Project Experience Using Information Models for Design and Detailing
AASHTO SCOBS Meeting June 12, 2017T-19 Subcommittee
Josh Sletten, PE and Francesca Maier, PE
![Page 2: Project Experience Using Information Models for …...Project Experience Using Information Models for Design and Detailing AASHTO SCOBS Meeting June 12, 2017 T-19 Subcommittee Josh](https://reader033.vdocument.in/reader033/viewer/2022041904/5e62a9c0d6203122d71c5ef9/html5/thumbnails/2.jpg)
Agenda
• Sustaining a 21st Century Workforce• Favorable Uses for 3D Models in Design• Managing Risks Associated with 3D Models
2
![Page 3: Project Experience Using Information Models for …...Project Experience Using Information Models for Design and Detailing AASHTO SCOBS Meeting June 12, 2017 T-19 Subcommittee Josh](https://reader033.vdocument.in/reader033/viewer/2022041904/5e62a9c0d6203122d71c5ef9/html5/thumbnails/3.jpg)
Sustaining a 21st Century WorkforceJosh Sletten, PEWSP Bridge Area Manager – Utah, Idaho & Montana
3
![Page 4: Project Experience Using Information Models for …...Project Experience Using Information Models for Design and Detailing AASHTO SCOBS Meeting June 12, 2017 T-19 Subcommittee Josh](https://reader033.vdocument.in/reader033/viewer/2022041904/5e62a9c0d6203122d71c5ef9/html5/thumbnails/4.jpg)
Workforce Development
4
![Page 5: Project Experience Using Information Models for …...Project Experience Using Information Models for Design and Detailing AASHTO SCOBS Meeting June 12, 2017 T-19 Subcommittee Josh](https://reader033.vdocument.in/reader033/viewer/2022041904/5e62a9c0d6203122d71c5ef9/html5/thumbnails/5.jpg)
Using BrIM before there are Standards
5Image Credit: FHWA
![Page 6: Project Experience Using Information Models for …...Project Experience Using Information Models for Design and Detailing AASHTO SCOBS Meeting June 12, 2017 T-19 Subcommittee Josh](https://reader033.vdocument.in/reader033/viewer/2022041904/5e62a9c0d6203122d71c5ef9/html5/thumbnails/6.jpg)
Favorable Uses for Different Project TypesJosh Sletten, PEWSP Bridge Area Manager – Utah, Idaho & Montana
6
![Page 7: Project Experience Using Information Models for …...Project Experience Using Information Models for Design and Detailing AASHTO SCOBS Meeting June 12, 2017 T-19 Subcommittee Josh](https://reader033.vdocument.in/reader033/viewer/2022041904/5e62a9c0d6203122d71c5ef9/html5/thumbnails/7.jpg)
Design Production
7
![Page 8: Project Experience Using Information Models for …...Project Experience Using Information Models for Design and Detailing AASHTO SCOBS Meeting June 12, 2017 T-19 Subcommittee Josh](https://reader033.vdocument.in/reader033/viewer/2022041904/5e62a9c0d6203122d71c5ef9/html5/thumbnails/8.jpg)
Detailing
8
![Page 9: Project Experience Using Information Models for …...Project Experience Using Information Models for Design and Detailing AASHTO SCOBS Meeting June 12, 2017 T-19 Subcommittee Josh](https://reader033.vdocument.in/reader033/viewer/2022041904/5e62a9c0d6203122d71c5ef9/html5/thumbnails/9.jpg)
Data Repository for Asset Information
9
“Subdivision of individual elements shall be at an appropriate scale, determined by the Private Partner. Subdivision at the scale of, for example, “bridge” is not
acceptable, and subdivision at the scale of, for example, “bolt” is not necessary.”
Geometry and Data
![Page 10: Project Experience Using Information Models for …...Project Experience Using Information Models for Design and Detailing AASHTO SCOBS Meeting June 12, 2017 T-19 Subcommittee Josh](https://reader033.vdocument.in/reader033/viewer/2022041904/5e62a9c0d6203122d71c5ef9/html5/thumbnails/10.jpg)
Managing Risks Associated with 3D ModelsFrancesca Maier, PEService Area Manager—CIM
10
![Page 11: Project Experience Using Information Models for …...Project Experience Using Information Models for Design and Detailing AASHTO SCOBS Meeting June 12, 2017 T-19 Subcommittee Josh](https://reader033.vdocument.in/reader033/viewer/2022041904/5e62a9c0d6203122d71c5ef9/html5/thumbnails/11.jpg)
Michigan DOT Research Project
11
https://mdotjboss.state.mi.us/SpecProv/trainingmaterials.htm
Talia N. Belill, P.E.Michigan DOTEngineering Support ServicesOffice: [email protected]
![Page 12: Project Experience Using Information Models for …...Project Experience Using Information Models for Design and Detailing AASHTO SCOBS Meeting June 12, 2017 T-19 Subcommittee Josh](https://reader033.vdocument.in/reader033/viewer/2022041904/5e62a9c0d6203122d71c5ef9/html5/thumbnails/12.jpg)
Cannot use the data. Specify deliverables.
Protect Institutional Data Assets
12
![Page 13: Project Experience Using Information Models for …...Project Experience Using Information Models for Design and Detailing AASHTO SCOBS Meeting June 12, 2017 T-19 Subcommittee Josh](https://reader033.vdocument.in/reader033/viewer/2022041904/5e62a9c0d6203122d71c5ef9/html5/thumbnails/13.jpg)
Data doesn’t align to the BMS. Specify minimum resolution.
Segmentation of 3D Model Elements
Accu
racy
of 3
D D
imen
sion
slo
whi
gh
low high
Control Data Organization & Resolution
13
Clash Detection Fabrication
4D ModelingVisualization
![Page 14: Project Experience Using Information Models for …...Project Experience Using Information Models for Design and Detailing AASHTO SCOBS Meeting June 12, 2017 T-19 Subcommittee Josh](https://reader033.vdocument.in/reader033/viewer/2022041904/5e62a9c0d6203122d71c5ef9/html5/thumbnails/14.jpg)
Clearly Define Expectations
14Expensive & not as expected. Specify requirements by element.
![Page 15: Project Experience Using Information Models for …...Project Experience Using Information Models for Design and Detailing AASHTO SCOBS Meeting June 12, 2017 T-19 Subcommittee Josh](https://reader033.vdocument.in/reader033/viewer/2022041904/5e62a9c0d6203122d71c5ef9/html5/thumbnails/15.jpg)
Using 3D Models Created by Others
• Grid vs. Ground• Level of Development• Data Exchange
15Model used not as intended. Use element-level metadata.
![Page 16: Project Experience Using Information Models for …...Project Experience Using Information Models for Design and Detailing AASHTO SCOBS Meeting June 12, 2017 T-19 Subcommittee Josh](https://reader033.vdocument.in/reader033/viewer/2022041904/5e62a9c0d6203122d71c5ef9/html5/thumbnails/16.jpg)
Questions
Coming Soon!Guide for Creating 3D Engineered Models for Bridges and Structureshttps://www.fhwa.dot.gov/construction/3d/guidance.cfm