Download - Project Management Ppt by Vikas s Kulkarni
![Page 1: Project Management Ppt by Vikas s Kulkarni](https://reader034.vdocument.in/reader034/viewer/2022052301/546b1b58b4af9fba128b4c34/html5/thumbnails/1.jpg)
VIKAS S KULKARNI DEOPETH WASHIM .
![Page 2: Project Management Ppt by Vikas s Kulkarni](https://reader034.vdocument.in/reader034/viewer/2022052301/546b1b58b4af9fba128b4c34/html5/thumbnails/2.jpg)
Basic Concepts, Project Development Process - What is Project Management? What Constitutes a project, Purpose of a project, stack holders, key stages/phases, various Project Management Techniques and their applicability to different types of projects.
Bar Charts and CPM -Estimating duration, Drawing a Bar Chart, features, Activity on Arrow, Time computations, critical path, floats Solve examples.
Network Analysis - Network Development, Dummies, Three Time estimate, difference between CPM & PERT, Probability of completing the projects Solve examples
Precedence Network Diagram - Activity on Nodes, Links, Lags, Comparative study of CPM & PND, Convert network to a Bar Chart & vice versa Solve examples
Work on a on-going construction site - and develop a network with its complete analysis, Put different constraints and logical sequence of the activities. Suspend and resume few activities.
![Page 3: Project Management Ppt by Vikas s Kulkarni](https://reader034.vdocument.in/reader034/viewer/2022052301/546b1b58b4af9fba128b4c34/html5/thumbnails/3.jpg)
Presentation of the above assignment with discussion Work Breakdown Structure - Detailed Analysis of WBS,
also Organization Breakdown Structure, Merger of WBS & OBS, Notation, codification system leading to ease of computation and data collection for project management, Allocation of responsibilities Solve examples
Crashing Projects and Time Control - The necessity of crashing, ways and means of crashing, methodology of crashing using least cost slopes, cost of crashing, Time Monitoring, What-if Analysis Solve examples
Resource Planning, scheduling, Leveling - Types of Resources, Productivity control, identifying time waster of a project team and taking corrective action, use of bar charts to use a manual method to solve problems.
Computer Applications , benefits and limitations. Communications, “S” curves, Earned Value, Cost Control - Drawing “S” curve from WBS, Calculations of earned value
![Page 4: Project Management Ppt by Vikas s Kulkarni](https://reader034.vdocument.in/reader034/viewer/2022052301/546b1b58b4af9fba128b4c34/html5/thumbnails/4.jpg)
A project is the PROCESS of carrying out work to achieve a RESULT
It has several characteristics : • Well defined objectives • Complex, unique effort • Defined timescale / cost / resource • Multi disciplinary team
![Page 5: Project Management Ppt by Vikas s Kulkarni](https://reader034.vdocument.in/reader034/viewer/2022052301/546b1b58b4af9fba128b4c34/html5/thumbnails/5.jpg)
Project is an endeavour in which human, material and financial resources are organized in a novel way to undertake a unique scope of work of given specification, within constraints of cost, and time, so as to achieve unitary, beneficial change, through the delivery of quantitative and qualitative objectives.
PurposeScope
Orgzn
Time Qlty
Cost
![Page 6: Project Management Ppt by Vikas s Kulkarni](https://reader034.vdocument.in/reader034/viewer/2022052301/546b1b58b4af9fba128b4c34/html5/thumbnails/6.jpg)
A project is an organized effort to do something useful or attain a timeful end result. It is sometimes referred to as plan, venture, or enterprise and is generally headed by a leader called as Project manager. Any given project undergoes the following phases :
Conception Phase Study Phase Design Phase Implementation Phase
![Page 7: Project Management Ppt by Vikas s Kulkarni](https://reader034.vdocument.in/reader034/viewer/2022052301/546b1b58b4af9fba128b4c34/html5/thumbnails/7.jpg)
Materials Manpower
Management
Land Equipment
The Project
Money
![Page 8: Project Management Ppt by Vikas s Kulkarni](https://reader034.vdocument.in/reader034/viewer/2022052301/546b1b58b4af9fba128b4c34/html5/thumbnails/8.jpg)
Incorrect Assumptions Incorrect Estimation Work More Difficult than
Anticipated Non-availability of Equipment Changes in Designs, Budget,
Dead line Land Acquisition Human Error Approvals
![Page 9: Project Management Ppt by Vikas s Kulkarni](https://reader034.vdocument.in/reader034/viewer/2022052301/546b1b58b4af9fba128b4c34/html5/thumbnails/9.jpg)
Real-Estate Infrastructure
Classifications Small, Medium, Large, Mega.
![Page 10: Project Management Ppt by Vikas s Kulkarni](https://reader034.vdocument.in/reader034/viewer/2022052301/546b1b58b4af9fba128b4c34/html5/thumbnails/10.jpg)
Conceptual Stage Preliminary Stage Design Stage Construction Stage Operation & Maintenance
![Page 11: Project Management Ppt by Vikas s Kulkarni](https://reader034.vdocument.in/reader034/viewer/2022052301/546b1b58b4af9fba128b4c34/html5/thumbnails/11.jpg)
Planning Analyzing and Scheduling Resource Allocation Controlling
![Page 12: Project Management Ppt by Vikas s Kulkarni](https://reader034.vdocument.in/reader034/viewer/2022052301/546b1b58b4af9fba128b4c34/html5/thumbnails/12.jpg)
• Defining the objectives• Developing WBS• Determining the Quanta of
individual work elements
![Page 13: Project Management Ppt by Vikas s Kulkarni](https://reader034.vdocument.in/reader034/viewer/2022052301/546b1b58b4af9fba128b4c34/html5/thumbnails/13.jpg)
• Determining the precedence relationship
• Determining the extend of inter dependency
• Scheduling the flowpath of activities
![Page 14: Project Management Ppt by Vikas s Kulkarni](https://reader034.vdocument.in/reader034/viewer/2022052301/546b1b58b4af9fba128b4c34/html5/thumbnails/14.jpg)
• Identifying the types of resources
• Quantity of resources• Duration of Activity
![Page 15: Project Management Ppt by Vikas s Kulkarni](https://reader034.vdocument.in/reader034/viewer/2022052301/546b1b58b4af9fba128b4c34/html5/thumbnails/15.jpg)
• Evaluating Progress• Degree of fulfilment of the
objectives• Analysing the status of the
project• Remedial measures/replan
![Page 16: Project Management Ppt by Vikas s Kulkarni](https://reader034.vdocument.in/reader034/viewer/2022052301/546b1b58b4af9fba128b4c34/html5/thumbnails/16.jpg)
PRISM HPM Success Planned Construction Manager Yojana Microsoft Project MSP Primavera P3
![Page 17: Project Management Ppt by Vikas s Kulkarni](https://reader034.vdocument.in/reader034/viewer/2022052301/546b1b58b4af9fba128b4c34/html5/thumbnails/17.jpg)
Scheduling for Resources. Plan Work Breakdown Structure Monitoring the Project Progress Controlling Time and Cost Estimates Documentation
![Page 18: Project Management Ppt by Vikas s Kulkarni](https://reader034.vdocument.in/reader034/viewer/2022052301/546b1b58b4af9fba128b4c34/html5/thumbnails/18.jpg)
Activity Details List, Duration, Links, Type, Constraints.
Calendars. WBS. Resources and cost.
![Page 19: Project Management Ppt by Vikas s Kulkarni](https://reader034.vdocument.in/reader034/viewer/2022052301/546b1b58b4af9fba128b4c34/html5/thumbnails/19.jpg)
Identification of Deviations
Identification of Deviations
Analysis of causes of Deviations
Corrective Action
Action Performance
Action Performance Vs
Standard
![Page 20: Project Management Ppt by Vikas s Kulkarni](https://reader034.vdocument.in/reader034/viewer/2022052301/546b1b58b4af9fba128b4c34/html5/thumbnails/20.jpg)
It is in the implementation phase that ONE has to play a major role of planning. Planning is the core element for the success of any project. The more meticulous the planning, the more are the chances of the project getting completed. It is here that the planning tools and techniques come into picture. Planning techniques are scales and graphs by which, time, cost, resources, and performance are scheduled, interrelated, measured and controlled. But the notion that scientific planning will automatically ensure good project management is wrong. For this understanding the techniques is equally an important aspect. The main planning techniques used in engineering projects are:
Bar Charts Flow Chart or Network Analysis
Precedence Network Analysis or Precedence Diagram Method (PDM)
Critical Path Method or Critical Path Analysis (CPM) Performance (also called ’project’ or ‘programme’) evaluation
and review technique. (PERT) Line of Balance
![Page 21: Project Management Ppt by Vikas s Kulkarni](https://reader034.vdocument.in/reader034/viewer/2022052301/546b1b58b4af9fba128b4c34/html5/thumbnails/21.jpg)
Management is the art of getting things done through others in the given time and stipulated cost.
WHAT IS PROJECT MANAGEMENT?
![Page 22: Project Management Ppt by Vikas s Kulkarni](https://reader034.vdocument.in/reader034/viewer/2022052301/546b1b58b4af9fba128b4c34/html5/thumbnails/22.jpg)
![Page 23: Project Management Ppt by Vikas s Kulkarni](https://reader034.vdocument.in/reader034/viewer/2022052301/546b1b58b4af9fba128b4c34/html5/thumbnails/23.jpg)
Like the song in the sound of music saysClimb every mountain,
Cross every stream,Stop you not,
Till you achieve your dreamHave this attitude towards project
management and you will see you have successfully executed a project.
![Page 24: Project Management Ppt by Vikas s Kulkarni](https://reader034.vdocument.in/reader034/viewer/2022052301/546b1b58b4af9fba128b4c34/html5/thumbnails/24.jpg)