Railway TransportationRailway Transportation
Ministry of Roads and Transportation Ministry of Roads and Transportation
ISLAMIC REPUBLIC OF IRANISLAMIC REPUBLIC OF IRAN
Capital = Tehran
Area= 1,648,195 km2
population= 75 million
Islamic Republic of Iran
Railway Transport
Rail Transportation
2009-2010Index
20513Number of freight wagons in service
1323Number of passenger wagons in service
646Number of locomotives
33Total freight transport in the country by rail (million tons)
796,817&
1,334,018
Freight transport by rail :Export &
Import
1,336,210Transit of goods by rail (million tons)
19%The share of the Railway transportation from the transit
�11760 Km Total Length of main railroads
�3352 Km under construction
�9891 km under study
I.R. of Iran Railway’s Network
18 66
Iran Existing, Under Construction & Under Study Ra ilway’s Network and connections to neighboring countries
Iran Railway’s Network (Under construction)
Total length =3352 km
Iran Railway’s Network (Under study )
Total length =9891 km
Completed Most Important Railway Projects
��Bafq Bafq ––Bandar Abbas railway Bandar Abbas railway
�� 670670 KmKm
��Bafq Bafq -- Mashhad railway Mashhad railway
800 Km800 Km
��Sarakhs Sarakhs -- Mashhad railwayMashhad railway
165 Km165 Km
��Esfahan Esfahan --shiraz railway shiraz railway 506 Km506 Km
��Doubling track on Doubling track on
TehranTehran -- Mashhad line Mashhad line 926 Km926 Km
KermanKerman --BamBam -- Zahedan railway Zahedan railway
545 Km545 Km
Iran Railway Projects
(Under Construction )
75Hamedan - Jokar
450Malayer –Kermanshah - khosravi
424Tehran-Qom- Esfahan (Electrified/Express)
16Khoramshahr -Shalamche
37Nezamiye-miyandasht
175Miyane -Ardebil
372Qazvin –Rasht -Anzali/Astara
205Miyane-Bostan Abad-Tabriz
Length (km)
Project
Iran Railway Projects
(Under Construction ) / continued
120Ahavaz –Khoramshar (rehabilitation)
97Mahabad -Oroumiye
86Maraghe -miyando Ab-Mahabad
90Arak -Malayer
647Shiraz-Boushehr-Asalouye
140Khaf -Herat(in Afghanistan)
418Tehran-Hamedan-Sanandaj
Length (km)Project
Total length= 3352km
SARAKHS
BANDAR ABBAS
TEHRAN
BAFQ
PERVADEHCHADORMALOO
SANGANTORBAT
Bafq -Mashhad Railway (completed)
Total length= 800 km
Mashhad
Persian Gulf
CaspianSea
ARAK
SARAKHSTEHRAN
MIRJAVEH
RAZI
BANDAR ABBAS
BANDAR EMAM
KHORRAMSHAHR
BAFQ
CHAHBAHAR
MILAK
CaspianSea
Persian Gulf
BAM
Kerman
Kerman-Bam- Zahedan Railway (completed)
Total length :545 Km
ZAHEDAN
Fahraj
BANDAR ABBAS
TEHRAN
ASTARA
372 Km.
BAFQ
Qazvin -Rasht- Anzali - Astara Railway
Qazvin -Rasht segment is under constructionCaspian
Sea
Persian Gulf
Qazvin
Rasht
TEHRAN
BANDAR ABBAS
BANDAR IMAM
BAFQKHORRAMSHAHR
1- Bandar Abbas-Northern Port (Amir Abad) Railway which connect CIS countries to worldwide open
seas via Caspian Sea
2- Bandar Imam- Northern Port (Amir Abad) Railway
Amir Abad
Persian Gulf
1
2
Caspian Sea
ARAK
TEHRAN
MIRJAVEH
RAZI
BANDAR ABBAS
BANDAR EMAM
KHORRAMSHAHR
BAFQ
CHABAHAR
CaspianSea
Persian Gulf
BAM
Kerman
Chabahar –Zahedan-Mashhad Railway with total lengths 1350 Km
(ready for construction)
ZAHEDAN
Mashhad
Fahraj
The ports in Caspian Sea and Persian Gulf
connected to the rail network
Proposed Rail Projects to be Financed and Invested by private sector
650Shiraz- Boushehr - Asalouye
180Maraghe - Oromiye
205Miyane - Tabriz
425Tehran- Hamedan - Sanandaj
370Qazvin - Rasht-Anzali-Astara
410Tehran- Qom -Esfahan
1350Chabahar -Zahedan- Mashhad
260Kermanshah -Khosravi
Length (km)Railways
Proposed Rail Projects to be Financed and Invested by private sector
6651Total
420Miyane - Ardebil- Pars Abad
540Esfahan - Ahvaz
336Ilam - Andimeshk
655Mashhad – Bojnord - Gorgan
850Mashhad-Tehran (maglev /high speed)
Length (km)Railways
ThanksThanksforfor
Your Kind AttentionYour Kind Attention