Renovation Update Meeting: November 11, 2011
Phasing Plan:Currently working in Phase 5, Façade 6, and Crystal Palace
Renovation Update Meeting: November 11, 2011
River Pavilion exterior with new glass & metal panelsVestibules to be renovated during Fall 2012
Renovation Update Meeting: November 11, 2011
River Pavilion interior, with new lighting, painted space frame, rebuilt walls, new floor, revised HVAC system.
Renovation Update Meeting: November 11, 2011
Completed Galleria North wall: New glass, lighting, paint, air duct & duct enclosures, plenum boxes, wall boxes for power, telecom & data.
Renovation Update Meeting: November 11, 2011
New metal panel wall (Façade 6) at 34th St. & West Side Highway
Renovation Update Meeting: November 11, 2011
Interior of Administration Entrance – Suspended ceiling, recessed lights, perimeter linear diffusers, sliding glass doors, new security cameras
Renovation Update Meeting: November 11, 2011
Southeast faces of Crystal Palace – Curtainwall removal and replacement
Renovation Update Meeting: November 11, 2011
New North Concourse Entrance Vestibule between column lines 800 & 900 under construction
Renovation Update Meeting: November 11, 2011
New Skylight Gutters at NN Cube of Crystal Palace – Looking East
Renovation Update Meeting: November 11, 2011
Northwest face of Crystal Palace and North Galleria complete; New RTUs through Phase 4 visible. Lightweight Concrete on top of insulating foam.
Renovation Update Meeting: November 11, 2011
Lightweight Concrete completed through Phase 3, surrounding new RTUs & duct. Second layer of waterproofing material applied above concrete in Phases 1 & 2
Renovation Update Meeting: November 11, 2011
MTA construction east of 11th avenue, Adjacent to Javits level 1 construction