696
The District Engineer has received a permit application to conduct work in waters of the United States from
Algonquin Gas Transmission, LLC. This work is proposed in Beverly Harbor and Collins Cove in Salem,
Massachusetts. The site coordinates are: Latitude 42.537160˚, Longitude -70.882474˚.
The work involves work, structures, and the discharge of fill material below the high tide line of waters of the
United States in order to construct the Algonquin Gas Salem Lateral Project. The Salem Lateral Project
includes the installation of 1.2 miles of new 16-inch diameter pipeline from the existing Hubline pipeline in
Beverly Harbor to the Salem Harbor Electric Station to supply natural gas for electricity generation. The Salem
Harbor Electric Station is converting from coal-fired electricity generation to natural gas-fired generation. The
Salem Lateral Project begins at a new subsea tap connection with the Hubline pipeline and will run south to the
Salem Harbor Electric Station.
The Salem Lateral will cross the marine areas of Beverly Harbor and Collins Cove using horizontal directional
drilling (HDD) to minimize impacts to the marine environment. The Collins Cove HDD will be a land-to-land
operation with no in-water work in Collins Cove. However, the Beverly Harbor HDD will involve a land-to-
water operation, given that the tie-in location to the existing HubLine for the Salem Lateral is in-water. The
Applicant will also need to conduct in-water construction work at the tie-in location to connect the Salem
Lateral with the HubLine pipeline. In an effort to isolate in-water activities, the Applicant will install a
temporary wet cofferdam in the area surrounding the subsea tie-in. Use of a cofferdam offers the opportunity to
limit the amount of suspended sediments leaving the work area, thereby reducing potential impacts on marine
resources. Based on design requirements and geotechnical soil analysis performed at the subsea tie-in location,
the Applicant determined that the use of a “wet cofferdam” will provide the most efficient approach to perform
the in-water work at the HDD exit hole and the Hubline connection point. The connection will be performed
via a hot-tap onto the active Hubline.
The project will require the hydraulic dredging of an 85 foot by 55 foot area of the seafloor to a depth of 8.5 feet
in Beverly Harbor. Approximately 1500 cubic yards of sediment will be excavated and placed in hopper barges
for temporary storage and decanting. The decanted material will then be placed back into the cofferdam.
A permanent, concrete vault will be installed below the seafloor in order to conduct future internal inspections
of the Salem Lateral line. The proposed vault will be about 8 feet by 10 feet. The upper elevation of this vault
will lie approximately 1 foot below the existing seafloor elevation. Removing the vault cover will facilitate
access to the Salem Lateral connection area and would only disturb about 80 square feet during maintenance.
Removal of the estimated 1 foot of sediment located on the top of the vault cover would be done by diver hand
jetting and would result in the suspension of about 4 cubic yards of bottom sediment into the water column.
696 Virginia Road Concord, MA 01742-2751
PUBLIC NOTICE Comment Period Begins: September 9, 2014
Comment Period Ends: October 8, 2014
File Number: NAE-2014-114
In Reply Refer To: Kevin Kotelly, P.E.
Phone: (978) 318-8703
E-mail: [email protected]
CENAE-R
FILE NO. NAE-2014-114
2
Performing maintenance operations with the vault would require the mobilization of a support vessel. No
temporary moorings or decanting barges would be needed. Once the maintenance activity is complete, the vault
cover will be replaced and restoration will occur naturally through sediment deposition or the area will be
backfilled with sandbags or some other suitable fill. Future maintenance activities will take approximately 12
days to complete.
The project will also include 0.67 acres of fill below the ordinary high water line of waters of the United States
for the temporary fill of freshwater wetlands via swamp mats during the construction phase of the project where
the pipeline will cross an overland section of Salem. Due to the use of HDD along the Salem Lateral alignment,
the pipeline will not be constructed across any freshwater wetlands via open trenching. However, the
workspace associated with the construction of the Salem Lateral will temporarily disturb a freshwater wetland
in Salem. This workspace is necessary for the pullback of the Beverly Harbor HDD pipe sections and other
support activities. Wooden mats will be placed to support construction equipment within the wetland. After
construction, the mats will be removed and the wetlands will be restored in place.
The work is shown on the attached plans entitled, “I-System, Salem Lateral Project, Proposed 16” Line No. I-
18, USACE Permit Drawing,” on 23 sheets, and dated July 25, 2014.
In designing the Salem Lateral Project, the Applicant evaluated a number of routing and construction
alternatives to address environmental impacts, as well as other concerns. The route selected and the HDD
construction method will avoid and minimize impacts to aquatic resources, including intertidal area, saltmarsh,
and freshwater wetlands. Temporary wetland impacts will be restored in place. Options for compensatory
mitigation for unavoidable impacts are being considered by the Corps of Engineers.
AUTHORITY
Permits are required pursuant to:
__X Section 10 of the Rivers and Harbors Act of 1899
__X_ Section 404 of the Clean Water Act
____ Section 103 of the Marine Protection, Research and Sanctuaries Act.
The decision whether to issue a permit will be based on an evaluation of the probable impact of the proposed
activity on the public interest. That decision will reflect the national concern for both protection and utilization
of important resources. The benefit which may reasonably accrue from the proposal must be balanced against
its reasonably foreseeable detriments. All factors which may be relevant to the proposal will be considered,
including the cumulative effects thereof; among those are: conservation, economics, aesthetics, general
environmental concerns, wetlands, cultural value, fish and wildlife values, flood hazards, flood plain value, land
use, navigation, shoreline erosion and accretion, recreation, water supply and conservation, water quality,
energy needs, safety, food production and, in general, the needs and welfare of the people.
The Corps of Engineers is soliciting comments from the public; Federal, state, and local agencies and officials;
Indian Tribes; and other interested parties in order to consider and evaluate the impacts of this proposed
activity. Any comments received will be considered by the Corps of Engineers to determine whether to issue,
modify, condition or deny a permit for this proposal. To make this decision, comments are used to assess
impacts on endangered species, historic properties, water quality, general environmental effects, and the other
public interest factors listed above. Comments are used in the preparation of an Environmental Assessment
and/or an Environmental Impact Statement pursuant to the National Environmental Policy Act. Comments are
CENAE-R
FILE NO. NAE-2014-114
3
also used to determine the need for a public hearing and to determine the overall public interest of the proposed
activity.
Where the activity involves the discharge of dredged or fill material into waters of the United States or the
transportation of dredged material for the purpose of disposing it in ocean waters, the evaluation of the impact
of the activity in the public interest will also include application of the guidelines promulgated by the
Administrator, U.S Environmental Protection Agency, under authority of Section 404(b) of the Clean Water
Act, and/or Section 103 of the Marine Protection Research and Sanctuaries Act of 1972, as amended.
ESSENTIAL FISH HABITAT
The Magnuson-Stevens Fishery Conservation and Management Act, as amended by the Sustainable Fisheries
Act of 1996 (Public Law 104-267), requires all federal agencies to consult with the National Marine Fisheries
Service on all actions, or proposed actions, permitted, funded, or undertaken by the agency, that may adversely
affect Essential Fish Habitat (EFH).
This project will impact 4675 SF of Essential Fish Habitat (EFH) for Atlantic cod (Gadus morhua), haddock
(Melanogrammus aeglefinus), pollock (Pollachius virens), whiting (Merluccius bilinearis), red hake (Urophycis
chuss), white hake (Urophycis tenuis), redfish (Sebastes fasciatus), winter flounder (Pseudopleuronectes
americanus), yellowtail flounder (Limanda ferruginea), windowpane flounder (Scophthalmus aquosus),
American plaice (Hippoglossoides platessoides), ocean pout (Macrozoarces americanus), Atlantic halibut
(Hippoglossus hippoglossus), Atlantic sea scallop (Placopecten magellanicus), Atlantic sea herring (Clupea
harengus), bluefish (Pomatomus saltatrix), long finned squid (Loligo pealeii), short finned squid (Illex
illecebrosus), Atlantic butterfish (Peprilus triacanthus), Atlantic mackerel (Scomber scombrus), summer
flounder (Paralichthys dentatus), scup (Stenotomus chrysops), black sea bass (Centropristis striata), surf clam
(Spisula solidissima), and bluefin tuna (Thunnus thynnus). This habitat consists of unvegetated, sandy bottom.
Loss of this habitat may adversely affect the species listed above. However, the District Engineer has made a
preliminary determination that the site-specific adverse effect will not be substantial. Further consultation with
the National Marine Fisheries Service regarding EFH conservation recommendations is being conducted and
will be concluded prior to the final decision.
NATIONAL HISTORIC PRESERVATION ACT
Based on his initial review, the District Engineer has determined that little likelihood exists for the proposed
work to impinge upon properties with cultural or Native American significance, or listed in, or eligible for
listing in, the National Register of Historic Places. Therefore, no further consideration of the requirements of
Section 106 of the National Historic Preservation Act of 1966, as amended, is necessary. This determination is
based upon one or more of the following:
a. The permit area has been extensively modified by previous work.
b. The permit area has been recently created.
c. The proposed activity is of limited nature and scope.
d. Review of the latest published version of the National Register shows that no presence of
registered properties listed as being eligible for inclusion therein are in the permit area or general vicinity.
e. Coordination with the State Historic Preservation Officer and/or Tribal Historic Preservation
Officer(s)
CENAE-R FILE NO. NAE-2014-114
ENDANGERED SPECIES CONSULTATION The New England District, Army Corps of Engineers has reviewed the list of species protected under the Endangered Species Act of 1973, as amended, which might occur at the project site. It is our preliminary detennination that the proposed activity for which authorization is being sought is designed, situated or will be operated/used in such a manner that it is not likely to adversely affect any Federally listed endangered or threatened species or their designated critical habitat. By this Public Notice, we are requesting that the appropriate Federal Agency concur with our determination.
COASTAL ZONE MANAGEMENT The States of Connecticut, Maine, Massachusetts, New Hampshire and Rhode Island have approved Coastal Zone Management Programs. Where applicable, the applicant states that any proposed activity will comply with and will be conducted in a manner that is consistent with the approved Coastal Zone Management Program. By this Public Notice, we are requesting the State concurrence or objection to the applicant's consistency statement.
The following authorizations have been applied for, or have been, or will be obtained: (X) Pennit, License or Assent from State. (X) Permit from Local Wetland Agency or Conservation Commission. (X) Water Quality Certification in accordance with Section 401 of the Clean Water Act.
In order to properly evaluate the proposal, we are seeking public comment. Anyone wishing to comment is encouraged to do so. Comments should be submitted in writing by the above date. If you have any questions, please contact Kevin Kotelly at (978) 318-8703, (800) 343-4789 or (800) 362-4367, if calling from within Massachusetts.
Any person may request, in writing, within the comment period specified in this notice, that a public hearing be held to consider the application. Requests for a public hearing shall specifically state the reasons for holding a public hearing. The Corps holds public hearings for the purpose of obtaining public comments when that is the best means for understanding a wide variety of concerns from a diverse segment of the public.
The initial determinations made herein will be reviewed in light of facts submitted in response to this notice. All comments will be considered a matter of public record. Copies of letters of objection will be forwarded to the applicant who will normally be requested to contact objectors directly in an effort to reach an understanding.
THIS NOTICE IS NOT AN AUTHORIZATION TO DO ANY WORK.
Karen K. Adams Chief, Permits and Enforcement Branch Regulatory Division
4
CENAE-R
FILE NO. NAE-2014-114
5
If you would prefer not to continue receiving Public Notices by email, please contact Ms. Tina Chaisson at
(978) 318-8058 or e-mail her at [email protected]. You may also check here ( ) and return
this portion of the Public Notice to: Bettina Chaisson, Regulatory Division, U.S. Army Corps of Engineers,
696 Virginia Road, Concord, MA 01742-2751.
NAME:
ADDRESS:
PHONE:
!(
")
")
BEVERLYSALEM
Proposed AlgonquinSalem Lateral Pipeline
SALEM
DANVERS
Milepost (MP) 0.0
MP 1.2
V:\PRO
JECTS
\AUGU
STA\S
PECT
RA\Sa
lem\W
QC_Fi
gure2_
1_1_U
SGS.m
xd
LegendProposed Algonquin Salem Lateral PipelineExisting Algonquin HubLine PipelineExisting Maritimes & Northeast Phase III PipelineTown Boundary
!( Tie-in with Existing Algonquin HubLine Pipeline") Existing Maritimes & Northeast Salem M&R Station") Proposed Algonquin Salem Lateral M&R Station Created: 7/28/2014
Algonquin Gas Transmission, LLCSalem Lateral ProjectSalem/Beverly, MA
Figure 2.1-1
0 1,000 2,000Feet
K
Data Sources: ESRI, SPECTRA, USGS, TRC
!(
")
Proposed AlgonquinSalem Lateral Pipeline
Milepost (MP) 0.0
MP 1.2
SALEM
BEVERLY
PEABODY
DANVERS
MARBLEHEAD
V:\PRO
JECTS
\AUGU
STA\S
PECT
RA\Sa
lem\W
QC_Fi
gure2_
1_2_N
OAA.m
xd
LegendProposed Salem Lateral PipelineExisting Algonquin HubLine PipelineExisting Maritimes & Northeast Phase III PipelineTown Boundary
!( Tie-in with Existing Algonquin HubLine Pipeline") Existing Maritimes & Northeast Salem M&R Station") Proposed Algonquin Salem Lateral M&R Station Created: 7/25/2014
Algonquin Gas Transmission, LLCSalem Lateral ProjectSalem/Beverly, MA
Figure 2.1-2
Data Sources: ESRI, SPECTRA, USGS, TRC
0 350 700
Feet
K
150 LOWER WESTFIELD ROAD
HOLYOKE, MASSACHUSETTS 01040
PHONE (413) 535-0135
FAX (413) 535-0136
LEGEND
PROPOSED PIPEUNE HDO ENTRY /EXIT POINT UIITS OF DISI\JRBANCE PERMANENT EASEMENT CONT'OURS PROPERTY UNE
-·2'--·-SALTMARSH ~ DEUN[ATED FRESHWA'TER ~ WETlAND BOUNDARY ~
WETlAND BOUNDARY ~ WITHIN TEMPCRARY WORI<SPH::E
TOP OF' COASTAL BANK - • • •-SILT FENCE
ME'AN LOW WATER (EL: -4.879') ME'AN HIGH WATER (EL: 4.328') HIGH TIDE UNE FLOOD PLAIN UMn\S
NOTES:
---MLw-
-HTL--··-
BEVERLY HARBOR
COWNS COVE
ISYS-P-1 005
ISYS-P-1 007 ISYS-P-1 006 L---------'
ISYS-P-1 004
KEY SHEET SCALE: N.T.S.
1. NO PERMANENT WETLAND IMPACTS ASSOCIATED WITH PROJECT 2. WETLAND RESOURCES WERE FIELD DELINEATED AND SURVEYED BY TRC ON 1/14/14. 3. 100-YEAR FLOOD ZONE (ZONE AE) LIMITS SHOWN BASED ON FEMA FLOOD INSURANCE RATE MAP NOS. 25009C0417G AND 25009C0419G,
EFFEC"nVE JULY 16, 2014. 4. CONTRACTOR TO COMPLY WITH ALL APPLICABLE PROVISIONS OF SPECTRA ENERGY EROSION & SEDIMENTATION CONTROL PLAN. 5. THE FINAL IMPLEMENTATION AND LOCATION OF EROSION AND SEDIMENT CONTROLS WILL BE DETERMINED BY A SPECTRA ENERGY ENVIRONMENTAL
INSPECTOR. 6. EXISTING CONDITIONS AND PROPERlY INFORMATION COMPILED FROM INFORMATION PROVIDED BY VHB (COORDINATE SYSTEM: UTM ZONE 1 8 / NAD
83, ELEVATION DATUM: NAVD 88) 7. BATHYMETRY SHOWN BASED ON SURVEYS PERFORMED BY OSI ON 11/6/2013 TO 11/9/2013. B. MLW AND MHW ELEVATIONS SHOWN ARE REFERENCED TO THE SALEM HARBOR TIDE STATION #8442645 WHICH PLACES MLLW AT EL. -5.0593'. 9. PROPERlY LINES ARE BASED ON TAX MAPS, PLANS/DEEDS OF RECORD AND ARE NOT THE RESULT OF A FULL BOUNDARY SURVEY.
Hatth Matt MacDonald
I-SYSTEM SALEM LATERAL PROJECT
PROPOSED 16" LINE NO. 1-18 USACE PERMIT DRAWING
SpcctlaEneriY} Partners.
Algonquin Gas Transmission, LLC 5400 W~ Ct HIRIIfoo, TX T70.S6-S310 7131627·5400
150 LOWER WESTFIELD ROAD
HOLYOKE, MASSACHUSETTS 01040
PHONE (413) 535-0135
FAX (413) 535-0136
l I
BEVERLY HARBOR
LOBSTER ROCKS ARE'A
Hatch Matt MacDonald
I-SYSTEM SALEM LATERAL PROJECT
PROPOSED 16" LINE NO. 1-18 USACE PERMIT DRAWING
PROPOSIED ur UNE NO. 1-18
1 BE\IERLY HARBOR HDD
I; /,'
/ / . .-' "' \v '
I
" \.
Spectra E,.,g;} Partners.
Algonquin Gas Transmission, LLC 5400 Weodboirruo-Ct HIRIIfoo, TX 770.S6-S310 7131627-5400
150 LOWER WESTFIELD ROAD
HOLYOKE, MASSACHUSETTS 01040
PHONE (413) 535-0135
FAX (413) 535-0136
z 0
!i ~
C!J)' OF SALEM ESSEX COUNTY. MASSACHUSETTS
10'
70'
8~~ +.1..::::1 Nl;t;;
110'
30'
MEAN HIGH WAlER El...E:V. 4.328 e~i
\ ~ 10'
........... ~ -10'
-30'
-ao·
-70'
-10'
0+00
Hatch Moll: MacDonald
'
~LOW WAlER EL£V. -4.679J I ~Ft.OOR 7 ~ ----I
PROPOSED HI" UNE NO. 1-18 BEVERLY HARBOR HDD
1+CXI
STA110N
PBQEILE :PI f• 1• •60' HORIZ. 1·-eo· VERT.
/
2+CXI
I-SYSTEM SALEM LATERAL PROJECT
PROPOSED 16" LINE NO. 1-18 USACE PERMIT DRAWING
"'"'
SpccbaEneriY} Partners.
Algonquin Gas Transmission, LLC 5400 Westheimm Ct Hoarton, TX 770!if>.5310 713/627-S4Cl0
150 LOWER WESTFIELD ROAD
HOLYOKE, MASSACHUSETTS 01040
PHONE (413) 535-0135
FAX (413) 535-0136
I -y
......
J !/
J
\
-
\ \
..........
- 1+00:
I
. ' /,r-1 I / / -~ / . ...--
<o I
~ \'v
' " \ '
I
" \ )
PLAN VIEW GRAPHIC SCALE 5P' Q
CITY Of SA!..EM ESSEX COUNJY. MASSACHUSETTS
lJ \ I l
1 lj \ I I II I IJ I
I ! I /\ I IJII II " I 1 11 ~ ~ 11~1 ~ 1
1
I 11 1!1 11 I
~ J 11 I II II I 1 coMMONWEALrn oF 1!1"1 I MASSACHUSETTS I \
TRACT NO. 1-18-1 ~ )
/1 /' ,_r.; 'f jl .r.A] I
I I' v ./ BEVERLY HARBOR 1,1 PERMANENT E"ASEUENT
~~~ l I -3+00- _ 4+00- - -5+00- l - -11+00- 7+00-
PROPOSED 11r' UNE NO. 1-18 BEVERLY HARBOR HOD
7 I I
'--.,
\" (
I \
\
-
Hatch Matt MacDonald
J
l \ \ ~ IJ\
I
\ )
I I
I-SYSTEM SALEM LATERAL PROJECT
PROPOSED 16" LINE NO. 1-18 USACE PERMIT DRAWING
" --\ \ \. I \]\
SpccttaEneriY} Partners.
Algonquin Gas Transmission, LLC 5400 W...theirmo- Ct. HIRIIfoo, TX T70.S6-S310 7131627-5400
150 LOWER WESTFIELD ROAD
HOLYOKE, MASSACHUSETTS 01040
PHONE (413) 535-0135
FAX (413) 535-0136
SIO'
70'
110'
30'
! 10'
!i -10'
~ -30'
-110'
-70'
--80'
- ;i - 8 .§ .......
IZ . L::::l .C'ol. ;z;
- .-~s~ ·ti-l =i
~
CITY OF SALEM ESSEX COUNTY. MASSACHUSEITS
ME'AN HIGH WATER ELEV. 4.328 ---...
f.- SEA FLOOR __,/
11' MfAN J. WATER ELEV. -4.879 --=::::/
' ' ' PROPOSED 16" UNE NO. 1-18 '
Hatth Matt MacDonald
BEVERLY HARBOR HOD
&tOO STATION
PROFILE SCN..E: 1••100' HORIZ. 1·=100' VERT.
' 7..00
I-SYSTEM SALEM LATERAL PROJECT
PROPOSED 16" LINE NO. 1-18 USACE PERMIT DRAWING
... ~== O~W-~.:.!-
~~= 1-~ Ill
SpcctlaEneriY} Partners.
Algonquin Gas Transmission, LLC 5400 Weolheinuo- Ct HIRIIfoo, TX T70.S6-S310 7131627-5400
150 LOWER WESTFIELD ROAD
HOLYOKE, MASSACHUSETTS 01040
PHONE (413) 535-0135
FAX (413) 535-0136
/I I' ,.,JYV I \ I \ ~~ \ I \l)JL \ I \
I I ..,
8 ., I
i I
a. I I
~!S! A I :::J •:Z: I l/ ii
' I\ I .... 1 I I ~ I ~~
I
II II I\ II I\
~ ~ 2
!i "
I !i ::1
PLAN VIEW GRAPHIC SCALE
LAND UNDER THE OCEAN
,. ,. Q 1'
\ J \
\J J
J
J
I I I I ljl I
~
\I ;I ~I
I I
"" ' I I
/ I
/~
Hatth Matt MacDonald
~ i ll
·~ i "''"'"'] J- -
llDAL. FlAT
I I
(~ J
I I
(
I I
/
I-SYSTEM SALEM LATERAL PROJECT
PROPOSED 16" LINE NO. 1-18 USACE PERMIT DRAWING
' 1
r" '\ \ ---·-__j,
./ '\ ("'-........
rUE aasmtt !Wi CoME!~ lMCT NO. 1-111-2 \
L..:/
\
\ \
~
Spectra Eneri¥) Partners.
Algonquin Gas Transmission, LLC 5400 Woolh.irruo-Ct H11111too, TX T70.S6-S310 7131627-5400
150 LOWER WESTFIELD ROAD
HOLYOKE, MASSACHUSETTS 01040
PHONE (413) 535-0135
FAX (413) 535-0136
-i§!i!rl +.I. ::::I
""·~ ~&:J ~
10'
" "' -10'
-70'
CITY OF SALEM ESSEX COUN~ MA5SAQHUSEOS
MEAN HIGH WATER El..E.V. 4.328 ----......._
'--- MEAN L.CW WATER El..E.V. -4.679
Hatth Matt MacDonald
' f-- - ~--~-
/ S£A FLOOR -
PROPOSED 16" UNE NO. 1-18 BEVERLY HARBOR HDD
STAll ON
PROFILE 5CN f• 1·=60' HORIZ. 1·-eo· VERT.
10+00
""" """'
I-SYSTEM SALEM LATERAL PROJECT
PROPOSED 16" LINE NO. 1-18 USACE PERMIT DRAWING
i---= ~j!i!rl
L::::l -
~~~-E ~-
...: z; .,.--
-=-,..._
......-----.--
11+00 12+00
Spectra Eneri¥) Partners.
Algonquin Gas Transmission, LLC 5400 Woolh.irruo-Ct H11111too, TX T70.S6-S310 7131627·5400
150 LOWER WESTFIELD ROAD
HOLYOKE, MASSACHUSETTS 01040
PHONE (413) 535-0135
FAX (413) 535-0136
\ )
BEYERL.Y HARBOR
I I
I
7-1
I
I I
Hatth Matt MacDonald
\ \
I-SYSTEM
\ \
SALEM LATERAL PROJECT PROPOSED 16" LINE NO. 1-18
USACE PERMIT DRAWING
I I l I I I I I \ \
\ \
\
" " " "
Spectra Eneri¥) Partners.
Algonquin Gas Transmission, LLC 5400 Woolh.irruo-Ct H11111too, TX T70.S6-S310 7131627-5400
150 LOWER WESTFIELD ROAD
HOLYOKE, MASSACHUSETTS 01040
PHONE (413) 535-0135
FAX (413) 535-0136
z 0
10'
70'
10'
~ -10'
~ -30'
CllY OF SALEM ESSEX COUNTY, MASSACHUSETTS
,~!1! NL::::I -·:z: c&i lili
I MeAN HIGH WAltR El..EV. 4.328 NATURAL GRADE
1
- \ \
-SEA FLOOR - .I ......,.,.,.., / __.,......- /
PROPOSED 1&" UNE NO. 1-18 /
BEVERLY HARBOR HDD
12+00
Hatth Matt MacDonald
I 111!1!--.1;L::::I - · I:Z:--
-E~ ~-~--
~ Ill
'-... "-... -~ ............. ""--
~ / ......... -/ -/
PROPOSED 1 &" UNE NO. 1-18 --' COLLINS COVE HDD
13+00 14+00 1!5+00
STATION
PRORLE SCAlE; 1·-eo· HORtZ. 1·-eo· VERT.
I-SYSTEM SALEM LATERAL PROJECT
PROPOSED 16" LINE NO. 1-18 USACE PERMIT DRAWING
Spectra Eneri¥) Partners.
Algonquin Gas Transmission, LLC 5400W~CtH111111oo, TXT70.S6-S310 7131627-5400
150 LOWER WESTFIELD ROAD
HOLYOKE, MASSACHUSETTS 01040
PHONE (413) 535-0135
FAX (413) 535-0136
/ -
,.
......... ------
----------I
PLAN VIEW GRAPHIC SCALE ,. 0
/
CITY Of SALEM ESSE~ COUNTY. MASSACHUS~
I I
/ \ \ ', \ 1 0' PERMANENT &Jat1
/ /
/
JO' PERMANENT EASEMENT / \ ~
7---- / '
Hatth Matt MacDonald
I-SYSTEM SALEM LATERAL PROJECT
PROPOSED 16" LINE NO. 1-18 USACE PERMIT DRAWING
I
J /
I I
I _...., . ..~ --L-
/ I \ \ \ \ \ \
1 1 \
/ /
/
) -~~~/ Spectra Eneri¥)
Partners. Algonquin Gas Transmission, LLC 5400 Woolh.irruo-Ct H11111too, TX T70.S6-S310 7131627-5400
150 LOWER WESTFIELD ROAD
HOLYOKE, MASSACHUSETTS 01040
PHONE (413) 535-0135
FAX (413) 535-0136
90'
70'
110'
.,i ..,_w ~·z a.:::J -•:z:
ci~ ti 2
i 30'
1D'
z 0
li -1D'
~
iiiiiiii;, ""'--- ....... , ""'""'
-30'
-110'
-7D'
-ID'
15+00
C!JY OF SA!.EM ESSEX COUNJY. MASSACHUSETTS
~N I-
~! t: t: I- ~! ~N I ~! g:!: I-- ~- ,.,-
+c I-- +c +c ;tc
~; 1- ~; :; ~; NATURAL GRADE ..........
I-
['...
............... ....... ............... ...... ............... ._,._.
PROPOSED HI" UNE NO. I 18 -_/
18+00
COWNS COllE HDD
Hatth Matt MacDonald
17+00
STATION
PRQElLE SCAI f• 1"•80' HORIZ. 1" -so· VERT.
111+00
I-SYSTEM SALEM LATERAL PROJECT
PROPOSED 16" LINE NO. 1-18 USACE PERMIT DRAWING
-,~~
I:::J .a.:z: -•e ~&~ i
-
1111+00
Spectra Eneri¥) Partners.
Algonquin Gas Transmission, LLC 5400 Woolh.irruo-Ct H11111too, TX T70.S6.S310 7131627·5400
150 LOWER WESTFIELD ROAD
HOLYOKE, MASSACHUSETTS 01040
PHONE (413) 535-0135
FAX (413) 535-0136
PLAN VIEW GRAPHIC SCALE
/ /
/
,. 30' 0 ,. ----
-
Hatth Matt MacDonald
CITY Of SALEM ESSEX COUNTY. MASSACHUSETTS
-:>.
'
"· \
" " \ \ \
N /E WARD II SOCIAL ewe or SALEM TRACT' NO. 1-18-4
I-SYSTEM SALEM LATERAL PROJECT
PROPOSED 16" LINE NO. 1-18 USACE PERMIT DRAWING
\ ... ~.
' " " " \
\ \ \ \
Spectra EneriY) Partners.
Algonquin Gas Transmission, LLC 5400W~CtH111111oo, TXT70.S6-S310 7131627·5400
150 LOWER WESTFIELD ROAD
HOLYOKE, MASSACHUSETTS 01040
PHONE (413) 535-0135
FAX (413) 535-0136
110'
70'
!10'
JO'
10' - t--
25 -10' ~
~ -JO'
-!10'
-70'
-110'
... s ,o ... "jz
caa.:::J
~t; Iii-~ .,
-
~~ 18~ +c
~~ '----
Hatth Matt MacDonald
CITY OF SALEM ESSEX COUNTY. MAS$ACHUSETIS
... 2~w t::
~l +IZ ~:jL:::J IZ
D.- si~ +c :; ~ --....
NATURAL GRADE - !'-..
" ....___ - t-- - I- - - -~-1-- - f-
PROPOSED 11!" UNE NO. 1-18 ---....., COWNS COVE HOD !"-..
21+00 22+00
STATION
PRQfiLE 5CN f• 1••100' HORIZ. 1••100' VERT.
I-SYSTEM SALEM LATERAL PROJECT
PROPOSED 16" LINE NO. 1-18 USACE PERMIT DRAWING
Spectra EneriY) Partners.
Algonquin Gas Transmission, LLC 5400W~CtH111111oo, TXT70.S6-S310 7131627·5400
150 LOWER WESTFIELD ROAD
HOLYOKE, MASSACHUSETTS 01040
PHONE (413) 535-0135
FAX (413) 535-0136
<&"®~<&= ' \ \ \ \ '\ \ '\ \
\ \ \
'\ '\ '\ '\
'\
'\ '\
'\ '\
'\ '\
'\ , N/F NEW ENGLAND ~POWER COMPANY
TRACT NO. 1-18-~
\ "
\ ..
\ \ \ \ \
PLAN VIEW GRAPHIC SCALE ,. 3P' Q ,.
CITY Of SA!..EM ESSEX COUNJY. MASSACHUSETTS
\
' N /F COMMONWEALTH OF MASSACHUSETTS
TRACT NO. 1-1 8-1
Hatch Matt MacDonald
I-SYSTEM SALEM LATERAL PROJECT
PROPOSED 16" LINE NO. 1-18 USACE PERMIT DRAWING
II
\ \ 1..,
\ \
\ \f\ \.
'1.
SpccttaEneriY} Partners.
Algonquin Gas Transmission, LLC 5400 W...theirmo' Ct. HIRIIfoo, TX T70.S6-S310 7131627-5400
150 LOWER WESTFIELD ROAD
HOLYOKE, MASSACHUSETTS 01040
PHONE (413) 535-0135
FAX (413) 535-0136
- ;:: -&~-! ... +I ~ -~-,. z -,eli ~ _Ji:l_-
-~ ~ NAlURAL GRADE
/ - 1-- --L.... - 1- -
COY OF SALEM ESSEX COUNJY. MASSACHUSETTS
lot~ HIGH WATER El.LV. 4.328 ----....
'
SE'A FlOOR -
PROPOSED 111" UNE NO. 1-18 ~ COUJNS COllE HOD -....
24+00
Hatch Matt MacDonald
STATION
PBOFJLE S'W E· 1·-eo· HORIZ. 1·-eo· VERT.
1'-...
I-SYSTEM SALEM LATERAL PROJECT
PROPOSED 16" LINE NO. 1-18 USACE PERMIT DRAWING
~-0
~ I ~ i ~ i-
7 t-- - I- -/
..../
27+00
SpectraE~ Partners.
Algonquin Gas Transmission, LLC 5400 Weodboirruo-Ct HIRIIfoo, TX 770.S6-S310 7131627·5400
150 LOWER WESTFIELD ROAD
HOLYOKE, MASSACHUSETTS 01040
PHONE (413) 535-0135
FAX (413) 535-0136
N /F CITY OF SALEM TRACT NO. 1-18-7
CITY Of SALEM ESSEX COUNTY. MASSACHUSETTS
N IF CITY OF SALEM TRACT NO. 1-18-8
Hatth Matt MacDonald
PROPOSED 1&" UNE NO. 1-18 COWNS COVE HDD
I-SYSTEM SALEM LATERAL PROJECT
PROPOSED 16" LINE NO. 1-18 USACE PERMIT DRAWING
I N/E CITY Of SALEM
TRACT NO. 1-18-10
-----
Spectra Eneri¥) Partners.
Algonquin Gas Transmission, LLC 5400 WeolheimmCt H11111too, TX T70.S6-S310 7131627·5400
150 LOWER WESTFIELD ROAD
HOLYOKE, MASSACHUSETTS 01040
PHONE (413) 535-0135
FAX (413) 535-0136
CrTY OE SALEM ESSEX COUNTY. MASSACHUSEIJS
~ I I
a
J
I "":
10' cool p.
o! olil:.
~ 70' I; !I! ~J~ =; !10' N, ... ~~! ""'l ..,
MEAN HICi H WATER I lEv. 4.321 ~ I JO' In' :ill Ill""'"
I .. " ...:
10' ~ ~
25 -10' --- - --r--- ""7""'"'"" 1---- - --r--- - ~---- - --r- - -~ /'
~~ ~ -JO' / SE'A FLOOR . ----"'
-!10' PROPOSED 111" UNE NO. 1-18
l ........ -70' COLLINS COVE HDD
--4 28+00 2t+OO 30+00 31+00 32+00 33+00 34+00 35+00 31+00 37+00
I STAllON
l ~BQEJLE SCAffi 1"-100' HORIZ. 1"-HlO' VERT.
) ..
~ - I-SYSTEM Spectra Eneri¥) - SALEM LATERAL PROJECT PROPOSED 1 6" LINE NO. 1-18 Partners.
Hatth Matt USACE PERMIT DRAWING Algonquin Gas Transmission, LLC 5400 WeolheimmCt H11111too, TX T70.56-S310 7131627-5400
MacDonald ~: ESSEX COUNTY, UAC:C:Ar.~IIC:8TS
!!![ liT: HMM P\1e 07/25/2014 ll
! CICD. BY: HMt.t ::MJi 1" = 1 00' ISHT.: _! 7 OF 19
ENG.: NO.: ISYS-P-1 009.1
150 LOWER WESTFIELD ROAD
HOLYOKE, MASSACHUSETTS 01040
PHONE (413) 535-0135
FAX (413) 535-0136
- - -- - -II
;II , N/F CITY OF SALEM )111 I 1J II
"TRACT NO. 1-18-8 I' I I !I f I///)
{/..////
' / - ~"' // " / '\.,/
PLAN VIEW GRAPHIC SCALE ,. ,. 0 ,.
HaU:h Matt MacDonald
[ 10' PERMANENT fASEMENT
---,--
I-SYSTEM SALEM LATERAL PROJECT
PROPOSED 16" LINE NO. 1-18 USACE PERMIT DRAWING
\..-
SpectJa E,.,g;} Partners.
Algonquin Gas Transmission, LLC 5400 Weolheirruo- Ct HIRIIfoo, TX T7D.S6-S310 7131627-5400
150 LOWER WESTFIELD ROAD
HOLYOKE, MASSACHUSETTS 01040
PHONE (413) 535-0135
FAX (413) 535-0136
g()'
70'
SO'
,~ .... IZ
f3G.:::J I:Z:
~-s~ ~-::II
~ JO'
10'
z 0
li -10'
~ ....
- - -
-30'
-SO'
-70'
-90'
CITY OE SALEM ESSEX COUNTY. MASSACHUSEIT$
NEAN HIGH WATER El..EV. 4.328 - ~ NAl\JRAL GRADE - r'--..
"" ' - f- r=- -- T r- -S£A FlOOR
/
PROPOSED HI" UNE NO. I 18 ----........ COLUNS C<7liE HOD
Hatth Matt MacDonald
r-.....
40tOD
STATION
PBOFJLE SCA!.£· 1••60' HORIZ. ,. -eo· VERT.
41-tOO
I-SYSTEM SALEM LATERAL PROJECT
PROPOSED 16" LINE NO. 1-18 USACE PERMIT DRAWING
"-.... -- ~- - ~ -
42+00
SpectJa E,.,g;} Partners.
Algonquin Gas Transmission, LLC 5400 Weolheirruo- Ct HIRIIfoo, TX T70.S6-S310 7131627·5400
ROJECT ONSULTING ERVICES, INC.
0' r.IAIJO 88 LN:
-e' NAVI> M ( NAT. !'OTTUM}
O'NAVDBI!IL1NE
- S' IVAW Ill! (NAT. OOTTOII)
DWG. NO. REFERENCE OVI{i. REV DSN CK
HOD EI.J'TR'f LOCJ\OON (1':/ AI-IGL.£) -8.00 FEET 1>W.I08B
DESCRIPTION
I
:.~-
'I . NAT BOTTOM
-m=m=i
PREUMINARY, NOT FOR CONSTl'lUCTlON
ENGI\JEERING APPROYA.LS 1-SYSTEM ""'"' BY '"" BID CONSTRUCTIOW SALEM LATERAL PROJECT
PROPOSED 16" LINE NO. 1-18 SEC"TlOIIJS
SpedniEnerW'j Partners.
LOC. BEVERLY HARBOR
"Tt"TLE SlGNAnJRE DATE SIGNATURE DATE 'r"EAA; 2.014 DWG. ISYS-Z-3000 REV. A
Section 404/10 Permit Application 3-6 SALEM LATERAL PROJECT
Figure 3.2-2 Offshore Cofferdam and HDD Workspace Layout in Beverly Harbor (Typical)
As previously described, the cofferdam sheet piling cannot be hammered in at the two locations where the existing HubLine pipeline will cross into and out of the cofferdam area. As such, two gaps will be built into the cofferdam walls. In addition, the buried end of the HDD casing pipe will be located within the cofferdam but it must be extended out through a third gap in the cofferdam wall to reach the HDD support vessel stationed outside of the cofferdam. To provide turbidity containment at these three openings in the cofferdam walls, Algonquin will install an alternative sheeting material that does not affect the integrity of the existing HubLine pipeline or HDD casing pipe, but does allow the water level to fluctuate with the ambient conditions and provide containment for a majority of the suspended sediments. The alternate material will consist of a geotextile fabric sheeting that is attached to wooden slats in the openings. The geotextile fabric will limit the size of particles that can pass through the openings yet will allow sufficient water flow to ensure the elevation of the water depth within the cofferdam is equal to the exterior of the cofferdam. A woven geotextile fabric is commonly used for silt curtains and may be used for this application. This fabric can typically pass approximately 18 gallons per minute per square foot of fabric while limiting particle sizes to 70 sieve and above. Figure 3.2-3 shows a typical view of one of the openings in the cofferdam where the existing HubLine pipeline would pass through. The angle of the installation of the HDD does not allow for the HDD casing to be completely enclosed within the cofferdam without increasing the length of the cofferdam by approximately 25 feet, which would also increase the environmental disturbance from the size and duration of installation. To address this issue, Algonquin will install the HDD casing into the bedrock to minimize the potential for inadvertent returns outside of the cofferdam. Algonquin proposes to install the HDD casing first and then build the cofferdam around it. The cofferdam will potentially provide support for the HDD casing or allow secondary bracing between the HDD casing and the cofferdam. On the west end of the cofferdam, where the HDD casing enters the mudline, the sheet pile can be installed so that it rests on bottom with very little penetration.