September 30Estimating implementation
level in % (2010-2015) 35% 60% 100% 80% 90% 73%Progress level
July 1 – September 30Estimating implementation
level in % (2010-2015) 10% N/A 45% 75% 25% 39%Progress level
July 1 – September 30Estimating implementation
level in % (2010-2015) 0% N/A 25% 0% 0% 25%Progress level
July 1 – September 30
Estimating implementation level in % (2010-2015) 37% 43% 48% 41% 37% 44%
EE TataraucaVeche
3 3 4 3
2 3
EE Nisporeni
EE Orhei2 N/A 2 3 2
TOTAL3 3 3 3
N/A N/A 2 N/A N/A N/A
2
3 3
CM TotalIntervention Area/Pilot Projects IA 1
LPP IMC INVM CB
Pagina 27
• Signing MoU to implement GIS projects.
• Providing support to RDAs in implementing GIS projects under the 5 elements.
• Organizing workshops with partners to develop the work plan for 2015.
• Launching and organizing public procurement in all pilot projects.
Priorities for October – December 2014
Pagina 28
• Transfer and consolidation of ownership of local and regional partners to implement pilot projects.
• The low number of bids and the low quality of technical documentation prepared by LPAs.
• The lack of synchronization of national standards and norms to European standards.
• Dividing the initial pilot project to improve SWM services in Soldanesti, Rezina and Floresti into two pilot projects.
• Implementation of changes in national legislation on the establishment of new forms of inter-municipal cooperation - inter-municipal enterprise.
• The final decision of the partners on applying necessary arrangements to support project implementation from the Energy Efficiency Fund takes some time.
Main Challenges
Issu
es fo
r Dis
cuss
ion
Pagina 30
Questions and answers
Pagina 31
Modernization of local public services in the Republic of Moldova
Intervention Area 2 – Regional planning and programming
Progress 1 June – 30 September 2014Priorities for 1 October – 31 December 2014
Chisinau, 22 October 2014
Pagina 32
• Planned activities lead to achieving the Result of the
Intervention Area 2:
Regional and local public authorities effectively plan strategic investment in selected priority sectors: energy efficiency in public buildings (EE); solid
waste management (SWM); water supply and sanitation (WSS); local and regional roads (RLR).
Basic Assumption
Pagina 33
Targets
• 11 Regional Sector Programmes (WSS, SWM, EE, RLR) for the three development regions (North, Center, South) developed and approved (Note: in the DR South the SWM programme has already been developed).
• Development of 39 investment projects for funding equivalent to a total budget of EUR 102.9 million.
• All projects will be developed based on regional/local sector planning and in accordance with national sector priorities and strategies.
Pagina 34
Regional sector planning and programming
Intervention Area → Sector↓
Regional sector planning Project development
Energy Efficiency in public buildings
• 3 RSP approved by RDC North, Centre and South (Feb 2014)
• 33 possible project concepts (PPC) were reviewed and presented at regional sector working groups (RSWG).
• 33 energy analysis reports for the 33 PPCs are developed and presented to MRDC; out of which 13 are to be prioritized by interministerial committees to be developed for the next phase of viable projects concepts (VPC).
Solid Waste Management
• 2 RSP approved by RDC North and Centre (Feb 2014)
• 3 feasibility studies for the 3 areas of SWM and proper environmental impact assessments ongoing.
• 3 PPC (1 PPC per region - which includes information on waste composition, analysis of the current situation and the selected location for the landfill) consulted and promoted.
• Landfill location for the South SWM zone (Cahul, Taraclia, Cantemir) approved.
Pagina 35
Regional sector planning and programming
Intervention Area → Sector↓
Regional sector planning
Project development
Water Supply and Sanitation
• 3 RSP approved by RDC North, Centre and South (June 2014)
• 32 PPC were developed and submitted to the MRDC for coordination.
• Study field visits to examine PPC proposed.
Regional and Local Roads
• As a result of three meetings of the RSWG (the third occurred during the reporting period), RSP projects for each development region were developed and submitted for comments to the MRDC and RDA.
• The methodology for establishing road corridors and cells has been discussed with the Ministry of Regional Development and Construction and the Ministry of Transport and Road Infrastructure.
Pagina 36
13.04.2023
Local Initiatives
1 Concepts
2 Outline design
3 Elaboration
4 Finalisation
Regional Sector Programmes
Project proposals &
ideas
Possible concept > Viable concept > Ready-to-go projects
SWM - 6 WSS - 45EE - 121RLR - 26
SWM - 6 WSS - 31EE - 65RLR -18
SWM - 3 WSS - 18 EE - 24 RLR - 18
SWM 3 (~26 MEUR)WSS - 12 (~25 MEUR)EE - 12 (~12 MEUR)RLR - 12 (~40 MEUR)
Total 39 (~103 MEUR) SWM = Solid Waste Management, WSS = Water Supply and Sanitation, EE = Energy efficiency in public buildings, RLR = Regional and local roads, MEUR = Million €
Projects pipeline – priority areas
Pagina 37
Estimated investment for financing projects from RSP
Sector Documentation Number of ready-
to-go projects
M € (indicative
value)
Energy Efficiency in public buildings
The implementation phase of the Regional Sector Programme. Development phase of energy efficiency analysis reports in accordance with established standards.
12 11.8
Solid Waste Management
The implementation phase of the Regional Sector Programme. The development phase includes feasibility study, environmental impact analysis, conceptual design.
3 26.1
Water Supply and Sanitation
The implementation phase of the Regional Sector Programme. The development phase includes feasibility study, environmental management plan, conceptual design.
12 25
Regional and Local Roads
The implementation phase of the Regional Sector Programme. The development phase includes feasibility study, environmental management plan, conceptual design.
12 x 15 km (180km)
40
102.9
Pagina 38
Intervention Area IA2Regional
sectorplanning
Project development
Capacity building
Total
EE in public buildings
Progress level 4 2 3 3June 1 – September 30
Estimating implementation level % (2010-2015) 100% 55% 50% 68%
SWM
Progress level 4 3 4 4June 1 – September 30
Estimating implementation level % (2010-2015) 100% 35% 65% 67%
RLR
Progress level 3 2 3 3June 1 – September 30
Estimating implementation level % (2010-2015) 75% 15% 50% 47%
WSS
Progress level 4 2 3 3June 1 – September 30
Estimating implementation level % (2010-2015) 100% 20% 50% 57%
CSPS
Progress level 4 N/A 3 4June 1 – September 30
Estimating implementation level % (2010-2015) 30% N/A 35% 33%
TOTAL
Progress level 4 2 3 3June 1 – September 30
Estimating implementation level % (2010-2015) 81% 31% 50% 54%
Overview of the progress achieved in the IA2 1 June to 30 September 2014
Pagina 39
• Evaluation of possible project concepts in the EE, SWM and WSS fields within interministerial committees’ sessions.
• Activities of selected projects development (field visits, (pre)feasibility studies , environmental impact assessment, etc.) and creation of working groups on each project.
• Submission for approval by the Regional Development Councils of the three sector programmes in the field of RLR, including public consultation in all three regions.
• Updating and presentation of the Guide on development of investment projects and adaptation to the 4 sectors; best practices incorporated.
• Elaboration and development of tools integrating gender and social issues, testing them in the EE and SWM field.
• Enhanced dialogue with potential donors.
Activities planned for October to December 2014
Pagina 40
• Regional sector programmes identify various proposals on sector reforms needed for some better framework conditions for coherent and coordinated implementation. This requires a substantial increase in structured political dialogue within and between involved ministries and national agencies.
• Implementation of regional sector programmes require medium-term financial planning within a more strategic approach, both in terms of existing national funds as well as of support from Moldova's development partners.
• The limited resources of technical assistance of the project for the development of all project concepts identified.
Main challenges
Issu
es to
dis
cuss
Pagina 41
Questions and answers
Pagina 42
Modernization of local public services in the Republic of Moldova
Interdisciplinary aspects
Progress 1 June – 30 September 2014Priorities for 1 October – 31 December 2014
Chisinau, 22 October 2014
Pagina 43
Interdisciplinary activities conducted
• In the field of Complementary Private Sector Support, in close cooperation with the Chamber of Commerce and Industry,
A programme was launched on capacity building of CCI representatives in the field of public procurement.
A database on sector enterprises was started being created.
• In the field of Cross-Border Cooperation support was offered to:
Develop a draft of the Government Decision on the establishment of the management and control system.
Develop proposals for adjusting internal rules of the institutions responsible for cross-border cooperation programs 2014-2020 according to the EU Regulation on common rules for cross-border cooperation programmes.
Pagina 44
Interdisciplinary activities conducted
• In support of and in cooperation with the Academy of Public Administration (APA),
The qualifying period for the 8 students selected by the APA was completed. They had the opportunity to enhance their practical skills in sector regional planning and programming.
Capacity building in the fields of regional development, communication and motivation, leadership in public administration is ongoing.
• In the field of Communication,
Grant implementation to support coverage of regional development activities was completed. It was provided to Independent Press Association (API).
Capacity building of MRDC and RDA representatives in communicating on regional development issues continued.
SIADR system was installed and configured, beneficiaries trained .
Pagina 45
Interdisciplinary activities conducted
• In the field of Evaluation and results based monitoring (RBM),
Assistance was offered to review the Memorandum of Understanding, logical frameworks matrices, matrices of risk evidence and implementation plans for all pilot projects.
The support mission on broader integration of RBM issues in the current M & E system in the field of regional development was finalised.
Pagina 4624/09/2013
Overview of the progress within the IA2, inter-disciplinary issues for the period 1 June to 3 September 2014
• As a result of the mid-term MLPS Monitoring Mission, it was decided to create the Policy Advisory Unit.
Intervention Area 2 APA CBC Communication M&EHorizontal
Aspects of RD
Progress Level 4 4 4 3 3
1 June - 30 September
Estimating implementation level in % (2010-2015) 70% 70% 80% 50% 60%
Pagina 47
• Capacity building in public procurement for CCI representatives, updating the database on sector enterprises.
• Organization of the national conference ‘Cross-border cooperation: achievements and prospects for the Republic of Moldova’.
• Development of proposals for operating regulations of the regional office of cross-border cooperation and for regulations on the co-financing system for cross-border cooperation programmes.
• Continued support for APA in developing training materials and/or providing training in areas such as regional development, leadership in public administration.
• Capacity building of journalists, of MRDC and RDAs representatives in terms of communication in the field of regional development.
• Implementation and ongoing monitoring of the revised RBM system for pilot projects.
• Presentation of the final report on the integration of RBM in the M & E system in the field of regional development.
Main activities planned for October – December 2014
Pagina 48
Main Challenges
• Different perceptions of journalists and civil servants on public communication about regional development.
• Delayed start of the EU project on improving statistics on regional development that could influence the more substantial review of the current system of M & E in terms of RBM.
• No assessment of the current Regional Development Strategy before upgrading it.
• Parliamentary elections that could delay some decision-making processes in the field.
Issu
es fo
r Dis
cuss
ion
Pagina 49
Questions and answers
Pagina 50
• 11th Progress Report on MLPS can be accessed at http://serviciilocale.md/doc.php?l=ro&idc=69&id=938&t=/Rapoarte-de-progres/Raport-de-progres-nr-11-iunie-septembrie-2014
• Presentation of the Steering Committee Session: http://www.slideshare.net/GIZMoldova/prezentare-mspl-comitet-director-din-22-octombrie-2014
• Regional Sector Programs can be found at : http://serviciilocale.md/pageview.php?l=ro&idc=94&id=694&t=/Cadru-legal-si-institutional/Dezvoltare-regionala/Programe-Regionale-Sectoriale/
• The Annual Work Plan for 2014 can be accessed at http://serviciilocale.md/public/files/2014_02_20_MLPS_Annual_Plan_2014_IA1IA2_LB_ROM_FINAL.pdf 24/09/2013
Main documents of the SC Session
Pagina 51
Thank you for your attention!
German Development Cooperation through GIZ
Chisinau, 31a Bulgara str.,
T + 373 22 22-83-19
F + 373 22 00-02-38
Internet: www.giz.de, www.serviciilocale.md