RAILWAY RESEARCH AND
TECHNOLOGY CENTER (DATEM)
ATİLA KESKİN
DATEM HISTORY
2
2009
TCDD Board Decision
2010Appointments and
Establishment of the Organization
2011Completing the Construction of
Administrative Buildings
2012 Completion of Geotechnical
Services Buildings and Laboratories
2018 Component Test Center,
Welding Center and EST Laboratory Completion
2016
Restructuring
2013 Completion of Material
Engineering Services Buildings and Laboratories
2019
Launch of Railway Welding Engineering
Services
3
DATEM MANAGER
DATEM VICE MANAGER
Administrativeand Financial Department
Material andWelding
EngineeringServices
EST Engineering
Services
GeotechnicalEngineering
Services
TrackSuperstructure
EngineeringServices
Technical Project
Department
Standardisation, Certification
Engineering Services
QualityAssurance
Office
DATEMORGANIZATION CHART
Total of 78 employees
59 Engineers 12 Doctoral Candidate 1 Doctorate Degree 10 MSc Candidates 21 MSc Degree(some of graduated MSc from UK, German and Chinese Universities)
4
DATEMORGANIZATION CHART
We support the graduate and doctoral students who study in the field of railway.
• VisionIn order to create a better world and a happy society,
Conducting R&D studies for the railway technologies of the future,
Provide solutions for the railway sector,
Become an international organization that increases operational security, reducingcosts, developing of environment friendly technology
• MissionIn order to respond to needs and social challenges,
Investigating the development and research around the world in the field of railway,
Identifying needs and problems, providing new solutions or improving existing situations,
R&D and innovation studies.5
DATEM
HORIZON 2020
6
H2020
EU FUNDED PROJECTS
SHIFT2RAIL
SHIFT2RAIL
INITIATIVE
EUROC UIC
TCDD
Supporters RICG
IRRB
7
Germany
Germany Sweden
FranceSpain
Sweden
ItalyPortugal
England
Germany Germany
Spain
Turkey
OUR PROJECT PARTICIPANTS
England Holland
8
SHIFT2RAILINNOVATION PROGRAMMES (IP)
TCDD participates in IP3 projects.
From 2011 to present:
Completed projects 10
Ongoing projects 2
To be launched projects 2
9
EU FUNDED PROJECTS
10
EU FUNDED PROJECTSCOMPLETED PROJECT
11
EU FUNDED PROJECTSONGOING PROJECTS
12
Project Topic: Research Into Enhanced Tracks, Switches and Structures
Starting Date: 01/09/2016
Project Duration :30 months
Ending Date: 28/02/2019
Total Budget: € 6.366.942 (TCDD Total Budget :100.000 €; H2020 Budget :63.486 €)
Coordinator : Trafikverket (Sweden)
PROJECT INFORMATION
IN2TRACK PROJECT
13
TASKS
Improvement of track geometry quality
through under sleeper pads are analyzed
numerically and by experiments
Rail breakage detection and monitoring
techniques are reviewed and evaluated
Shot peening application on welded rail
zones for fatigue life improvement.
A numerical model development for the
modeling of rail corrugation for
prediction.
The grinding processes, methods and
procedures used by the worldwide
operators are examined.
IN2TRACK PROJECT
14
Project Topic : Intelligent Innovative Smart Maintenance of Assets By Integrated Technologies
Starting Date : 01/09/2016
Project Duration :36 months
Ending Date : 31/08/2019
Total Budget : € 16.405.562,56 (TCDD Total Budget :30.000 €; H2020 Budget:13.355 €)
Coordinator : Ansaldo STS (Italy)
PROJECT INFORMATION
IN2SMART PROJECT
15
IN2SMART PROJECT
16
PROJECT INFORMATION
Project Topic : Indicator Monitoring for a new railway Paradigm in seamlessly
integrated Cross modal Transport chains – Phase 2
Starting Date : 01/09/2017
Project Duration :59 months
Ending Date : 30/08/2022
Total Budget : € 3,153,652 (TCDD Total Budget : € 53,000 ; H2020 Budget : € 23,996)
Coordinator : Jan Bergstrand / Trafikverket
IMPACT-2 PROJECT
17
TASKS
Researching about Condition Based Monitoring/Maintenance Activies, State of Art technologies
Constitute common smart maintenance concept
Constitute common & efficient standards
Data Acqusition – Transmission
Storage –Analysing
IMPACT-2 PROJECT
18
PROJECT INFORMATION
Project Topic: Research Into Enhanced Tracks, Switches and Structures - 2
Starting date: 01/11/2018
Duration: 30 months
Ending date: 30/04/2021
Total budget: € 30.162.671,14 (TCDD total budget :107.700 €; H2020 Funding :
47.861,86 €)
Coordinatır : Network Rail Infrastructure Limited (England)
IN2TRACK-2 PROJECT
19
Numerical and experimental analysis for
track geometry quality improvement via
Under Sleeper Pads
Embedded track (concrete) system research
for transition zones
IN2TRACK-2 PROJECT
20
PROJECTS TO BE LAUNCHED
IN2TRACK-3 (SHIFT2RAIL)
• Project Name: Research Into Enhanced Tracks, Switches and Structures - 3
DECAMERON(HORIZON 2020)
• Project Name : 5G for Connected & Automated Mobility
FUTURE
21
HORIZON EUROPE
PROGRAMME
(Horizon Europe)
2021-2027
SHIFT2RAIL2
INITIATIVE
Demiryolu
Projeleri
• The issues that we want to take part in Horizon Europe;
Main topics of projects are;
smart – autonomous
implementable solutions,
environment friendly,
responding to needs,
production technologies for cost reduction
And also focusing on warning technologies and structural precautions to determine effect of
global warming and disasters (such as earthquakes, floods, heavy and sudden precipitation,
storms)
RAILWAY PROJECTS
22
CLOSURE
THANK YOU!
“Pek çok şafak vardırHenüz ışıldamamış olan.”
“ There are many dawnThat has not yet shined. ”
Friedrich Nietzsche