5-2 Copyright © 2010 Pearson Education,
Inc. Publishing as Prentice Hall
Project Scope
Project scope is everything about a project – work content as well as expected outcomes.
Scope management is the function of controlling
a project in terms of its goals and objectives and consists of:
1) Conceptual development 4) Scope reporting 2) Scope statement 5) Control systems 3) Work authorization 6) Project closeout
![Page 3: Project Management C5 -scope_management](https://reader034.vdocument.in/reader034/viewer/2022042713/545c8fa8b0af9fa92c8b489d/html5/thumbnails/3.jpg)
5-3 Copyright © 2010 Pearson Education,
Inc. Publishing as Prentice Hall
Conceptual Development
The process that addresses project objectives by finding the best ways to meet them.
Key steps in information development: • Problem/need statement • Information gathering • Constraints • Alternative analysis • Project objectives
![Page 4: Project Management C5 -scope_management](https://reader034.vdocument.in/reader034/viewer/2022042713/545c8fa8b0af9fa92c8b489d/html5/thumbnails/4.jpg)
5-4 Copyright © 2010 Pearson Education,
Inc. Publishing as Prentice Hall
Problem Statements
Successful conceptual development requires:
• Reduction of overall project complexity
• Goals and objects are clearly stated –Reference points are provided
• Complete understanding of the problem
![Page 5: Project Management C5 -scope_management](https://reader034.vdocument.in/reader034/viewer/2022042713/545c8fa8b0af9fa92c8b489d/html5/thumbnails/5.jpg)
5-5 Copyright © 2010 Pearson Education,
Inc. Publishing as Prentice Hall
Statement of Work (SOW)
A SOW is a detailed narrative description of the work required for a project.
Effective SOWs contain
1. Introduction and background
2. Technical description
3. Timeline and milestones
4. Client expectations
![Page 6: Project Management C5 -scope_management](https://reader034.vdocument.in/reader034/viewer/2022042713/545c8fa8b0af9fa92c8b489d/html5/thumbnails/6.jpg)
5-6 Copyright © 2010 Pearson Education,
Inc. Publishing as Prentice Hall
The Scope Statement Process
1. Establish the project goal criteria a) cost
b) schedule
c) performance
d) deliverables
e) review and approval gates
2. Develop the management plan for the project
3. Establish a work breakdown structure
4. Create a scope baseline
![Page 7: Project Management C5 -scope_management](https://reader034.vdocument.in/reader034/viewer/2022042713/545c8fa8b0af9fa92c8b489d/html5/thumbnails/7.jpg)
5-7 Copyright © 2010 Pearson Education,
Inc. Publishing as Prentice Hall
Work Breakdown Structure
a process that sets a project’s scope by breaking down its overall mission into a cohesive set of synchronous, increasingly specific tasks.
What does WBS accomplish?
Echoes project objectives
Offers a logical structure
Establishes a method of control
Communicates project status
Improves communication
Demonstrates control structure
![Page 8: Project Management C5 -scope_management](https://reader034.vdocument.in/reader034/viewer/2022042713/545c8fa8b0af9fa92c8b489d/html5/thumbnails/8.jpg)
5-8 Copyright © 2010 Pearson Education,
Inc. Publishing as Prentice Hall
Work Breakdown Structure and Codes
Work Packages are individual project activities
1.0
1.2 1.3 1.4
1.2.1
1.2.2
1.2.3
1.3.1
1.3.2
1.2.3.1
1.2.3.2
Deliverables are major project components
Subdeliverables are supporting deliverables
The project is the overall project under development
![Page 9: Project Management C5 -scope_management](https://reader034.vdocument.in/reader034/viewer/2022042713/545c8fa8b0af9fa92c8b489d/html5/thumbnails/9.jpg)
![Page 10: Project Management C5 -scope_management](https://reader034.vdocument.in/reader034/viewer/2022042713/545c8fa8b0af9fa92c8b489d/html5/thumbnails/10.jpg)
![Page 11: Project Management C5 -scope_management](https://reader034.vdocument.in/reader034/viewer/2022042713/545c8fa8b0af9fa92c8b489d/html5/thumbnails/11.jpg)
5-13 Copyright © 2010 Pearson Education,
Inc. Publishing as Prentice Hall
Organizational Breakdown Structure
Organizational Breakdown Structure (OBS) allows
• Work definition
• Owner assignment of work packages
• Budget assignment to departments
OBS links cost, activity & responsibility
![Page 12: Project Management C5 -scope_management](https://reader034.vdocument.in/reader034/viewer/2022042713/545c8fa8b0af9fa92c8b489d/html5/thumbnails/12.jpg)
5-14 Copyright © 2010 Pearson Education,
Inc. Publishing as Prentice Hall
Responsibility Assignment Matrix
Notification Responsible Support Approval
LEAD PROJECT PERSONNEL
Bob IS
Dave Sue HR
Ann R&D
Jim R&D
Task & Code Deliverable IS
Match IT to Org. Tasks
proposal Prepare
1.3
1.1
Identify IS user needs
1.2
Problem Analysis
Develop info
Interview
users
show Develop
Gain user “buy in”
Find cost/ benefit info
1.1.1
1.1.2
1.2.1
1.2.2
1.2.3
1.3.1
![Page 13: Project Management C5 -scope_management](https://reader034.vdocument.in/reader034/viewer/2022042713/545c8fa8b0af9fa92c8b489d/html5/thumbnails/13.jpg)
5-15 Copyright © 2010 Pearson Education,
Inc. Publishing as Prentice Hall
Work Authorization
The formal “go ahead” to begin work
Follows the scope management steps of:
1. scope definition
2. planning documents
3. management plans
4. contractual documents
![Page 14: Project Management C5 -scope_management](https://reader034.vdocument.in/reader034/viewer/2022042713/545c8fa8b0af9fa92c8b489d/html5/thumbnails/14.jpg)
5-16 Copyright © 2010 Pearson Education,
Inc. Publishing as Prentice Hall
Contractual Documentation
Most contracts contain:
Requirements
Valid consideration
Contracted terms
Contracts range from: Lump Sum Cost Plus
also called “Turnkey”
![Page 15: Project Management C5 -scope_management](https://reader034.vdocument.in/reader034/viewer/2022042713/545c8fa8b0af9fa92c8b489d/html5/thumbnails/15.jpg)
5-17 Copyright © 2010 Pearson Education,
Inc. Publishing as Prentice Hall
Scope Reporting
determines what types of information reported, who receives copies, when, and how information is acquired and disseminated.
Typical project reports contain
1. Cost status
2. Schedule status
3. Technical performance
![Page 16: Project Management C5 -scope_management](https://reader034.vdocument.in/reader034/viewer/2022042713/545c8fa8b0af9fa92c8b489d/html5/thumbnails/16.jpg)
5-18 Copyright © 2010 Pearson Education,
Inc. Publishing as Prentice Hall
Types of Control Systems
o Configuration
o Design
o Trend monitoring
o Document
o Acquisition
o Specification
![Page 17: Project Management C5 -scope_management](https://reader034.vdocument.in/reader034/viewer/2022042713/545c8fa8b0af9fa92c8b489d/html5/thumbnails/17.jpg)
5-19 Copyright © 2010 Pearson Education,
Inc. Publishing as Prentice Hall
Project Closeout
The job is not over until the paperwork is done…
Closeout documentation is used to:
Resolve disputes
Train project managers
Facilitate auditing
Closeout documentation includes:
Historical records
Post project analysis
Financial closeout
![Page 18: Project Management C5 -scope_management](https://reader034.vdocument.in/reader034/viewer/2022042713/545c8fa8b0af9fa92c8b489d/html5/thumbnails/18.jpg)
What about IT Projects????
5-20 Copyright © 2010 Pearson Education,
Inc. Publishing as Prentice Hall
![Page 19: Project Management C5 -scope_management](https://reader034.vdocument.in/reader034/viewer/2022042713/545c8fa8b0af9fa92c8b489d/html5/thumbnails/19.jpg)
FLOWCHART
5-21 Copyright © 2010 Pearson Education,
Inc. Publishing as Prentice Hall
![Page 20: Project Management C5 -scope_management](https://reader034.vdocument.in/reader034/viewer/2022042713/545c8fa8b0af9fa92c8b489d/html5/thumbnails/20.jpg)
5-22 Copyright © 2010 Pearson Education,
Inc. Publishing as Prentice Hall
![Page 21: Project Management C5 -scope_management](https://reader034.vdocument.in/reader034/viewer/2022042713/545c8fa8b0af9fa92c8b489d/html5/thumbnails/21.jpg)
5-23 Copyright © 2010 Pearson Education,
Inc. Publishing as Prentice Hall
![Page 22: Project Management C5 -scope_management](https://reader034.vdocument.in/reader034/viewer/2022042713/545c8fa8b0af9fa92c8b489d/html5/thumbnails/22.jpg)
5-24 Copyright © 2010 Pearson Education,
Inc. Publishing as Prentice Hall
Sample WBS in MS Project
![Page 23: Project Management C5 -scope_management](https://reader034.vdocument.in/reader034/viewer/2022042713/545c8fa8b0af9fa92c8b489d/html5/thumbnails/23.jpg)
5-25 Copyright © 2010 Pearson Education,
Inc. Publishing as Prentice Hall
![Page 24: Project Management C5 -scope_management](https://reader034.vdocument.in/reader034/viewer/2022042713/545c8fa8b0af9fa92c8b489d/html5/thumbnails/24.jpg)
5-26 Copyright © 2010 Pearson Education,
Inc. Publishing as Prentice Hall
![Page 25: Project Management C5 -scope_management](https://reader034.vdocument.in/reader034/viewer/2022042713/545c8fa8b0af9fa92c8b489d/html5/thumbnails/25.jpg)
5-27 Copyright © 2010 Pearson Education,
Inc. Publishing as Prentice Hall
Responsibility Assignment Matrix
Notification Responsible Support Approval
LEAD PROJECT PERSONNEL
Bob IS
Dave Sue HR
Ann R&D
Jim R&D
Task & Code Deliverable IS
Match IT to Org. Tasks
proposal Prepare
1.3
1.1
Identify IS user needs
1.2
Problem Analysis
Develop info
Interview
users
show Develop
Gain user “buy in”
Find cost/ benefit info
1.1.1
1.1.2
1.2.1
1.2.2
1.2.3
1.3.1
![Page 26: Project Management C5 -scope_management](https://reader034.vdocument.in/reader034/viewer/2022042713/545c8fa8b0af9fa92c8b489d/html5/thumbnails/26.jpg)
5-28 Copyright © 2010 Pearson Education,
Inc. Publishing as Prentice Hall
![Page 27: Project Management C5 -scope_management](https://reader034.vdocument.in/reader034/viewer/2022042713/545c8fa8b0af9fa92c8b489d/html5/thumbnails/27.jpg)
5-29 Copyright © 2010 Pearson Education,
Inc. Publishing as Prentice Hall