Transmission
Principles of Transmission, applied to the EU transmission network
1. Line limits2. Principles of dispatch3. Role of frequency in ac lines and stability
requirements 4. Transmission shortage, the internal market
and the 2050 carbon targets
![Page 3: Principles of transmission, applied to the eu transmission network 2011.12.06](https://reader038.vdocument.in/reader038/viewer/2022103010/542947e38d7f72714e8b72aa/html5/thumbnails/3.jpg)
![Page 4: Principles of transmission, applied to the eu transmission network 2011.12.06](https://reader038.vdocument.in/reader038/viewer/2022103010/542947e38d7f72714e8b72aa/html5/thumbnails/4.jpg)
![Page 5: Principles of transmission, applied to the eu transmission network 2011.12.06](https://reader038.vdocument.in/reader038/viewer/2022103010/542947e38d7f72714e8b72aa/html5/thumbnails/5.jpg)
Electricity is an essential part of our lives
![Page 6: Principles of transmission, applied to the eu transmission network 2011.12.06](https://reader038.vdocument.in/reader038/viewer/2022103010/542947e38d7f72714e8b72aa/html5/thumbnails/6.jpg)
Power plants
![Page 7: Principles of transmission, applied to the eu transmission network 2011.12.06](https://reader038.vdocument.in/reader038/viewer/2022103010/542947e38d7f72714e8b72aa/html5/thumbnails/7.jpg)
Distributors
![Page 8: Principles of transmission, applied to the eu transmission network 2011.12.06](https://reader038.vdocument.in/reader038/viewer/2022103010/542947e38d7f72714e8b72aa/html5/thumbnails/8.jpg)
Transmission
![Page 9: Principles of transmission, applied to the eu transmission network 2011.12.06](https://reader038.vdocument.in/reader038/viewer/2022103010/542947e38d7f72714e8b72aa/html5/thumbnails/9.jpg)
September 28th, 2003
Huge blackout cripples Italy!
![Page 10: Principles of transmission, applied to the eu transmission network 2011.12.06](https://reader038.vdocument.in/reader038/viewer/2022103010/542947e38d7f72714e8b72aa/html5/thumbnails/10.jpg)
Rome’s “white night”
![Page 11: Principles of transmission, applied to the eu transmission network 2011.12.06](https://reader038.vdocument.in/reader038/viewer/2022103010/542947e38d7f72714e8b72aa/html5/thumbnails/11.jpg)
Rome’s “white night”110 trains stopped
Thousands of people stuck
![Page 12: Principles of transmission, applied to the eu transmission network 2011.12.06](https://reader038.vdocument.in/reader038/viewer/2022103010/542947e38d7f72714e8b72aa/html5/thumbnails/12.jpg)
![Page 13: Principles of transmission, applied to the eu transmission network 2011.12.06](https://reader038.vdocument.in/reader038/viewer/2022103010/542947e38d7f72714e8b72aa/html5/thumbnails/13.jpg)
Mettlen-Lavorgo
Sils-Soazza
03:01
“Cross-border transmission lines”
“Interconnectors”
Tree flashover!
![Page 14: Principles of transmission, applied to the eu transmission network 2011.12.06](https://reader038.vdocument.in/reader038/viewer/2022103010/542947e38d7f72714e8b72aa/html5/thumbnails/14.jpg)
Mettlen-Lavorgo
Sils-Soazza
03:01
Tree flashover!
![Page 15: Principles of transmission, applied to the eu transmission network 2011.12.06](https://reader038.vdocument.in/reader038/viewer/2022103010/542947e38d7f72714e8b72aa/html5/thumbnails/15.jpg)
Mettlen-Lavorgo
Sils-Soazza
03:0103:01-03.16
![Page 16: Principles of transmission, applied to the eu transmission network 2011.12.06](https://reader038.vdocument.in/reader038/viewer/2022103010/542947e38d7f72714e8b72aa/html5/thumbnails/16.jpg)
03:11
The Swiss TSO operator asks the Italian TSO for countermeasures
![Page 17: Principles of transmission, applied to the eu transmission network 2011.12.06](https://reader038.vdocument.in/reader038/viewer/2022103010/542947e38d7f72714e8b72aa/html5/thumbnails/17.jpg)
Mettlen-Lavorgo
Sils-Soazza
03:21
Italy reduces import by -300 MW
03:25
Tree flashover!
![Page 18: Principles of transmission, applied to the eu transmission network 2011.12.06](https://reader038.vdocument.in/reader038/viewer/2022103010/542947e38d7f72714e8b72aa/html5/thumbnails/18.jpg)
Mettlen-Lavorgo
Sils-Soazza
03:25
Tree flashover!
![Page 19: Principles of transmission, applied to the eu transmission network 2011.12.06](https://reader038.vdocument.in/reader038/viewer/2022103010/542947e38d7f72714e8b72aa/html5/thumbnails/19.jpg)
03:26
All interconnectors are automatically disconnected
![Page 20: Principles of transmission, applied to the eu transmission network 2011.12.06](https://reader038.vdocument.in/reader038/viewer/2022103010/542947e38d7f72714e8b72aa/html5/thumbnails/20.jpg)
![Page 21: Principles of transmission, applied to the eu transmission network 2011.12.06](https://reader038.vdocument.in/reader038/viewer/2022103010/542947e38d7f72714e8b72aa/html5/thumbnails/21.jpg)
![Page 22: Principles of transmission, applied to the eu transmission network 2011.12.06](https://reader038.vdocument.in/reader038/viewer/2022103010/542947e38d7f72714e8b72aa/html5/thumbnails/22.jpg)
1. Transmission lines limits
2. Dispatch
3. Frequency and synchronicity
4. The future of the EU transmission network
![Page 23: Principles of transmission, applied to the eu transmission network 2011.12.06](https://reader038.vdocument.in/reader038/viewer/2022103010/542947e38d7f72714e8b72aa/html5/thumbnails/23.jpg)
1. Transmission lines limits
![Page 24: Principles of transmission, applied to the eu transmission network 2011.12.06](https://reader038.vdocument.in/reader038/viewer/2022103010/542947e38d7f72714e8b72aa/html5/thumbnails/24.jpg)
Mettlen-Lavorgo
Sils-Soazza
03:01
Tree flashover!
Transmission lines limits
![Page 25: Principles of transmission, applied to the eu transmission network 2011.12.06](https://reader038.vdocument.in/reader038/viewer/2022103010/542947e38d7f72714e8b72aa/html5/thumbnails/25.jpg)
3 risk factors for flashoverFactor 1: High voltage
Transmission lines limits
![Page 26: Principles of transmission, applied to the eu transmission network 2011.12.06](https://reader038.vdocument.in/reader038/viewer/2022103010/542947e38d7f72714e8b72aa/html5/thumbnails/26.jpg)
![Page 27: Principles of transmission, applied to the eu transmission network 2011.12.06](https://reader038.vdocument.in/reader038/viewer/2022103010/542947e38d7f72714e8b72aa/html5/thumbnails/27.jpg)
High voltage
Dramatically lowers losses to resistance
1 KV-> 10KVLoss falls to 1%
Factor 100
Transmission lines limits
![Page 28: Principles of transmission, applied to the eu transmission network 2011.12.06](https://reader038.vdocument.in/reader038/viewer/2022103010/542947e38d7f72714e8b72aa/html5/thumbnails/28.jpg)
1 KV-> 100KVLoss falls to 0.01%
Factor 10.000
Transmission lines limits
![Page 29: Principles of transmission, applied to the eu transmission network 2011.12.06](https://reader038.vdocument.in/reader038/viewer/2022103010/542947e38d7f72714e8b72aa/html5/thumbnails/29.jpg)
3 risk factors for flashoverFactor 1: High voltage
Factor 2: High load
Transmission lines limits
![Page 30: Principles of transmission, applied to the eu transmission network 2011.12.06](https://reader038.vdocument.in/reader038/viewer/2022103010/542947e38d7f72714e8b72aa/html5/thumbnails/30.jpg)
Sagging of the line
Transmission lines limits
![Page 31: Principles of transmission, applied to the eu transmission network 2011.12.06](https://reader038.vdocument.in/reader038/viewer/2022103010/542947e38d7f72714e8b72aa/html5/thumbnails/31.jpg)
3 risk factors for flashoverFactor 1: High voltage
Factor 3: Proximity to trees
Factor 2: High load
Transmission lines limits
![Page 32: Principles of transmission, applied to the eu transmission network 2011.12.06](https://reader038.vdocument.in/reader038/viewer/2022103010/542947e38d7f72714e8b72aa/html5/thumbnails/32.jpg)
Clearance: Trees below transmission lines must be kept short enough
Transmission lines limits
![Page 33: Principles of transmission, applied to the eu transmission network 2011.12.06](https://reader038.vdocument.in/reader038/viewer/2022103010/542947e38d7f72714e8b72aa/html5/thumbnails/33.jpg)
Mettlen-Lavorgo
Sils-Soazza
After the blackout incident, the Swiss
authorities revised their policy of clearance.
Transmission lines limits
![Page 34: Principles of transmission, applied to the eu transmission network 2011.12.06](https://reader038.vdocument.in/reader038/viewer/2022103010/542947e38d7f72714e8b72aa/html5/thumbnails/34.jpg)
Question
Do transmission lines have a higher capacity in winter or in summer?
Raise your hand if you think that transmission lines have a higher capacity in winter.
Transmission lines limits
![Page 35: Principles of transmission, applied to the eu transmission network 2011.12.06](https://reader038.vdocument.in/reader038/viewer/2022103010/542947e38d7f72714e8b72aa/html5/thumbnails/35.jpg)
1. Transmission lines limits
2. Dispatch
![Page 36: Principles of transmission, applied to the eu transmission network 2011.12.06](https://reader038.vdocument.in/reader038/viewer/2022103010/542947e38d7f72714e8b72aa/html5/thumbnails/36.jpg)
Mettlen-Lavorgo
Sils-Soazza
03:01
Dispatch
![Page 37: Principles of transmission, applied to the eu transmission network 2011.12.06](https://reader038.vdocument.in/reader038/viewer/2022103010/542947e38d7f72714e8b72aa/html5/thumbnails/37.jpg)
?
A B
Injection: 100MW Injection:
20MW
Withdrawal: 50MW
Withdrawal: 70MW
Net Injection: 50MW
Net Withdrawal:
50MW
Dispatch
![Page 38: Principles of transmission, applied to the eu transmission network 2011.12.06](https://reader038.vdocument.in/reader038/viewer/2022103010/542947e38d7f72714e8b72aa/html5/thumbnails/38.jpg)
Physical flow: 50MW
A B
Net Injection: 50MW
Net Withdrawal:
50MW
Dispatch
![Page 39: Principles of transmission, applied to the eu transmission network 2011.12.06](https://reader038.vdocument.in/reader038/viewer/2022103010/542947e38d7f72714e8b72aa/html5/thumbnails/39.jpg)
Net Withdrawal:
50MW
Physical flow: 50MW
A B
Net Injection: 50MW ∆ -10MW
40MW
∆-10MW
40MW
∆ -10MW
40MW
Dispatch
![Page 40: Principles of transmission, applied to the eu transmission network 2011.12.06](https://reader038.vdocument.in/reader038/viewer/2022103010/542947e38d7f72714e8b72aa/html5/thumbnails/40.jpg)
Physical flow: 40MW
A B
Net Injection: 40MW
Net Withdrawal:
40MW
Electricity cannot just be “send” somewhere
Any flow is the RESULT of the injection and withdrawals
Dispatch
![Page 41: Principles of transmission, applied to the eu transmission network 2011.12.06](https://reader038.vdocument.in/reader038/viewer/2022103010/542947e38d7f72714e8b72aa/html5/thumbnails/41.jpg)
03:11
The Swiss TSO operator asks the Italian TSO for countermeasures
![Page 42: Principles of transmission, applied to the eu transmission network 2011.12.06](https://reader038.vdocument.in/reader038/viewer/2022103010/542947e38d7f72714e8b72aa/html5/thumbnails/42.jpg)
Mettlen-Lavorgo
Sils-Soazza
03:21
Italy reduces import by -300 MW
03:25
Dispatch
![Page 43: Principles of transmission, applied to the eu transmission network 2011.12.06](https://reader038.vdocument.in/reader038/viewer/2022103010/542947e38d7f72714e8b72aa/html5/thumbnails/43.jpg)
1. Transmission lines limits
2. Dispatch
3. Frequency and synchronicity
![Page 44: Principles of transmission, applied to the eu transmission network 2011.12.06](https://reader038.vdocument.in/reader038/viewer/2022103010/542947e38d7f72714e8b72aa/html5/thumbnails/44.jpg)
Frequency and Synchronicity
Direct Current (DC)
Alternating Current (AC)
![Page 45: Principles of transmission, applied to the eu transmission network 2011.12.06](https://reader038.vdocument.in/reader038/viewer/2022103010/542947e38d7f72714e8b72aa/html5/thumbnails/45.jpg)
Frequency and Synchronicity
AlternatingCurrent (AC)
50 Hertz
![Page 46: Principles of transmission, applied to the eu transmission network 2011.12.06](https://reader038.vdocument.in/reader038/viewer/2022103010/542947e38d7f72714e8b72aa/html5/thumbnails/46.jpg)
Does a lamp in your house receive zero energy 100 times a second and is thus blinking?
Raise your hand if you think that this is indeed the case.
Frequency and Synchronicity
![Page 47: Principles of transmission, applied to the eu transmission network 2011.12.06](https://reader038.vdocument.in/reader038/viewer/2022103010/542947e38d7f72714e8b72aa/html5/thumbnails/47.jpg)
50 Herz is the frequency in Europe
Frequency and Synchronicity
![Page 48: Principles of transmission, applied to the eu transmission network 2011.12.06](https://reader038.vdocument.in/reader038/viewer/2022103010/542947e38d7f72714e8b72aa/html5/thumbnails/48.jpg)
A shortage of generation makes the frequency fall
Slight shortage
Frequency and Synchronicity
![Page 49: Principles of transmission, applied to the eu transmission network 2011.12.06](https://reader038.vdocument.in/reader038/viewer/2022103010/542947e38d7f72714e8b72aa/html5/thumbnails/49.jpg)
A surplus of generation makes the frequency rise
Slight surplus
Frequency and Synchronicity
![Page 50: Principles of transmission, applied to the eu transmission network 2011.12.06](https://reader038.vdocument.in/reader038/viewer/2022103010/542947e38d7f72714e8b72aa/html5/thumbnails/50.jpg)
http://www.dynamicdemand.co.uk/grid.htm
Frequency and Synchronicity
![Page 51: Principles of transmission, applied to the eu transmission network 2011.12.06](https://reader038.vdocument.in/reader038/viewer/2022103010/542947e38d7f72714e8b72aa/html5/thumbnails/51.jpg)
All generators are synchronized
UCTE = Continental
Synchronous Area
![Page 52: Principles of transmission, applied to the eu transmission network 2011.12.06](https://reader038.vdocument.in/reader038/viewer/2022103010/542947e38d7f72714e8b72aa/html5/thumbnails/52.jpg)
UCTE = Continental
Synchronous Area
![Page 53: Principles of transmission, applied to the eu transmission network 2011.12.06](https://reader038.vdocument.in/reader038/viewer/2022103010/542947e38d7f72714e8b72aa/html5/thumbnails/53.jpg)
03:26
All interconnectors are automatically disconnected
Frequency and Synchronicity
![Page 54: Principles of transmission, applied to the eu transmission network 2011.12.06](https://reader038.vdocument.in/reader038/viewer/2022103010/542947e38d7f72714e8b72aa/html5/thumbnails/54.jpg)
Mini circuit breakersFrequency and Synchronicity
![Page 55: Principles of transmission, applied to the eu transmission network 2011.12.06](https://reader038.vdocument.in/reader038/viewer/2022103010/542947e38d7f72714e8b72aa/html5/thumbnails/55.jpg)
High voltage circuit breakersFrequency and Synchronicity
![Page 56: Principles of transmission, applied to the eu transmission network 2011.12.06](https://reader038.vdocument.in/reader038/viewer/2022103010/542947e38d7f72714e8b72aa/html5/thumbnails/56.jpg)
1. Transmission lines limits
2. Dispatch
3. Frequency and synchronicity
4. The future of the EU transmission network.
![Page 57: Principles of transmission, applied to the eu transmission network 2011.12.06](https://reader038.vdocument.in/reader038/viewer/2022103010/542947e38d7f72714e8b72aa/html5/thumbnails/57.jpg)
03:26
Interconnectors very high loaded at night!
The future of the EU transmission network
![Page 58: Principles of transmission, applied to the eu transmission network 2011.12.06](https://reader038.vdocument.in/reader038/viewer/2022103010/542947e38d7f72714e8b72aa/html5/thumbnails/58.jpg)
QuestionWhat can explain the intensive use of
interconnectors? A. Stability and security support B. Reserves sharingC. Internal energy marketD. The EU 2020 and 2050 targets
The future of the EU transmission network
![Page 59: Principles of transmission, applied to the eu transmission network 2011.12.06](https://reader038.vdocument.in/reader038/viewer/2022103010/542947e38d7f72714e8b72aa/html5/thumbnails/59.jpg)
Internal EU market induces increase in cross-border trading
The future of the EU transmission network
![Page 60: Principles of transmission, applied to the eu transmission network 2011.12.06](https://reader038.vdocument.in/reader038/viewer/2022103010/542947e38d7f72714e8b72aa/html5/thumbnails/60.jpg)
Greenhouse-effect undisputed
The future of the EU transmission network
![Page 61: Principles of transmission, applied to the eu transmission network 2011.12.06](https://reader038.vdocument.in/reader038/viewer/2022103010/542947e38d7f72714e8b72aa/html5/thumbnails/61.jpg)
2020 Targets: 20% decarbonization
2050 Targets: 80% decarbonization
The future of the EU transmission network
![Page 62: Principles of transmission, applied to the eu transmission network 2011.12.06](https://reader038.vdocument.in/reader038/viewer/2022103010/542947e38d7f72714e8b72aa/html5/thumbnails/62.jpg)
Massive deployment of wind and solar energy
The future of the EU transmission network
![Page 63: Principles of transmission, applied to the eu transmission network 2011.12.06](https://reader038.vdocument.in/reader038/viewer/2022103010/542947e38d7f72714e8b72aa/html5/thumbnails/63.jpg)
ENTSOE Ten-year network development
plan
2015-2020 Increase from 300.000 KM to
340.000KM
The future of the EU transmission network
Increase of 14%
![Page 64: Principles of transmission, applied to the eu transmission network 2011.12.06](https://reader038.vdocument.in/reader038/viewer/2022103010/542947e38d7f72714e8b72aa/html5/thumbnails/64.jpg)
European Climate
FoundationIncrease of almost
400%
The future of the EU transmission network
2050 Increase from 34 GW to 127
GW
![Page 65: Principles of transmission, applied to the eu transmission network 2011.12.06](https://reader038.vdocument.in/reader038/viewer/2022103010/542947e38d7f72714e8b72aa/html5/thumbnails/65.jpg)
![Page 66: Principles of transmission, applied to the eu transmission network 2011.12.06](https://reader038.vdocument.in/reader038/viewer/2022103010/542947e38d7f72714e8b72aa/html5/thumbnails/66.jpg)
![Page 67: Principles of transmission, applied to the eu transmission network 2011.12.06](https://reader038.vdocument.in/reader038/viewer/2022103010/542947e38d7f72714e8b72aa/html5/thumbnails/67.jpg)
ReferencesENTSOE. 210. Ten-year network development plan 2010-2020. ENTSO-E AISBL: Brussels.
European Climate Foundation, 2010. Roadmap, a practical guide to a prosperous, low-carbon Europe. Available at www. roadmap2050.eu.
Grainger, John and William Stevenson, 1994. Power system analysis. McGraw-Hill: New York.
UCTE. 2004. Final report of the Investigation Committee on the 28 September 2003 Blackout in Italy. Secretariat of UCTE: Brussels.
UCTE. 2009. The 50 Year Success Story – Evolution of a European Interconnected Grid. Secretariat of UCTE: Brussels.
![Page 68: Principles of transmission, applied to the eu transmission network 2011.12.06](https://reader038.vdocument.in/reader038/viewer/2022103010/542947e38d7f72714e8b72aa/html5/thumbnails/68.jpg)
THANK YOU!Principles of Transmission
applied to the EU transmission network
Silvester van KotenJean-Monnet Fellow at EUI, FSR