Defining the Critical Path
• The Critical Path– The Sequence of Tasks
that takes the Longest to Complete
– Defines Duration of the Project
– Determines the End Date of the Project
• The Overall Duration of the Project Cannot be Reduced without shortening the Critical Path
![Page 3: Reviewing “The Building Blocks” Project Scheduling](https://reader036.vdocument.in/reader036/viewer/2022062308/56649d9e5503460f94a88e8a/html5/thumbnails/3.jpg)
• Free Float– The Amount of Extra Time
the Task can be Delayed or Extended without Affecting the Start of a Successor task
• Total Float– The Amount of Extra Time
the Duration of the Task can Expand without Affecting the Project End Date
• Negative Float– Negative Total Float is the
Amount of Time by which a Critical Task Misses its Required Date
Critical Path
![Page 4: Reviewing “The Building Blocks” Project Scheduling](https://reader036.vdocument.in/reader036/viewer/2022062308/56649d9e5503460f94a88e8a/html5/thumbnails/4.jpg)
Gantt Chart OverviewThe Gantt Chart
Displays theProject Schedule in a
TimePhased Format
The Gantt Chart Indicates:• Start & End Dates• Task Durations• Float• Baselines• Task Completion &
Status• Parallel Activities• Major Project Events
The Gantt Chart
![Page 5: Reviewing “The Building Blocks” Project Scheduling](https://reader036.vdocument.in/reader036/viewer/2022062308/56649d9e5503460f94a88e8a/html5/thumbnails/5.jpg)
• Who are the “players?”
• What do we use a project schedule for?
• The Project Delivery Information System (PDIS)
• The WSDOT Master Deliverables List (MDL)
• Working with the MDL (Task Planning)
WSDOT Project Scheduling
![Page 6: Reviewing “The Building Blocks” Project Scheduling](https://reader036.vdocument.in/reader036/viewer/2022062308/56649d9e5503460f94a88e8a/html5/thumbnails/6.jpg)
Your “road map” for getting from here to there.
• What tasks will be done• Who will do them• How long will they take• What sequence will they be done• How much will they cost
“You got to be careful if you don’t know whereyou’re going, because you might not get there.”
-Yogi Berra
The Project ScheduleThe Project Schedule
What information can we get from the schedule?
![Page 7: Reviewing “The Building Blocks” Project Scheduling](https://reader036.vdocument.in/reader036/viewer/2022062308/56649d9e5503460f94a88e8a/html5/thumbnails/7.jpg)
• Who are the “players?”
• What do we use a project schedule for?
• The Project Delivery Information System (PDIS)
• The WSDOT Master Deliverables List (MDL)
• Working with the MDL (Task Planning)
WSDOT Project Scheduling
![Page 8: Reviewing “The Building Blocks” Project Scheduling](https://reader036.vdocument.in/reader036/viewer/2022062308/56649d9e5503460f94a88e8a/html5/thumbnails/8.jpg)
• Who are the “players?”
• What do we use a project schedule for?
• The Project Delivery Information System (PDIS)
• The WSDOT Master Deliverables List (MDL)
• Working with the MDL
WSDOT Project Scheduling
![Page 9: Reviewing “The Building Blocks” Project Scheduling](https://reader036.vdocument.in/reader036/viewer/2022062308/56649d9e5503460f94a88e8a/html5/thumbnails/9.jpg)
Master Deliverables List (MDL)
![Page 10: Reviewing “The Building Blocks” Project Scheduling](https://reader036.vdocument.in/reader036/viewer/2022062308/56649d9e5503460f94a88e8a/html5/thumbnails/10.jpg)
Master Deliverables List (MDL)
Level 1
Level 2
Level 3
Processes
Level 4
Deliverables
PhasePre-Construction Construction
Deliverables (in some cases)
Level 5-10Tasks
![Page 11: Reviewing “The Building Blocks” Project Scheduling](https://reader036.vdocument.in/reader036/viewer/2022062308/56649d9e5503460f94a88e8a/html5/thumbnails/11.jpg)
Work Breakdown Structure (WBS)•A deliverable oriented hierarchical decomposition of the work to be executed by the project team to accomplish the team mission and create the required deliverables. The WBS defines the project scope.
Scheduling Terminology
Team Mission
![Page 12: Reviewing “The Building Blocks” Project Scheduling](https://reader036.vdocument.in/reader036/viewer/2022062308/56649d9e5503460f94a88e8a/html5/thumbnails/12.jpg)
Deliverable•Any unique and verifiable product or result that must be produces to complete a project. Usually the lowest level of the WBS.
Scheduling Terminology
Team Mission
![Page 13: Reviewing “The Building Blocks” Project Scheduling](https://reader036.vdocument.in/reader036/viewer/2022062308/56649d9e5503460f94a88e8a/html5/thumbnails/13.jpg)
Scheduled Activity (task)•A component of work performed to create a deliverable.
Scheduling Terminology
Team Mission
Task 1Task 2(Etc.)
Task 1Task 2(Etc.)
Task 1Task 2(Etc.)
Task 1Task 2(Etc.)
Task 1Task 2(Etc.)
Task 1Task 2(Etc.)
WB
S(S
cope
)A
ctiv
ity L
ist
(Sch
edul
e)
![Page 14: Reviewing “The Building Blocks” Project Scheduling](https://reader036.vdocument.in/reader036/viewer/2022062308/56649d9e5503460f94a88e8a/html5/thumbnails/14.jpg)
Level 1 (Project Phase)
Level 2 (Process)
Level 3 (Deliverable)
Levels 4-10 (Tasks & sub tasks)
(Preconstruction) PC
(Hydraulics) PC - 25
(Type B Report) PC-25 . 02
(Assignable Tasks) PC-25.02 . 01 PC-25.02 . 02
etc…
Example
Master Deliverables List (MDL)
![Page 15: Reviewing “The Building Blocks” Project Scheduling](https://reader036.vdocument.in/reader036/viewer/2022062308/56649d9e5503460f94a88e8a/html5/thumbnails/15.jpg)
• Who are the “players?”
• What do we use a project schedule for?
• The Project Delivery Information System (PDIS)
• The WSDOT Master Deliverables List (MDL)
• Working with the MDL
WSDOT Project Scheduling
![Page 16: Reviewing “The Building Blocks” Project Scheduling](https://reader036.vdocument.in/reader036/viewer/2022062308/56649d9e5503460f94a88e8a/html5/thumbnails/16.jpg)
Working with the MDL
1. Process of Elimination2. Preferential Re-ordering
– By “family”3. WBS completion –
“sufficiency”– Define tasks (levels 4 – 10)
4. Task Planning5. Network (precedence)
Diagram6. Gantt Chart
![Page 17: Reviewing “The Building Blocks” Project Scheduling](https://reader036.vdocument.in/reader036/viewer/2022062308/56649d9e5503460f94a88e8a/html5/thumbnails/17.jpg)
Master Deliverables List (MDL)
Level 1
Level 2
Level 3
Processes
Level 4
Deliverables
PhasePre-Construction Construction
Tasks (Deliverables in some cases)
Level 5-10Sub-Tasks
![Page 18: Reviewing “The Building Blocks” Project Scheduling](https://reader036.vdocument.in/reader036/viewer/2022062308/56649d9e5503460f94a88e8a/html5/thumbnails/18.jpg)
Type B Report
Task Planning Worksheet
![Page 19: Reviewing “The Building Blocks” Project Scheduling](https://reader036.vdocument.in/reader036/viewer/2022062308/56649d9e5503460f94a88e8a/html5/thumbnails/19.jpg)
PC-25.02.01 Prepare Hydraulic Report Type B for Review
Prepare Hydraulic Report Type B according to the standards prescribed in the Highway Runoff Manual and Storm water Management Policy. Includes verification of existing drainage facilities on project site. When completed, report will be sent to Region Hydraulics Engineer for review and concurrence.
Type B ReportPC-25.02
![Page 20: Reviewing “The Building Blocks” Project Scheduling](https://reader036.vdocument.in/reader036/viewer/2022062308/56649d9e5503460f94a88e8a/html5/thumbnails/20.jpg)
Defining Activities/Tasks
•Definition
•Assignment
•Significance
![Page 21: Reviewing “The Building Blocks” Project Scheduling](https://reader036.vdocument.in/reader036/viewer/2022062308/56649d9e5503460f94a88e8a/html5/thumbnails/21.jpg)
PC-25.02.01 Prepare Hydraulic Report Type B for Review
Prepare Hydraulic Report Type B according to the standards prescribed in the Highway Runoff Manual. Includes verification of existing drainage facilities on project site. When completed, report will be sent to Region Hydraulics Engineer for concurrence.
Type B ReportPC-25.02
![Page 22: Reviewing “The Building Blocks” Project Scheduling](https://reader036.vdocument.in/reader036/viewer/2022062308/56649d9e5503460f94a88e8a/html5/thumbnails/22.jpg)
Estimating Percent Complete
Is key to simplify schedule tracking and used to calculate EVM values for the project.
Methods to calculate percent complete:
• Units Produced
• Milestones (Agreement) Method
• 50 – 50 Convention
• 0 – 100 Convention
• Proportional Relationships (hammock)
Task Planning
![Page 23: Reviewing “The Building Blocks” Project Scheduling](https://reader036.vdocument.in/reader036/viewer/2022062308/56649d9e5503460f94a88e8a/html5/thumbnails/23.jpg)
Units Produced
• Ratio of units completed to the total planned
• Units must be nearly identical
• Examples:
• Drilling 10 holes, 4 completed; 40% complete
• Paving 5 lane miles, paved 4 lane miles; 80% complete
Estimating Percent Complete
Task Planning
![Page 24: Reviewing “The Building Blocks” Project Scheduling](https://reader036.vdocument.in/reader036/viewer/2022062308/56649d9e5503460f94a88e8a/html5/thumbnails/24.jpg)
Milestone (Agreement) Method
• At the onset of the project, agree with the project team members on percent complete of various stages of the process/deliverable. These points can be entered as interim schedule milestones for the deliverable.
• Example:
• Data Collection – 10%
• Draft Traffic Signal Design – 70%
• Final Traffic Signal Design – 90%
• Traffic Signal PS&E – 100%
Estimating Percent Complete
Task Planning
![Page 25: Reviewing “The Building Blocks” Project Scheduling](https://reader036.vdocument.in/reader036/viewer/2022062308/56649d9e5503460f94a88e8a/html5/thumbnails/25.jpg)
50 – 50 Convention
• The 50 – 50 convention is best used when an accurate estimate is nearly impossible and when durations are relatively short (less than the reporting frequency).
• This method is a good method for higher-level EVM and when there are several processes (or deliverables) to be evaluated.
• The more tasks/deliverables evaluated, the more accurate the EVM. 50% complete is assumed when the task/deliverable has started. 100% complete is assumed when the task/deliverable is finished.
Estimating Percent Complete
Task Planning
![Page 26: Reviewing “The Building Blocks” Project Scheduling](https://reader036.vdocument.in/reader036/viewer/2022062308/56649d9e5503460f94a88e8a/html5/thumbnails/26.jpg)
0 – 100 Convention
• The 0 – 100 convention is best used when a task/deliverable has no value unless it is completed and when durations are relatively short (less than the reporting frequency).
• This method is also a good method for higher-level EVM and when there are several processes (or deliverables) to be evaluated.
• 0% complete is assumed until a task/deliverable is complete. 100% complete is assumed when the task/deliverable is finished.
Estimating Percent Complete
Task Planning
![Page 27: Reviewing “The Building Blocks” Project Scheduling](https://reader036.vdocument.in/reader036/viewer/2022062308/56649d9e5503460f94a88e8a/html5/thumbnails/27.jpg)
Proportional Relationship
• This method is used when the completion of a measurable amount of one work package indicates the completion of another task that cannot be easily measured.
• This method works well for the “on-going” or hammock tasks within the project schedule.
• Example:
• 40% of the project is complete, so 40% of the project management task is complete.
Estimating Percent Complete
Task Planning
![Page 28: Reviewing “The Building Blocks” Project Scheduling](https://reader036.vdocument.in/reader036/viewer/2022062308/56649d9e5503460f94a88e8a/html5/thumbnails/28.jpg)
PC-25.02.01 Prepare Hydraulic Report Type B for Review
Prepare Hydraulic Report Type B according to the standards prescribed in the Highway Runoff Manual. Includes verification of existing drainage facilities on project site. When completed, report will be sent to Region Hydraulics Engineer for concurrence.
Type B ReportPC-25.02
X
![Page 29: Reviewing “The Building Blocks” Project Scheduling](https://reader036.vdocument.in/reader036/viewer/2022062308/56649d9e5503460f94a88e8a/html5/thumbnails/29.jpg)
Duration Estimating
Task Planning
Expert Judgment
• Guided by historical information
• “Top-down” estimating
Analogous Estimating
• Using actual durations of a previous, similar schedule activity as basis for estimating duration of future schedule activity.
• Uses expert judgment and historical information
• “Top-down” estimating
![Page 30: Reviewing “The Building Blocks” Project Scheduling](https://reader036.vdocument.in/reader036/viewer/2022062308/56649d9e5503460f94a88e8a/html5/thumbnails/30.jpg)
Duration Estimating
Task Planning
Parametric Estimating
• Quantitatively determined by multiplying quantity of work to be performed by the productivity rate.
• “Bottom-up” estimating
![Page 31: Reviewing “The Building Blocks” Project Scheduling](https://reader036.vdocument.in/reader036/viewer/2022062308/56649d9e5503460f94a88e8a/html5/thumbnails/31.jpg)
Duration Estimating
Task Planning
Three-Point Estimates
• Formerly called Program Evaluation and Review Technique (PERT)
• Incorporates risk factors into estimate
• Three types of estimates:
• Most Likely (ML): Realistic expectations
• Optimistic (O): Best-case scenario
• Pessimistic (P): Worst case scenario
• Typically provides a more accurate duration estimate than single point estimating.
![Page 32: Reviewing “The Building Blocks” Project Scheduling](https://reader036.vdocument.in/reader036/viewer/2022062308/56649d9e5503460f94a88e8a/html5/thumbnails/32.jpg)
Duration Estimating
Task Planning
Three-Point Estimates
Most Likely:
(1 x O) + (4 x ML) + (1 x P)6
Optimistic:
Pessimistic:
3.0 hrs
2.5 hrs
5.5 hrs
Task: Drive home from class (Yakima to Enumclaw ~ 160 miles)
(1 x 2.5) + (4 x 3.0) + (1 x 5.5)6
= 3.33 hrs
![Page 33: Reviewing “The Building Blocks” Project Scheduling](https://reader036.vdocument.in/reader036/viewer/2022062308/56649d9e5503460f94a88e8a/html5/thumbnails/33.jpg)
Duration Estimating
Task Planning
Three-Point Estimates
• Formerly called Program Evaluation and Review Technique (PERT)
• Incorporates risk factors into estimate
• Three types of estimates:
• Most Likely (ML): Realistic expectations
• Optimistic (O): Best-case scenario
• Pessimistic (P): Worst case scenario
• Typically provides a more accurate duration estimate than single point estimating.
![Page 34: Reviewing “The Building Blocks” Project Scheduling](https://reader036.vdocument.in/reader036/viewer/2022062308/56649d9e5503460f94a88e8a/html5/thumbnails/34.jpg)
PC-25.02.01 Prepare Hydraulic Report Type B for Review
Prepare Hydraulic Report Type B according to the standards prescribed in the Highway Runoff Manual. Includes verification of existing drainage facilities on project site. When completed, report will be sent to Region Hydraulics Engineer for concurrence.
Type B ReportPC-25.02
X
20d
![Page 35: Reviewing “The Building Blocks” Project Scheduling](https://reader036.vdocument.in/reader036/viewer/2022062308/56649d9e5503460f94a88e8a/html5/thumbnails/35.jpg)
![Page 36: Reviewing “The Building Blocks” Project Scheduling](https://reader036.vdocument.in/reader036/viewer/2022062308/56649d9e5503460f94a88e8a/html5/thumbnails/36.jpg)
Task Interdependencies Specify Task Relationships
All tasks are Related To:• Other Schedule Activities
– “Mandatory” or “Hard Logic”– “Discretionary” or “Soft
Logic”
• External Events– Dependent Dates– Required Dates Network Diagram
Task Interdependencies
![Page 37: Reviewing “The Building Blocks” Project Scheduling](https://reader036.vdocument.in/reader036/viewer/2022062308/56649d9e5503460f94a88e8a/html5/thumbnails/37.jpg)
Scheduled Activity (task)•A component of work performed to create a deliverable.
Scheduling Terminology
Team Mission
Task 1Task 2(Etc.)
Task 1Task 2(Etc.)
Task 1Task 2(Etc.)
Task 1Task 2(Etc.)
Task 1Task 2(Etc.)
Task 1Task 2(Etc.)
WB
S(S
cope
)A
ctiv
ity L
ist
(Sch
edul
e)
![Page 38: Reviewing “The Building Blocks” Project Scheduling](https://reader036.vdocument.in/reader036/viewer/2022062308/56649d9e5503460f94a88e8a/html5/thumbnails/38.jpg)
PC-24.10 – Roadway Sections FS
PC-18.07.01 – Biological Evaluation FS
TE 2 (Design) Effort 40h None
TT 2 (Design) Effort 80h None
![Page 39: Reviewing “The Building Blocks” Project Scheduling](https://reader036.vdocument.in/reader036/viewer/2022062308/56649d9e5503460f94a88e8a/html5/thumbnails/39.jpg)
Master Deliverables List (MDL)
Level 1
Level 2
Level 3
Processes
Level 4
Deliverables
PhasePre-Construction Construction
Deliverables (in some cases)
Level 5-10Tasks
![Page 40: Reviewing “The Building Blocks” Project Scheduling](https://reader036.vdocument.in/reader036/viewer/2022062308/56649d9e5503460f94a88e8a/html5/thumbnails/40.jpg)
Project TO(Organization Breakdown
Structure - OBS)
$ponsorSr. Mgmt.
ProjectManager
TeamMember
Manager
TeamMember
QS
$R
Plan at Deliverable level
1. What (deliverable, constraints, standards)
2. How Much?3. Duration
Task Planning
![Page 41: Reviewing “The Building Blocks” Project Scheduling](https://reader036.vdocument.in/reader036/viewer/2022062308/56649d9e5503460f94a88e8a/html5/thumbnails/41.jpg)
Executive Order 1032.00
…directs WSDOT employees to deliver capital transportation projects consistent with the principles and practices of the department’s project management process.
Further direction given to:• Executive Managers• Project Managers• Project Team Members• Specialty Groups• HQ Staff
![Page 42: Reviewing “The Building Blocks” Project Scheduling](https://reader036.vdocument.in/reader036/viewer/2022062308/56649d9e5503460f94a88e8a/html5/thumbnails/42.jpg)
Executive Order 1032.00
IV.Executive Order…D. Direction to Specialty Groups
1. Provide the Project Manager with the schedule and estimate for the tasks assigned.…
![Page 43: Reviewing “The Building Blocks” Project Scheduling](https://reader036.vdocument.in/reader036/viewer/2022062308/56649d9e5503460f94a88e8a/html5/thumbnails/43.jpg)
Project TO(Organization Breakdown
Structure - OBS)
$ponsorSr. Mgmt.
ProjectManager
TeamMember
Manager
TeamMember
QS
$R
Plan at Deliverable level
1. What (deliverable, constraints, standards)
2. How Much?3. Duration
Task Planning
![Page 44: Reviewing “The Building Blocks” Project Scheduling](https://reader036.vdocument.in/reader036/viewer/2022062308/56649d9e5503460f94a88e8a/html5/thumbnails/44.jpg)
Working with the MDL
1. Process of Elimination2. Preferential Re-ordering
– By “family”3. WBS completion –
“sufficiency”– Define tasks (levels 5 – 10)
4. Task Planning5. Network (precedence)
Diagram6. Gantt Chart (From PDIS)
![Page 45: Reviewing “The Building Blocks” Project Scheduling](https://reader036.vdocument.in/reader036/viewer/2022062308/56649d9e5503460f94a88e8a/html5/thumbnails/45.jpg)
Activity AWBS Code Activity
Early Start (ES)
Early Finish (EF)
Late Start (LS)
Late Finish (LF)
Duration
Total Float (TF) =
7
Activity BWBS Code Activity
Early Start (ES)
Early Finish (EF)
Late Start (LS)
Late Finish (LF)
Duration
Total Float (TF) =
5
Activity CWBS Code Activity
Early Start (ES)
Early Finish (EF)
Late Start (LS)
Late Finish (LF)
Duration
Total Float (TF) =
2
Activity DWBS Code Activity
Early Start (ES)
Early Finish (EF)
Late Start (LS)
Late Finish (LF)
Duration
Total Float (TF) =
3
Activity EWBS Code Activity
Early Start (ES)
Early Finish (EF)
Late Start (LS)
Late Finish (LF)
Duration
Total Float (TF) =
3
Simple Project consisting of 5 Tasks
![Page 46: Reviewing “The Building Blocks” Project Scheduling](https://reader036.vdocument.in/reader036/viewer/2022062308/56649d9e5503460f94a88e8a/html5/thumbnails/46.jpg)
Working with the MDL
1. Process of Elimination2. Preferential Re-ordering
– By “family”3. WBS completion –
“sufficiency”– Define tasks (levels 5 – 10)
4. Task Planning5. Network (precedence)
Diagram6. Gantt Chart (From PDIS)
![Page 47: Reviewing “The Building Blocks” Project Scheduling](https://reader036.vdocument.in/reader036/viewer/2022062308/56649d9e5503460f94a88e8a/html5/thumbnails/47.jpg)
![Page 48: Reviewing “The Building Blocks” Project Scheduling](https://reader036.vdocument.in/reader036/viewer/2022062308/56649d9e5503460f94a88e8a/html5/thumbnails/48.jpg)
Project Performance Baseline
Work Breakdown Structure
(WBS)
RiskPlanning
BudgetTask
Planning & Scheduling
“Progressive Elaboration”