Rapid Technologies to Enhance Quality Control on Asphalt Pavements Infrared (IR) Scanner Workshop
Hosted by Maine DOTApril 28, 2016
![Page 2: Rapid Technologies to Enhance Quality Control on Asphalt Pavements Infrared (IR ...shrp2.transportation.org/documents/renewal/MaineIR... · 2016. 6. 27. · IR – What is it & why](https://reader035.vdocument.in/reader035/viewer/2022070210/60fb38d882d805348a06dc75/html5/thumbnails/2.jpg)
Our Focus for Today
2
Workshop Objective …
1. Describe the Infrared Scanner Technology (What is it and Why it is needed?)
2. Understand how to use the IR Equipment & Software
3. Discuss the results from the Maine DOT
4. Discuss the Contractor’s and Agency’s Perspective as a QC or QA Tool
5. Know Implementation Strategies
![Page 3: Rapid Technologies to Enhance Quality Control on Asphalt Pavements Infrared (IR ...shrp2.transportation.org/documents/renewal/MaineIR... · 2016. 6. 27. · IR – What is it & why](https://reader035.vdocument.in/reader035/viewer/2022070210/60fb38d882d805348a06dc75/html5/thumbnails/3.jpg)
Infrared Scanner Workshop
3
AGENDA:
![Page 4: Rapid Technologies to Enhance Quality Control on Asphalt Pavements Infrared (IR ...shrp2.transportation.org/documents/renewal/MaineIR... · 2016. 6. 27. · IR – What is it & why](https://reader035.vdocument.in/reader035/viewer/2022070210/60fb38d882d805348a06dc75/html5/thumbnails/4.jpg)
Infrared Technology (IR)
What is it and why use it?
April 28, 2016
![Page 5: Rapid Technologies to Enhance Quality Control on Asphalt Pavements Infrared (IR ...shrp2.transportation.org/documents/renewal/MaineIR... · 2016. 6. 27. · IR – What is it & why](https://reader035.vdocument.in/reader035/viewer/2022070210/60fb38d882d805348a06dc75/html5/thumbnails/5.jpg)
IR – What is it & why use it?
5
1. IR - Defined. 2. How is it measured?3. Why is it important?
![Page 6: Rapid Technologies to Enhance Quality Control on Asphalt Pavements Infrared (IR ...shrp2.transportation.org/documents/renewal/MaineIR... · 2016. 6. 27. · IR – What is it & why](https://reader035.vdocument.in/reader035/viewer/2022070210/60fb38d882d805348a06dc75/html5/thumbnails/6.jpg)
IR – What is it & why use it?
Infrared Thermography:• The mapping of temperature contours (equal
temperature) over the surface of a material. • Contours are used to evaluate materials by
measurement of their surface temperature and its variation.
6
![Page 7: Rapid Technologies to Enhance Quality Control on Asphalt Pavements Infrared (IR ...shrp2.transportation.org/documents/renewal/MaineIR... · 2016. 6. 27. · IR – What is it & why](https://reader035.vdocument.in/reader035/viewer/2022070210/60fb38d882d805348a06dc75/html5/thumbnails/7.jpg)
IR – What is it & why use it?
Temperature segregation (differential):• More than 25 ºF difference in mat temperature behind
screed.
7
![Page 8: Rapid Technologies to Enhance Quality Control on Asphalt Pavements Infrared (IR ...shrp2.transportation.org/documents/renewal/MaineIR... · 2016. 6. 27. · IR – What is it & why](https://reader035.vdocument.in/reader035/viewer/2022070210/60fb38d882d805348a06dc75/html5/thumbnails/8.jpg)
IR – What is it & why use it?
Types of Temperature Differences: 1. Cold spots
– Truck to truck temperature differences
– Improper loading and unloading of trucks
2. Thermal streaks – Longitudinal segregation– Inadequate or non-uniform
amount of material across the mat
![Page 9: Rapid Technologies to Enhance Quality Control on Asphalt Pavements Infrared (IR ...shrp2.transportation.org/documents/renewal/MaineIR... · 2016. 6. 27. · IR – What is it & why](https://reader035.vdocument.in/reader035/viewer/2022070210/60fb38d882d805348a06dc75/html5/thumbnails/9.jpg)
IR – What is it & why use it?
• Cold spots– Temperature difference of
mat between truck exchanges – common.
– Areas with higher air voids• Focused testing have
validated higher air voids– Coring – Radar (full coverage)– Nuclear gauge
![Page 10: Rapid Technologies to Enhance Quality Control on Asphalt Pavements Infrared (IR ...shrp2.transportation.org/documents/renewal/MaineIR... · 2016. 6. 27. · IR – What is it & why](https://reader035.vdocument.in/reader035/viewer/2022070210/60fb38d882d805348a06dc75/html5/thumbnails/10.jpg)
IR – What is it & why use it?
Background• 1996 through 2000s – field
work concluded temperature differences could be accurately detected and quantified:– Low temperatures result
in low density zones in mat
– A few States adopt temperature uniformity specification
.
Temperature profile criteria based on desired density
uniformity.
![Page 11: Rapid Technologies to Enhance Quality Control on Asphalt Pavements Infrared (IR ...shrp2.transportation.org/documents/renewal/MaineIR... · 2016. 6. 27. · IR – What is it & why](https://reader035.vdocument.in/reader035/viewer/2022070210/60fb38d882d805348a06dc75/html5/thumbnails/11.jpg)
IR – What is it & why use it?
11
1. IR - Defined. 2. How is it measured?3. Why is it important?
![Page 12: Rapid Technologies to Enhance Quality Control on Asphalt Pavements Infrared (IR ...shrp2.transportation.org/documents/renewal/MaineIR... · 2016. 6. 27. · IR – What is it & why](https://reader035.vdocument.in/reader035/viewer/2022070210/60fb38d882d805348a06dc75/html5/thumbnails/12.jpg)
IR – What is it & why use it?
History; Mat Temperature Measurements• Temperature guns
– Point readings• Temperature cameras
– Time specific to identify areas with cold spots or thermal streaks
12
![Page 13: Rapid Technologies to Enhance Quality Control on Asphalt Pavements Infrared (IR ...shrp2.transportation.org/documents/renewal/MaineIR... · 2016. 6. 27. · IR – What is it & why](https://reader035.vdocument.in/reader035/viewer/2022070210/60fb38d882d805348a06dc75/html5/thumbnails/13.jpg)
IR – What is it & why use it?
History; Mat Temperature Measurements• IR sensors, IR-Bar; first device for continuous readings• Pave-IR Scanner; second generation device for
continuous readings
13
![Page 14: Rapid Technologies to Enhance Quality Control on Asphalt Pavements Infrared (IR ...shrp2.transportation.org/documents/renewal/MaineIR... · 2016. 6. 27. · IR – What is it & why](https://reader035.vdocument.in/reader035/viewer/2022070210/60fb38d882d805348a06dc75/html5/thumbnails/14.jpg)
IR – What is it & why use it?
Application & use of temperature cameras• Identify areas with cold spots for biased sampling in
density specification• Identify thermal streaks
14
![Page 15: Rapid Technologies to Enhance Quality Control on Asphalt Pavements Infrared (IR ...shrp2.transportation.org/documents/renewal/MaineIR... · 2016. 6. 27. · IR – What is it & why](https://reader035.vdocument.in/reader035/viewer/2022070210/60fb38d882d805348a06dc75/html5/thumbnails/15.jpg)
IR – What is it & why use it?
Application & use of IR-Bar and Scanner• Continuous readings to
evaluate mat uniformity through temperature uniformity.
• Non-uniform temperatures usually mean, non-uniform densities.
![Page 16: Rapid Technologies to Enhance Quality Control on Asphalt Pavements Infrared (IR ...shrp2.transportation.org/documents/renewal/MaineIR... · 2016. 6. 27. · IR – What is it & why](https://reader035.vdocument.in/reader035/viewer/2022070210/60fb38d882d805348a06dc75/html5/thumbnails/16.jpg)
IR – What is it & why use it?
16
1. IR - Defined. 2. How is it measured?3. Why is it important?
![Page 17: Rapid Technologies to Enhance Quality Control on Asphalt Pavements Infrared (IR ...shrp2.transportation.org/documents/renewal/MaineIR... · 2016. 6. 27. · IR – What is it & why](https://reader035.vdocument.in/reader035/viewer/2022070210/60fb38d882d805348a06dc75/html5/thumbnails/17.jpg)
IR – What is it & why use it?
• Aggregate segregation in mat = temperature segregation• Non-uniform temperatures usually result in non-uniform
densities
17
![Page 18: Rapid Technologies to Enhance Quality Control on Asphalt Pavements Infrared (IR ...shrp2.transportation.org/documents/renewal/MaineIR... · 2016. 6. 27. · IR – What is it & why](https://reader035.vdocument.in/reader035/viewer/2022070210/60fb38d882d805348a06dc75/html5/thumbnails/18.jpg)
Segregation – A difficult issue to resolve, when it is difficult to identify or confirm.
IR – What is it & why use it?
![Page 19: Rapid Technologies to Enhance Quality Control on Asphalt Pavements Infrared (IR ...shrp2.transportation.org/documents/renewal/MaineIR... · 2016. 6. 27. · IR – What is it & why](https://reader035.vdocument.in/reader035/viewer/2022070210/60fb38d882d805348a06dc75/html5/thumbnails/19.jpg)
IR – What is it & why use it?
• Truck to truck segregation results in cold spots; IR can accurately identify these areas.
![Page 20: Rapid Technologies to Enhance Quality Control on Asphalt Pavements Infrared (IR ...shrp2.transportation.org/documents/renewal/MaineIR... · 2016. 6. 27. · IR – What is it & why](https://reader035.vdocument.in/reader035/viewer/2022070210/60fb38d882d805348a06dc75/html5/thumbnails/20.jpg)
IR – What is it & why use it?
• Both sided longitudinal and centerline segregation result in thermal streaks; IR can identify these areas.
![Page 21: Rapid Technologies to Enhance Quality Control on Asphalt Pavements Infrared (IR ...shrp2.transportation.org/documents/renewal/MaineIR... · 2016. 6. 27. · IR – What is it & why](https://reader035.vdocument.in/reader035/viewer/2022070210/60fb38d882d805348a06dc75/html5/thumbnails/21.jpg)
IR – What is it & why use it?
• Effect of cold spots, low mat temperatures on percent compaction; densities are:– Lower– More variable
21
![Page 22: Rapid Technologies to Enhance Quality Control on Asphalt Pavements Infrared (IR ...shrp2.transportation.org/documents/renewal/MaineIR... · 2016. 6. 27. · IR – What is it & why](https://reader035.vdocument.in/reader035/viewer/2022070210/60fb38d882d805348a06dc75/html5/thumbnails/22.jpg)
IR – What is it & why use it?
• Effect of reduced compaction or higher air voids because of lower mat temperatures.
22
![Page 23: Rapid Technologies to Enhance Quality Control on Asphalt Pavements Infrared (IR ...shrp2.transportation.org/documents/renewal/MaineIR... · 2016. 6. 27. · IR – What is it & why](https://reader035.vdocument.in/reader035/viewer/2022070210/60fb38d882d805348a06dc75/html5/thumbnails/23.jpg)
IR – What is it & why use it?
• Fatigue life can be substantially reduced, as a result of lower densities because of lower mat temperatures.
Source: NCAT (2000)
![Page 24: Rapid Technologies to Enhance Quality Control on Asphalt Pavements Infrared (IR ...shrp2.transportation.org/documents/renewal/MaineIR... · 2016. 6. 27. · IR – What is it & why](https://reader035.vdocument.in/reader035/viewer/2022070210/60fb38d882d805348a06dc75/html5/thumbnails/24.jpg)
Impact of temperature differences or areas with low temperatures.
24
Research and Development
IR – What is it & why use it?
Loss of service life or increase in maintenance costs.
![Page 25: Rapid Technologies to Enhance Quality Control on Asphalt Pavements Infrared (IR ...shrp2.transportation.org/documents/renewal/MaineIR... · 2016. 6. 27. · IR – What is it & why](https://reader035.vdocument.in/reader035/viewer/2022070210/60fb38d882d805348a06dc75/html5/thumbnails/25.jpg)
IR – What is it & why use it?
Cold spots; areas with increased potential for:• Fatigue cracks• Raveling• Pot holes
![Page 26: Rapid Technologies to Enhance Quality Control on Asphalt Pavements Infrared (IR ...shrp2.transportation.org/documents/renewal/MaineIR... · 2016. 6. 27. · IR – What is it & why](https://reader035.vdocument.in/reader035/viewer/2022070210/60fb38d882d805348a06dc75/html5/thumbnails/26.jpg)
IR – What is it & why use it?
Thermal streaks; longitudinal areas with increased potential for:• Longitudinal cracking
26
![Page 27: Rapid Technologies to Enhance Quality Control on Asphalt Pavements Infrared (IR ...shrp2.transportation.org/documents/renewal/MaineIR... · 2016. 6. 27. · IR – What is it & why](https://reader035.vdocument.in/reader035/viewer/2022070210/60fb38d882d805348a06dc75/html5/thumbnails/27.jpg)
IR – What is it & why use it?
• Thermal streaks can be very damaging, depending on the level of density achieved in localized areas.
• Measuring the density, accurately, in a localized area is complicated.
27
![Page 28: Rapid Technologies to Enhance Quality Control on Asphalt Pavements Infrared (IR ...shrp2.transportation.org/documents/renewal/MaineIR... · 2016. 6. 27. · IR – What is it & why](https://reader035.vdocument.in/reader035/viewer/2022070210/60fb38d882d805348a06dc75/html5/thumbnails/28.jpg)
Questions?
28
NEXT:
• Equipment and Software: How to use it?
![Page 29: Rapid Technologies to Enhance Quality Control on Asphalt Pavements Infrared (IR ...shrp2.transportation.org/documents/renewal/MaineIR... · 2016. 6. 27. · IR – What is it & why](https://reader035.vdocument.in/reader035/viewer/2022070210/60fb38d882d805348a06dc75/html5/thumbnails/29.jpg)
Infrared Technology (IR)
IR Equipment and Software: How to Use It?
April 28, 2015
![Page 30: Rapid Technologies to Enhance Quality Control on Asphalt Pavements Infrared (IR ...shrp2.transportation.org/documents/renewal/MaineIR... · 2016. 6. 27. · IR – What is it & why](https://reader035.vdocument.in/reader035/viewer/2022070210/60fb38d882d805348a06dc75/html5/thumbnails/30.jpg)
IR Equipment and Software
30
1. Equipment and Installation2. Software and Its Features
![Page 31: Rapid Technologies to Enhance Quality Control on Asphalt Pavements Infrared (IR ...shrp2.transportation.org/documents/renewal/MaineIR... · 2016. 6. 27. · IR – What is it & why](https://reader035.vdocument.in/reader035/viewer/2022070210/60fb38d882d805348a06dc75/html5/thumbnails/31.jpg)
IR Equipment and Software
Equipment• Mast Base• Mast Extension• Mast Arm• IR Scanner• DMI• GPS Unit• Wiring• Connection bolts
& materials
![Page 32: Rapid Technologies to Enhance Quality Control on Asphalt Pavements Infrared (IR ...shrp2.transportation.org/documents/renewal/MaineIR... · 2016. 6. 27. · IR – What is it & why](https://reader035.vdocument.in/reader035/viewer/2022070210/60fb38d882d805348a06dc75/html5/thumbnails/32.jpg)
IR Equipment and Software
IR mast base and extension attached to paver.
32
![Page 33: Rapid Technologies to Enhance Quality Control on Asphalt Pavements Infrared (IR ...shrp2.transportation.org/documents/renewal/MaineIR... · 2016. 6. 27. · IR – What is it & why](https://reader035.vdocument.in/reader035/viewer/2022070210/60fb38d882d805348a06dc75/html5/thumbnails/33.jpg)
IR Equipment and Software
• IR Scanner attached to paver; scans mat behind screed in one direction.
• GPS attached to the mast arm.
33
![Page 34: Rapid Technologies to Enhance Quality Control on Asphalt Pavements Infrared (IR ...shrp2.transportation.org/documents/renewal/MaineIR... · 2016. 6. 27. · IR – What is it & why](https://reader035.vdocument.in/reader035/viewer/2022070210/60fb38d882d805348a06dc75/html5/thumbnails/34.jpg)
IR Equipment and Software
34
IR scan screen used to see/monitor mat temperatures in real time; attached to the mast post or extension.
![Page 35: Rapid Technologies to Enhance Quality Control on Asphalt Pavements Infrared (IR ...shrp2.transportation.org/documents/renewal/MaineIR... · 2016. 6. 27. · IR – What is it & why](https://reader035.vdocument.in/reader035/viewer/2022070210/60fb38d882d805348a06dc75/html5/thumbnails/35.jpg)
IR Equipment and Software
35
DMI placed on wheel hub to measure distance during paving operation.
![Page 36: Rapid Technologies to Enhance Quality Control on Asphalt Pavements Infrared (IR ...shrp2.transportation.org/documents/renewal/MaineIR... · 2016. 6. 27. · IR – What is it & why](https://reader035.vdocument.in/reader035/viewer/2022070210/60fb38d882d805348a06dc75/html5/thumbnails/36.jpg)
IR Equipment and Software
36
1. Equipment and Installation2. Software and Its Features
![Page 37: Rapid Technologies to Enhance Quality Control on Asphalt Pavements Infrared (IR ...shrp2.transportation.org/documents/renewal/MaineIR... · 2016. 6. 27. · IR – What is it & why](https://reader035.vdocument.in/reader035/viewer/2022070210/60fb38d882d805348a06dc75/html5/thumbnails/37.jpg)
IR Equipment and Software
37
Two models of data transfer and extraction
![Page 38: Rapid Technologies to Enhance Quality Control on Asphalt Pavements Infrared (IR ...shrp2.transportation.org/documents/renewal/MaineIR... · 2016. 6. 27. · IR – What is it & why](https://reader035.vdocument.in/reader035/viewer/2022070210/60fb38d882d805348a06dc75/html5/thumbnails/38.jpg)
IR Equipment and Software
38
• Online Web App: https://eroutes.info/paveappweb/• Login is user specific
![Page 39: Rapid Technologies to Enhance Quality Control on Asphalt Pavements Infrared (IR ...shrp2.transportation.org/documents/renewal/MaineIR... · 2016. 6. 27. · IR – What is it & why](https://reader035.vdocument.in/reader035/viewer/2022070210/60fb38d882d805348a06dc75/html5/thumbnails/39.jpg)
IR Equipment and Software
39
Explore Data: MOBA Pave Project Manager Main Screen
Color Map
Thermal Profile
Diagrams and project information
Properties
![Page 40: Rapid Technologies to Enhance Quality Control on Asphalt Pavements Infrared (IR ...shrp2.transportation.org/documents/renewal/MaineIR... · 2016. 6. 27. · IR – What is it & why](https://reader035.vdocument.in/reader035/viewer/2022070210/60fb38d882d805348a06dc75/html5/thumbnails/40.jpg)
IR Equipment and Software
Color Map and Properties for Screen
40
![Page 41: Rapid Technologies to Enhance Quality Control on Asphalt Pavements Infrared (IR ...shrp2.transportation.org/documents/renewal/MaineIR... · 2016. 6. 27. · IR – What is it & why](https://reader035.vdocument.in/reader035/viewer/2022070210/60fb38d882d805348a06dc75/html5/thumbnails/41.jpg)
IR Equipment and Software
41
Thermal Profile Properties Screen
![Page 42: Rapid Technologies to Enhance Quality Control on Asphalt Pavements Infrared (IR ...shrp2.transportation.org/documents/renewal/MaineIR... · 2016. 6. 27. · IR – What is it & why](https://reader035.vdocument.in/reader035/viewer/2022070210/60fb38d882d805348a06dc75/html5/thumbnails/42.jpg)
IR Equipment and Software
42
Project Properties Screen
![Page 43: Rapid Technologies to Enhance Quality Control on Asphalt Pavements Infrared (IR ...shrp2.transportation.org/documents/renewal/MaineIR... · 2016. 6. 27. · IR – What is it & why](https://reader035.vdocument.in/reader035/viewer/2022070210/60fb38d882d805348a06dc75/html5/thumbnails/43.jpg)
IR Equipment and Software
43
Time Diagram Screen
![Page 44: Rapid Technologies to Enhance Quality Control on Asphalt Pavements Infrared (IR ...shrp2.transportation.org/documents/renewal/MaineIR... · 2016. 6. 27. · IR – What is it & why](https://reader035.vdocument.in/reader035/viewer/2022070210/60fb38d882d805348a06dc75/html5/thumbnails/44.jpg)
IR Equipment and Software
44
Speed Diagram Screen
![Page 45: Rapid Technologies to Enhance Quality Control on Asphalt Pavements Infrared (IR ...shrp2.transportation.org/documents/renewal/MaineIR... · 2016. 6. 27. · IR – What is it & why](https://reader035.vdocument.in/reader035/viewer/2022070210/60fb38d882d805348a06dc75/html5/thumbnails/45.jpg)
IR Equipment and Software
45
Temperature Class Diagram Screen
![Page 46: Rapid Technologies to Enhance Quality Control on Asphalt Pavements Infrared (IR ...shrp2.transportation.org/documents/renewal/MaineIR... · 2016. 6. 27. · IR – What is it & why](https://reader035.vdocument.in/reader035/viewer/2022070210/60fb38d882d805348a06dc75/html5/thumbnails/46.jpg)
IR Equipment and Software
46
Map Diagram Screen
![Page 47: Rapid Technologies to Enhance Quality Control on Asphalt Pavements Infrared (IR ...shrp2.transportation.org/documents/renewal/MaineIR... · 2016. 6. 27. · IR – What is it & why](https://reader035.vdocument.in/reader035/viewer/2022070210/60fb38d882d805348a06dc75/html5/thumbnails/47.jpg)
IR Equipment and Software
47
Click any location on the thermal profile
Adding Point Measurements
![Page 48: Rapid Technologies to Enhance Quality Control on Asphalt Pavements Infrared (IR ...shrp2.transportation.org/documents/renewal/MaineIR... · 2016. 6. 27. · IR – What is it & why](https://reader035.vdocument.in/reader035/viewer/2022070210/60fb38d882d805348a06dc75/html5/thumbnails/48.jpg)
IR Equipment and Software
48
Generates PDF Report
Generating Reports
![Page 49: Rapid Technologies to Enhance Quality Control on Asphalt Pavements Infrared (IR ...shrp2.transportation.org/documents/renewal/MaineIR... · 2016. 6. 27. · IR – What is it & why](https://reader035.vdocument.in/reader035/viewer/2022070210/60fb38d882d805348a06dc75/html5/thumbnails/49.jpg)
IR Equipment and Software
49
Generating Reports
![Page 50: Rapid Technologies to Enhance Quality Control on Asphalt Pavements Infrared (IR ...shrp2.transportation.org/documents/renewal/MaineIR... · 2016. 6. 27. · IR – What is it & why](https://reader035.vdocument.in/reader035/viewer/2022070210/60fb38d882d805348a06dc75/html5/thumbnails/50.jpg)
IR Equipment and Software
50
Generating Reports
![Page 51: Rapid Technologies to Enhance Quality Control on Asphalt Pavements Infrared (IR ...shrp2.transportation.org/documents/renewal/MaineIR... · 2016. 6. 27. · IR – What is it & why](https://reader035.vdocument.in/reader035/viewer/2022070210/60fb38d882d805348a06dc75/html5/thumbnails/51.jpg)
IR Equipment and Software
Exporting Data• Export to .txt (semicolon separated) • Save as .paveproj
51
![Page 52: Rapid Technologies to Enhance Quality Control on Asphalt Pavements Infrared (IR ...shrp2.transportation.org/documents/renewal/MaineIR... · 2016. 6. 27. · IR – What is it & why](https://reader035.vdocument.in/reader035/viewer/2022070210/60fb38d882d805348a06dc75/html5/thumbnails/52.jpg)
Questions?
52
NEXT:
• Data Analyses and Findings: I-95 Rehabilitation;
Houlton, ME
![Page 53: Rapid Technologies to Enhance Quality Control on Asphalt Pavements Infrared (IR ...shrp2.transportation.org/documents/renewal/MaineIR... · 2016. 6. 27. · IR – What is it & why](https://reader035.vdocument.in/reader035/viewer/2022070210/60fb38d882d805348a06dc75/html5/thumbnails/53.jpg)
Infrared Technology (IR)
Data Analyses and Findings: I-95 Rehabilitation; Houlton, ME
April 28, 2016
![Page 54: Rapid Technologies to Enhance Quality Control on Asphalt Pavements Infrared (IR ...shrp2.transportation.org/documents/renewal/MaineIR... · 2016. 6. 27. · IR – What is it & why](https://reader035.vdocument.in/reader035/viewer/2022070210/60fb38d882d805348a06dc75/html5/thumbnails/54.jpg)
Data Analyses & FindingsI-95 Houlton, ME
54
1. Project Overview2. Data Collection3. Data Processing4. Data Summary
![Page 55: Rapid Technologies to Enhance Quality Control on Asphalt Pavements Infrared (IR ...shrp2.transportation.org/documents/renewal/MaineIR... · 2016. 6. 27. · IR – What is it & why](https://reader035.vdocument.in/reader035/viewer/2022070210/60fb38d882d805348a06dc75/html5/thumbnails/55.jpg)
Data Analyses & FindingsI-95 Houlton, ME
55
Northbound and Southbound Lanes; Canadian Border to the South
![Page 56: Rapid Technologies to Enhance Quality Control on Asphalt Pavements Infrared (IR ...shrp2.transportation.org/documents/renewal/MaineIR... · 2016. 6. 27. · IR – What is it & why](https://reader035.vdocument.in/reader035/viewer/2022070210/60fb38d882d805348a06dc75/html5/thumbnails/56.jpg)
Data Analyses & FindingsI-95 Houlton, ME
56
Northbound and Southbound Lanes; Canadian Border to the South
![Page 57: Rapid Technologies to Enhance Quality Control on Asphalt Pavements Infrared (IR ...shrp2.transportation.org/documents/renewal/MaineIR... · 2016. 6. 27. · IR – What is it & why](https://reader035.vdocument.in/reader035/viewer/2022070210/60fb38d882d805348a06dc75/html5/thumbnails/57.jpg)
Data Analyses & FindingsI-95 Houlton, ME
Mixture delivered to site with end dump and horizontal discharge trucks.
57
Mixture placed with Caterpillar paver and Weiler material transfer vehicle.
![Page 58: Rapid Technologies to Enhance Quality Control on Asphalt Pavements Infrared (IR ...shrp2.transportation.org/documents/renewal/MaineIR... · 2016. 6. 27. · IR – What is it & why](https://reader035.vdocument.in/reader035/viewer/2022070210/60fb38d882d805348a06dc75/html5/thumbnails/58.jpg)
Data Analyses & FindingsI-95 Houlton, MECompaction Train:• Breakdown: Volvo & Ingersoll-
Rand Vibratory rollers, & Hamm steel wheel oscillatory roller. Two used in echelon.
• Intermediate; Caterpillar rubber tired roller
• Finish; Caterpillar static steel wheel drum
58
![Page 59: Rapid Technologies to Enhance Quality Control on Asphalt Pavements Infrared (IR ...shrp2.transportation.org/documents/renewal/MaineIR... · 2016. 6. 27. · IR – What is it & why](https://reader035.vdocument.in/reader035/viewer/2022070210/60fb38d882d805348a06dc75/html5/thumbnails/59.jpg)
Data Analyses & FindingsI-95 Houlton, MEFour steel wheel rollers used, including: Caterpillar, Volvo & Ingersoll-Rand Vibratory rollers, & Hamm steel wheel oscillatory roller.
59
![Page 60: Rapid Technologies to Enhance Quality Control on Asphalt Pavements Infrared (IR ...shrp2.transportation.org/documents/renewal/MaineIR... · 2016. 6. 27. · IR – What is it & why](https://reader035.vdocument.in/reader035/viewer/2022070210/60fb38d882d805348a06dc75/html5/thumbnails/60.jpg)
Data Analyses & FindingsI-95 Houlton, ME
60
Nuclear & non-nuclear density gauge used to measure mat density
![Page 61: Rapid Technologies to Enhance Quality Control on Asphalt Pavements Infrared (IR ...shrp2.transportation.org/documents/renewal/MaineIR... · 2016. 6. 27. · IR – What is it & why](https://reader035.vdocument.in/reader035/viewer/2022070210/60fb38d882d805348a06dc75/html5/thumbnails/61.jpg)
Data Analyses & FindingsI-95 Houlton, ME
61
1. Project Overview2. Data Collection3. Data Processing4. Data Summary
![Page 62: Rapid Technologies to Enhance Quality Control on Asphalt Pavements Infrared (IR ...shrp2.transportation.org/documents/renewal/MaineIR... · 2016. 6. 27. · IR – What is it & why](https://reader035.vdocument.in/reader035/viewer/2022070210/60fb38d882d805348a06dc75/html5/thumbnails/62.jpg)
Data Analyses & FindingsI-95 Houlton, ME
62
Raw Temperature Profile for first part of the southbound lane.
![Page 63: Rapid Technologies to Enhance Quality Control on Asphalt Pavements Infrared (IR ...shrp2.transportation.org/documents/renewal/MaineIR... · 2016. 6. 27. · IR – What is it & why](https://reader035.vdocument.in/reader035/viewer/2022070210/60fb38d882d805348a06dc75/html5/thumbnails/63.jpg)
Data Analyses & FindingsI-95 Houlton, ME
63
Raw Temperature Profile for center part of the southbound lane.
![Page 64: Rapid Technologies to Enhance Quality Control on Asphalt Pavements Infrared (IR ...shrp2.transportation.org/documents/renewal/MaineIR... · 2016. 6. 27. · IR – What is it & why](https://reader035.vdocument.in/reader035/viewer/2022070210/60fb38d882d805348a06dc75/html5/thumbnails/64.jpg)
Data Analyses & FindingsI-95 Houlton, ME
64
Raw Temperature Profile for latter path of the southbound lane.
![Page 65: Rapid Technologies to Enhance Quality Control on Asphalt Pavements Infrared (IR ...shrp2.transportation.org/documents/renewal/MaineIR... · 2016. 6. 27. · IR – What is it & why](https://reader035.vdocument.in/reader035/viewer/2022070210/60fb38d882d805348a06dc75/html5/thumbnails/65.jpg)
Data Analyses & FindingsI-95 Houlton, ME
65
Raw Temperature Profile showing continuous improvement or more uniform mat temperatures along the southbound lane.
Near Start of
Lot
Near Center of Lot
Near End of
Lot
![Page 66: Rapid Technologies to Enhance Quality Control on Asphalt Pavements Infrared (IR ...shrp2.transportation.org/documents/renewal/MaineIR... · 2016. 6. 27. · IR – What is it & why](https://reader035.vdocument.in/reader035/viewer/2022070210/60fb38d882d805348a06dc75/html5/thumbnails/66.jpg)
Data Analyses & FindingsI-95 Houlton, ME
66
Summary of Raw Data for One Lot
Avg. Temp. = 276.0 ºF
Not mat temperatures
![Page 67: Rapid Technologies to Enhance Quality Control on Asphalt Pavements Infrared (IR ...shrp2.transportation.org/documents/renewal/MaineIR... · 2016. 6. 27. · IR – What is it & why](https://reader035.vdocument.in/reader035/viewer/2022070210/60fb38d882d805348a06dc75/html5/thumbnails/67.jpg)
Data Analyses & FindingsI-95 Houlton, ME
67
0
100
200
300
400
500
600
0 2000 4000 6000 8000 10000 12000
Pave
r Spe
ed (i
n/m
in)
Distance (ft)
Paver Speed Diagram
![Page 68: Rapid Technologies to Enhance Quality Control on Asphalt Pavements Infrared (IR ...shrp2.transportation.org/documents/renewal/MaineIR... · 2016. 6. 27. · IR – What is it & why](https://reader035.vdocument.in/reader035/viewer/2022070210/60fb38d882d805348a06dc75/html5/thumbnails/68.jpg)
Data Analyses & FindingsI-95 Houlton, ME
68
0.0
50.0
100.0
150.0
200.0
250.0
300.0
350.0
0 2000 4000 6000 8000 10000 12000
Avg.
Tem
p. (F
)
Distance (ft)
Average Temperature Plot
![Page 69: Rapid Technologies to Enhance Quality Control on Asphalt Pavements Infrared (IR ...shrp2.transportation.org/documents/renewal/MaineIR... · 2016. 6. 27. · IR – What is it & why](https://reader035.vdocument.in/reader035/viewer/2022070210/60fb38d882d805348a06dc75/html5/thumbnails/69.jpg)
Data Analyses & FindingsI-95 Houlton, ME
69
1. Project Overview2. Data Collection3. Data Processing4. Data Summary
![Page 70: Rapid Technologies to Enhance Quality Control on Asphalt Pavements Infrared (IR ...shrp2.transportation.org/documents/renewal/MaineIR... · 2016. 6. 27. · IR – What is it & why](https://reader035.vdocument.in/reader035/viewer/2022070210/60fb38d882d805348a06dc75/html5/thumbnails/70.jpg)
Data Analyses & FindingsI-95 Houlton, ME
Data Processing—eliminate invalid temperature measurements:1. Eliminate measurement locations within 2 feet of the
mat’s edge.
70
![Page 71: Rapid Technologies to Enhance Quality Control on Asphalt Pavements Infrared (IR ...shrp2.transportation.org/documents/renewal/MaineIR... · 2016. 6. 27. · IR – What is it & why](https://reader035.vdocument.in/reader035/viewer/2022070210/60fb38d882d805348a06dc75/html5/thumbnails/71.jpg)
Data Analyses & FindingsI-95 Houlton, ME
Data Processing—eliminate invalid temperature measurements:2. Eliminate data with paver stops greater than 10 seconds,
between locations:– 2 feet behind measurement location of stop– 8 feet in front of measurement location of stop
3. Eliminate temperature readings < 170 ºF and > 400 ºF.
71
![Page 72: Rapid Technologies to Enhance Quality Control on Asphalt Pavements Infrared (IR ...shrp2.transportation.org/documents/renewal/MaineIR... · 2016. 6. 27. · IR – What is it & why](https://reader035.vdocument.in/reader035/viewer/2022070210/60fb38d882d805348a06dc75/html5/thumbnails/72.jpg)
Data Analyses & FindingsI-95 Houlton, ME
72
T1.0 T98.5
• Temperature Differential, each 150 foot segment
![Page 73: Rapid Technologies to Enhance Quality Control on Asphalt Pavements Infrared (IR ...shrp2.transportation.org/documents/renewal/MaineIR... · 2016. 6. 27. · IR – What is it & why](https://reader035.vdocument.in/reader035/viewer/2022070210/60fb38d882d805348a06dc75/html5/thumbnails/73.jpg)
Data Analyses & FindingsI-95 Houlton, ME• Temperature Differential Criteria, each 150 foot
segment:
• Tdiff < 25 ºF No temperature difference• 25 ºF < Tdiff < 50 ºF Moderate temperature difference• Tdiff > 50 ºF Severe temperature difference
73
0.15.98 TTTDiff −=
![Page 74: Rapid Technologies to Enhance Quality Control on Asphalt Pavements Infrared (IR ...shrp2.transportation.org/documents/renewal/MaineIR... · 2016. 6. 27. · IR – What is it & why](https://reader035.vdocument.in/reader035/viewer/2022070210/60fb38d882d805348a06dc75/html5/thumbnails/74.jpg)
Data Analyses & FindingsI-95 Houlton, ME
74
0
20000
40000
60000
80000
100000
120000
140000
160000
180000
200000
180 190 200 210 220 230 240 250 260 270 280 290 300 310 320
Freq
uenc
y
Temperature Bins (degree F)
Summary of Processed Data for first day of paving
Raw IR data: Tavg. = 276 ºFProcessed data: Tavg. = 306 ºF
![Page 75: Rapid Technologies to Enhance Quality Control on Asphalt Pavements Infrared (IR ...shrp2.transportation.org/documents/renewal/MaineIR... · 2016. 6. 27. · IR – What is it & why](https://reader035.vdocument.in/reader035/viewer/2022070210/60fb38d882d805348a06dc75/html5/thumbnails/75.jpg)
Data Analyses & FindingsI-95 Houlton, ME
75
1. Project Overview2. Data Collection3. Data Processing4. Data Summary
![Page 76: Rapid Technologies to Enhance Quality Control on Asphalt Pavements Infrared (IR ...shrp2.transportation.org/documents/renewal/MaineIR... · 2016. 6. 27. · IR – What is it & why](https://reader035.vdocument.in/reader035/viewer/2022070210/60fb38d882d805348a06dc75/html5/thumbnails/76.jpg)
Data Analyses & FindingsI-95 Houlton, ME
76
Paver Stops
Total Number of Increments
Number of Increments within Temp. Regimes Thermal
StreakingMinor Moderate SevereExclude 579 546 25 8 NoneInclude 579 494 56 29 None
Processed Data
To include or exclude paver stops?If paver stop cause severe temperature differences:
they should be included. However:
![Page 77: Rapid Technologies to Enhance Quality Control on Asphalt Pavements Infrared (IR ...shrp2.transportation.org/documents/renewal/MaineIR... · 2016. 6. 27. · IR – What is it & why](https://reader035.vdocument.in/reader035/viewer/2022070210/60fb38d882d805348a06dc75/html5/thumbnails/77.jpg)
Data Analyses & FindingsI-95 Houlton, ME
77
Required paver stops due to sampling should be eliminated from temperature difference profiles.
![Page 78: Rapid Technologies to Enhance Quality Control on Asphalt Pavements Infrared (IR ...shrp2.transportation.org/documents/renewal/MaineIR... · 2016. 6. 27. · IR – What is it & why](https://reader035.vdocument.in/reader035/viewer/2022070210/60fb38d882d805348a06dc75/html5/thumbnails/78.jpg)
Data Analyses & FindingsI-95 Houlton, ME
78
Paver Stops
Total Number of Increments
Number of Increments within Temp. Regimes Thermal
StreakingMinor Moderate SevereExclude 579 546 25 8 NoneInclude 579 494 56 29 None
Processed Data
Minnesota DOT’s specification:• Minor Temperature Difference: +$20 per Increment• Moderate Temperature Difference: $0 per Increment• Severe Temperature Difference: -$20 per Increment
Total Incentive to Contractor: $9,300 for the project section.[Including paver stops]
![Page 79: Rapid Technologies to Enhance Quality Control on Asphalt Pavements Infrared (IR ...shrp2.transportation.org/documents/renewal/MaineIR... · 2016. 6. 27. · IR – What is it & why](https://reader035.vdocument.in/reader035/viewer/2022070210/60fb38d882d805348a06dc75/html5/thumbnails/79.jpg)
Data Analyses & FindingsI-95 Houlton, ME
79
In summary: very good temperature consistency along the I-95 Houlton, ME rehabilitation project.
![Page 80: Rapid Technologies to Enhance Quality Control on Asphalt Pavements Infrared (IR ...shrp2.transportation.org/documents/renewal/MaineIR... · 2016. 6. 27. · IR – What is it & why](https://reader035.vdocument.in/reader035/viewer/2022070210/60fb38d882d805348a06dc75/html5/thumbnails/80.jpg)
Data Analyses & FindingsI-95 Houlton, ME
Contact Information:• Dale Peabody; [email protected]• Bruce Yeaton; [email protected]• Ulrich Amoussou-Guenov; ulrich.amoussou-
[email protected]• Paul Angerhofer; [email protected]• Harold Von Quintus; [email protected]• Paul Dalbey; [email protected]
80
![Page 81: Rapid Technologies to Enhance Quality Control on Asphalt Pavements Infrared (IR ...shrp2.transportation.org/documents/renewal/MaineIR... · 2016. 6. 27. · IR – What is it & why](https://reader035.vdocument.in/reader035/viewer/2022070210/60fb38d882d805348a06dc75/html5/thumbnails/81.jpg)
Questions?
81
NEXT:
• Implementation: Maine DOT and Contractor
Points of View
![Page 82: Rapid Technologies to Enhance Quality Control on Asphalt Pavements Infrared (IR ...shrp2.transportation.org/documents/renewal/MaineIR... · 2016. 6. 27. · IR – What is it & why](https://reader035.vdocument.in/reader035/viewer/2022070210/60fb38d882d805348a06dc75/html5/thumbnails/82.jpg)
Infrared Technology (IR)
Implementation: Maine DOT and Contractor Points of View
April 28, 2015
![Page 83: Rapid Technologies to Enhance Quality Control on Asphalt Pavements Infrared (IR ...shrp2.transportation.org/documents/renewal/MaineIR... · 2016. 6. 27. · IR – What is it & why](https://reader035.vdocument.in/reader035/viewer/2022070210/60fb38d882d805348a06dc75/html5/thumbnails/83.jpg)
Agency/Contractor Deployment
1. Agency; Maine DOT– Reasons for deploying IR Technology– Benefits – Agency points of view– Plans to implement IR Technology; short-term plans– Schedule for deployment
2. Contractors: Lane & Pike – Reasons for using IR Technology– Benefits – Contractor points of view– Making decisions in real time to minimize penalties– Use of future projects
83
![Page 84: Rapid Technologies to Enhance Quality Control on Asphalt Pavements Infrared (IR ...shrp2.transportation.org/documents/renewal/MaineIR... · 2016. 6. 27. · IR – What is it & why](https://reader035.vdocument.in/reader035/viewer/2022070210/60fb38d882d805348a06dc75/html5/thumbnails/84.jpg)
Agency/Contractor Deployment
Some Typical Questions for Deployment:1. How many projects has Pave-IR ScanTM been used on?2. How many projects were for quality assurance?3. What percent of profiles exhibited medium & severe temperature
differences?4. How easy is it to set up the project in Pave-IR ScanTM?5. Any problems experienced with the equipment?6. Has the Pave-IR system changed daily practice?7. Has use of the Pave-IR system changed interaction between the
owner & contractor?8. How easy is the IR data to extract and process?9. Do you review the Pave-IR reports at the end of the day?10. Do you think you are getting a higher quality mat at the end of the
day using the Pave-IR system?84
![Page 85: Rapid Technologies to Enhance Quality Control on Asphalt Pavements Infrared (IR ...shrp2.transportation.org/documents/renewal/MaineIR... · 2016. 6. 27. · IR – What is it & why](https://reader035.vdocument.in/reader035/viewer/2022070210/60fb38d882d805348a06dc75/html5/thumbnails/85.jpg)
Infrared Technology (IR)
Implementation Products and Strategies
April 28, 2016
![Page 86: Rapid Technologies to Enhance Quality Control on Asphalt Pavements Infrared (IR ...shrp2.transportation.org/documents/renewal/MaineIR... · 2016. 6. 27. · IR – What is it & why](https://reader035.vdocument.in/reader035/viewer/2022070210/60fb38d882d805348a06dc75/html5/thumbnails/86.jpg)
Implementation Products and Strategies
86
1. Field Demonstration Projects and Products2. Application and Use: Examples3. Questions and Answers
![Page 87: Rapid Technologies to Enhance Quality Control on Asphalt Pavements Infrared (IR ...shrp2.transportation.org/documents/renewal/MaineIR... · 2016. 6. 27. · IR – What is it & why](https://reader035.vdocument.in/reader035/viewer/2022070210/60fb38d882d805348a06dc75/html5/thumbnails/87.jpg)
CA
AZ
CO
NM
TX
OK AR
LA
MO KY
AL GA
FL
VA
OH
MI
VTAK
MT
NV
MEWA
OR
UTKS
IDWY
ND
SD
MN
NE
WI
IAIL IN
MS
TNSC
NC
WV
PA
NY
CTNJDEMD
MANH
PR
RI
Demonstration Projects and Products
DC
HI
NorthernMarianaIslands /Guam
AmericanSoma
V.I.
EFL
![Page 88: Rapid Technologies to Enhance Quality Control on Asphalt Pavements Infrared (IR ...shrp2.transportation.org/documents/renewal/MaineIR... · 2016. 6. 27. · IR – What is it & why](https://reader035.vdocument.in/reader035/viewer/2022070210/60fb38d882d805348a06dc75/html5/thumbnails/88.jpg)
Demonstration Projects and Products
1. Case Study/Demonstration Report2. Showcase3. Trouble Shooting and Best Practices Guide4. Specification Guide5. IR Guide/Primer
88
![Page 89: Rapid Technologies to Enhance Quality Control on Asphalt Pavements Infrared (IR ...shrp2.transportation.org/documents/renewal/MaineIR... · 2016. 6. 27. · IR – What is it & why](https://reader035.vdocument.in/reader035/viewer/2022070210/60fb38d882d805348a06dc75/html5/thumbnails/89.jpg)
Demonstration Projects and Products
1. Field Demonstration Projects and Case Study Report:
• Purpose– Enhance the deployment and use of the IR
technology. – Identify/summarize lessons learned from field trials.– Confirm Pave-IR can identify the different types of
temperature differentials that affect mat density and pavement performance.
89
![Page 90: Rapid Technologies to Enhance Quality Control on Asphalt Pavements Infrared (IR ...shrp2.transportation.org/documents/renewal/MaineIR... · 2016. 6. 27. · IR – What is it & why](https://reader035.vdocument.in/reader035/viewer/2022070210/60fb38d882d805348a06dc75/html5/thumbnails/90.jpg)
Demonstration Projects and Products
1. Field Demonstration Projects and Case Study Report, continued:
• Outcome– Case Study Report– Information for showcase– Workshops for individual field demonstration projects
• Demonstrate and discuss value added using IR technology to agency and contractor.
90
![Page 91: Rapid Technologies to Enhance Quality Control on Asphalt Pavements Infrared (IR ...shrp2.transportation.org/documents/renewal/MaineIR... · 2016. 6. 27. · IR – What is it & why](https://reader035.vdocument.in/reader035/viewer/2022070210/60fb38d882d805348a06dc75/html5/thumbnails/91.jpg)
Demonstration Projects and Products
2. Showcase:• Showcase for IR Technology
– Missouri DOT is the host agency– June 1, 2016
• Purpose– Highlight IR technology, provide training & operation. – Attendance includes agencies, contractors, industry,
consultants and academia.• Outcome
– Report to document showcase
91
All participating agencies in IR
demonstration projects have received an
invitation.
![Page 92: Rapid Technologies to Enhance Quality Control on Asphalt Pavements Infrared (IR ...shrp2.transportation.org/documents/renewal/MaineIR... · 2016. 6. 27. · IR – What is it & why](https://reader035.vdocument.in/reader035/viewer/2022070210/60fb38d882d805348a06dc75/html5/thumbnails/92.jpg)
Demonstration Projects and Products
3. Trouble Shooting and Best Practices Guide• Purpose of Guide
– Provide guidance on:• Setting up the equipment and getting started.• Interpreting the raw data for making decisions.
– Identify data collection and maintenance issues with the equipment and software.
• Outcome– Based on all 10 demonstration projects – Experience of agencies & consultants
92
![Page 93: Rapid Technologies to Enhance Quality Control on Asphalt Pavements Infrared (IR ...shrp2.transportation.org/documents/renewal/MaineIR... · 2016. 6. 27. · IR – What is it & why](https://reader035.vdocument.in/reader035/viewer/2022070210/60fb38d882d805348a06dc75/html5/thumbnails/93.jpg)
Demonstration Projects and Products
4. Specification Guide; AASHTO PP 80-14
93
![Page 94: Rapid Technologies to Enhance Quality Control on Asphalt Pavements Infrared (IR ...shrp2.transportation.org/documents/renewal/MaineIR... · 2016. 6. 27. · IR – What is it & why](https://reader035.vdocument.in/reader035/viewer/2022070210/60fb38d882d805348a06dc75/html5/thumbnails/94.jpg)
Demonstration Projects and Products
4. Specification Guide, continued• Purpose
– Advance standardization of IR equipment and testing protocols through AASHTO.
– Agencies can customize it to their needs• Outcome
– Revised/Enhanced AASHTO PP 80-14 • Based on:
– 10 Demonstration Projects– Agency Experience: Minnesota DOT, Texas DOT, etc.
94
![Page 95: Rapid Technologies to Enhance Quality Control on Asphalt Pavements Infrared (IR ...shrp2.transportation.org/documents/renewal/MaineIR... · 2016. 6. 27. · IR – What is it & why](https://reader035.vdocument.in/reader035/viewer/2022070210/60fb38d882d805348a06dc75/html5/thumbnails/95.jpg)
Demonstration Projects and Products
5. IR Guide/Primer• Purpose
– Introduce the Pave-IR method to transportation agencies and contractors.
– Increase awareness of how IR can improve paving operations and increase uniformity of mat.
– Demonstrate use of Pave-IR as a QC Tool.• Outcome
– Based on all 10 demonstration projects.
95
![Page 96: Rapid Technologies to Enhance Quality Control on Asphalt Pavements Infrared (IR ...shrp2.transportation.org/documents/renewal/MaineIR... · 2016. 6. 27. · IR – What is it & why](https://reader035.vdocument.in/reader035/viewer/2022070210/60fb38d882d805348a06dc75/html5/thumbnails/96.jpg)
Implementation Products and Strategies
96
1. Field Demonstration Projects and Products2. Application and Use: Examples3. Questions and Answers
![Page 97: Rapid Technologies to Enhance Quality Control on Asphalt Pavements Infrared (IR ...shrp2.transportation.org/documents/renewal/MaineIR... · 2016. 6. 27. · IR – What is it & why](https://reader035.vdocument.in/reader035/viewer/2022070210/60fb38d882d805348a06dc75/html5/thumbnails/97.jpg)
Application and Use: Examples
Application & Use, WHY:• Continuous readings to evaluate
mat uniformity through temperature uniformity.
• Non-uniform temperatures imply non-uniform densities, which usually mean higher maintenance.
97
![Page 98: Rapid Technologies to Enhance Quality Control on Asphalt Pavements Infrared (IR ...shrp2.transportation.org/documents/renewal/MaineIR... · 2016. 6. 27. · IR – What is it & why](https://reader035.vdocument.in/reader035/viewer/2022070210/60fb38d882d805348a06dc75/html5/thumbnails/98.jpg)
Application and Use: Examples
Role of IR in Quality Assurance Programs1. Quality control plan; contractor
– Monitor production/placement operations to minimize temperature differentials of mat.
– Use data to trouble shoot low or non-uniform densities
2. Acceptance plan; agency– Reduce future distress and maintenance costs – Dispute resolution
98
![Page 99: Rapid Technologies to Enhance Quality Control on Asphalt Pavements Infrared (IR ...shrp2.transportation.org/documents/renewal/MaineIR... · 2016. 6. 27. · IR – What is it & why](https://reader035.vdocument.in/reader035/viewer/2022070210/60fb38d882d805348a06dc75/html5/thumbnails/99.jpg)
Application and Use: Examples
IR Role in Quality Control Plan; 3 examples1. Missouri demonstration project2. Virginia demonstration project3. Federal Lands demonstration project
99
![Page 100: Rapid Technologies to Enhance Quality Control on Asphalt Pavements Infrared (IR ...shrp2.transportation.org/documents/renewal/MaineIR... · 2016. 6. 27. · IR – What is it & why](https://reader035.vdocument.in/reader035/viewer/2022070210/60fb38d882d805348a06dc75/html5/thumbnails/100.jpg)
Application and Use: Examples
1. Missouri demonstration project– Communication between plant and paver; monitoring
production/placement operations to minimize temperature differentials of mat.
100
![Page 101: Rapid Technologies to Enhance Quality Control on Asphalt Pavements Infrared (IR ...shrp2.transportation.org/documents/renewal/MaineIR... · 2016. 6. 27. · IR – What is it & why](https://reader035.vdocument.in/reader035/viewer/2022070210/60fb38d882d805348a06dc75/html5/thumbnails/101.jpg)
Application and Use: Examples
2. Virginia demonstration project– Identify reason for severe temperature differentials and
take action.• Avg. temperature differential at start of paving
project; about 30 ºF.• Avg. temperature differential after adding two
trucks; about 15 ºF.
101
![Page 102: Rapid Technologies to Enhance Quality Control on Asphalt Pavements Infrared (IR ...shrp2.transportation.org/documents/renewal/MaineIR... · 2016. 6. 27. · IR – What is it & why](https://reader035.vdocument.in/reader035/viewer/2022070210/60fb38d882d805348a06dc75/html5/thumbnails/102.jpg)
Application and Use: Examples
3. Federal Lands demonstration project– Identify reason for severe temperature differentials and
take action; loading of trucks.• One dump of mix in truck bed – severe temp.
differential• Two dump, no stockpile – reduced temp. differential.
102
![Page 103: Rapid Technologies to Enhance Quality Control on Asphalt Pavements Infrared (IR ...shrp2.transportation.org/documents/renewal/MaineIR... · 2016. 6. 27. · IR – What is it & why](https://reader035.vdocument.in/reader035/viewer/2022070210/60fb38d882d805348a06dc75/html5/thumbnails/103.jpg)
Application and Use: Examples
IR Role in Acceptance Plan; examples:• Identify cold spots
– Colorado, Michigan, Minnesota, Quebec, Texas, Washington
• Identify thermal streaks– Quebec
103
![Page 104: Rapid Technologies to Enhance Quality Control on Asphalt Pavements Infrared (IR ...shrp2.transportation.org/documents/renewal/MaineIR... · 2016. 6. 27. · IR – What is it & why](https://reader035.vdocument.in/reader035/viewer/2022070210/60fb38d882d805348a06dc75/html5/thumbnails/104.jpg)
Application and Use: Examples
Cold spots; areas with increased potential for:• Fatigue cracks• Raveling• Pot holes
104
• Increase in maintenance costs.
• Loss of service life
![Page 105: Rapid Technologies to Enhance Quality Control on Asphalt Pavements Infrared (IR ...shrp2.transportation.org/documents/renewal/MaineIR... · 2016. 6. 27. · IR – What is it & why](https://reader035.vdocument.in/reader035/viewer/2022070210/60fb38d882d805348a06dc75/html5/thumbnails/105.jpg)
Thermal streaks; areas with increased potential for longitudinal cracking.
Research and Development
Application and Use: Examples
Loss of service life & increase in maintenance costs.
105
![Page 106: Rapid Technologies to Enhance Quality Control on Asphalt Pavements Infrared (IR ...shrp2.transportation.org/documents/renewal/MaineIR... · 2016. 6. 27. · IR – What is it & why](https://reader035.vdocument.in/reader035/viewer/2022070210/60fb38d882d805348a06dc75/html5/thumbnails/106.jpg)
Application and Use: Examples
Specification Guide; AASHTO PP 80-14
106
1. Scope2. Referenced Document3. Terminology4. General Thermal Profile Requirements5. Hardware6. Data File Format7. Calibration8. Profiler Accuracy9. References10.Appendices (Non-mandatory)
1. Example Acceptance Criteria2. Terminology3. Criteria4. Monetary Adjustment
![Page 107: Rapid Technologies to Enhance Quality Control on Asphalt Pavements Infrared (IR ...shrp2.transportation.org/documents/renewal/MaineIR... · 2016. 6. 27. · IR – What is it & why](https://reader035.vdocument.in/reader035/viewer/2022070210/60fb38d882d805348a06dc75/html5/thumbnails/107.jpg)
Application and Use: Examples
IR Role in Acceptance Plan• Determine biased areas for
sampling and testing– Washington DOT
• Determine pay factors– Minnesota DOT– Quebec
• Minnesota pay factors for each 150 foot segment:– $20 bonus; <25ºF– $20 penalty; >50ºF
107
![Page 108: Rapid Technologies to Enhance Quality Control on Asphalt Pavements Infrared (IR ...shrp2.transportation.org/documents/renewal/MaineIR... · 2016. 6. 27. · IR – What is it & why](https://reader035.vdocument.in/reader035/viewer/2022070210/60fb38d882d805348a06dc75/html5/thumbnails/108.jpg)
Application and Use: Examples
Washington State DOT; WSDOT SOP 733• Aggregate segregation: spots and streaks defined by
visual inspection• Equipment for measuring temperature differentials:
– Infrared camera– Handheld noncontact infrared device– IR-Bar or IR-Scanner not identified
• Temperature Differential Area: > 25ºF and paver stops are included– Measured prior to compaction
• In temperature differential areas; systematic compaction test is required for all areas.
108
![Page 109: Rapid Technologies to Enhance Quality Control on Asphalt Pavements Infrared (IR ...shrp2.transportation.org/documents/renewal/MaineIR... · 2016. 6. 27. · IR – What is it & why](https://reader035.vdocument.in/reader035/viewer/2022070210/60fb38d882d805348a06dc75/html5/thumbnails/109.jpg)
Application and Use: Examples
Alaska DOT; Special Provision draft• IR and IC added to Glenn Hwy project• After test strip is completed, monitor is covered for first
lot, then removed for latter lots and compared to the first:– IR-Scanner
• Temperature Differential Area: > 25ºF and paver stops are included– Measured prior to compaction
• In temperature differential areas:– Perform density profiles– Adjust compaction and paving equipment operation to eliminate
temperature differential areas.109
![Page 110: Rapid Technologies to Enhance Quality Control on Asphalt Pavements Infrared (IR ...shrp2.transportation.org/documents/renewal/MaineIR... · 2016. 6. 27. · IR – What is it & why](https://reader035.vdocument.in/reader035/viewer/2022070210/60fb38d882d805348a06dc75/html5/thumbnails/110.jpg)
Application and Use: Examples
Texas DOT; Item 341, Tex-244-F• Equipment for measuring temperature differentials:
– Infrared camera– IR-Bar or IR Scanner
• Temperature Differential Category, behind paver and paver stops are excluded:– < 25ºF is minor thermal segregation– 25ºF to 50ºF moderate thermal segregation– > 50ºF is severe thermal segregation
• In areas with severe temperature differential:– Eliminate or remove and replace.– Density profile not required when using IR devices
110
![Page 111: Rapid Technologies to Enhance Quality Control on Asphalt Pavements Infrared (IR ...shrp2.transportation.org/documents/renewal/MaineIR... · 2016. 6. 27. · IR – What is it & why](https://reader035.vdocument.in/reader035/viewer/2022070210/60fb38d882d805348a06dc75/html5/thumbnails/111.jpg)
Application and Use: Examples
Minnesota DOT• Equipment for measuring temperature differentials:
– IR Scanner
• Temperature Differential Category and acceptance:– < 25ºF is minor thermal segregation; $20 bonus/sect.– 25ºF to 50ºF moderate thermal segregation $0 bonus– > 50ºF is severe thermal segregation $20 penalty/sect.
111
![Page 112: Rapid Technologies to Enhance Quality Control on Asphalt Pavements Infrared (IR ...shrp2.transportation.org/documents/renewal/MaineIR... · 2016. 6. 27. · IR – What is it & why](https://reader035.vdocument.in/reader035/viewer/2022070210/60fb38d882d805348a06dc75/html5/thumbnails/112.jpg)
Application and Use: Examples
Deployment Strategy, Common Steps/Tasks:1. Define temperature differences that cause significant distress,
increasing maintenance cost & reducing service life (Minnesota, Ontario, Texas, Washington). a) Many published reports that document the importance of temp.
2. Identify mat property changes between areas with severe temperature differentials (Ontario, Texas).a) Many research reports that identify how density affects the mat’s
properties related to performance.3. Draft IR specification (Minnesota, Ontario, Texas, Washington)4. Obtain comments from industry for revising specification; getting input
from other partners (Ontario, Minnesota, Texas).5. Host/sponsor training sessions with equipment/software
112
![Page 113: Rapid Technologies to Enhance Quality Control on Asphalt Pavements Infrared (IR ...shrp2.transportation.org/documents/renewal/MaineIR... · 2016. 6. 27. · IR – What is it & why](https://reader035.vdocument.in/reader035/viewer/2022070210/60fb38d882d805348a06dc75/html5/thumbnails/113.jpg)
Application and Use: Examples
Deployment Strategy, Common Steps/Tasks:6. Execute pilot projects over 1 to 2 years (Minnesota, Ontario)7. Educate industry/agency personnel on results (Ontario).8. Update/revise specification (Minnesota, Ontario, Texas, Washington)9. Establish actions based on temperature profile differences (all)
a) Increased density testing (Texas) b) Biased testing (Washington)c) Incentives/disincentives based temperature differentials
(Minnesota, Ontario)10. Confirm appropriateness of acceptance plan (Ontario)11. Full deployment
113
![Page 114: Rapid Technologies to Enhance Quality Control on Asphalt Pavements Infrared (IR ...shrp2.transportation.org/documents/renewal/MaineIR... · 2016. 6. 27. · IR – What is it & why](https://reader035.vdocument.in/reader035/viewer/2022070210/60fb38d882d805348a06dc75/html5/thumbnails/114.jpg)
Application and Use: Examples
Conclusion from demonstration projects, to-date:• Pave-IR scanner is one tool
to confirm a uniform, high-quality mat.
114
![Page 115: Rapid Technologies to Enhance Quality Control on Asphalt Pavements Infrared (IR ...shrp2.transportation.org/documents/renewal/MaineIR... · 2016. 6. 27. · IR – What is it & why](https://reader035.vdocument.in/reader035/viewer/2022070210/60fb38d882d805348a06dc75/html5/thumbnails/115.jpg)
Implementation Products and Strategies
115
1. Field Demonstration Projects and Products2. Application and Use: Examples3. Questions and Answers
![Page 116: Rapid Technologies to Enhance Quality Control on Asphalt Pavements Infrared (IR ...shrp2.transportation.org/documents/renewal/MaineIR... · 2016. 6. 27. · IR – What is it & why](https://reader035.vdocument.in/reader035/viewer/2022070210/60fb38d882d805348a06dc75/html5/thumbnails/116.jpg)
Agency/Contractor Deployment
Some Questions for Deployment:1. How many projects has Pave-IR ScanTM been used on?2. How many projects were for quality assurance?3. What percent of profiles exhibited medium & severe temperature
differences?4. How easy is it to set up the project in Pave-IR ScanTM?5. Any problems experienced with the equipment?6. Has the Pave-IR system changed daily practice?7. Has use of the Pave-IR system changed interaction between the
owner & contractor?8. How easy is the IR data to extract and process?9. Do you review the Pave-IR reports at the end of the day?10. Do you think you are getting a higher quality mat at the end of the
day using the Pave-IR system?11. How have agencies/contractors used the IR products? 116
![Page 117: Rapid Technologies to Enhance Quality Control on Asphalt Pavements Infrared (IR ...shrp2.transportation.org/documents/renewal/MaineIR... · 2016. 6. 27. · IR – What is it & why](https://reader035.vdocument.in/reader035/viewer/2022070210/60fb38d882d805348a06dc75/html5/thumbnails/117.jpg)
Workshop Wrap-Up
117
Complete workshop forms.
NEXT:
• Presentation and Demonstration of Ground
Penetrating Radar Equipment