![Page 1: Purple Line Extension · The PLE project team is working to deliver the project consistent with Measure M. Purple Line Extension Section 2 Alignment 6. Section 2 Wilshire/Rodeo Station](https://reader034.vdocument.in/reader034/viewer/2022042314/5f02f1007e708231d406c530/html5/thumbnails/1.jpg)
Purple Line ExtensionSection 2 Construction Community Meeting February 20, 2020
![Page 2: Purple Line Extension · The PLE project team is working to deliver the project consistent with Measure M. Purple Line Extension Section 2 Alignment 6. Section 2 Wilshire/Rodeo Station](https://reader034.vdocument.in/reader034/viewer/2022042314/5f02f1007e708231d406c530/html5/thumbnails/2.jpg)
Agency News
2
Metro is growing, and that's great news for LA because we have big plans for new rail and busway lines in the coming years
A temporary transitional naming system will help riders connect the letter to the color while we update customer information
![Page 3: Purple Line Extension · The PLE project team is working to deliver the project consistent with Measure M. Purple Line Extension Section 2 Alignment 6. Section 2 Wilshire/Rodeo Station](https://reader034.vdocument.in/reader034/viewer/2022042314/5f02f1007e708231d406c530/html5/thumbnails/3.jpg)
Agenda
> Wilshire/Rodeo Station > Staging Yards> Utility Work> N Cañon Closure> Piling> Decking> Geotechnical
Instrumentation
3
> Century City/Constellation Station> Advance Utility Relocation (AUR)> Constellation Blvd. Full Closure
Extension> Tunnel Boring Machine Launch> Water Line Relocation> Piling> Decking
> Business Interruption Fund (BIF)> #EatShopPlay #BeverlyHills #Century
City
![Page 4: Purple Line Extension · The PLE project team is working to deliver the project consistent with Measure M. Purple Line Extension Section 2 Alignment 6. Section 2 Wilshire/Rodeo Station](https://reader034.vdocument.in/reader034/viewer/2022042314/5f02f1007e708231d406c530/html5/thumbnails/4.jpg)
Purple Line ExtensionProject Alignment
4
![Page 5: Purple Line Extension · The PLE project team is working to deliver the project consistent with Measure M. Purple Line Extension Section 2 Alignment 6. Section 2 Wilshire/Rodeo Station](https://reader034.vdocument.in/reader034/viewer/2022042314/5f02f1007e708231d406c530/html5/thumbnails/5.jpg)
Sections 1, 2 & 3 Status
5
Forecasted Schedule
Section Section 1 Section 2 Section 3
Length 3.92 Miles 2.59 Miles 2.56 Miles
New Stations Wilshire/La Brea
Wilshire/Fairfax
Wilshire/La Cienega
Wilshire/Rodeo
Century City/
Constellation
Westwood/UCLA
Westwood/VA
Hospital
Pre-Construction
Activities
2014 – 2015 2016 – 2018 2018 – 2019
Construction 2015 – 2023 2018 – 2025 2019 – 2026
Operations 2023 2025 2027
*Subject to change. The PLE project team is working to deliver the project consistent with Measure M
![Page 6: Purple Line Extension · The PLE project team is working to deliver the project consistent with Measure M. Purple Line Extension Section 2 Alignment 6. Section 2 Wilshire/Rodeo Station](https://reader034.vdocument.in/reader034/viewer/2022042314/5f02f1007e708231d406c530/html5/thumbnails/6.jpg)
Purple Line ExtensionSection 2 Alignment
6
![Page 7: Purple Line Extension · The PLE project team is working to deliver the project consistent with Measure M. Purple Line Extension Section 2 Alignment 6. Section 2 Wilshire/Rodeo Station](https://reader034.vdocument.in/reader034/viewer/2022042314/5f02f1007e708231d406c530/html5/thumbnails/7.jpg)
Section 2 Wilshire/Rodeo Station
![Page 8: Purple Line Extension · The PLE project team is working to deliver the project consistent with Measure M. Purple Line Extension Section 2 Alignment 6. Section 2 Wilshire/Rodeo Station](https://reader034.vdocument.in/reader034/viewer/2022042314/5f02f1007e708231d406c530/html5/thumbnails/8.jpg)
Wilshire/Rodeo Station BoxStation Box
8
Rendering shows length of the underground station box on Wilshire Bl from Cañon Dr to Beverly Dr
![Page 9: Purple Line Extension · The PLE project team is working to deliver the project consistent with Measure M. Purple Line Extension Section 2 Alignment 6. Section 2 Wilshire/Rodeo Station](https://reader034.vdocument.in/reader034/viewer/2022042314/5f02f1007e708231d406c530/html5/thumbnails/9.jpg)
Wilshire/Rodeo Station Schedule*As of February 2020, subject to change. Pending Council approval.
9
![Page 10: Purple Line Extension · The PLE project team is working to deliver the project consistent with Measure M. Purple Line Extension Section 2 Alignment 6. Section 2 Wilshire/Rodeo Station](https://reader034.vdocument.in/reader034/viewer/2022042314/5f02f1007e708231d406c530/html5/thumbnails/10.jpg)
Driveway InstallationReeves Staging Yard
10
Where: Wilshire/Reeves Yard (on Reeves Dr)
Duration: 1 week
Start Date: Mid-February 2020*
Work Hours: Monday – Friday, 7am – 4pm
Traffic Control:
Sidewalk closures adjacent to yard from 7am – 4pm
Closure of southbound Reeves Dr from 9am – 4pm
For your safety, do not use streets as awalkway
*Dates subject to change
![Page 11: Purple Line Extension · The PLE project team is working to deliver the project consistent with Measure M. Purple Line Extension Section 2 Alignment 6. Section 2 Wilshire/Rodeo Station](https://reader034.vdocument.in/reader034/viewer/2022042314/5f02f1007e708231d406c530/html5/thumbnails/11.jpg)
11
Remaining Work: Installation of pedestrian push
buttons Sidewalk and street restoration Replacement of temporary traffic
poles with permanent poles
Duration: 4-6 weeks*
Work Hours: Monday – Friday,
9am – 4pm
> Parking meters were removed on Clifton Wy. Replacement parking available at 257 N Cañon Dr from 8am to 6pm
Traffic Signal Installation Clifton Wy/Crescent Dr
*Dates subject to change
Intersection of Clifton Wy/ Crescent Dr
Traffic Control:
Intermittent lane, crosswalk, and sidewalk closures will be required
Traffic Control Officers will be in place to mitigate traffic impacts
Pedestrian access will be maintained during construction
![Page 12: Purple Line Extension · The PLE project team is working to deliver the project consistent with Measure M. Purple Line Extension Section 2 Alignment 6. Section 2 Wilshire/Rodeo Station](https://reader034.vdocument.in/reader034/viewer/2022042314/5f02f1007e708231d406c530/html5/thumbnails/12.jpg)
N Cañon Drive Cul-de-SacThrough September 2021* *Dates subject to change
12
![Page 13: Purple Line Extension · The PLE project team is working to deliver the project consistent with Measure M. Purple Line Extension Section 2 Alignment 6. Section 2 Wilshire/Rodeo Station](https://reader034.vdocument.in/reader034/viewer/2022042314/5f02f1007e708231d406c530/html5/thumbnails/13.jpg)
N Cañon Drive Detour
Note: Wayfinding signage installed prior to closure
During work at Clifton Wy and N Crescent Dr, Clifton Wy between N Cañon Dr and N Crescent Dr becomes one way eastbound
Vehicles trying to access N Cañon Dr from Crescent Dr need to go to Brighton Wy
13
![Page 14: Purple Line Extension · The PLE project team is working to deliver the project consistent with Measure M. Purple Line Extension Section 2 Alignment 6. Section 2 Wilshire/Rodeo Station](https://reader034.vdocument.in/reader034/viewer/2022042314/5f02f1007e708231d406c530/html5/thumbnails/14.jpg)
Pile Drilling InstallationThrough July 2020*
14
Pile installation includes: Drill 100-120 foot holes, place piles, and
back fill piles along the perimeter of the station box
All work occurs behind K-rail and/or traffic closures within station box area
Schedule Through July 2020* Piling to shift to south side of Wilshire Bl
in April 2020*
Work Hours 7 days a week 8am – 9pm, drilling 9pm – 11pm, non-drilling
*Dates subject to change
Need new pic
North side piling work on Wilshire Bl
![Page 15: Purple Line Extension · The PLE project team is working to deliver the project consistent with Measure M. Purple Line Extension Section 2 Alignment 6. Section 2 Wilshire/Rodeo Station](https://reader034.vdocument.in/reader034/viewer/2022042314/5f02f1007e708231d406c530/html5/thumbnails/15.jpg)
Piling at Wilshire Bl/Beverly DrLane Reductions Outside K-rail
15
Duration: through April 2020*
Work hours in the Intersection Only (outside piling k-rail):
> Monday – Friday, 9am – 4pm
> Saturday – Sunday, 7am –10pm (non-drilling activities after 8pm)
Beverly Dr Lane Reduction:
One through lane open northbound and southbound during work hours
Pedestrian Control:
North crosswalk and west crosswalk will be closed at the intersection
Pedestrian detour will be provided
*Dates subject to change
![Page 16: Purple Line Extension · The PLE project team is working to deliver the project consistent with Measure M. Purple Line Extension Section 2 Alignment 6. Section 2 Wilshire/Rodeo Station](https://reader034.vdocument.in/reader034/viewer/2022042314/5f02f1007e708231d406c530/html5/thumbnails/16.jpg)
16
Pile Drilling InstallationPhotos of piling on north side of Wilshire Bl
Need new pic
![Page 17: Purple Line Extension · The PLE project team is working to deliver the project consistent with Measure M. Purple Line Extension Section 2 Alignment 6. Section 2 Wilshire/Rodeo Station](https://reader034.vdocument.in/reader034/viewer/2022042314/5f02f1007e708231d406c530/html5/thumbnails/17.jpg)
Pile Drilling InstallationProtected sidewalk features wayfinding signage
17
![Page 18: Purple Line Extension · The PLE project team is working to deliver the project consistent with Measure M. Purple Line Extension Section 2 Alignment 6. Section 2 Wilshire/Rodeo Station](https://reader034.vdocument.in/reader034/viewer/2022042314/5f02f1007e708231d406c530/html5/thumbnails/18.jpg)
Wilshire Bl Piling Set-upNorth Side Piling Set-up (October 2019 to April 2020*)
18Example of construction area with piling set-up on the north side of Wilshire Bl
![Page 19: Purple Line Extension · The PLE project team is working to deliver the project consistent with Measure M. Purple Line Extension Section 2 Alignment 6. Section 2 Wilshire/Rodeo Station](https://reader034.vdocument.in/reader034/viewer/2022042314/5f02f1007e708231d406c530/html5/thumbnails/19.jpg)
Wilshire Bl Piling Set-upSouth Side Piling Set-up (April 2020 to July 2020*)
19Example of construction area with piling set-up on the south side of Wilshire Bl
![Page 20: Purple Line Extension · The PLE project team is working to deliver the project consistent with Measure M. Purple Line Extension Section 2 Alignment 6. Section 2 Wilshire/Rodeo Station](https://reader034.vdocument.in/reader034/viewer/2022042314/5f02f1007e708231d406c530/html5/thumbnails/20.jpg)
Piling Plan
20
NORTH SIDE PILING:
> Start Date: October 21, 2019
> Anticipated End Date: April 2020*
> Traffic Lane Closures Required:
> Wilshire/Beverly Dr
> Alleys between N Crescent and N Beverly Dr
*Dates subject to change
SOUTH SIDE PILING:
> Anticipated Start Date: April 2020*
> Anticipated End Date: July 2020*
> Traffic Lane Closures Required:
> Wilshire/Beverly Dr
> Wilshire/Reeves Dr
> Wilshire/S Cañon Dr
North Side Piling(October 2019 to
April 2020)
South Side Piling
(April 2020 to July 2020)
Decking (Beginning
August 2020)
![Page 21: Purple Line Extension · The PLE project team is working to deliver the project consistent with Measure M. Purple Line Extension Section 2 Alignment 6. Section 2 Wilshire/Rodeo Station](https://reader034.vdocument.in/reader034/viewer/2022042314/5f02f1007e708231d406c530/html5/thumbnails/21.jpg)
Santa Monica Bl Haul Route
21
Haul Routes on Wilshire Bland Santa Monica Bl
![Page 22: Purple Line Extension · The PLE project team is working to deliver the project consistent with Measure M. Purple Line Extension Section 2 Alignment 6. Section 2 Wilshire/Rodeo Station](https://reader034.vdocument.in/reader034/viewer/2022042314/5f02f1007e708231d406c530/html5/thumbnails/22.jpg)
DeckingBeginning August 2020*
22
Construction of a concrete deck, curb-to-curb on Wilshire Bl
Decking will serve as the temporary street surface
Metro will work closely with first responders on emergency access and safety
Duration: Anticipated 13 weekends
Work Hours: Full closure 8pm Friday through 7am Monday
Additional activities during decking closures:
Ground improvements, piling, temporary civil improvements, dewatering system installation and geotechnical instrumentation
Excavation for decking on Wilshire Bl near Hamilton Dr
Installing deck panels
*Dates subject to change
![Page 23: Purple Line Extension · The PLE project team is working to deliver the project consistent with Measure M. Purple Line Extension Section 2 Alignment 6. Section 2 Wilshire/Rodeo Station](https://reader034.vdocument.in/reader034/viewer/2022042314/5f02f1007e708231d406c530/html5/thumbnails/23.jpg)
23
Geotechnical InstrumentationInstallation
Instruments will be installed within the tunnel alignment and station box area to monitor ground movement, settlement and other geological conditions. These installations will be within the public right of way and within privately owned properties.
Duration: Ongoing
Work Hours:
> Weekdays: 7am – 4pm
> Weekends: 8am – 7pm (as needed)Example of geotechnical instrument installation in Century City
![Page 24: Purple Line Extension · The PLE project team is working to deliver the project consistent with Measure M. Purple Line Extension Section 2 Alignment 6. Section 2 Wilshire/Rodeo Station](https://reader034.vdocument.in/reader034/viewer/2022042314/5f02f1007e708231d406c530/html5/thumbnails/24.jpg)
24
Geotechnical InstrumentationInstallation
Locations: Wilshire Bl, Young Dr, Lasky Dr, S Moreno Dr, Charleville Bl, Spalding Dr
Traffic Control> Intermittent lane, sidewalk, and crosswalk, parking meter closures will be required
for this work within the area of Moreno Dr on the west, Wilshire Bl on the north, La Cienega on the east, and as far south as Charleville Bl
> Flaggers will be available at alleys> Two lanes in each direction will be maintained for day work on Wilshire Bl > One lane in each direction will be maintained on Young Dr, Lasky Dr , Charleville
Bl, Spalding Dr
![Page 25: Purple Line Extension · The PLE project team is working to deliver the project consistent with Measure M. Purple Line Extension Section 2 Alignment 6. Section 2 Wilshire/Rodeo Station](https://reader034.vdocument.in/reader034/viewer/2022042314/5f02f1007e708231d406c530/html5/thumbnails/25.jpg)
Century City/Constellation Station
25
![Page 26: Purple Line Extension · The PLE project team is working to deliver the project consistent with Measure M. Purple Line Extension Section 2 Alignment 6. Section 2 Wilshire/Rodeo Station](https://reader034.vdocument.in/reader034/viewer/2022042314/5f02f1007e708231d406c530/html5/thumbnails/26.jpg)
Century City/ConstellationStation Box
Rendering shows length of the underground station box on Constellation Bl from Century Park East to Avenue of the Stars
26
![Page 27: Purple Line Extension · The PLE project team is working to deliver the project consistent with Measure M. Purple Line Extension Section 2 Alignment 6. Section 2 Wilshire/Rodeo Station](https://reader034.vdocument.in/reader034/viewer/2022042314/5f02f1007e708231d406c530/html5/thumbnails/27.jpg)
Century City/Constellation Station Schedule
27
*As of February 2020, subject to change.
![Page 28: Purple Line Extension · The PLE project team is working to deliver the project consistent with Measure M. Purple Line Extension Section 2 Alignment 6. Section 2 Wilshire/Rodeo Station](https://reader034.vdocument.in/reader034/viewer/2022042314/5f02f1007e708231d406c530/html5/thumbnails/28.jpg)
Century City/ConstellationAdvanced Utility Relocation Schedule
28
*As of February 2020, subject to change
![Page 29: Purple Line Extension · The PLE project team is working to deliver the project consistent with Measure M. Purple Line Extension Section 2 Alignment 6. Section 2 Wilshire/Rodeo Station](https://reader034.vdocument.in/reader034/viewer/2022042314/5f02f1007e708231d406c530/html5/thumbnails/29.jpg)
Construction Staging Yards1940, 1950, 2010, 2040 Century Park East
29
> Utility installation
> Horizontal drillings to check for underground obstructions
Work Hours:
> Monday – Friday
> 6am – 5pm and 7pm – 5am
Tunnel shaft excavation
Tunnel shaft excavation progressInstallation of tower crane foundation
![Page 30: Purple Line Extension · The PLE project team is working to deliver the project consistent with Measure M. Purple Line Extension Section 2 Alignment 6. Section 2 Wilshire/Rodeo Station](https://reader034.vdocument.in/reader034/viewer/2022042314/5f02f1007e708231d406c530/html5/thumbnails/30.jpg)
30
Constellation Bl Full Closure Through July 2020
> No Public Access for Tenants through Driveway> Limited Access for: Large Trucks, Deliveries, Construction, Trash, FedEx/UPS
> Flaggers will be present for access
![Page 31: Purple Line Extension · The PLE project team is working to deliver the project consistent with Measure M. Purple Line Extension Section 2 Alignment 6. Section 2 Wilshire/Rodeo Station](https://reader034.vdocument.in/reader034/viewer/2022042314/5f02f1007e708231d406c530/html5/thumbnails/31.jpg)
Constellation Bl Launch BoxTunnel boring machine assembly
31
Launch box invert beneath Constellation Bl full closure
![Page 32: Purple Line Extension · The PLE project team is working to deliver the project consistent with Measure M. Purple Line Extension Section 2 Alignment 6. Section 2 Wilshire/Rodeo Station](https://reader034.vdocument.in/reader034/viewer/2022042314/5f02f1007e708231d406c530/html5/thumbnails/32.jpg)
Launch of Tunnel Boring Machines
• Excavation Duration: Approx. 2 years
• Anticipated Launch: Beginning March 2020
• Extraction Location: Wilshire Bl/ La Cienega Bl
*Dates subject to change
![Page 33: Purple Line Extension · The PLE project team is working to deliver the project consistent with Measure M. Purple Line Extension Section 2 Alignment 6. Section 2 Wilshire/Rodeo Station](https://reader034.vdocument.in/reader034/viewer/2022042314/5f02f1007e708231d406c530/html5/thumbnails/33.jpg)
Constellation Bl Water Line Relocation Between full closure and Solar Way
Work will be done during night hours in stages to minimize impact and maintain traffic accessibility. Relocation will begin east of AOS and move west toward Solar Way.
Anticipated Start Date: March 2020*
Duration: 2-3 months
Work Hours: Monday – Friday, 8pm – 6am
Traffic Control:
> Partial and full lane closures will be required on Constellation Bl and AOS
> Access to Craft valet will be maintained through work
33
*Dates subject to change
![Page 34: Purple Line Extension · The PLE project team is working to deliver the project consistent with Measure M. Purple Line Extension Section 2 Alignment 6. Section 2 Wilshire/Rodeo Station](https://reader034.vdocument.in/reader034/viewer/2022042314/5f02f1007e708231d406c530/html5/thumbnails/34.jpg)
Pile Drilling Installation
Process of reinforcing the station box by drilling 70-100 ft holes, placing piles, and backfilling with concrete around perimeter of station box. All work occurs behind k-rail and/or lane closures.
> Anticipated Start Date: Spring/Summer 2020*
> Duration: 3-4 months
> Work Hours: 7 days a week, 7am – 4pm and 8pm – 6am
> Coordinating directly with Westfield Mall, Century Plaza Hotel, Century Park, Watt Plaza and JMB
34
*Dates subject to change
![Page 35: Purple Line Extension · The PLE project team is working to deliver the project consistent with Measure M. Purple Line Extension Section 2 Alignment 6. Section 2 Wilshire/Rodeo Station](https://reader034.vdocument.in/reader034/viewer/2022042314/5f02f1007e708231d406c530/html5/thumbnails/35.jpg)
35
Pile Drilling InstallationPhotos of launch box piling on Constellation Bl
![Page 36: Purple Line Extension · The PLE project team is working to deliver the project consistent with Measure M. Purple Line Extension Section 2 Alignment 6. Section 2 Wilshire/Rodeo Station](https://reader034.vdocument.in/reader034/viewer/2022042314/5f02f1007e708231d406c530/html5/thumbnails/36.jpg)
Piling StagesAnticipated Start Date: Spring/Summer 2020* *Dates subject to change
![Page 37: Purple Line Extension · The PLE project team is working to deliver the project consistent with Measure M. Purple Line Extension Section 2 Alignment 6. Section 2 Wilshire/Rodeo Station](https://reader034.vdocument.in/reader034/viewer/2022042314/5f02f1007e708231d406c530/html5/thumbnails/37.jpg)
DeckingBeginning June 2020*
37
> Construction of a concrete deck, curb-to-curb on Constellation Bl
> Decking will serve as the temporary street surface
> Metro will work closely with first responders on emergency access and safety
> Work will be done in stages, beginning east of AOS, through the Constellation/AOS intersection, then west of AOS.
Duration: Anticipated 8 weekends
Work Hours: Full closures Friday, 8pm through Monday, 6am
Asphalt removal on Wilshire Bl
Concrete deck panel installation at Launch Box
*Dates subject to change
![Page 38: Purple Line Extension · The PLE project team is working to deliver the project consistent with Measure M. Purple Line Extension Section 2 Alignment 6. Section 2 Wilshire/Rodeo Station](https://reader034.vdocument.in/reader034/viewer/2022042314/5f02f1007e708231d406c530/html5/thumbnails/38.jpg)
Decking StagesAnticipated Start Date: June 2020* *Dates subject to change
![Page 39: Purple Line Extension · The PLE project team is working to deliver the project consistent with Measure M. Purple Line Extension Section 2 Alignment 6. Section 2 Wilshire/Rodeo Station](https://reader034.vdocument.in/reader034/viewer/2022042314/5f02f1007e708231d406c530/html5/thumbnails/39.jpg)
39
![Page 40: Purple Line Extension · The PLE project team is working to deliver the project consistent with Measure M. Purple Line Extension Section 2 Alignment 6. Section 2 Wilshire/Rodeo Station](https://reader034.vdocument.in/reader034/viewer/2022042314/5f02f1007e708231d406c530/html5/thumbnails/40.jpg)
40
Greenleaf Gourmet Chopshop1888 Century Park East Century City, CA 90067
(424) 239-8706
![Page 41: Purple Line Extension · The PLE project team is working to deliver the project consistent with Measure M. Purple Line Extension Section 2 Alignment 6. Section 2 Wilshire/Rodeo Station](https://reader034.vdocument.in/reader034/viewer/2022042314/5f02f1007e708231d406c530/html5/thumbnails/41.jpg)
Helping local businesses as we build.Purple Line Extension Update
![Page 42: Purple Line Extension · The PLE project team is working to deliver the project consistent with Measure M. Purple Line Extension Section 2 Alignment 6. Section 2 Wilshire/Rodeo Station](https://reader034.vdocument.in/reader034/viewer/2022042314/5f02f1007e708231d406c530/html5/thumbnails/42.jpg)
BIF Information and Eligibility
> Financial assistance to small “mom & pop” businesses with 25 or fewer full-time employees directly impacted by Metro Rail construction along three project areas
> Crenshaw/LAX Transit Project
> Purple Line Extension, Sections 1, 2 & 3
> Regional Connector Project, Little Tokyo area & 2nd/Broadway Segment
> Businesses must be located immediately adjacent to the rail corridor and meet other eligibility requirements
> Grant amount determined by business revenue loss directly related to period of Metro construction disruption
![Page 43: Purple Line Extension · The PLE project team is working to deliver the project consistent with Measure M. Purple Line Extension Section 2 Alignment 6. Section 2 Wilshire/Rodeo Station](https://reader034.vdocument.in/reader034/viewer/2022042314/5f02f1007e708231d406c530/html5/thumbnails/43.jpg)
BIF Information and Eligibility
> To date, 1,060 grants have been have been awarded totaling more than $26 million to 387 small “mom & pop” businesses along all three project areas:
> Crenshaw/LAX Transit Project
> Regional Connector, Little Tokyo area and 2nd/Broadway segment*
> Purple Line Extension Section 1 and Section 2
*Segment eligibility based on full street closure with duration greater than six continuous months.
![Page 44: Purple Line Extension · The PLE project team is working to deliver the project consistent with Measure M. Purple Line Extension Section 2 Alignment 6. Section 2 Wilshire/Rodeo Station](https://reader034.vdocument.in/reader034/viewer/2022042314/5f02f1007e708231d406c530/html5/thumbnails/44.jpg)
Business Interruption Fund
100% 97% 99% 94%84%
76%
Businessesreferred to
supportservices
Applicationsprocessedwithin 9business
days
Clientssatisfaction
rating
Businessesremaining
open after 6months of
grant award
Businessesremaining
open after 1year of grant
award
Businessesremaining
open after 2years of grant
award
Measures of Effectiveness(as of CY 2019 Q4)
![Page 45: Purple Line Extension · The PLE project team is working to deliver the project consistent with Measure M. Purple Line Extension Section 2 Alignment 6. Section 2 Wilshire/Rodeo Station](https://reader034.vdocument.in/reader034/viewer/2022042314/5f02f1007e708231d406c530/html5/thumbnails/45.jpg)
Business Interruption Fund
Value of BIF Grants Awarded:$26,167,690.69*
$15,440,564.52
$5,571,526.50
$2,209,271.48 $1,996,164.16 $950,164.03
Crenshaw/LAX Purple LineExtension Section 1
Purple LineExtension Section 2
RegionalConnector, Little
Tokyo Area
RegionalConnector,
2nd/BroadwaySegment
(*As of 2/14/2020)
![Page 46: Purple Line Extension · The PLE project team is working to deliver the project consistent with Measure M. Purple Line Extension Section 2 Alignment 6. Section 2 Wilshire/Rodeo Station](https://reader034.vdocument.in/reader034/viewer/2022042314/5f02f1007e708231d406c530/html5/thumbnails/46.jpg)
BIF Grant Award Update
> Purple Line Extension Section 1 (as of 2/14/20)
> BIF Grants Awarded: 215
> BIF Grant Amount Awarded: $5,571,526.50
> Number of small businesses awarded: 79
> City of Beverly Hills only
> BIF Grants Awarded: 41
> BIF Grant Amount Awarded: $1,066,676.76
> Number of small businesses awarded: 17
> BIF Business Advisor: Brian Lazo, PCR, 213.739.2999
![Page 47: Purple Line Extension · The PLE project team is working to deliver the project consistent with Measure M. Purple Line Extension Section 2 Alignment 6. Section 2 Wilshire/Rodeo Station](https://reader034.vdocument.in/reader034/viewer/2022042314/5f02f1007e708231d406c530/html5/thumbnails/47.jpg)
BIF Grant Award Update
> Purple Line Extension Section 2 (as of 2/14/20)
> BIF Grants Awarded: 71
> BIF Grant Amount Awarded: $2,209,271.48
> Number of small businesses awarded: 38
> City of Beverly Hills only
> BIF Grants Awarded: 59
> BIF Grant Amount Awarded: $1,860,844.80
> Number of small businesses awarded: 32
> BIF Business Advisor: Darrell Smith, PCR, 213.739.2999
![Page 48: Purple Line Extension · The PLE project team is working to deliver the project consistent with Measure M. Purple Line Extension Section 2 Alignment 6. Section 2 Wilshire/Rodeo Station](https://reader034.vdocument.in/reader034/viewer/2022042314/5f02f1007e708231d406c530/html5/thumbnails/48.jpg)
BIF and Eat Shop Play Workshop
When: Tuesday, February 25, 2020
Time: 10am – 2pm – Stop by any time for one-on-one assistance
Where: 2029 Century Park East
Conference Room B
Los Angeles, CA 90067
![Page 49: Purple Line Extension · The PLE project team is working to deliver the project consistent with Measure M. Purple Line Extension Section 2 Alignment 6. Section 2 Wilshire/Rodeo Station](https://reader034.vdocument.in/reader034/viewer/2022042314/5f02f1007e708231d406c530/html5/thumbnails/49.jpg)
Updates on La Cienega and Rodeo Stations
Wednesday, March 46:30pm – 8pm
Beverly Hills City Hall2nd Floor Municipal Gallery
445 N Rexford DrBeverly Hills, CA 90210
*On-site parking free after 5pm
49
Next Community MeetingBeverly Hills
![Page 50: Purple Line Extension · The PLE project team is working to deliver the project consistent with Measure M. Purple Line Extension Section 2 Alignment 6. Section 2 Wilshire/Rodeo Station](https://reader034.vdocument.in/reader034/viewer/2022042314/5f02f1007e708231d406c530/html5/thumbnails/50.jpg)
La Cienega and Rodeo Stations
Wednesday, March 412pm – 1pm
Link to the online meeting: WebexAccess Code: 806 634 776 | Password: Purple
Join by phone: 1-650-479-3207 (toll-free)
50
Lunch with Us: Public WebinarBeverly Hills
![Page 51: Purple Line Extension · The PLE project team is working to deliver the project consistent with Measure M. Purple Line Extension Section 2 Alignment 6. Section 2 Wilshire/Rodeo Station](https://reader034.vdocument.in/reader034/viewer/2022042314/5f02f1007e708231d406c530/html5/thumbnails/51.jpg)
Section 2: Construction Community Meeting
Thursday, May 216:30pm – 8pm
Century Plaza Towers2029 Century Park EastLos Angeles, CA 90067
Concourse Level D, Room A
*Parking will be validated51
Next Community MeetingSection 2
![Page 52: Purple Line Extension · The PLE project team is working to deliver the project consistent with Measure M. Purple Line Extension Section 2 Alignment 6. Section 2 Wilshire/Rodeo Station](https://reader034.vdocument.in/reader034/viewer/2022042314/5f02f1007e708231d406c530/html5/thumbnails/52.jpg)