RAP of River Mindhola
INDEX
Sr. No. Particulates Page No. A EXECUTING SUMMARY 1
River Action Plan of River Mindhola 1 Background 4
2 Municipal Sewage Generation and Treatment 4 3 Status of Industrial effluent and treatment facilities 5
4 Drain out-falling in River Mindhola 6 5 Status of Water Quality 7
6 Plan for restoration of Water Quality 8
7A Solid Waste Generation & Treatment 8 7B Bio Medical Waste 9
7C Industrial Waste 9 8 Ground Water extraction details 9
8A Details of bore well samples- River Mindhola 10 9 Environmental Flow (E-Flow) 12
10 Plantation/Vegetation cover along the River stretch/River
12
11 Biodiversity Park 12
12 Details of good Irrigation Practices 12 13 Details on Flood plain management zone 13
14 Public Health Study in the vicinity of polluted river stretch
13
15 Time Targeted Management Plan 13
ANNEXURE
Annexure-I List of other Responsible Organization (s) for implementation of River action plans
14
Annexure-I (a) Responsible Organization (s) for implementation of action plans of STPs & CETPs
15
Annexure:- II Proposed Mechanism for execution of action plans 16
Annexure-A Map of Mindhola River 17
Annexure-B Data received from Health dept. (Health Impact Study & Mitigation Measures)
18
TABLE Table: 1 Status of Domestic Pollution in Mindhola 5
Table: 2 Industries- Water shed of River Mindhola 6 Table: 3 Particulars of Drains Falling into River Mindhola 6
Table: 4 Status of water quality in Major Drains 7
Table: 5 Quantity of effluent in sub tributary drains meting to major drains
7
Table: 6 Status of Water Quality of Mindhola 7
Page | 1
EXECUTING SUMMARY ON PROPOSED ACTION PLANS OF MINDHOLA FOR REJUVENATION OF POLLUTED RIVER STRETCH (PRS) Of MINDHOLA
S. No.
DESCRIPTION OF ITEM Details
1. Name of the identified polluted river and its tributaries
: River:- MINDHOLA PRS:- Along Sachin
Tributaries of PRS:- -- pl. Refer tablel-5
2. Is river is perineal and total length of the polluted river
: Non- Perennial river Length:- 10 KM
3. No of drains contributing to pollution and names of major drains
: Total No of drains:- 01 Name of Drains (Location):
i) Kapletha village drain
4. Whether ‘River Rejuvenation Committee (RRC) constituted by the State Govt./UT Administration and If so, Date of constitution of ‘RRC’
: Yes, The “River Rejuvenation Committee (RRC)” has been constituted on 29th November, 2018 by Forest and Environment Department, Govt. of Gujarat for the execution of River Action Plan (RAP) of the Gujarat.
5. Major Towns on the banks of the river with population
: Name of Town/Area/villages
Population
Town Sachin 129585
a. Total water consumption and sewage generation in MLD
: Total Water consumption:- 2 MLD Total Sewage generation:- 1.6 MLD
b. Total no. of existing STPs and the total capacities in MLD
: No. of existing STPs: - No STPs
c. Gaps in sewage treatment in MLD and no. of towns not having STPs
: Total Gaps in sewage treatment: - 1.6 MLD. No. of Towns/Villages not having STPs:- as per below:-
Name of Area/Towns/
Villages
Remarks
Sachin Town Proposed STP- 2MLD + 2 MLD cap.
d. Total MSW generation in TPA : MSW:- 3650 TPA (10 TPD)
e. Existing treatment and disposal facilities and total capacity
: Authorized Agencies/end users/recyclers
6. Major industrial estates located with total no. of industries
: No effluent discharge by industry into this stretch
a. Total water consumption and total industrial effluent generation in MLD
:
b. No. of industries having captive :
Page | 2
ETPs and their treatment capacity in MLD
c. No of CETP’s and their treatment capacity
: No CETPs
d. Gaps in treatment of industrial effluent
: No effluent discharge by industry into this
stretch
e. Total HW generation in TPA in the catchment area
: NA
f. Existing HW Treatment and Disposal Facilities and total capacity with life span
:
7. Action plan includes mainly covering aspect such as (Proposal for utilisation of sewage, ground water recharging or rain water harvesting, measures for regulating ground water use, protection and management of flood plain zone, maintaining minimum E-flows and water shed management, plantation on both sides of the river, setting up of bio-diversity parks etc., as per Hon’ble NGT Orders dated 20.09.2018 and 19.12.2018)
: No, details are not available with the Board hence letters to concern authority/organizations have been issued as under for the necessary actions. Please also refer Annexure:- I
Concern
Authority/
Organizations
For the activities
/issues
Central Ground Water Authority/Gujarat Water Resource Development Corporation Ltd.
Ground water related
issues & for
implementation of the
schemes related to
recharging of Ground
water
Irrigation department
E-flow, regulation of
activities in flood plain
zone & Flood plain
management , Good
Irrigation Practices etc.
Forest offices of the Gujarat
Plantation /Vegetation
cover along the River
stretch/River, setting
up of Biodiversity Park
etc.
Sachin Notified Area
Proper
disposal/Treatment of
Sewage
Page | 3
8. Min. and Max. required time period for implementation of action plans
up to 2020 (Approximate)
9. Total estimated budget in crores
towards implementation of
proposed action plans with break-
up ( e.g. No. of STPs, capacity, total
cost; No of CETPs, total capacity,
Cost towards interception and
diversion of sewage/effluent to
STPs/CETPs etc.,)
: STPs Details:-
Proposed STP MLD
Time Limit
Estimated Budget in Cr.
Responsible Agency
Sachin- 2 +2 MLD
24 months (2020)
20 cr. Sachin Notified Area
CETPs Details:- No effluent discharge by industry into this
stretch
10. Responsible Organisation (s) for implementation of proposed action plans (Please enclose details as annexure )
: Annexure:- I & I (a)
11. Proposed Mechanism for execution of action plans
: Annexure:-II
12. Expected deliverables w r to achieving Goals (Please enclose as annexure )
: As above
Page | 4
River Action Plan of River Mindhola
AlongSachin
Priority V
1. Background
Location of river stretch with geographical detail like Latitude & Longitude etc.
Stretch identified: River Mindhola flowing along Sachin having 10 KM stretch
and is non-perennial river.
Latitude : 21o3’17.53” N
Longitude: 72o52’47.31” E
Towns mentioned: Sachin
Background of pollution causes into river stretch
River Mindhola flows passing from villages in BardoliTaluka and merges into Arabian Sea via
Sachin. The domestic discharge is done in River Mindhola. The downstream of the river
Mindhola witnesses domestic discharge via creeks. There is no industrial discharge from GIDC
or notified area in this stretch. This stretch along Sachin is basically the downstream part which
is not contaminating the sweet water.
2. Municipal Sewage Generation and Treatment
Name of towns/villages/area which are discharging their domestic sewage into river
stretch
Total domestic water consumption:-2 MLD
Town identified by CPCB is Sachin which are discharging their domestic sewage into this river
stretch are Kanakpur – Kansad, Pardi, Sachin GIDC, etc.
Page | 5
Quantity of domestic sewage discharged into river stretch
Quantity of domestic sewage discharged into this stretch is approximately 1.6 MLD.
Source: https://www.suratmunicipal.gov.in/TheCity/City/Stml2
Action taken to reduce pollution in river stretch
STP can be made by local authority. As per NGT application no. 50/2015(WZ) (M.A. No.
192/2015) GIDC Sachin notified area will provide STP and they have appointed M/s. M-W2E Eco
Ventures Pvt. Ltd. for technical assistance for this work. They are also intimated via written
letter regarding providing action plan for sewage treatment via letter no: ગપુ્રનિબોર્ડ/પ્રા.ક.
સરુત/કેમ્પ-સરુત/NGT/૨૩૬૩તા. ૧૬/૦૧/૨૦૧૯.
Table 1: Status of Domestic Pollution in River Mindhola
District
name/
area
Total domestic water consumption
Total
Sewage
Generati-
on in
MLD
Total
Capacity
of Sewage
Treatment
Plant in
MLD
Total gap
between
generation
&
treatment
capacity
in MLD
Achieve
norms
or not
if not
give
detail
plan to
achiev-
e it
Action to
be taken
to cover
gap
(model
plan STP-
with
capacity)
Time line
for
proposed
model
plan
(STP)
Population
Dist:
Surat
Town
Sachin
2 MLD 1.6 STP not
provided
1.6 -- 2 MLD +
2 MLD
at
different
location
in
Notified
area
Budget:
@ 20
crore
Year 2020 Population
of Sachin
129585
Total 2 MLD 1.6 MLD -- 1.6 MLD -- -- -- --
3. Status of Industrial effluent and treatment facilities
Total industrial water consumption:-No industrial waste water discharge so N A.
Total no. of industries: - N A
Major industrial estates located with total no. of industries: -N A
No. of industries having captive ETPs and their treatment capacity in MLD: - N A
Nos. of CETPs & Treatment capacity of CETPs: - N A
Page | 6
Type/category of industries discharging effluent into river stretch
No effluent discharge by industry into this stretch
Quantity of industrial effluentdischarged into river stretch
No effluent discharge by industry into this stretch
Table 2: Industries- water shed of River Mindhola
Sr.No. Category of
industries/Name of
CETP/Common
Pipeline
Location
/Area
(District)
Quantity Quality of
discharge
effluent
(Whether
achieve Outlet
norms or not
if not give
detail plan to
achieve it)
Proposed
model
plan
( CETP
with
Capacity)
Time
limit
Remarks
Not applicable
Analysis report format for CETP
Parameters pH COD
Mg/L
BOD
Mg/L
Not applicable
4. Drain out –Falling in river Mindhola
Table 3: Particulars of drains falling into River Mindhola.
Sr.No. Location Name of
Inletting
River/Drain
Discharged Length
(Km)
Width
(mtr)
Depth
(mtr)
Gradient of
the river
(cm/km) Max Min
1 Sachin
Notified
area
Kapletha
village drain
meeting
River
Mindhola
1.6
MLD
0.5 MLD
3 km 3 0.5 -
Note:- Entire Baleshwar Khadi is meeting to River Mindhola at village Samrod as major drain.
Polluted River action plan of Baleshwar Khadi is prepared and submitted separately.
Page | 7
Table 4: Status of Water quality in Major Drains
Location Major Drain BOD(mg/L) COD( mg/L)
River Mindholaat S.H.Surat-
NavsariRoad,Sachin
Kapletha village
drain meeting
River Mindhola
2.51 60.2
Table 5: Quantity of effluent in sub tributary drains meeting to major drains
Sr.
No
District Name of
the Drain
Place where
drains join
with river
Quantity of
effluent (MLD)
Remarks
No sub-tributary drains meeting to major drains.
5. Status of Water Quality
Location of water quality measuring station under NWMP
River Mindhola at S.H. Surat-Navsari Road,Sachin
Table 6: Status of Water Quality of River Mindhola
Year Location DO (mg/l) pH BOD (mg/l) COD (mg/l) Fecal
Coliform
(MPN/100)
Total
Coliform
(MPN/100)
Min
.
Max
.
Min
.
Max
.
Min
.
Max
.
Min
.
Max
.
Min. Max
.
Min. Max
.
2016 River Mindholaat
S.H. Surat-Navsari
Road
1.2 6 7.1
3
8.11 1 6 12 236 23 348 23 130
2017 River
MindholaatS.H.Sur
at-Navsari Road
3.6 6.5 7.0
8
8.19 1.2 3.1 4 45 94 426 278 542
2018 River
MindholaatS.H.Sur
at-NavsariRoad
4.6 6.9 7.1
3
7.88 1.2 9 42 89 3 120 17 348
Page | 8
6. Plan for Restoration of Water Quality
STP can be made by local authority. As per NGT application no. 50/2015(WZ) (M.A. No.
192/2015) GIDC Sachin notified area will provide STP and they have appointed M/s. M-W2E Eco
Ventures Pvt. Ltd. for technical assistance for this work. They are also intimated via written
letter regarding providing action plan for sewage treatment via letter no: ગપુ્રનિબોર્ડ/પ્રા.ક.
સરુત/કેમ્પ-સરુત/NGT/૨૩૬૩તા. ૧૬/૦૧/૨૦૧૯.
Steps Taken
STP can be made by local authority. As per NGT application no. 50/2015(WZ) (M.A. No.
192/2015) GIDC Sachin notified area will provide STP and they have appointed M/s. M-W2E Eco
Ventures Pvt. Ltd. for technical assistance for this work. Reply is received from Sachin Notified
Area Authority with reference to the letter sent.
Directions issued for planning and execution of facilities by municipal authorities to
develop infrastructure for sewage treatment
Directions issued for setting up online monitoring system in the industrial units for
enforcement of prescribed standards
7A. Solid Waste generation & Treatment
This data is relevant to local authority
Type of
waste/
Characteristic
of waste
Generated
quantity/
day
Collection/
Storage
facility with
capacity
Disposal/Treatment
facility with
capacity along with
location
Total Gap
with
generation
&existing
treatment
facilities if
any
Proposed
action
plan/facility
to cover
gap
Time
limit
Remarks
Solid waste, 10
-
-
Authorized
Agencies/end
users/recyclers
10
DPR is
under
processes
Year
2020
Total 10 10
Note: - Letter has been issued to Panchayat, Rural Housing & Rural Development Department by GPCB, Head
office-Gandhinagar (Letter No.:- GPCB/HO/Ankl/P-3-101 (3)/493163-2 dated 31/01/2019)
Page | 9
7B:- Bio-medical waste (BMW):-
Total no. of healthcare units in this stretch: 30
Disposal facilities i.e. Common Biomedical Waste Treatment Facility operational in Surat in this
stretch:
1) Globe Bio-Care
7C. Industrial Waste:-
All Industrial Units have consent with the authorization under Haz. Waste Management Rules,
amended time to time & they all are member of TSDF/CHWIF/registered recycler under Rule-
9/Co-processing and disposed their Industrial waste as per consent conditions. Please refer
Annexure:-I.
8. Ground Water extraction details
The details are not available with the Board hence letter to Central Ground Water Authority has been
issued by GPCB, Head office-Gandhinagar for the submission of the details.(Letter No.:-
GPCB/HO/Ankl/P-3-101 (3)/493160-2 dated 31/01/2019).
The details received from Central Ground Water Board, West Central Region are as under
District Taluka
Net Annual Ground Water
Availability (mcm)
Total Ground Water Draft
(mcm)
Gap between
availability and Draft
(mcm)
Stage of Ground Water
Development (%)*
Category
Surat CHORASI 171.63 70.16 101.47 40.88 *Safe (≤ 70) Surat PALSANA 122.74 60.99 61.76 49.69
Note:-The ground water resources assessment is carried out on Taluka wise(Administrative Units) The State Govt. has taken up various Recharge/Water Conservation Schemes like Sujalam Sufalam Yojana, Jal Sanchay Abhiyan etc for augmentation of ground water resources.
NOTE: Analysis results of borewells are attached as Annexure A
Page | 10
8A. Details of borewell samples- River Mindhola 41672 - WATER PROJECT NWQM BOREWELL ATSACHIN GIDC (SIEL), HALF YEARLY / S
Samp ID & Dt %NA ABHC ALK ARS BOD BOR CAD CAL CHL CND COD COL COP DDT DOX FCO FDS FLU HCH IRO
244578-08/10/2018 42.42 0.00 150 NA 0.9 0.05 NA 264.53 1570 9017.6 11 5 BDL 0.00 2.1 13 NA 0.4 0.0 NA
230988-04/04/2018 ND 140 BDL 2.2 0.08 BDL 104.2 1489 8571 11 5 BDL ND 4.5 2 NA 0.69
In process BDL
Avg. 42.4200 0.0000 145.0000 BDL 1.55 0.065 BDL 184.365 1529.5 8794.3 11.00 5.00 BDL 0.0000 3.3000 7.5000 NA 0.5450 0.0000 BDL
Samp ID & Dt LEA LIN MAG MER NH3 NIC NTR pH PHO POT SOD SS SUP T.H TCH TCO TDS TKN TMP TUR ZIN
244578-08/10/2018 BDL ND 182.4 NA 0.56 NA 0.118 7.42 0.033 5 480.11 32 580 1410 0.074 83 5636 3.08 32 8 0.029
230988-04/04/2018 BDL ND 68 BDL 0.56 0.012 0.108 7.64 0.02 2.72 212.2 12 330 540 BDL 8 5546 3.92 32 0.7 BDL
Avg. BDL ND 125.2 NA 0.56 0.012 0.113 7.53 0.0265 3.86 346.155 22 455 975 0.0740 45.5 5591 3.50 32.0 4.35 0.029
41675-WATER PROJECT NWQM BOREWELL AT NR COMMON HAZ WASTE DSPO.SITE (GEPIL), HALF YEARLY/S Samp ID &
Dt %NA ABHC ALK ARS BOD BOR CAD CAL CHL CND COD COL COP DDT DOX FCO FDS FLU HCH IRO
244567-08/10/2018 46.91 0.00 170 NA 0.9 0.04 NA 72.14 90 508.2 12 5 BDL 0.00 2.9 9 NA 0.38 0.0 NA
230987-04/04/2018 0.0 240 BDL 2.2 0.062 BDL 112.2 672 4555 11 5 BDL ND 4.5 2 NA 0.96 0.0 BDL
Avg. 46.91 0 205 BDL 1.550 0.051 BDL 92.170 381 2531.6 11.5 5 BDL 0.000 3.7 5.5 NA 0.67 0 BDL
Samp ID & Dt LEA LIN MAG MER NH3 NIC NTR pH PHO POT SOD SS SUP T.H TCH TCO TDS TKN TMP TUR ZIN
244567-08/10/2018 BDL 0.00 41.34 NA 0.84 NA 0.128 8.05 0.017 1.89 143.26 6 32 350 0.04 64 308 3.36 32 3 BDL
230987-04/04/2018 BDL ND 58.3 BDL 0.56 BDL 0.156 7.51 0.01 1.43 226.2 8 230 520 BDL 8 2718 4.48 32 1.3 BDL
Avg. BDL 0 49.820 NA 0.7 BDL 0.142 7.78 0.014 1.66 184.73 7 131 435 0.04 36 1513 3.920 32.000 2.150 BDL
Page | 11
31052 - WATER PROJECT NWQM OPEN WELL AT GABHENI OPP: PANCHYAT OFFICE, HALF YEARLY / S
Samp ID & Dt %NA ABHC ALK ARS BOD BOR CAD CAL CHL CND COD COL COP DDT DOX FCO FDS FLU HCH IRO
244570-08/10/2018 42.81 0.00 140 NA 0.8 0.03 NA 36.07 160 835.2 10 5 BDL 0.0 6.1 3 NA 0.14 0 NA
230985-04/04/2018 0.00 150 BDL 1.4 0.084 BDL 96.1 302 2178 9 5 BDL ND 4.9 120 NA 0.43 BDL BDL
Avg. 42.810 0.000 145.000 BDL 1.100 0.057 BDL 66.085 231 1506.6 9.5 5 BDL 0 5.5 61.5 NA 0.285 0.000 BDL
Samp ID & Dt LEA LIN MAG MER NH3 NIC NTR pH PHO POT SOD SS SUP T.H TCH TCO TDS TKN TMP TUR ZIN
244570-08/10/2018 BDL 0.00 29.18 NA 0.56 NA 0.088 8.2 0.013 2.12 73.26 8 65 210 0.042 0.04 522 2.8 32 3 BDL
230985-04/04/2018 BDL ND 46.2 BDL 0.28 BDL 0.098 7.25 0.02 3.8 143.2 12 89 430 BDL 348 1292 2.8 32 1.1 BDL
Avg. BDL 0 37.69 NA 0.420 BDL 0.093 7.725 0.017 2.96 108.23 10 77 320 0.042 174.021 907 2.8 32 2.05 BDL
ABHC α- B.H.C(Benzene
Hexa Chloride) CHL Chloride FCO Fecal coliform MAG Magnesium PHO Phosphate TCO Total Coliform
ALK Alkalinity CND Conductivitiy FDS Fixed Dissolved Solids MER Mercury POT Potassium TDS Total Dissolved Solids
ARS Arsenic COD
Chemical Oxygen Demand FLU Fluoride NH3
Ammonical Nitrogen SOD Sodium TKN Total Kjeldahl Nitrogen
BOD
Bio chemical oxygen Dimand COL Colour HCH
Hexa Valent Chromium NIC Nickel SS
Suspended Solids TMP Temperature
BOR Boron COP Copper IRO Iron NIT Nitrite SUP Sulphate TUR Turbidity
CAD Cadmium DDT
Dichloro Diphenyl trichloro Ethane LEA Lead NTR Nitrate TH Total Hardness ZIN Zinc
CAL Calcium DOX Dissolved Oxygen LIN Lindane pH pH TCH
Total Chromium %Na %Sodium
Page | 12
9. Environmental Flow (E-Flow)
Stretch Existing E-flow Proposed plan to
achieve min. E-
flow
Time Limit Remarks
This data is related to Irrigation Department. Letter is written to irrigation department by Regional
Office (via letter no: ગ.ુપ્ર.નિ.બોર્ડ/પ્રા.ક.સરુત/ટી-૩૩૬/૨૪૧૩dated 31/01/2019) & by Head office-
Gandhinagar (Letter No.:- GPCB/HO/Ankl/P-3-101 (3)/493164 dated 31/01/2019)
10. Plantation/Vegetation covers along River Stretch/River
This data is related to Forest Department. Letter is written to forest department by Regional Office
(via letter no: ગ.ુપ્ર.નિ.બોર્ડ/પ્રા.ક.સરુત/ટી-૩૩૬/૨૪૧૪dated 31/01/2019) & by Head office-Gandhinagar
(Letter No.:- GPCB/HO/Ankl/P-3-101 (3)/493160 dated 31/01/2019) for the submission of the details.
The details received from Social Forestry wing, Aranya Bhavan, Gandhinagar are as under
Stretch/river Existing
plantation/vegetation
cover details
Proposed plan to
cover remaining gap
along river/river
stretch
Time limit Remarks
Mindhola
(Along
sachin)
1250 trees
Presently there is no separate scheme for plantations
along river /river stretch
11. Biodiversity Park
This data is related to Forest Department. Letter is written to forest department by Regional Office
(via letter no: ગ.ુપ્ર.નિ.બોર્ડ/પ્રા.ક.સરુત/ટી-૩૩૬/૨૪૧૪dated 31/01/2019) & by Head office-Gandhinagar
(Letter No.:- GPCB/HO/Ankl/P-3-101 (3)/493160 dated 31/01/2019) for the submission of the details. The details received from Social Forestry wing, Aranya Bhavan, Gandhinagar are as under
District/Area
Name
Existing
Biodiversity
Park Name
Total area of
Biodiversity
park
Proposed
Biodiversity
park
Time limit Remarks
Nil
12. Details of good Irrigation Practices:
This data is related to Irrigation Department. Letter is written to irrigation department by Regional
Office (via letter no: ગ.ુપ્ર.નિ.બોર્ડ/પ્રા.ક.સરુત/ટી-૩૩૬/૨૪૧૩dated 31/01/2019) & by Head office-
Gandhinagar (Letter No.:- GPCB/HO/Ankl/P-3-101 (3)/493164 dated 31/01/2019)
Page | 13
13. Details on Flood plain management zone: This data is related to Irrigation Department. Letter is written to irrigation department by Regional
Office (via letter no: ગ.ુપ્ર.નિ.બોર્ડ/પ્રા.ક.સરુત/ટી-૩૩૬/૨૪૧૩dated 31/01/2019) & by Head office-
Gandhinagar (Letter No.:- GPCB/HO/Ankl/P-3-101 (3)/493164 dated 31/01/2019)
14. Public Health Study in the vicinity of polluted river stretch:- As details on Health Aspects are not available with the Board, it was decided to give the work to carry out Health impact study to NIOH, Ahmedabad. However as per the letter received from NIOH (letter No.:- DIR/108/GPCB-Proj/2019/9752 dated 07/02/2019) they are not able to carried out the study as per requirement, So letter has been issued to Health & Family welfare dept. to submit the action plan of Health Aspects includes Health impact study and mitigation measures to improve the health in the catchment of polluted river stretch. Data received from Health dept. is attached as Annexure-B
15. Time Targeted Management Plan STP can be made by local authority. As per NGT application no. 50/2015(WZ) (M.A. No. 192/2015) GIDC Sachin notified area will provide STP and they have appointed M/s. M-W2E Eco Ventures Pvt. Ltd. for technical assistance for this work. They are also intimated via written letter regarding providing action
plan for sewage treatment via letter no: ગપુ્રનિબોર્ડ/પ્રા.ક. સરુત/કેમ્પ-સરુત/NGT/૨૩૬૩તા. ૧૬/૦૧/૨૦૧૯.
Steps to be taken (Action plan) STP can be made by local authority. As per NGT application no. 50/2015(WZ) (M.A. No. 192/2015) GIDC Sachin notified area will provide STP and they have appointed M/s. M-W2E Eco Ventures Pvt. Ltd. for technical assistance for this work. Reply is received from Sachin Notified Area Authority with reference to the letter sent.
Timelines for implementation of model restoration plan for STPs at Sachin area (2+2 MLD)
Activity/Year Responsible Agency 2019 2020 Remarks
Reconnaissance
Survey
Sachin notified area
Sampling GPCB/CPCB Continuous
Process
Preparation of DPR Sachin notified area
Execution (Setting up
of model, facility)
Augmentation of
river flow if any and
restoration of water
quality
-- -- -- --
Note: - Letter has been issued to Panchayat, Rural Housing & Rural Development Department by GPCB, Head
office-Gandhinagar (Letter No.:- GPCB/HO/Ankl/P-3-101 (3)/493163-2 dated 31/01/2019)
Page | 14
Annexure:- I
List of other Responsible Organization (s) for implementation of River action plans
Responsible Organization
for the activities /issues Remarks
Central Ground Water Authority / Gujarat Water Resource Development Corporation Ltd.
Ground water related issues & for execution of the plan for the same etc.
Letter issued to Central Ground Water Authority by GPCB, Head office-Gandhinagar for the submission of the details vide Letter No.:- GPCB/HO/Ankl/P-3-101 (3)/493160-2 dated 31/01/2019. Some data received in this regards from Central Ground Water Board, West Central Region, Gandhinagar, are incorporated in the Point 8 of Action Plan.
Irrigation department
E-flow, regulation of activities in flood plain zone & Flood plain management , Good Irrigation Practices etc.
Letter to Irrigation division has been issued by GPCB, Head office-Gandhinagar (Letter No.:- GPCB/HO/Ankl/P-3-101 (3)/493164 dated 31/01/2019) & by Regional Office, GPCB
(ગ.ુપ્ર.નિ.બોર્ડ/પ્રા.ક.સરુત/ટી-૩૩૬/૨૪૧૩dated 31/01/2019) for the
submission of the details.
Forest offices of the Gujarat
Plantation /Vegetation cover along the River stretch/River, Biodiversity Park etc.
Letter issued to concerned Forest office by regional Office vide Letter No.:-
ગ.ુપ્ર.નિ.બોર્ડ/પ્રા.ક.સરુત/ટી-૩૩૬/૨૪૧૪dated
31/01/2019& by GPCB, Head office-Gandhinagar (Letter No.:- GPCB/HO/Ankl/P-3-101 (3)/493160 dated 31/01/2019) Some data received in this regards from Social Forestry wing, Aranyabhavan, Gandhinagar are incorporated in the Point 10 & 11 of Action Plan.
Urban Development and Urban Housing Department
For discharge & disposal of Sewage/Solid waste in Environmentally sound manner such as efficient operation of existing STPs, up gradation of the existing STPs & provide new STPs, providing proper collection, disposal & treatment facilities for solid waste/garbage (MSW) etc.
Letter issued from ACS,F&ED, GoG to Urban Development and Urban Housing Department (UD&UHD), GoG dated 07/02/2019 for the necessary actions.
Page | 15
Annexure: - I (a) Responsible Organization (s) for implementation of action plans of STPs & CETPs
River STPs/Sewage CETPs/Effluent
Gap if any
As per Table:- 1
MLD
Proposed STP MLD
Time Limit
Estimated Fund
Responsible Organization
for Sewage/STP
Gap if any
As per Table:-
2 MLD
Proposed CETP MLD
Time Limit
Estimated Fund
Responsible Organization
for CETPs/Effluent
Mindhola 1.6 MLD
2 MLD + 2 MLD at different location
in Notified
area
2020 20 Crore Sachin notified
area
No effluent discharge by industry into this
stretch
Page | 16
Annexure: - II
Proposed Mechanism for execution of action plans
Monitoring Mechanism for the PRS water quality
Activities Frequency Time Line Organization
Sampling Monthly Preferably 1st week of the month GPCB
Analysis Monthly Preferably within 10 days of sampling
Review Quarterly --
Monitoring Mechanism for the Ground water quality within catchment area of PRS
Sampling Half yearly Preferably 1st week of that month
Analysis Half yearly Preferably within 10 days of sampling
Review In subsequent RRC meeting after analysis
--
Monitoring Mechanism for various discharges (STP O/L, CETP O/L etc.)
Frequency of monitoring of various Waste discharge/disposal including waste water, solid wastes, Bio-medical waste etc. will be followed as per CPCB guideline issued from time to time & action under the provision of the Act would be taken against defaulting units
Monitoring Mechanism for Model Restoration Plan
RRC meeting shall be held periodically to monitor environmental Infrastructure progress preferably once in 3 months.