Download - Region V ERP Auto Body Training Introduction to Data Quality Training Chicago, IL November 18, 2009
![Page 1: Region V ERP Auto Body Training Introduction to Data Quality Training Chicago, IL November 18, 2009](https://reader036.vdocument.in/reader036/viewer/2022072013/56649e715503460f94b7034a/html5/thumbnails/1.jpg)
Region V ERP Auto Body TrainingIntroduction to Data Quality Training
Chicago, ILNovember 18, 2009
![Page 2: Region V ERP Auto Body Training Introduction to Data Quality Training Chicago, IL November 18, 2009](https://reader036.vdocument.in/reader036/viewer/2022072013/56649e715503460f94b7034a/html5/thumbnails/2.jpg)
About Me
• Nine Years as ERP Manager at MassDEP– rolled-out first ERP program– helped design ERP measurement
methodology– partnered with EPA in 2000 to “spread” ERP
• Lead contractor for NEWMOA on the States Common Measures Project
![Page 3: Region V ERP Auto Body Training Introduction to Data Quality Training Chicago, IL November 18, 2009](https://reader036.vdocument.in/reader036/viewer/2022072013/56649e715503460f94b7034a/html5/thumbnails/3.jpg)
Why Emphasize Quality Assurance?
– Ensure adequate planning in advance so that:• data collected is reliable• analysis supports anticipated decision-making
– Get defensible results– Avoid surprises– Better ensure that data represent actual
conditions
![Page 4: Region V ERP Auto Body Training Introduction to Data Quality Training Chicago, IL November 18, 2009](https://reader036.vdocument.in/reader036/viewer/2022072013/56649e715503460f94b7034a/html5/thumbnails/4.jpg)
EPA QAPP Requirements
• All organizations conducting environmental programs funded by EPA are required to establish and implement a quality system.
• EPA has developed the Quality Assurance Project Plan (QAPP) as a tool for project managers and planners to document the type and quality of data needed for environmental decisions and to describe the methods for collecting and assessing those data.
• EPA requires that all environmental data used in decision making be supported by an approved QAPP.
![Page 5: Region V ERP Auto Body Training Introduction to Data Quality Training Chicago, IL November 18, 2009](https://reader036.vdocument.in/reader036/viewer/2022072013/56649e715503460f94b7034a/html5/thumbnails/5.jpg)
Region V Project Meeting QAPP Requirements
• Prepared draft QAPP (November 2009)
• Project participants will commit to a final QA plan (November)
• No data collection will occur before QA plan is approved
![Page 6: Region V ERP Auto Body Training Introduction to Data Quality Training Chicago, IL November 18, 2009](https://reader036.vdocument.in/reader036/viewer/2022072013/56649e715503460f94b7034a/html5/thumbnails/6.jpg)
For more information
• Tara Acker, NEWMOA• [email protected]• (413) 549-5309• or• Renee Bashel, WI Department of Commerce• [email protected]• (608) 264-6153