This is NOT where you want
to find your valve handle…
Project Engineering – Safety Moment
![Page 3: Project Engineering This is NOT where you want is NOT where you want to find your ... •Executed projects with 8 different Engineering companies •Contracts: LSTK, EPC, ... without](https://reader034.vdocument.in/reader034/viewer/2022051723/5ab482e17f8b9a6e1c8bec06/html5/thumbnails/3.jpg)
9/10/2013 3
…especially when it came
from HERE!
Project Engineering – Safety Moment
![Page 4: Project Engineering This is NOT where you want is NOT where you want to find your ... •Executed projects with 8 different Engineering companies •Contracts: LSTK, EPC, ... without](https://reader034.vdocument.in/reader034/viewer/2022051723/5ab482e17f8b9a6e1c8bec06/html5/thumbnails/4.jpg)
9/10/2013 4
…from this high!
Project Engineering – Safety Moment
![Page 5: Project Engineering This is NOT where you want is NOT where you want to find your ... •Executed projects with 8 different Engineering companies •Contracts: LSTK, EPC, ... without](https://reader034.vdocument.in/reader034/viewer/2022051723/5ab482e17f8b9a6e1c8bec06/html5/thumbnails/5.jpg)
• Scott Brandenburg – BASF – Owner
• Bob Reymond – Burns &McDonnell – Engineer
• Willie Lefever – Performance Contractors – Constructor
• Matt Wilson – Mitsubishi Polysilicon - Moderator
Project Engineering – Why? Where? How Much?
![Page 6: Project Engineering This is NOT where you want is NOT where you want to find your ... •Executed projects with 8 different Engineering companies •Contracts: LSTK, EPC, ... without](https://reader034.vdocument.in/reader034/viewer/2022051723/5ab482e17f8b9a6e1c8bec06/html5/thumbnails/6.jpg)
OWNER
Scott Brandenburg
Vice President Engineering and Maintenance
BASF Corporation
![Page 7: Project Engineering This is NOT where you want is NOT where you want to find your ... •Executed projects with 8 different Engineering companies •Contracts: LSTK, EPC, ... without](https://reader034.vdocument.in/reader034/viewer/2022051723/5ab482e17f8b9a6e1c8bec06/html5/thumbnails/7.jpg)
• 25+ years experience
• Engineering and Maintenance
• US and Europe
• Executed projects with 8 different Engineering companies
• Contracts: LSTK, EPC, EP, E, Reimbursable
• 4 Joint Ventures
• Types: Environmental driven, Emergency rebuild, New
Technologies, Turnarounds, Grassroots Ethylene Complex
•
Scott’s Background
![Page 8: Project Engineering This is NOT where you want is NOT where you want to find your ... •Executed projects with 8 different Engineering companies •Contracts: LSTK, EPC, ... without](https://reader034.vdocument.in/reader034/viewer/2022051723/5ab482e17f8b9a6e1c8bec06/html5/thumbnails/8.jpg)
• Too much turnover on Project Team (Owner, Engineer,
Constructor). Loss of knowledge setbacks occur.
• Too much cut and paste engineering delays attention to design
issues until HAZOP unearths them
• Size of job- if not staffed properly causes delays and quality
issues especially if Contractor over-focuses on cost
• Late deliverables by Owner or Engineer impact Construction
contractor, causes misalignment
• Large project=large risk, without good Project Engineering can
lead to short sighted decision making
What contributes to an “Unsuccessful Project”? And how I lived through it.
![Page 9: Project Engineering This is NOT where you want is NOT where you want to find your ... •Executed projects with 8 different Engineering companies •Contracts: LSTK, EPC, ... without](https://reader034.vdocument.in/reader034/viewer/2022051723/5ab482e17f8b9a6e1c8bec06/html5/thumbnails/9.jpg)
• Lack of understanding between Contractor and Owner
regarding HAZOP and Pre-startup Safety review by
EPC contract
• Contractor uses “blackbox” approach for package units
• Contract revisions and incentives not used early
enough to address potential delays and responsibilities
late in the project
• Operations/Maintenance input ignored
• Turnover packages/responsibilities between
Construction and Commissioning and Operations is not
well defined.
Unsuccessful Projects (continued)
![Page 10: Project Engineering This is NOT where you want is NOT where you want to find your ... •Executed projects with 8 different Engineering companies •Contracts: LSTK, EPC, ... without](https://reader034.vdocument.in/reader034/viewer/2022051723/5ab482e17f8b9a6e1c8bec06/html5/thumbnails/10.jpg)
ENGINEER
Bob Reymond
Vice President, Projects
Burns & McDonnell
![Page 11: Project Engineering This is NOT where you want is NOT where you want to find your ... •Executed projects with 8 different Engineering companies •Contracts: LSTK, EPC, ... without](https://reader034.vdocument.in/reader034/viewer/2022051723/5ab482e17f8b9a6e1c8bec06/html5/thumbnails/11.jpg)
ENGINEER
Bob Reymond
Vice President, Projects
Burns & McDonnell
![Page 12: Project Engineering This is NOT where you want is NOT where you want to find your ... •Executed projects with 8 different Engineering companies •Contracts: LSTK, EPC, ... without](https://reader034.vdocument.in/reader034/viewer/2022051723/5ab482e17f8b9a6e1c8bec06/html5/thumbnails/12.jpg)
• 25+ Years Experience
• 17 Yr Engineering Firms / 3 Yr Owner
• Mostly EPC / Some engineering only
• International and Domestic
• Power, Nuclear, Petrochemical, Foods
• Most projects $100MM - $500MM
• Largest project $2 Billion
Bob’s Background
![Page 13: Project Engineering This is NOT where you want is NOT where you want to find your ... •Executed projects with 8 different Engineering companies •Contracts: LSTK, EPC, ... without](https://reader034.vdocument.in/reader034/viewer/2022051723/5ab482e17f8b9a6e1c8bec06/html5/thumbnails/13.jpg)
• Owner project objectives well defined
• Alignment of goals
• Good scope definition; discipline
• Safety & Constructability considered early
• Disciplined planning process
• Realistic schedule expectations
• Design effort correlates to project size & complexity
Engineering a “Successful Project”
![Page 14: Project Engineering This is NOT where you want is NOT where you want to find your ... •Executed projects with 8 different Engineering companies •Contracts: LSTK, EPC, ... without](https://reader034.vdocument.in/reader034/viewer/2022051723/5ab482e17f8b9a6e1c8bec06/html5/thumbnails/14.jpg)
• Significant external change
• Vendor information
• Engineer staffing
• Project Schedule
Engineering into Crisis
![Page 15: Project Engineering This is NOT where you want is NOT where you want to find your ... •Executed projects with 8 different Engineering companies •Contracts: LSTK, EPC, ... without](https://reader034.vdocument.in/reader034/viewer/2022051723/5ab482e17f8b9a6e1c8bec06/html5/thumbnails/15.jpg)
Unacceptable Compression
Inefficient Schedule
Engineering Quality vs. Schedule
Schedule Length
Engineering Quality Acceptable
Schedule
![Page 16: Project Engineering This is NOT where you want is NOT where you want to find your ... •Executed projects with 8 different Engineering companies •Contracts: LSTK, EPC, ... without](https://reader034.vdocument.in/reader034/viewer/2022051723/5ab482e17f8b9a6e1c8bec06/html5/thumbnails/16.jpg)
CONSTRUCTOR
Willie Lefever
Vice President
Performance Contractors, Inc.
![Page 17: Project Engineering This is NOT where you want is NOT where you want to find your ... •Executed projects with 8 different Engineering companies •Contracts: LSTK, EPC, ... without](https://reader034.vdocument.in/reader034/viewer/2022051723/5ab482e17f8b9a6e1c8bec06/html5/thumbnails/17.jpg)
• 35 years experience
• Primarily US construction, (1) international
• 10+ EPC or EPCM projects
• Contracts: LSTK, CPFF
• Power, Refining, Petrochemical, Upstream
• Types: Grassroots, Expansion, Environmental, Retrofit
• Technology led- vendor/contractor partnering
Willie’s Background
![Page 18: Project Engineering This is NOT where you want is NOT where you want to find your ... •Executed projects with 8 different Engineering companies •Contracts: LSTK, EPC, ... without](https://reader034.vdocument.in/reader034/viewer/2022051723/5ab482e17f8b9a6e1c8bec06/html5/thumbnails/18.jpg)
“Successful Project”
• Lump Sum EPC - $50+MM
• Proven process technology (reference plant basis)
• Clear project objectives
• Contract strategy alignment
• Defined Project Risk- all parties
• Clear roles and responsibilities (all contracting parties)
Willie’s Project Example(s)
![Page 19: Project Engineering This is NOT where you want is NOT where you want to find your ... •Executed projects with 8 different Engineering companies •Contracts: LSTK, EPC, ... without](https://reader034.vdocument.in/reader034/viewer/2022051723/5ab482e17f8b9a6e1c8bec06/html5/thumbnails/19.jpg)
“Not So Good” Project
• Lump Sum EPC - $50+MM
• Technology and Schedule driven project
• Inexperienced technology provider in EPC project lead role
• EPC Contractor prime : construction subcontractor relationship
• Incomplete scope definition
• Segregated EP and C schedule
Willie’s Project Example(s)
![Page 20: Project Engineering This is NOT where you want is NOT where you want to find your ... •Executed projects with 8 different Engineering companies •Contracts: LSTK, EPC, ... without](https://reader034.vdocument.in/reader034/viewer/2022051723/5ab482e17f8b9a6e1c8bec06/html5/thumbnails/20.jpg)
“Successful Project”
• Cost savings
• Ahead of schedule
• Client achieved business objectives
“Not So Good” Project
• Front end engineering & procurement delays
• Scope creep/quantity growth
• Construction schedule compression/excess costs
Willie’s Project Example(s)
![Page 21: Project Engineering This is NOT where you want is NOT where you want to find your ... •Executed projects with 8 different Engineering companies •Contracts: LSTK, EPC, ... without](https://reader034.vdocument.in/reader034/viewer/2022051723/5ab482e17f8b9a6e1c8bec06/html5/thumbnails/21.jpg)
• Fill out an index card
• Text – 251-377-4495
Questions?
![Page 22: Project Engineering This is NOT where you want is NOT where you want to find your ... •Executed projects with 8 different Engineering companies •Contracts: LSTK, EPC, ... without](https://reader034.vdocument.in/reader034/viewer/2022051723/5ab482e17f8b9a6e1c8bec06/html5/thumbnails/22.jpg)
Our project is:
• Process Industry
• $200M
• Green field
• Technology provided and not cutting edge
• 5 Full Time owner’s engineers for PM and support
• Project is EPC
• Permits done by owner
Cost of Project Engineering and Impacts on Project?
![Page 23: Project Engineering This is NOT where you want is NOT where you want to find your ... •Executed projects with 8 different Engineering companies •Contracts: LSTK, EPC, ... without](https://reader034.vdocument.in/reader034/viewer/2022051723/5ab482e17f8b9a6e1c8bec06/html5/thumbnails/23.jpg)
How much for Project Engineering?
• PE reduces costs.
• Last cost item to look at.
• Who cares?
• Somebody cares.
Cost of Project Engineering?
![Page 24: Project Engineering This is NOT where you want is NOT where you want to find your ... •Executed projects with 8 different Engineering companies •Contracts: LSTK, EPC, ... without](https://reader034.vdocument.in/reader034/viewer/2022051723/5ab482e17f8b9a6e1c8bec06/html5/thumbnails/24.jpg)
How much for Project Engineering?
Answer:
• Front end? 1-2%
• Detailed design? 8 – 12%
• Construction Management? 6 – 8%
• Start up assistance? 1-2%
• Documentation and Clean up? Included above.
A Definitive Answer
![Page 25: Project Engineering This is NOT where you want is NOT where you want to find your ... •Executed projects with 8 different Engineering companies •Contracts: LSTK, EPC, ... without](https://reader034.vdocument.in/reader034/viewer/2022051723/5ab482e17f8b9a6e1c8bec06/html5/thumbnails/25.jpg)
• How does it happen?
• What are the consequences?
Cost
Schedule
Quality
• How do you get it just right?
Project Engineering Over / Under
![Page 26: Project Engineering This is NOT where you want is NOT where you want to find your ... •Executed projects with 8 different Engineering companies •Contracts: LSTK, EPC, ... without](https://reader034.vdocument.in/reader034/viewer/2022051723/5ab482e17f8b9a6e1c8bec06/html5/thumbnails/26.jpg)
The Experts Say:
CAUSES • Underestimation.
• Lack of definition.
• Engineering costs become significant.
• Schedule delays, costs increase, ripples through entire project.
SOLUTIONS • Plan to get it right.
• Experience in all the right places.
• Get construction involved early.
![Page 27: Project Engineering This is NOT where you want is NOT where you want to find your ... •Executed projects with 8 different Engineering companies •Contracts: LSTK, EPC, ... without](https://reader034.vdocument.in/reader034/viewer/2022051723/5ab482e17f8b9a6e1c8bec06/html5/thumbnails/27.jpg)
• Fill out an index card
• Text – 251-377-4495
Questions?
![Page 28: Project Engineering This is NOT where you want is NOT where you want to find your ... •Executed projects with 8 different Engineering companies •Contracts: LSTK, EPC, ... without](https://reader034.vdocument.in/reader034/viewer/2022051723/5ab482e17f8b9a6e1c8bec06/html5/thumbnails/28.jpg)
• How does project engineering minimize the impact of an ever evolving design?
• How do you know when to kill the engineer, finish construction and start up?
• Is this the sole responsibility of the Owner?
Ongoing Design – Scope Creep
![Page 29: Project Engineering This is NOT where you want is NOT where you want to find your ... •Executed projects with 8 different Engineering companies •Contracts: LSTK, EPC, ... without](https://reader034.vdocument.in/reader034/viewer/2022051723/5ab482e17f8b9a6e1c8bec06/html5/thumbnails/29.jpg)
• Discipline, discipline, discipline.
• Learn when to FREEZE! Live with it.
• Engineers abhor a vacuum. An engineer will fill the schedule.
• Rods up, pencils down.
• Accountability: Project manager, owner. Hold engineers accountable to schedule.
• Could be EPC contractor depending on contracts.
Famous Sayings
![Page 30: Project Engineering This is NOT where you want is NOT where you want to find your ... •Executed projects with 8 different Engineering companies •Contracts: LSTK, EPC, ... without](https://reader034.vdocument.in/reader034/viewer/2022051723/5ab482e17f8b9a6e1c8bec06/html5/thumbnails/30.jpg)
• Definition of Project Controls – Part of the project team dedicated to making sure we do what we’re supposed to do.
• Why is this needed?
• Is it a good thing?
• How to determine if it is worth the cost?
• Keys to execution
Project Controls
![Page 31: Project Engineering This is NOT where you want is NOT where you want to find your ... •Executed projects with 8 different Engineering companies •Contracts: LSTK, EPC, ... without](https://reader034.vdocument.in/reader034/viewer/2022051723/5ab482e17f8b9a6e1c8bec06/html5/thumbnails/31.jpg)
• Absolutely necessary.
• Can’t manage project by “feel”?
• Cost should be minimal.
• Focuses on forecasts, not the past.
• Early warning system.
• Develop the correct project metrics and monitor religiously.
We all agree!
![Page 32: Project Engineering This is NOT where you want is NOT where you want to find your ... •Executed projects with 8 different Engineering companies •Contracts: LSTK, EPC, ... without](https://reader034.vdocument.in/reader034/viewer/2022051723/5ab482e17f8b9a6e1c8bec06/html5/thumbnails/32.jpg)
• Fill out an index card
• Text – 251-377-4495
Questions?
![Page 33: Project Engineering This is NOT where you want is NOT where you want to find your ... •Executed projects with 8 different Engineering companies •Contracts: LSTK, EPC, ... without](https://reader034.vdocument.in/reader034/viewer/2022051723/5ab482e17f8b9a6e1c8bec06/html5/thumbnails/33.jpg)
• Project Engineering is the key component to a successful project. How do we make sure each participant understands and accepts the appropriate risk?
• When is the appropriate time to have clear understanding? Why can’t we get it done at the beginning?
• How can we stay out of court?
• Ultimately – Is the owner responsible?
RISK is not just a Board Game.
![Page 34: Project Engineering This is NOT where you want is NOT where you want to find your ... •Executed projects with 8 different Engineering companies •Contracts: LSTK, EPC, ... without](https://reader034.vdocument.in/reader034/viewer/2022051723/5ab482e17f8b9a6e1c8bec06/html5/thumbnails/34.jpg)
Risky Business
• Clear and concise and
proven contract
language.
• Address risk and
problems immediately,
DO NOT WAIT!
• Agree on Project Risk
Matrix.
• He who controls risk
should take
responsibility.
• Anna Karenina Project
Model
• Owner should allocate
risk contractually.
• Some risks only the
Owner can have.
• Owner has to live with
it.
![Page 35: Project Engineering This is NOT where you want is NOT where you want to find your ... •Executed projects with 8 different Engineering companies •Contracts: LSTK, EPC, ... without](https://reader034.vdocument.in/reader034/viewer/2022051723/5ab482e17f8b9a6e1c8bec06/html5/thumbnails/35.jpg)
• One trend among owners is to have third party oversight of the Engineer and/or Constructor.
• Why is this needed?
• Is it a good thing?
• How to determine if it is worth the cost?
• Keys to execution
Third Part Oversight
![Page 36: Project Engineering This is NOT where you want is NOT where you want to find your ... •Executed projects with 8 different Engineering companies •Contracts: LSTK, EPC, ... without](https://reader034.vdocument.in/reader034/viewer/2022051723/5ab482e17f8b9a6e1c8bec06/html5/thumbnails/36.jpg)
• Inexperienced Owner
• Limited resources available.
• Roles defined and communicated
• Danger of competing agendas
• Adds cost and redundancy
• Owner has to evaluate his/her Project toolbox
Survey says!
![Page 37: Project Engineering This is NOT where you want is NOT where you want to find your ... •Executed projects with 8 different Engineering companies •Contracts: LSTK, EPC, ... without](https://reader034.vdocument.in/reader034/viewer/2022051723/5ab482e17f8b9a6e1c8bec06/html5/thumbnails/37.jpg)
• How can Project Engineering influence:
• Construction?
• Operations?
Safety
![Page 38: Project Engineering This is NOT where you want is NOT where you want to find your ... •Executed projects with 8 different Engineering companies •Contracts: LSTK, EPC, ... without](https://reader034.vdocument.in/reader034/viewer/2022051723/5ab482e17f8b9a6e1c8bec06/html5/thumbnails/38.jpg)
• Design for construction techniques and risk
• Constructability reviews
• Include construction and operations in all safety
reviews
• Detailed planning on sequence of construction
• Project Engineering need to insure mindset
Safety Pays:
![Page 39: Project Engineering This is NOT where you want is NOT where you want to find your ... •Executed projects with 8 different Engineering companies •Contracts: LSTK, EPC, ... without](https://reader034.vdocument.in/reader034/viewer/2022051723/5ab482e17f8b9a6e1c8bec06/html5/thumbnails/39.jpg)
• How do you integrate a third party technology provider into the project team?
• Owner?
• Engineer?
• Constructor?
• How do you handle the risk?
Third Party Technology Providers
![Page 40: Project Engineering This is NOT where you want is NOT where you want to find your ... •Executed projects with 8 different Engineering companies •Contracts: LSTK, EPC, ... without](https://reader034.vdocument.in/reader034/viewer/2022051723/5ab482e17f8b9a6e1c8bec06/html5/thumbnails/40.jpg)
• Contractual synergy – all parties
• Assigning risk adds cost
• Define responsibilities and deliverables
• Performance guarantees
Get it straight up front
![Page 41: Project Engineering This is NOT where you want is NOT where you want to find your ... •Executed projects with 8 different Engineering companies •Contracts: LSTK, EPC, ... without](https://reader034.vdocument.in/reader034/viewer/2022051723/5ab482e17f8b9a6e1c8bec06/html5/thumbnails/41.jpg)
What is the biggest hindrance to communications:
• Owner to Engineer?
• Engineer to Constructor?
• Owner to Constructor?
Then how to improve?
Communications
![Page 42: Project Engineering This is NOT where you want is NOT where you want to find your ... •Executed projects with 8 different Engineering companies •Contracts: LSTK, EPC, ... without](https://reader034.vdocument.in/reader034/viewer/2022051723/5ab482e17f8b9a6e1c8bec06/html5/thumbnails/42.jpg)
• Owner be full time present.
• Talk, don’t email.
• Get goals aligned and check often.
• Meet face to face.
• Then talk some more.
Get Personal:
![Page 43: Project Engineering This is NOT where you want is NOT where you want to find your ... •Executed projects with 8 different Engineering companies •Contracts: LSTK, EPC, ... without](https://reader034.vdocument.in/reader034/viewer/2022051723/5ab482e17f8b9a6e1c8bec06/html5/thumbnails/43.jpg)
Project engineering becomes more critical?
• Craft labor shortage/ skill deterioration?
• Professional labor shortage?
• Modularization in all it’s forms
What is the Future? Is the Future Now?
![Page 44: Project Engineering This is NOT where you want is NOT where you want to find your ... •Executed projects with 8 different Engineering companies •Contracts: LSTK, EPC, ... without](https://reader034.vdocument.in/reader034/viewer/2022051723/5ab482e17f8b9a6e1c8bec06/html5/thumbnails/44.jpg)
• Blatant advertisement – Go to the forums on this stuff.
• Send in evaluations
Matt says:
![Page 45: Project Engineering This is NOT where you want is NOT where you want to find your ... •Executed projects with 8 different Engineering companies •Contracts: LSTK, EPC, ... without](https://reader034.vdocument.in/reader034/viewer/2022051723/5ab482e17f8b9a6e1c8bec06/html5/thumbnails/45.jpg)