Transcript
Page 1: Radar Development Status Report

Radar Development Status Report

• S. Gogineni, C. Allen, J. Ledford, K. Marathe, V. Jara, S. Raghunathan and M. A. Hameed

Page 2: Radar Development Status Report

2 of XX

Outline

• Radar specs

• Radar block diagram

• Radar hardware

• Antennas

• Cabling for P-3

• Schedule

Page 3: Radar Development Status Report

3 of XX

Radar specs

Page 4: Radar Development Status Report

4 of XX

Radar Block Diagram

Page 5: Radar Development Status Report

5 of XX

Digital System and Clock Generation

Page 6: Radar Development Status Report

6 of XX

Transmitter

Page 7: Radar Development Status Report

7 of XX

Antennas

Page 8: Radar Development Status Report

8 of XX

Receiver

Page 9: Radar Development Status Report

9 of XX

Radar hardware• Development and testing are

• underway

Page 10: Radar Development Status Report

10 of XX

Antennas•Antenna modifications simulated, emulated, and engineered

Page 11: Radar Development Status Report

11 of XX

Cabling for P-3P-3 aircraftRF cabling for CARDS (GISMO) and

PARIS radar systems

Left wing

Right wing

CARDS (GISMO)

rackPARIS

rack

4 bulkhead connectors

4 bulkhead connectors

Bundle of 4 coaxial cables, 25 feet long

Bundle of 4 coaxial cables, 25 feet long

Bundle of 2 coaxial cables, 50 feet long

4-elementdipole array

1:4 power splitter/combiner

single RF cable

to fuselage

Existing (“old”) configuration for connecting to the antennas within the wings

4-elementdipole array

4-cable bundle

to fuselage

New configuration of connecting to antennas within the wings

(X 2) (X 2)

Cable details:Semflex BPE240Specs available athttp://www.semflex.com/pdf/BPE%20100-300.pdf 4 RF

connectors

Page 12: Radar Development Status Report

12 of XX

Status and Schedule

• Transmitter boards tested• Transmitter assembly awaiting testing• 1st receiver boards in test• Remaining receiver boards awaiting assembly• System level testing: 12 Feb thru 26 Feb• Aircraft and antenna mods: Underway• Aircraft installation and test: Begins 15 Mar

• We are on or ahead of schedule


Top Related