SOFTWARE PROJECT PLAN 4/8/2023
Project Plan
Date: Friday, March 29, 2013
Virtual Classroom System
PAGE 1 OF 9 DOCUMENT.DOC
![Page 2: Project Scheduling Example](https://reader035.vdocument.in/reader035/viewer/2022073116/546518feb4af9f443f8b4a78/html5/thumbnails/2.jpg)
SOFTWARE PROJECT PLAN 4/8/2023
Table of Contents1. Introduction...................................................................................................................................32. Project Overview ..........................................................................................................................3
2.1 Project Scope...............................................................................................................32.2 Key Contacts and Stakeholders....................................................................................3
3. Project Schedule............................................................................................................................43.1 Major Project Milestones.............................................................................................43.2 PERT Chart For Project...............................................................................................5Fig.3.2. Activity Network For Project.................................................................................63.3 Gantt Chart For Project.................................................................................................73.4 Process Model..............................................................................................................8
4. Project Resource Requirements....................................................................................................94.1 Hardware/Software Resource Requirements.................................................................9
PAGE 2 OF 9 DOCUMENT.DOC
![Page 3: Project Scheduling Example](https://reader035.vdocument.in/reader035/viewer/2022073116/546518feb4af9f443f8b4a78/html5/thumbnails/3.jpg)
SOFTWARE PROJECT PLAN 4/8/2023
1. INTRODUCTION
VCS (Virtual Classroom System) aims to promote a greater count of students to splurge into the
field of Education. It integrates the benefits of a physical classroom with the convenience of a ‘no-
physical-bar’ virtual learning environment, minus the commuting hazards and expenses. It will usher
in the immense flexibility and sophistication in the existing learning platform structures, with the
perfect blend of synchronous and asynchronous interaction. It provides a means of collaborative
learning for the students.
2. PROJECT OVERVIEW 1
2.1 Project Scope
This project mainly focuses on the design of Virtual Classroom System.
Students can choose courses, attend lectures, take exams, view their attendance records,
progress reports etc as per their convenience.
Attend lectures either at the scheduled time or on request view lecture at a later time. Faculties can take lectures, upload assignments, announcements, evaluate answer sheets
and also can upload lectures and other discussions in various formats as in videos, power point presentation etc.
Upload and Download of various assignments, college notices, student's notices, journals, videos.
Real Time collaboration among Users via Chat Rooms, shared and interactive Whiteboards. Asynchronous communication in the form of Emails, discussion boards that enable
communication to occur at "convenient-times" that suit student schedules and are not accessed at simultaneous or prearranged times.
There can be Forums, Blogs etc to discuss various queries and to put up suggestions posted both by students and teachers.
Administrator can generate reports, log files, backup/recovery of data at any time. Shared documents and media library that can help in active learning of a student. One-to-Many, Many-to-One and Many-to-Many information sharing. Availability of Voice Mail Box to allow faculties to get the descriptive messages left by the
students. Provision of resources to arouse the interest of students in extracurricular activities like public
speaking etc and to grasp the chance to enhance their personalities. Students can take up various quizzes which can help them to realize their inbuilt talents in
various fields.
2.2 Key Contacts and Stakeholders
Name Registration Number Phone Number Lokesh Jaliminche 12MCS0058 9894086539Gurudatt Kulkarni 12MCS0043 9750434429
1
PAGE 3 OF 9 DOCUMENT.DOC
![Page 4: Project Scheduling Example](https://reader035.vdocument.in/reader035/viewer/2022073116/546518feb4af9f443f8b4a78/html5/thumbnails/4.jpg)
SOFTWARE PROJECT PLAN 4/8/2023
3. PROJECT SCHEDULE
3.1 Major Project Milestones
Milestone Estimated Start Date
Estimated Completion Date
Estimated Hours
Number of Resources
Number of Days
Requirements 21/1/2013 30/1/2013 192 3 8
Analysis 31/1/2013 15/2/2013 288 2 12
Design 31/1/2013 25/2/2013 432 4 18
All Module related to student & Unit Testing
26/2/2013 15/3/2013 336 3 14
All modules related to faculty & Unit Testing
18/3/2013 29/3/2013 240 3 10
All Module related to management and admin & Unit Testing
18/3/2013 4/4/2013 336 3 14
Integration Testing
4/4/2013 15/3/2013 192 2 8
Deployment 16/4/2013 19/4/2013 96 2 4
Project Demo 22/4/2013 25/4/2013 96 2 4
Total Hours 2208
PAGE 4 OF 9 DOCUMENT.DOC
![Page 5: Project Scheduling Example](https://reader035.vdocument.in/reader035/viewer/2022073116/546518feb4af9f443f8b4a78/html5/thumbnails/5.jpg)
SOFTWARE PROJECT PLAN 4/8/2023
3.2 PERT Chart For Project
Activity Tasks
Dependency Duration(Days)
Resources Estimated Start Time
Estimated Finish Time
Latest Finish Time
A - 08 00 08 08B A 12 08 20 26C A 18 08 26 26D B,C 14 26 40 40E D 10 40 50 54F D 14 40 54 54G E,F 08 54 62 62H G 04 62 66 66I H 04 66 70 70
A Requirements
B Analysis
C Design
D All Module related to student
E All Module related to faculty
F All Module related to management and
admin G Testing
H Deployment
I Project Demo
PAGE 5 OF 9 DOCUMENT.DOC
![Page 6: Project Scheduling Example](https://reader035.vdocument.in/reader035/viewer/2022073116/546518feb4af9f443f8b4a78/html5/thumbnails/6.jpg)
SOFTWARE PROJECT PLAN 4/8/2023
Estimated Start Time
Activity Task
Estimated Finish Time
Latest Start Time
Duration Latest Finish Time
Fig.3.2. Activity Network For Project
PAGE 6 OF 9 DOCUMENT.DOC
![Page 7: Project Scheduling Example](https://reader035.vdocument.in/reader035/viewer/2022073116/546518feb4af9f443f8b4a78/html5/thumbnails/7.jpg)
SOFTWARE PROJECT PLAN 4/8/2023
3.3 Gantt Chart For Project
PAGE 7 OF 9 DOCUMENT.DOC
![Page 8: Project Scheduling Example](https://reader035.vdocument.in/reader035/viewer/2022073116/546518feb4af9f443f8b4a78/html5/thumbnails/8.jpg)
SOFTWARE PROJECT PLAN 4/8/2023
3.4 Process Model
We are using iterative life cycle model that does not attempt to start with full specification of requirement.
Instead development begins by specifying and implementing just part of the software, which can then be
reviewed in order to identify other requirements. This process is then repeated producing new version of
software for each cycle of the model.
Hence the suitable process model for this system is
LG process Model
PAGE 8 OF 9 DOCUMENT.DOC
Requirement analysis
System design and software design
Implementing and unit testing
Integration testing
Operation and maintenance
![Page 9: Project Scheduling Example](https://reader035.vdocument.in/reader035/viewer/2022073116/546518feb4af9f443f8b4a78/html5/thumbnails/9.jpg)
SOFTWARE PROJECT PLAN 4/8/2023
4. PROJECT RESOURCE REQUIREMENTS
4.1 Hardware/Software Resource Requirements
CLIENT SIDE
PROCESSOR RAM DISK SPACEINTERNET EXPLORER6 AND ABOVE
PENTIUM III1 GHz AND ABOVE
256 MB 1 GB
SERVER SIDE
WEB SPHEREAPPLICATION SERVERV5.0
PENTIUM III at 1GHz
512 MB 2 GB
DB2 V9.1 PENTIUM III at 1GHz
512 MB 1 GB(Excluding data size)
Software Requirements
Client: Web Browser, Operating System (any)
Web Server: WAS, Operating System (any)
Data Base Server: DB2, Operating System (any)
PAGE 9 OF 9 DOCUMENT.DOC