Project Description
Requirements: Family oriented entertainment Scenic over look of the bayou Ample parking space Scenic park, entertainment, and fitness options Generate enough revenue to pay back construction costs
Details: 2.5 acres Previously served as two parking lots Bounded by Commerce Street, La Branch Street, and Caroline
Street Flood plain for the Buffalo Bayou
![Page 3: Presented and arranged by: Jason Vila and Sergio Castillo](https://reader033.vdocument.in/reader033/viewer/2022050714/56649db55503460f94aa73a8/html5/thumbnails/3.jpg)
Conceptual Ideas
Building Features and Land Use: Restaurants Outdoor Theatre and Stage Night Club Retail Space Gym Rock gym and central rock climbing pillar Dodge ball or Sky High Flood Plain Rain water harvesting facility on roof
![Page 4: Presented and arranged by: Jason Vila and Sergio Castillo](https://reader033.vdocument.in/reader033/viewer/2022050714/56649db55503460f94aa73a8/html5/thumbnails/4.jpg)
Architectural DesignPerspective View X –ray Elevation
Plan
Elevation
![Page 5: Presented and arranged by: Jason Vila and Sergio Castillo](https://reader033.vdocument.in/reader033/viewer/2022050714/56649db55503460f94aa73a8/html5/thumbnails/5.jpg)
Conceptual Rendering
Site Plan realisticPerspective View
![Page 6: Presented and arranged by: Jason Vila and Sergio Castillo](https://reader033.vdocument.in/reader033/viewer/2022050714/56649db55503460f94aa73a8/html5/thumbnails/6.jpg)
Foundation and Structural Plans
Foundation: Due to the previous status of the site being a parking
lot, the foundation has already been constructed with concrete.
The parking lot will remain as the building will expand upward.
Structural : Entire structural plan will be based on concrete. Concrete beams: 5 – 10 ft. Concrete girders: 10 - 25 ft. Concrete columns: 20 - 25 ft.
![Page 7: Presented and arranged by: Jason Vila and Sergio Castillo](https://reader033.vdocument.in/reader033/viewer/2022050714/56649db55503460f94aa73a8/html5/thumbnails/7.jpg)
Construction Specifics
Glass windows Tile flooring Accessible Green roof Concrete walls (could be tile) Retaining walls on the roof Lockers for the gyms Parking lot at ground level Hydraulic Pump Elevators Inside retailing --- involves core and shell
construction (walls, flooring, etc.)
![Page 8: Presented and arranged by: Jason Vila and Sergio Castillo](https://reader033.vdocument.in/reader033/viewer/2022050714/56649db55503460f94aa73a8/html5/thumbnails/8.jpg)
Budget and Construction Schedule
![Page 9: Presented and arranged by: Jason Vila and Sergio Castillo](https://reader033.vdocument.in/reader033/viewer/2022050714/56649db55503460f94aa73a8/html5/thumbnails/9.jpg)
Area Water and Wastewater
![Page 10: Presented and arranged by: Jason Vila and Sergio Castillo](https://reader033.vdocument.in/reader033/viewer/2022050714/56649db55503460f94aa73a8/html5/thumbnails/10.jpg)
Satellite Visual
![Page 11: Presented and arranged by: Jason Vila and Sergio Castillo](https://reader033.vdocument.in/reader033/viewer/2022050714/56649db55503460f94aa73a8/html5/thumbnails/11.jpg)