![Page 1: Presentation on the final designs for NCH given by John Pollock](https://reader033.vdocument.in/reader033/viewer/2022051507/589efc171a28abe0498c354b/html5/thumbnails/1.jpg)
8th NCH Project Update to Temple Street Hospital John Pollock, Project Director NPHDB
![Page 2: Presentation on the final designs for NCH given by John Pollock](https://reader033.vdocument.in/reader033/viewer/2022051507/589efc171a28abe0498c354b/html5/thumbnails/2.jpg)
Highly Confidential
Sense of Place
![Page 3: Presentation on the final designs for NCH given by John Pollock](https://reader033.vdocument.in/reader033/viewer/2022051507/589efc171a28abe0498c354b/html5/thumbnails/3.jpg)
NCH Satellite Centres at Connolly & Tallaght
![Page 4: Presentation on the final designs for NCH given by John Pollock](https://reader033.vdocument.in/reader033/viewer/2022051507/589efc171a28abe0498c354b/html5/thumbnails/4.jpg)
Satellite Centres: Key services Urgent Care (each 20% of total activity)
Outpatients (each 7% of total activity)
Child Sexual Assault Unit
Education
Primary Care Dental Services (Connolly only)
Imaging (shared)
![Page 5: Presentation on the final designs for NCH given by John Pollock](https://reader033.vdocument.in/reader033/viewer/2022051507/589efc171a28abe0498c354b/html5/thumbnails/5.jpg)
NATIONAL CHILDREN’S HOSPITAL SATELLITE CENTRES
Connolly Hospital
Proposed Traffic and Parking provision
![Page 6: Presentation on the final designs for NCH given by John Pollock](https://reader033.vdocument.in/reader033/viewer/2022051507/589efc171a28abe0498c354b/html5/thumbnails/6.jpg)
Site Photographs
NEW CHILDREN’S HOSPITAL SATELLITE CENTRES
1.2 Planning Deliverables – Connolly Existing
![Page 7: Presentation on the final designs for NCH given by John Pollock](https://reader033.vdocument.in/reader033/viewer/2022051507/589efc171a28abe0498c354b/html5/thumbnails/7.jpg)
NATIONAL CHILDREN’S HOSPITAL SATELLITE CENTRES
Connolly Hospital
3D Visualisation
![Page 8: Presentation on the final designs for NCH given by John Pollock](https://reader033.vdocument.in/reader033/viewer/2022051507/589efc171a28abe0498c354b/html5/thumbnails/8.jpg)
NEW CHILDREN’S HOSPITAL SATELLITE CENTRES
Connolly Hospital
![Page 9: Presentation on the final designs for NCH given by John Pollock](https://reader033.vdocument.in/reader033/viewer/2022051507/589efc171a28abe0498c354b/html5/thumbnails/9.jpg)
Tallaght Hospital
Site Massing
NEW CHILDREN’S HOSPITAL SATELLITE CENTRES
![Page 10: Presentation on the final designs for NCH given by John Pollock](https://reader033.vdocument.in/reader033/viewer/2022051507/589efc171a28abe0498c354b/html5/thumbnails/10.jpg)
Tallaght Hospital
Site Photographs
NEW CHILDREN’S HOSPITAL SATELLITE CENTRES
![Page 11: Presentation on the final designs for NCH given by John Pollock](https://reader033.vdocument.in/reader033/viewer/2022051507/589efc171a28abe0498c354b/html5/thumbnails/11.jpg)
Tallaght Hospital
3D Visualisation
NEW CHILDREN’S HOSPITAL SATELLITE CENTRES
![Page 12: Presentation on the final designs for NCH given by John Pollock](https://reader033.vdocument.in/reader033/viewer/2022051507/589efc171a28abe0498c354b/html5/thumbnails/12.jpg)
NEW CHILDREN’S HOSPITAL SATELLITE CENTRES
Tallaght Hospital
![Page 13: Presentation on the final designs for NCH given by John Pollock](https://reader033.vdocument.in/reader033/viewer/2022051507/589efc171a28abe0498c354b/html5/thumbnails/13.jpg)
New Children’s Hospital Project Update at St James’s Campus
![Page 14: Presentation on the final designs for NCH given by John Pollock](https://reader033.vdocument.in/reader033/viewer/2022051507/589efc171a28abe0498c354b/html5/thumbnails/14.jpg)
National Paediatric Hospital Project - SID Planning
Application (www.nchplanning.ie)
• Main NCH at St James’s Hospital campus (SJH), (160,000m2 approx)
• 473 beds (380 In-patient & 93 day care). Single rooms with ensuite and family area
• Advanced diagnostics, intervention and theatre facilities
• Play areas, external gardens and courtyards
• Therapy area with hydro pool & gym
• Third Level Education Centre & Hospital School
• 1,000 space car park (35,000m2)
• Existing building to be demolished 20,000m2
• Children’s Research & Innovation Centre at SJH (3,000m2 approx)
• 53 bed family accommodation unit adjacent to the hospital at SJH (4,400m2 approx)
• Contractors holding compound for material deliveries at Davitt Roads (0.8ha site)
• Children’s Hospital Satellite Centres at Tallaght & Connolly Hospitals (4,500m2 & 5,000m2 approx)
![Page 15: Presentation on the final designs for NCH given by John Pollock](https://reader033.vdocument.in/reader033/viewer/2022051507/589efc171a28abe0498c354b/html5/thumbnails/15.jpg)
M C
A
R
![Page 16: Presentation on the final designs for NCH given by John Pollock](https://reader033.vdocument.in/reader033/viewer/2022051507/589efc171a28abe0498c354b/html5/thumbnails/16.jpg)
![Page 17: Presentation on the final designs for NCH given by John Pollock](https://reader033.vdocument.in/reader033/viewer/2022051507/589efc171a28abe0498c354b/html5/thumbnails/17.jpg)
![Page 18: Presentation on the final designs for NCH given by John Pollock](https://reader033.vdocument.in/reader033/viewer/2022051507/589efc171a28abe0498c354b/html5/thumbnails/18.jpg)
![Page 19: Presentation on the final designs for NCH given by John Pollock](https://reader033.vdocument.in/reader033/viewer/2022051507/589efc171a28abe0498c354b/html5/thumbnails/19.jpg)
![Page 20: Presentation on the final designs for NCH given by John Pollock](https://reader033.vdocument.in/reader033/viewer/2022051507/589efc171a28abe0498c354b/html5/thumbnails/20.jpg)
![Page 21: Presentation on the final designs for NCH given by John Pollock](https://reader033.vdocument.in/reader033/viewer/2022051507/589efc171a28abe0498c354b/html5/thumbnails/21.jpg)
![Page 22: Presentation on the final designs for NCH given by John Pollock](https://reader033.vdocument.in/reader033/viewer/2022051507/589efc171a28abe0498c354b/html5/thumbnails/22.jpg)
![Page 23: Presentation on the final designs for NCH given by John Pollock](https://reader033.vdocument.in/reader033/viewer/2022051507/589efc171a28abe0498c354b/html5/thumbnails/23.jpg)
![Page 24: Presentation on the final designs for NCH given by John Pollock](https://reader033.vdocument.in/reader033/viewer/2022051507/589efc171a28abe0498c354b/html5/thumbnails/24.jpg)
![Page 25: Presentation on the final designs for NCH given by John Pollock](https://reader033.vdocument.in/reader033/viewer/2022051507/589efc171a28abe0498c354b/html5/thumbnails/25.jpg)
![Page 26: Presentation on the final designs for NCH given by John Pollock](https://reader033.vdocument.in/reader033/viewer/2022051507/589efc171a28abe0498c354b/html5/thumbnails/26.jpg)
![Page 27: Presentation on the final designs for NCH given by John Pollock](https://reader033.vdocument.in/reader033/viewer/2022051507/589efc171a28abe0498c354b/html5/thumbnails/27.jpg)
Engagement NPHDB and CHG have conducted over 1000 hours of engagement
• Young People and Parent Groups
Youth Advisory Council (YAC)
Family Forum
Children in Hospital Group
Tallaght Hospital Action Group
Advocacy Patient Forums
Special Needs Advocacy Patient Forums
• User Groups/ Staff from the 3 existing children’s
hospitals, Connolly, Tallaght & St. James’s Hospital
• Families through patient advocacy groups and
Hospital in Ireland were invited to attend a
series of workshops
![Page 28: Presentation on the final designs for NCH given by John Pollock](https://reader033.vdocument.in/reader033/viewer/2022051507/589efc171a28abe0498c354b/html5/thumbnails/28.jpg)
Engagement
A variety of drop-in sessions, meetings, briefings, information evenings have
been held for key stakeholders to the project.
For residents:
- The Project team commenced a series of ‘drop in’ information sessions
- Leaflets informing residents about these sessions were distributed to over
4000 homes, councillors and TD’s and resident associations were also
invited.
- A regular resident newsletter ‘connect’ has been produced which includes a
regular ‘FAQ ‘section and images of the hospital as they are developed.
- Localised meetings with residents within close proximity to proposed
construction took place and as a result of this engagement a number of
actions were taken.
NPHDB and CHG have conducted over 1000 hours of engagement…
![Page 29: Presentation on the final designs for NCH given by John Pollock](https://reader033.vdocument.in/reader033/viewer/2022051507/589efc171a28abe0498c354b/html5/thumbnails/29.jpg)
Design commenced
Planning submission to An Bord Pleanála,
incl. CRIC, RMHC, Satellites & Davitt Rd
Start Construction Procurement
Planning decision
Start construction main NCH
Commence transition of services
to the Satellites at Tallaght & Connolly
Commence transition of services
to the new children’s hospital
The Programme 6th August 2014
10th August ‘15
February 2016
March 2016
Q4 2017
Q4- 2019
August ‘15