RHM - ADAMS MISSION CHURCH BUILDING PROJECT
AFM Folweni Manase Branch
![Page 3: RHM - ADAMS MISSION CHURCH BUILDING PROJECT](https://reader035.vdocument.in/reader035/viewer/2022070406/56814294550346895daec1a4/html5/thumbnails/3.jpg)
Phase I Erecting the steel structure with roof and isolated ceiling.
![Page 4: RHM - ADAMS MISSION CHURCH BUILDING PROJECT](https://reader035.vdocument.in/reader035/viewer/2022070406/56814294550346895daec1a4/html5/thumbnails/4.jpg)
The vacant site in Manase (Adams Mission)
![Page 5: RHM - ADAMS MISSION CHURCH BUILDING PROJECT](https://reader035.vdocument.in/reader035/viewer/2022070406/56814294550346895daec1a4/html5/thumbnails/5.jpg)
The Team from Gauteng arrivesThe off loading begins
![Page 6: RHM - ADAMS MISSION CHURCH BUILDING PROJECT](https://reader035.vdocument.in/reader035/viewer/2022070406/56814294550346895daec1a4/html5/thumbnails/6.jpg)
Like puzzle pieces... The components of the structure is laid out
![Page 7: RHM - ADAMS MISSION CHURCH BUILDING PROJECT](https://reader035.vdocument.in/reader035/viewer/2022070406/56814294550346895daec1a4/html5/thumbnails/7.jpg)
The first sections are made to stand
![Page 8: RHM - ADAMS MISSION CHURCH BUILDING PROJECT](https://reader035.vdocument.in/reader035/viewer/2022070406/56814294550346895daec1a4/html5/thumbnails/8.jpg)
Making great progress. The roof about 80% completed!
![Page 9: RHM - ADAMS MISSION CHURCH BUILDING PROJECT](https://reader035.vdocument.in/reader035/viewer/2022070406/56814294550346895daec1a4/html5/thumbnails/9.jpg)
Now for the last finishing touches
![Page 10: RHM - ADAMS MISSION CHURCH BUILDING PROJECT](https://reader035.vdocument.in/reader035/viewer/2022070406/56814294550346895daec1a4/html5/thumbnails/10.jpg)
The view from inside
![Page 11: RHM - ADAMS MISSION CHURCH BUILDING PROJECT](https://reader035.vdocument.in/reader035/viewer/2022070406/56814294550346895daec1a4/html5/thumbnails/11.jpg)
Phase II
Adding the side pannels (shade netting) During the next two weeks we will be preparing the
temporary side pannels made of sheet netting. These pannels will be added on all sides of the structure and will basically work like window blinds.
![Page 12: RHM - ADAMS MISSION CHURCH BUILDING PROJECT](https://reader035.vdocument.in/reader035/viewer/2022070406/56814294550346895daec1a4/html5/thumbnails/12.jpg)
Phase III
Floor slab
The local church will start raising funds to pour the floor slab. In the meanwhile the ground will just be levelled completely and compacted. This will allow them to use the church even without the cement floor being in place.
![Page 13: RHM - ADAMS MISSION CHURCH BUILDING PROJECT](https://reader035.vdocument.in/reader035/viewer/2022070406/56814294550346895daec1a4/html5/thumbnails/13.jpg)
Phase IVBuilding the permanent outer walls. The last phase will
be the building of permanent outer walls. Funds will be raised to buy building blocks for this purpose