Project Management in Practice Fifth Edition
Copyright © 2014 John Wiley & Sons, Inc.
Chapter 5
Scheduling the Project
![Page 2: Project Management in Practice Fifth Edition Chapter 5 ...€¦ · ± Gantt charts ± PERT network ± CPM network . 5-3 PERT and CPM Networks PERT and CPM developed independently](https://reader030.vdocument.in/reader030/viewer/2022020121/5baf30ea09d3f2c70e8c0177/html5/thumbnails/2.jpg)
5-2
Introduction
• Project schedule is the project plan in an altered format
• It is a convenient form for monitoring and controlling project activities
• Can be prepared in several formats
– Gantt charts
– PERT network
– CPM network
![Page 3: Project Management in Practice Fifth Edition Chapter 5 ...€¦ · ± Gantt charts ± PERT network ± CPM network . 5-3 PERT and CPM Networks PERT and CPM developed independently](https://reader030.vdocument.in/reader030/viewer/2022020121/5baf30ea09d3f2c70e8c0177/html5/thumbnails/3.jpg)
5-3
PERT and CPM Networks
• PERT and CPM developed independently in 1950’s
• Program Evaluation and Review Technique (PERT) – U.S. Navy, Booz-Allen Hamilton, and Lockheed
Aircraft
– Probabilistic activity durations
• Critical Path Method (CPM) – Dupont De Nemours Inc.
– Deterministic activity durations
![Page 4: Project Management in Practice Fifth Edition Chapter 5 ...€¦ · ± Gantt charts ± PERT network ± CPM network . 5-3 PERT and CPM Networks PERT and CPM developed independently](https://reader030.vdocument.in/reader030/viewer/2022020121/5baf30ea09d3f2c70e8c0177/html5/thumbnails/4.jpg)
5-4
The Language of PERT/CPM
• Activity – A task or set of tasks
– Uses resources and time
• Event – An identifiable state resulting from completion of one
or more activities
– Consumes no resources or time
– Predecessor activities must be completed
• Milestones – Identifiable and noteworthy events that mark significant
progress
![Page 5: Project Management in Practice Fifth Edition Chapter 5 ...€¦ · ± Gantt charts ± PERT network ± CPM network . 5-3 PERT and CPM Networks PERT and CPM developed independently](https://reader030.vdocument.in/reader030/viewer/2022020121/5baf30ea09d3f2c70e8c0177/html5/thumbnails/5.jpg)
5-5
The Language of PERT/CPM Continued
• Network
– A diagram of nodes (activities or events) and arrows (directional arcs) that illustrate the technological relationships of activities
• Path
– A series of connected activities between two events
• Critical path
– The set of activities on a path that, if delayed, will delay the completion date of the project
• Critical Time
– The time required to complete all activities on the critical path
![Page 6: Project Management in Practice Fifth Edition Chapter 5 ...€¦ · ± Gantt charts ± PERT network ± CPM network . 5-3 PERT and CPM Networks PERT and CPM developed independently](https://reader030.vdocument.in/reader030/viewer/2022020121/5baf30ea09d3f2c70e8c0177/html5/thumbnails/6.jpg)
5-6
Building the Network
• There are two ways of displaying a project network
1. Activities on arrows (AOA) network • The activities are shown as arrows and events as nodes
• Generally more difficult to draw but depicts the technical relationships of the activities well
2. Activities on nodes (AON) network • Each task is shown as a node and the technological
relationship is shown by the arrows
• AON network usually associated with CPM
• AOA network usually associated with PERT
![Page 7: Project Management in Practice Fifth Edition Chapter 5 ...€¦ · ± Gantt charts ± PERT network ± CPM network . 5-3 PERT and CPM Networks PERT and CPM developed independently](https://reader030.vdocument.in/reader030/viewer/2022020121/5baf30ea09d3f2c70e8c0177/html5/thumbnails/7.jpg)
5-7
Sample AON Network
Table 5-1 Figure 5-3
![Page 8: Project Management in Practice Fifth Edition Chapter 5 ...€¦ · ± Gantt charts ± PERT network ± CPM network . 5-3 PERT and CPM Networks PERT and CPM developed independently](https://reader030.vdocument.in/reader030/viewer/2022020121/5baf30ea09d3f2c70e8c0177/html5/thumbnails/8.jpg)
5-8
Sample AOA Network
Table 5-1 Figure 5-6 (a)
![Page 9: Project Management in Practice Fifth Edition Chapter 5 ...€¦ · ± Gantt charts ± PERT network ± CPM network . 5-3 PERT and CPM Networks PERT and CPM developed independently](https://reader030.vdocument.in/reader030/viewer/2022020121/5baf30ea09d3f2c70e8c0177/html5/thumbnails/9.jpg)
5-9
Which to Use?
• Mostly AON used throughout this textbook
• AON used by most of the popular software
• AON networks are easier to draw by hand
– Large (20+ activities) AOA networks are
difficult to draw
• Software to draw AOA networks is
expensive
![Page 10: Project Management in Practice Fifth Edition Chapter 5 ...€¦ · ± Gantt charts ± PERT network ± CPM network . 5-3 PERT and CPM Networks PERT and CPM developed independently](https://reader030.vdocument.in/reader030/viewer/2022020121/5baf30ea09d3f2c70e8c0177/html5/thumbnails/10.jpg)
5-10
Finding the Critical Path and Critical
Time
• ES: Earliest start time
• EF: Earliest finish time
• LS: Latest start time
• LF: Latest finish time
• Displayed on node as shown
• ES + completion = EF
• LS + completion = LF Figure 5-9
![Page 11: Project Management in Practice Fifth Edition Chapter 5 ...€¦ · ± Gantt charts ± PERT network ± CPM network . 5-3 PERT and CPM Networks PERT and CPM developed independently](https://reader030.vdocument.in/reader030/viewer/2022020121/5baf30ea09d3f2c70e8c0177/html5/thumbnails/11.jpg)
5-11
A Sample Problem for Finding the
Critical Path and Critical Time
Table 5-2
![Page 12: Project Management in Practice Fifth Edition Chapter 5 ...€¦ · ± Gantt charts ± PERT network ± CPM network . 5-3 PERT and CPM Networks PERT and CPM developed independently](https://reader030.vdocument.in/reader030/viewer/2022020121/5baf30ea09d3f2c70e8c0177/html5/thumbnails/12.jpg)
5-12
The Complete Network
Table 5-2 and Figure 5-8
![Page 13: Project Management in Practice Fifth Edition Chapter 5 ...€¦ · ± Gantt charts ± PERT network ± CPM network . 5-3 PERT and CPM Networks PERT and CPM developed independently](https://reader030.vdocument.in/reader030/viewer/2022020121/5baf30ea09d3f2c70e8c0177/html5/thumbnails/13.jpg)
5-13
The Critical Path and Completion
Time for Sample Project
Figure 5-10
![Page 14: Project Management in Practice Fifth Edition Chapter 5 ...€¦ · ± Gantt charts ± PERT network ± CPM network . 5-3 PERT and CPM Networks PERT and CPM developed independently](https://reader030.vdocument.in/reader030/viewer/2022020121/5baf30ea09d3f2c70e8c0177/html5/thumbnails/14.jpg)
5-14
Notes on Sample Project
• All activities, and thus all paths, must be
completed to finish the project
• The shortest time for completion of the network is
equal to the longest path through the network
– In this case a-e-h-j
• If any activity on this path
is even slightly delayed,
the project will be delayed
![Page 15: Project Management in Practice Fifth Edition Chapter 5 ...€¦ · ± Gantt charts ± PERT network ± CPM network . 5-3 PERT and CPM Networks PERT and CPM developed independently](https://reader030.vdocument.in/reader030/viewer/2022020121/5baf30ea09d3f2c70e8c0177/html5/thumbnails/15.jpg)
5-15
Calculating Activity Slack
• ES: Earliest start time
• EF: Earliest finish time
• LS: Latest start time
• LF: Latest finish time
• Slack = LS – ES
• Slack = LF – EF
• Either method of calculating slack gives the same
results
![Page 16: Project Management in Practice Fifth Edition Chapter 5 ...€¦ · ± Gantt charts ± PERT network ± CPM network . 5-3 PERT and CPM Networks PERT and CPM developed independently](https://reader030.vdocument.in/reader030/viewer/2022020121/5baf30ea09d3f2c70e8c0177/html5/thumbnails/16.jpg)
5-16
Managerial Implications
• The primary attention of the project
manager must be to activities on the critical
path
• If anything delays one of these activities,
the project will be late
• Projects are easier to manage when there is
project slack
![Page 17: Project Management in Practice Fifth Edition Chapter 5 ...€¦ · ± Gantt charts ± PERT network ± CPM network . 5-3 PERT and CPM Networks PERT and CPM developed independently](https://reader030.vdocument.in/reader030/viewer/2022020121/5baf30ea09d3f2c70e8c0177/html5/thumbnails/17.jpg)
5-17
Doing It the Easy Way—Microsoft
Project (MSP)
• Data is entered using a tab entry table
– Shown on next slide
• MSP automatically numbers each activity
• MSP has numerous options for viewing the
data
• MSP automatically draws an AON network
– Shown on later slide
![Page 18: Project Management in Practice Fifth Edition Chapter 5 ...€¦ · ± Gantt charts ± PERT network ± CPM network . 5-3 PERT and CPM Networks PERT and CPM developed independently](https://reader030.vdocument.in/reader030/viewer/2022020121/5baf30ea09d3f2c70e8c0177/html5/thumbnails/18.jpg)
5-18
A Microsoft Project Version of Data
in Table 5-2
Table 5-3
![Page 19: Project Management in Practice Fifth Edition Chapter 5 ...€¦ · ± Gantt charts ± PERT network ± CPM network . 5-3 PERT and CPM Networks PERT and CPM developed independently](https://reader030.vdocument.in/reader030/viewer/2022020121/5baf30ea09d3f2c70e8c0177/html5/thumbnails/19.jpg)
5-19
A Microsoft Project Version of the
PERT/CPM Network from Table 5-3
Figure 5-11
![Page 20: Project Management in Practice Fifth Edition Chapter 5 ...€¦ · ± Gantt charts ± PERT network ± CPM network . 5-3 PERT and CPM Networks PERT and CPM developed independently](https://reader030.vdocument.in/reader030/viewer/2022020121/5baf30ea09d3f2c70e8c0177/html5/thumbnails/20.jpg)
5-20
Calculating Probabilistic Activity
Times
• Figure below shows distribution of all possible
durations for some task
• Estimate a is such that the actual duration of the
task will be a or lower less than 1 percent of the
time
• Estimate b is such that the actual finish time will
be b or greater less than 1 percent of the time
• Estimate m is the most likely time
Figure 5-13
![Page 21: Project Management in Practice Fifth Edition Chapter 5 ...€¦ · ± Gantt charts ± PERT network ± CPM network . 5-3 PERT and CPM Networks PERT and CPM developed independently](https://reader030.vdocument.in/reader030/viewer/2022020121/5baf30ea09d3f2c70e8c0177/html5/thumbnails/21.jpg)
5-21
Activity Expected Time and
Variance
2
2
E
6
)(Var
6
)4(T
ab
bma
![Page 22: Project Management in Practice Fifth Edition Chapter 5 ...€¦ · ± Gantt charts ± PERT network ± CPM network . 5-3 PERT and CPM Networks PERT and CPM developed independently](https://reader030.vdocument.in/reader030/viewer/2022020121/5baf30ea09d3f2c70e8c0177/html5/thumbnails/22.jpg)
5-22
95 Percent Level
• Task will be a or lower 5 percent of the
time
• Task will be b or greater 5 percent of the
time
3.3
)( ab
![Page 23: Project Management in Practice Fifth Edition Chapter 5 ...€¦ · ± Gantt charts ± PERT network ± CPM network . 5-3 PERT and CPM Networks PERT and CPM developed independently](https://reader030.vdocument.in/reader030/viewer/2022020121/5baf30ea09d3f2c70e8c0177/html5/thumbnails/23.jpg)
5-23
90 Percent Level
• Task will be a or lower 10 percent of the
time
• Task will be b or greater 10 percent of the
time
6.2
)( ab
![Page 24: Project Management in Practice Fifth Edition Chapter 5 ...€¦ · ± Gantt charts ± PERT network ± CPM network . 5-3 PERT and CPM Networks PERT and CPM developed independently](https://reader030.vdocument.in/reader030/viewer/2022020121/5baf30ea09d3f2c70e8c0177/html5/thumbnails/24.jpg)
5-24
The Probabilistic Network
• Expected time (TE) for each activity is calculated
• Variance (σ2) for each activity is calculated
• TE for each activity is used to find the critical path
and critical time for the network
– Slack is calculated in the usual fashion
• The variance (σ2) of a path is the sum of the
activity variances for that path
– Standard deviation (σ) is the square of the variance
![Page 25: Project Management in Practice Fifth Edition Chapter 5 ...€¦ · ± Gantt charts ± PERT network ± CPM network . 5-3 PERT and CPM Networks PERT and CPM developed independently](https://reader030.vdocument.in/reader030/viewer/2022020121/5baf30ea09d3f2c70e8c0177/html5/thumbnails/25.jpg)
5-25
The Probabilistic Network, an
Example
Table 5-4
![Page 26: Project Management in Practice Fifth Edition Chapter 5 ...€¦ · ± Gantt charts ± PERT network ± CPM network . 5-3 PERT and CPM Networks PERT and CPM developed independently](https://reader030.vdocument.in/reader030/viewer/2022020121/5baf30ea09d3f2c70e8c0177/html5/thumbnails/26.jpg)
5-26
Is it Really the Critical path
• Given uncertainty, cannot be sure that any specific path is the critical path
• “Critical” path may take less than expected while another path takes longer
• Only after the fact do we know which path was actually critical
• Managerial implication is the project manager must carefully manage all paths that have a reasonable probability of becoming critical
![Page 27: Project Management in Practice Fifth Edition Chapter 5 ...€¦ · ± Gantt charts ± PERT network ± CPM network . 5-3 PERT and CPM Networks PERT and CPM developed independently](https://reader030.vdocument.in/reader030/viewer/2022020121/5baf30ea09d3f2c70e8c0177/html5/thumbnails/27.jpg)
5-27
Once More the Easy Way
• Microsoft Project can easily handle the
probabilistic network
– However, it does not perform some of the calculations
– These can be done in Excel
• Microsoft Project calculates using a calendar
rather than days
• Uses a real-world calendar including weekends
and holidays
![Page 28: Project Management in Practice Fifth Edition Chapter 5 ...€¦ · ± Gantt charts ± PERT network ± CPM network . 5-3 PERT and CPM Networks PERT and CPM developed independently](https://reader030.vdocument.in/reader030/viewer/2022020121/5baf30ea09d3f2c70e8c0177/html5/thumbnails/28.jpg)
5-28
The Probability of Completing the
Project on Time
• Can the project be completed in X days?
• Can be answered with the information available concerning the level of uncertainty for the various project activities
– Assumes activities are statistically independent
• To complete a project by a specified time requires that all the paths in the network be completed by the specified time
![Page 29: Project Management in Practice Fifth Edition Chapter 5 ...€¦ · ± Gantt charts ± PERT network ± CPM network . 5-3 PERT and CPM Networks PERT and CPM developed independently](https://reader030.vdocument.in/reader030/viewer/2022020121/5baf30ea09d3f2c70e8c0177/html5/thumbnails/29.jpg)
5-29
The Probability of Completing the
Project on Time Continued
• Determining the probability that a project is
completed by a specified time requires calculating
the probability that all paths are finished by the
specified time
• We then calculate the probability that the entire
project is completed within the specified time by
multiplying these probabilities together
– This requires the assumption that the paths are
statistically independent
![Page 30: Project Management in Practice Fifth Edition Chapter 5 ...€¦ · ± Gantt charts ± PERT network ± CPM network . 5-3 PERT and CPM Networks PERT and CPM developed independently](https://reader030.vdocument.in/reader030/viewer/2022020121/5baf30ea09d3f2c70e8c0177/html5/thumbnails/30.jpg)
5-30
Calculating Path Probability
• D = desired project completion time
– 50 in this example
• μ = the sum of the TE activities on the path being investigated
– 47 in this example
• σ2u = the variance of the path
being considered
• A Z of 1.10 yields a probability of 0.8643 or 86 percent
Table 5-4
10.1
00.400.025.078.1
4750
2
D
Z
![Page 31: Project Management in Practice Fifth Edition Chapter 5 ...€¦ · ± Gantt charts ± PERT network ± CPM network . 5-3 PERT and CPM Networks PERT and CPM developed independently](https://reader030.vdocument.in/reader030/viewer/2022020121/5baf30ea09d3f2c70e8c0177/html5/thumbnails/31.jpg)
5-31
The Statistical Distribution of the
Completion Times for Example
Figure 5-18
![Page 32: Project Management in Practice Fifth Edition Chapter 5 ...€¦ · ± Gantt charts ± PERT network ± CPM network . 5-3 PERT and CPM Networks PERT and CPM developed independently](https://reader030.vdocument.in/reader030/viewer/2022020121/5baf30ea09d3f2c70e8c0177/html5/thumbnails/32.jpg)
5-32
Selecting Risk and Finding D
![Page 33: Project Management in Practice Fifth Edition Chapter 5 ...€¦ · ± Gantt charts ± PERT network ± CPM network . 5-3 PERT and CPM Networks PERT and CPM developed independently](https://reader030.vdocument.in/reader030/viewer/2022020121/5baf30ea09d3f2c70e8c0177/html5/thumbnails/33.jpg)
5-33
Simulation
• Simulation is a different approach to managing risk
• Builds on the probabilistic functions already discussed
• Helps to understand the consequences of uncertainty
• Provides insight into the range and distribution of project completion times
![Page 34: Project Management in Practice Fifth Edition Chapter 5 ...€¦ · ± Gantt charts ± PERT network ± CPM network . 5-3 PERT and CPM Networks PERT and CPM developed independently](https://reader030.vdocument.in/reader030/viewer/2022020121/5baf30ea09d3f2c70e8c0177/html5/thumbnails/34.jpg)
5-34
Crystal Ball Chart for Project
Completion Time
Figure 5-19
![Page 35: Project Management in Practice Fifth Edition Chapter 5 ...€¦ · ± Gantt charts ± PERT network ± CPM network . 5-3 PERT and CPM Networks PERT and CPM developed independently](https://reader030.vdocument.in/reader030/viewer/2022020121/5baf30ea09d3f2c70e8c0177/html5/thumbnails/35.jpg)
5-35
Traditional Statistics vs. Simulation
• Both approaches assume that task times are
statistically independent
• Both approaches assume the paths are independent
– A simulation can circumvent the assumption of
statistical independence by including the activity or
path dependencies as part of the model
• Simulation requires less computational effort
![Page 36: Project Management in Practice Fifth Edition Chapter 5 ...€¦ · ± Gantt charts ± PERT network ± CPM network . 5-3 PERT and CPM Networks PERT and CPM developed independently](https://reader030.vdocument.in/reader030/viewer/2022020121/5baf30ea09d3f2c70e8c0177/html5/thumbnails/36.jpg)
5-36
The Gantt Chart
• Henry Gantt developed the Gantt chart
around 1917
• It displays project activities as bars
measured against a horizontal time scale
• Most popular way of exhibiting sets of
related activities in the form of schedules
![Page 37: Project Management in Practice Fifth Edition Chapter 5 ...€¦ · ± Gantt charts ± PERT network ± CPM network . 5-3 PERT and CPM Networks PERT and CPM developed independently](https://reader030.vdocument.in/reader030/viewer/2022020121/5baf30ea09d3f2c70e8c0177/html5/thumbnails/37.jpg)
5-37
The Chart
• Gantt charts are easy to draw
• Problems arise when several tasks begin at the same time and have the same duration
– Can make it hard to find critical path
– Only a problem on hand-drawn charts
• Software shows critical path using some visual method
• Even with software, technical dependencies are harder to see on a Gantt chart
![Page 38: Project Management in Practice Fifth Edition Chapter 5 ...€¦ · ± Gantt charts ± PERT network ± CPM network . 5-3 PERT and CPM Networks PERT and CPM developed independently](https://reader030.vdocument.in/reader030/viewer/2022020121/5baf30ea09d3f2c70e8c0177/html5/thumbnails/38.jpg)
5-38
A Gantt Chart of a Sample Project
Figure 5-21
![Page 39: Project Management in Practice Fifth Edition Chapter 5 ...€¦ · ± Gantt charts ± PERT network ± CPM network . 5-3 PERT and CPM Networks PERT and CPM developed independently](https://reader030.vdocument.in/reader030/viewer/2022020121/5baf30ea09d3f2c70e8c0177/html5/thumbnails/39.jpg)
5-39
A Gantt Chart Showing Critical
Path, Path Connections, Other Data
Figure 5-22
![Page 40: Project Management in Practice Fifth Edition Chapter 5 ...€¦ · ± Gantt charts ± PERT network ± CPM network . 5-3 PERT and CPM Networks PERT and CPM developed independently](https://reader030.vdocument.in/reader030/viewer/2022020121/5baf30ea09d3f2c70e8c0177/html5/thumbnails/40.jpg)
5-40
Extensions to PET/CPM
• Application of fuzzy set theory to aid in
estimating activity durations
• Extensions to precedence diagramming
• Goldratt’s Critical Chain
![Page 41: Project Management in Practice Fifth Edition Chapter 5 ...€¦ · ± Gantt charts ± PERT network ± CPM network . 5-3 PERT and CPM Networks PERT and CPM developed independently](https://reader030.vdocument.in/reader030/viewer/2022020121/5baf30ea09d3f2c70e8c0177/html5/thumbnails/41.jpg)
5-41
Precedence Diagramming
• Finish to start (F to S)
– Finish of Activity A to start of Activity B
• Start to start (S to S)
– Start of Activity A to start of Activity B
• Finish to finish (F to F)
– Finish of Activity A to finish of Activity B
• Start to finish (S to F)
– Start of Activity A to finish of Activity B
![Page 42: Project Management in Practice Fifth Edition Chapter 5 ...€¦ · ± Gantt charts ± PERT network ± CPM network . 5-3 PERT and CPM Networks PERT and CPM developed independently](https://reader030.vdocument.in/reader030/viewer/2022020121/5baf30ea09d3f2c70e8c0177/html5/thumbnails/42.jpg)
5-42
Precedence Diagramming
Conventions
Figure 5-25
![Page 43: Project Management in Practice Fifth Edition Chapter 5 ...€¦ · ± Gantt charts ± PERT network ± CPM network . 5-3 PERT and CPM Networks PERT and CPM developed independently](https://reader030.vdocument.in/reader030/viewer/2022020121/5baf30ea09d3f2c70e8c0177/html5/thumbnails/43.jpg)
5-43
Copyright
Copyright © 2014 John Wiley & Sons, Inc.
All rights reserved. Reproduction or translation of this work beyond that permitted in Section 117 of the 1976 United States Copyright Act without express permission of the copyright owner is unlawful. Request for further information should be addressed to the Permissions Department, John Wiley & Sons, Inc. The purchaser may make back-up copies for his/her own use only and not for distribution or resale. The Publisher assumes no responsibility for errors, omissions, or damages, caused by the use of these programs or from the use of the information herein.