Download - Risk asessment

Transcript
Page 1: Risk asessment

Hazard People who may be harmed.

Property which may be damaged.

Risk controls already in place.

Risk Assessment, Low, Moderate, High, Extreme.

Further action required to control risk.

Trip on wires.

Model, photographer.

The QE lighting, wires.

Keeping wires organized and away from footing.

Low risk Check for risks beforehand and if there is any remove them.

Trip on stairs.

Model, photographer

N/A Hand Rail. Low Risk Check for risks beforehand and if there is any remove them.

Hit head on lighting

Model, photographer

Lighting, QE property.

Keeping lighting away from head height, and away from hazards.

Low Risk Check for risks beforehand and if there is any remove them.

Top Related