Removing financing obstacles through project structuring
Antonio VivesManager, a.i.
Sustainable Development DepartmentInter-American Development Bank
Access to Finance for Local GovernmentsIV World Water Forum
March 17, 2006
![Page 2: Removing financing obstacles through project structuring](https://reader035.vdocument.in/reader035/viewer/2022072015/568130d6550346895d96eaf3/html5/thumbnails/2.jpg)
Outline of the presentation
Project preparation
Project structuring
![Page 3: Removing financing obstacles through project structuring](https://reader035.vdocument.in/reader035/viewer/2022072015/568130d6550346895d96eaf3/html5/thumbnails/3.jpg)
NEEDS Preparation Structuring Financing
Project finance cycle
![Page 4: Removing financing obstacles through project structuring](https://reader035.vdocument.in/reader035/viewer/2022072015/568130d6550346895d96eaf3/html5/thumbnails/4.jpg)
Project preparation
One of the major obstacles to water and sanitation finance is project preparation
Low institutional capacityA local affair, sometimes removed from
decision making centersDifficult political and economic conditionsScarcity of financial resources: users,
taxpayers, marketsProject preparation not given the key role
![Page 5: Removing financing obstacles through project structuring](https://reader035.vdocument.in/reader035/viewer/2022072015/568130d6550346895d96eaf3/html5/thumbnails/5.jpg)
Project preparation
Donors and multilaterals financial institutions must emphasize support for the early stage.
We at the IDB hope to approve on Monday a Project Preparation Fund with grants for capacity building and project preparation
Donors should consider “debt for water swaps” as part of their official assistance.
Both would leverage other funds: “teach them how to fish instead of giving them fish”
![Page 6: Removing financing obstacles through project structuring](https://reader035.vdocument.in/reader035/viewer/2022072015/568130d6550346895d96eaf3/html5/thumbnails/6.jpg)
Project structuring
Financial structures adapted to local realitiesExploit all possibilities to maximize synergies
between scarce resources: own labor, tariffs, donors, multilaterals, public and private resources
At one extreme, cooperatives, water microenterprises, municipal utilities
In the middle, management contracts, for operation, maintenance, collections, etc.
At the other extreme, full-fledged concessions
![Page 7: Removing financing obstacles through project structuring](https://reader035.vdocument.in/reader035/viewer/2022072015/568130d6550346895d96eaf3/html5/thumbnails/7.jpg)
Project structuring: local conditions
Willingness to pay/local viewsTariff sustainabilitySite and locationInstitutional capacityFiscal spaceLegal frameworkPolitical riskMacroeconomic conditions
![Page 8: Removing financing obstacles through project structuring](https://reader035.vdocument.in/reader035/viewer/2022072015/568130d6550346895d96eaf3/html5/thumbnails/8.jpg)
Size and Location
Tariff sustainability
Willingness to pay
Institutional Capacity
Macroeconomics Factors
Fiscal Space
Political Risk
Legal Framework
Variables with
low Rating Fu
lly
pu
blic
Fu
lly
pu
blic
Co
op
era
tive
sC
oo
pe
rati
ves
Ou
tso
urc
ing
Ou
tso
urc
ing
Ma
na
ge
men
t C
on
trac
tsM
an
ag
em
ent
Co
ntr
acts
Fra
nc
his
eF
ran
ch
ise
Le
asi
ng
Le
asi
ng
Co
nc
ess
ion
Co
nc
ess
ion
BO
T-B
OO
-BO
OT
BO
T-B
OO
-BO
OT
Fu
lly
pri
vate
-s
ale
Fu
lly
pri
vate
-s
ale
Fu
lly
pri
vate
-L
icen
se
Fu
lly
pri
vate
-L
icen
se
Fu
lly
pri
vate
Fu
lly
pri
vate
Project Feasibility MapProject Feasibility Map
Fu
lly
pu
blic
-C
orp
ora
tize
Fu
lly
pu
blic
-C
orp
ora
tize
Available Structures
Non-Feasible Structures
Tool-Enabled Structures
Note that feasible structures are only considered when a full column of circles exists.
Suggested feasible structures
Local conditions
![Page 9: Removing financing obstacles through project structuring](https://reader035.vdocument.in/reader035/viewer/2022072015/568130d6550346895d96eaf3/html5/thumbnails/9.jpg)
Water financing model
Sesión FT3.40,
Domingo 19 marzo, 11:00 am
Diezmo 4
![Page 10: Removing financing obstacles through project structuring](https://reader035.vdocument.in/reader035/viewer/2022072015/568130d6550346895d96eaf3/html5/thumbnails/10.jpg)
In summary
Project preparation and structuring may not be a source of funds, but can help bring funds and enhance the long term sustainability of water projects
All actors, all sources, all structures must be explored
![Page 11: Removing financing obstacles through project structuring](https://reader035.vdocument.in/reader035/viewer/2022072015/568130d6550346895d96eaf3/html5/thumbnails/11.jpg)
Removing financing obstacles through project structuring
Antonio VivesManager, a.i.
Sustainable Development DepartmentInter-American Development Bank
Access to Finance for Local GovernmentsIV World Water Forum
March 17, 2006