Download - Project summary education
EDUCATION
363 Ripple Road, Essex. IG1 19PN 020 8594 2594 020 8591 [email protected] www.carmelcrest.co.uk
Tel: Fax:Email: Website:
Project: School Extension with featured timber domed roofHead Teacher:Architect:
George PotrykusStewart Maclachlan, LBN
This prestigious project involved the erection of a steelframed building with a featured timber domed roof. Thebuilding designed by Stewart Maclachlan of LondonBorough of Newham (LBN) incorporates an innovativevaulted and domed semi-circular timber roof. The roof wasmanufactured on site with traditional craft hand skills. Thefinished inside is a beautiful array of circular timber.
RONALD OPENSHAW
NURSERY
VALUE: £457,000
ELMHURST PRIMARY
SCHOOL
VALUE: £350, 000
Project: Refurbishment of School toilets
Head Teacher:
Site Contact:
ShahedAhmed
Maxine Dixon - 020 8472 1062
This project involved the complete strip out and
refurbishment of 27 toilets. We used the time leading
up to the project start date to develop the design. We
assisted the school in selecting the design, colours
and appliances they required. Works were carried
out over a ten month period including school term-
time on a rolling programme without a hitch. This is
because our tradesmen are specially trained to work
in school environments.
The school was very pleased with the outcome. The
Head Teacher is available to give reference.
Project: Refurbishment of School toilets
Head Teacher: Lorna Jackson - 020 8534 8135
The project comprised the complete strip out and
refurbishment of boys, girls and staff toilets. The
time leading up to the start was used to develop
the design. We engaged the school heads in the
process of working up a design together until they
were satisfied.
The project was completed during the summer
holidays and the school was very pleased with the
outcome. The Head teacher is available for
reference.
MARYLAND PRIMARY
SCHOOL
VALUE: £63, 700
Our team ensured the highest standards of quality, as the tightest of tolerances were required for the domedend to accurately meet the vaulted section. The finished project is a unique quality piece of work not oftenseen on construction sites these days. The quality and precision achieved in this project is testament to ourteamwork and co-operation.