Transcript
Page 1: RTROFITImprovements aking Homes/media/Files/... · • Roof sheathing replacement • Soffit replacement • Residing Illustrations Retrofit Option 1: Hurricane clip connecting the

RETROFIT Improvements MakingHomesSafer inDisasters

Hazards

Februar y 2012 Working Draf t w w w.toolbase.org

Purpose•Tocreateacontinuousload-pathfromtherooftothewall

•Toresistupliftforcesfromwind•Toresistlateralforcesfromwindandearthquakes

Benefits•Strengthensconnectionsinwindandseismicevents

Retrofit Opportunity•Roofsheathingreplacement•Soffitreplacement•Residing

IllustrationsRetrofitOption 1:Hurricane clip connecting the truss or rafter to top plates.

SummaryInmanyhomesbuiltbefore1990,rooftrussesorrafterswerefastenedtothewallwithtwoframingnailsangledintotherafterandwallplateinwhatisknownasatoe-nailedconnection.Theconnectionisinadequatetoresisttheforceofhighwindpushingupontheoverhangandsoffit(whichcanactlikeasailtocatchwind).Inhurricaneandgalewindconditions,roofstructuralsupportshavebeenpriedawayfromthewallbytheforceofwind.Installingastrongermechanicalconnectionbetweentheroofframingmembersandthewallwillincreasethecapabilityoftheroofstructuretowithstandtheupliftforcesfromhurricanewindsandlateralforcesfromearthquakes.Steelhardware,suchasisoftenseenonoutdoordecks,canprovidethesecureconnectionrequiredbetweenroofandwallframing.Tiedownhardware,alsoknownashurricaneclips,canbeinstalledforunder$10.Ahousesized40’x30’requiresapproximately42pieces,soprovidingaddedassurancewithtiedownhardwarewouldcostbetween$200and$400.Thiscost,however,assumesdirectandsimpleaccesstothewallandroofframing,whichisnotoftenthecaseinacompletedhouse.But,retrofittingrooftiedownhardwarebecomescosteffectivewhenincludedinthescopeofotherremodelingworksuchasresiding,replacingsoffitandfascia,orreplacingroofsheathingattheoverhang.Consultyourcontractorfortheinclusionofthisandothersafetydetailsthatwilladdvalueandpeaceofmindtoyourplannedhomeimprovementprojects.

Roof-to-Wall AttachmentFloodWind Rain Seismic SnowFire

Option 2:Tie strap connecting the truss or rafter to the wall stud and top plates.

Page 2: RTROFITImprovements aking Homes/media/Files/... · • Roof sheathing replacement • Soffit replacement • Residing Illustrations Retrofit Option 1: Hurricane clip connecting the

Februar y 2012 Working Draf t w w w.toolbase.org

Potential Damage

Key Steps •Planthisretrofitasapartofalargerhomeimprovementprojecttomaximizecostefficiency,asaccesstothewallandroofframingintersection(frominsideoroutside)isnecessary.

• Inspecttheframingtoensureacontinuousloadpath.• Inspectforexistingtie-downhardwareanddetermineadditionalhardwarerequirements.• Installtie-downhardwarebeforeproceedingwithlargerproject.Hardwareinstallationwillrequireabouttwohours,soitshouldn’tmateriallyaffectthepaceoftheoverallproject.

•Yourcontractormayhaveadditionalideasonhowtoimprovethesafetyofyourhome.•Formoredetailsaboutthisretrofitimprovement,pleaserefertothelistofResourcesinthesectionbelow.

ResourcesFEMA,Home Builder’s Guide to Coastal Constructionhttp://www.fema.gov/library/viewRecord.do?id=2138

Photo:www.fema.gov


Top Related