RED WING BRIDGE PROJECT US 63 River Bridge and Approach Roadways
![Page 2: RED WING BRIDGE PROJECT - Minnesota](https://reader031.vdocument.in/reader031/viewer/2022012016/615ae4eea7436314da6dea3b/html5/thumbnails/2.jpg)
Agenda
• Design Process
• Approach Roadways Design
• River Bridge Design
• Visual Quality
• Staging
• Project Schedule
• Right of Way Update
![Page 3: RED WING BRIDGE PROJECT - Minnesota](https://reader031.vdocument.in/reader031/viewer/2022012016/615ae4eea7436314da6dea3b/html5/thumbnails/3.jpg)
Design Process • Preliminary Design/Environmental Review
• Final Design: Approach Roadways • Minnesota • Wisconsin
• Final Design: River Bridge
• Letting
![Page 4: RED WING BRIDGE PROJECT - Minnesota](https://reader031.vdocument.in/reader031/viewer/2022012016/615ae4eea7436314da6dea3b/html5/thumbnails/4.jpg)
Approach Roadways Design
![Page 5: RED WING BRIDGE PROJECT - Minnesota](https://reader031.vdocument.in/reader031/viewer/2022012016/615ae4eea7436314da6dea3b/html5/thumbnails/5.jpg)
Approach Roadways Design
• Box Culvert Replacement
![Page 6: RED WING BRIDGE PROJECT - Minnesota](https://reader031.vdocument.in/reader031/viewer/2022012016/615ae4eea7436314da6dea3b/html5/thumbnails/6.jpg)
Approach Roadways Design
• Pedestrian Ramps
• Sidewalk along Coca-Cola & Bluff St
![Page 7: RED WING BRIDGE PROJECT - Minnesota](https://reader031.vdocument.in/reader031/viewer/2022012016/615ae4eea7436314da6dea3b/html5/thumbnails/7.jpg)
Approach Roadways Design
• Remove Pond
• Use Ditches and
Water Quality
• Manholes instead
![Page 8: RED WING BRIDGE PROJECT - Minnesota](https://reader031.vdocument.in/reader031/viewer/2022012016/615ae4eea7436314da6dea3b/html5/thumbnails/8.jpg)
River Bridge Design
![Page 9: RED WING BRIDGE PROJECT - Minnesota](https://reader031.vdocument.in/reader031/viewer/2022012016/615ae4eea7436314da6dea3b/html5/thumbnails/9.jpg)
River Bridge Design
![Page 10: RED WING BRIDGE PROJECT - Minnesota](https://reader031.vdocument.in/reader031/viewer/2022012016/615ae4eea7436314da6dea3b/html5/thumbnails/10.jpg)
River Bridge Final Design
![Page 11: RED WING BRIDGE PROJECT - Minnesota](https://reader031.vdocument.in/reader031/viewer/2022012016/615ae4eea7436314da6dea3b/html5/thumbnails/11.jpg)
Visual Quality
• Light Wash
![Page 12: RED WING BRIDGE PROJECT - Minnesota](https://reader031.vdocument.in/reader031/viewer/2022012016/615ae4eea7436314da6dea3b/html5/thumbnails/12.jpg)
Visual Quality
• River Bridge Piers
![Page 13: RED WING BRIDGE PROJECT - Minnesota](https://reader031.vdocument.in/reader031/viewer/2022012016/615ae4eea7436314da6dea3b/html5/thumbnails/13.jpg)
Visual Quality • River Bridge overlook and spires (Day)
![Page 14: RED WING BRIDGE PROJECT - Minnesota](https://reader031.vdocument.in/reader031/viewer/2022012016/615ae4eea7436314da6dea3b/html5/thumbnails/14.jpg)
Visual Quality • River Bridge overlook and spires (Evening)
![Page 15: RED WING BRIDGE PROJECT - Minnesota](https://reader031.vdocument.in/reader031/viewer/2022012016/615ae4eea7436314da6dea3b/html5/thumbnails/15.jpg)
Visual Quality
• Hwy 61 overpass bridge and retaining walls
![Page 16: RED WING BRIDGE PROJECT - Minnesota](https://reader031.vdocument.in/reader031/viewer/2022012016/615ae4eea7436314da6dea3b/html5/thumbnails/16.jpg)
Visual Quality
• Slip ramp bridge
![Page 17: RED WING BRIDGE PROJECT - Minnesota](https://reader031.vdocument.in/reader031/viewer/2022012016/615ae4eea7436314da6dea3b/html5/thumbnails/17.jpg)
Visual Quality
• Landscaping
![Page 18: RED WING BRIDGE PROJECT - Minnesota](https://reader031.vdocument.in/reader031/viewer/2022012016/615ae4eea7436314da6dea3b/html5/thumbnails/18.jpg)
Visual Quality
• Lighting Overview
![Page 19: RED WING BRIDGE PROJECT - Minnesota](https://reader031.vdocument.in/reader031/viewer/2022012016/615ae4eea7436314da6dea3b/html5/thumbnails/19.jpg)
Visual Quality
• Lighting Overview
![Page 20: RED WING BRIDGE PROJECT - Minnesota](https://reader031.vdocument.in/reader031/viewer/2022012016/615ae4eea7436314da6dea3b/html5/thumbnails/20.jpg)
Visual Quality • MnDOT Standard Lighting
![Page 21: RED WING BRIDGE PROJECT - Minnesota](https://reader031.vdocument.in/reader031/viewer/2022012016/615ae4eea7436314da6dea3b/html5/thumbnails/21.jpg)
Visual Quality • City of Red Wing Lighting
![Page 22: RED WING BRIDGE PROJECT - Minnesota](https://reader031.vdocument.in/reader031/viewer/2022012016/615ae4eea7436314da6dea3b/html5/thumbnails/22.jpg)
Staging - 2017 – Stage 1A Construction • Begin construction of River Bridge • Surcharge the poor soils for Wisconsin embankment • Construct temporary bridge over Hwy 61 • Construct button-hook connection
• Construct Hwy 61 east of the temporary bridge
Traffic • Hwy 63 traffic remains on existing River Bridge • One lane traffic each way on Hwy 61 • 825th St closed at River Bridge and traffic detoured
![Page 23: RED WING BRIDGE PROJECT - Minnesota](https://reader031.vdocument.in/reader031/viewer/2022012016/615ae4eea7436314da6dea3b/html5/thumbnails/23.jpg)
Staging - 2017 – Stage 1B Construction • Begin construction of River Bridge • Surcharge the poor soils for Wisconsin embankment • Construct temporary bridge over Hwy 61 • Construct button-hook connection
• Construct Hwy 61 east of the temporary bridge
Traffic • Hwy 63 traffic remains on existing River Bridge • One lane traffic each way on Hwy 61 • 825th St closed at River Bridge and traffic detoured
![Page 24: RED WING BRIDGE PROJECT - Minnesota](https://reader031.vdocument.in/reader031/viewer/2022012016/615ae4eea7436314da6dea3b/html5/thumbnails/24.jpg)
Staging - 2018 – Stage 2 Construction • Construction of River Bridge • Construct new bridge over Hwy 61, slip ramp,
slip ramp bridge, 3rd Street, and Bluff Street
Traffic • Hwy 63 traffic remains on existing River Bridge and routed
onto temporary bridge and button-hook connection to new signalized intersection with Hwy 61
• 825th St closed at River Bridge and traffic detoured • 3rd St closed, traffic allowed thru at Potter St.
![Page 25: RED WING BRIDGE PROJECT - Minnesota](https://reader031.vdocument.in/reader031/viewer/2022012016/615ae4eea7436314da6dea3b/html5/thumbnails/25.jpg)
Staging - 2019 – Stage 3
Construction • Construction of River Bridge • Construct Hwy 63 in Wisconsin
Traffic • Hwy 63 traffic remains on existing River Bridge and routed onto
temporary bridge and button-hook connection to new signalizedintersection with Hwy 61
• Two lane traffic each way on Hwy 61 • 825th St closed at River Bridge and traffic detoured • 3rd St and Bluff St open
![Page 26: RED WING BRIDGE PROJECT - Minnesota](https://reader031.vdocument.in/reader031/viewer/2022012016/615ae4eea7436314da6dea3b/html5/thumbnails/26.jpg)
Staging - 2020 – Stage 4A
Traffic • Hwy 63 traffic on new River Bridge • One lane traffic each way on Hwy 61 • 825th St open at River Bridge • Slip ramp open
Construction • Construction of River Bridge complete, remove existing
River Bridge • Construct Hwy 61 under Hwy 63 bridge
![Page 27: RED WING BRIDGE PROJECT - Minnesota](https://reader031.vdocument.in/reader031/viewer/2022012016/615ae4eea7436314da6dea3b/html5/thumbnails/27.jpg)
Staging - 2020 – Stage 4B
Traffic • Hwy 63 traffic on new River Bridge • One lane traffic each way on Hwy 61 • 825th St open at River Bridge
Construction • Construction of River Bridge complete, remove
existing River Bridge • Construct Hwy 61 under Hwy 63 bridge
• Slip ramp open
![Page 28: RED WING BRIDGE PROJECT - Minnesota](https://reader031.vdocument.in/reader031/viewer/2022012016/615ae4eea7436314da6dea3b/html5/thumbnails/28.jpg)
Staging - 2020 – Stage 5 Construction • Construction of River Bridge complete, remove
existing River Bridge • Construct Hwy 61 under Hwy 63 bridge • Complete 825th St Ring Road
Traffic • Hwy 63 traffic on new River Bridge • One lane traffic each way on Hwy 61 • 825th St open at River Bridge • Slip ramp open
![Page 29: RED WING BRIDGE PROJECT - Minnesota](https://reader031.vdocument.in/reader031/viewer/2022012016/615ae4eea7436314da6dea3b/html5/thumbnails/29.jpg)
Project Schedule
• Final design initiated: September 2015
• Environmental review complete (FONSI): mid-March
• Right-of-way acquisition: 2016
• Final design complete: November 2016
• Project letting: February 2017
• Construction: 2017-2020
![Page 30: RED WING BRIDGE PROJECT - Minnesota](https://reader031.vdocument.in/reader031/viewer/2022012016/615ae4eea7436314da6dea3b/html5/thumbnails/30.jpg)
Right-of-Way Process
• Total Acquisitions (began February 2016)
• Legal descriptions being prepared
• Appraisals nearing completion
• Environmental clearance needed
• Partial Acquisitions/Easement
• Construction limits currently being finalized
![Page 31: RED WING BRIDGE PROJECT - Minnesota](https://reader031.vdocument.in/reader031/viewer/2022012016/615ae4eea7436314da6dea3b/html5/thumbnails/31.jpg)
Questions/Comments Chad Hanson, P.E. David Koepp MnDOT Project Manager WisDOT 507-286-7637 715-836-2078 [email protected] [email protected]