![Page 1: Runway 10/28 – Open Phase 1 QRunway 18/36 – Open 25 ... 10 Presentation-rev3.0.pdf · W/IN RUNWAY 18/36 RSA [NIGHT WORK 90 MIN.PPR NOTAM] RUNWAY 10-28 CLOSED RESURFACING 5,000’,](https://reader033.vdocument.in/reader033/viewer/2022050606/5fad802d4088c47ce354cd94/html5/thumbnails/1.jpg)
Phase 125 Calendar Days
8/5 – 8/30/17
CONTRACTOR ACCESS ROUTE
CONTRACTOR STORAGE AREA
MATERIAL STOCKPILE
PERIMETER ROADGRADING & FENCE
RELOCATION
BORROW/FILL AREA 20’HEIGHT
GRADE OBSERVATION PARK
CONTRACTORS DOUBLE-GATE ACCESS
RUNWAY 10/28CONDUIT\CANS[NIGHT WORK
90 MIN. PPR NOTAM]
Q Runway 10/28 – OpenQ Runway 10/28 Lights - AvailableQ Runway 18/36 – OpenQ Runway 28 ILS – AvailableQ Runway 10 VASI – AvailableQ Runway 10 GPS Approach - Available
RUNWAY 18/36 SIGNAGE[NIGHT WORK
30 MIN. PPR NOTAM]
![Page 2: Runway 10/28 – Open Phase 1 QRunway 18/36 – Open 25 ... 10 Presentation-rev3.0.pdf · W/IN RUNWAY 18/36 RSA [NIGHT WORK 90 MIN.PPR NOTAM] RUNWAY 10-28 CLOSED RESURFACING 5,000’,](https://reader033.vdocument.in/reader033/viewer/2022050606/5fad802d4088c47ce354cd94/html5/thumbnails/2.jpg)
Phase 26 Calendar Days
8/26-9/1/17
CONSTRUCT PORTION OF TAXIWAY D
CLOSE RUNWAY 18-36
INSTALL SILT FENCE &GRADE PERIMETER ROAD
Q Runway 10/28 – OpenQ Runway 10/28 Lights - AvailableQ Runway 18/36 – CLOSEDQ Runway 28 ILS – AvailableQ Runway 10 VASI – AvailableQ Runway 10 GPS Approach – Available
NON-MOVEMENT LINE
PPR – TOWED AIRCRAFT ACCESS
![Page 3: Runway 10/28 – Open Phase 1 QRunway 18/36 – Open 25 ... 10 Presentation-rev3.0.pdf · W/IN RUNWAY 18/36 RSA [NIGHT WORK 90 MIN.PPR NOTAM] RUNWAY 10-28 CLOSED RESURFACING 5,000’,](https://reader033.vdocument.in/reader033/viewer/2022050606/5fad802d4088c47ce354cd94/html5/thumbnails/3.jpg)
Phase 310 Calendar Days
9/4-9/14/17
RUNWAY 10-28TEMPORARY THRESHOLD MARKING
AND LIGHTS(6,008’ X 150’)
CONSTRUCT BLAST PAD,MALSR THRESHOLD AND
FOUNDATIONS, RSAGRADING
EXTEND TAXIWAY G
EXTEND TAXIWAY D
VASIs OTS
Q Runway 10/28 – OPEN 6008’Q Runway 10/28 Lights - AvailableQ Runway 18/36 – OpenQ Runway 28 ILS – EST. OTS 9/6Q Runway 10 VASI – OTSQ Runway 10 GPS Approach – OTSQ Runway 10 Circling - Available
![Page 4: Runway 10/28 – Open Phase 1 QRunway 18/36 – Open 25 ... 10 Presentation-rev3.0.pdf · W/IN RUNWAY 18/36 RSA [NIGHT WORK 90 MIN.PPR NOTAM] RUNWAY 10-28 CLOSED RESURFACING 5,000’,](https://reader033.vdocument.in/reader033/viewer/2022050606/5fad802d4088c47ce354cd94/html5/thumbnails/4.jpg)
RUNWAY 18-36CLOSED 2300-0600 HOURS
INSTALL PAPIFOUNDATIONS
(OUTSIDE RWY 18/36 RSA)
TAXIWAY C CLOSED
DAYTIME BACK TAXI ONRUNWAY 18/36
CONSTRUCT PAVED SHOULDERSW/IN RUNWAY 18/36 RSA
[NIGHT WORK90 MIN.PPR NOTAM]
RUNWAY 10-28CLOSED
RESURFACING 5,000’,RECONSTRUCTION OF 800’
PAVEMENT,NEW DISTANCE REMAINING SIGNS,
NEW EDGE LIGHTING SYSTEM
Phase 41.5 Calendar Days
9/15-9/16/17
Q Runway 10/28 – CLOSEDQ Runway 10/28 Lights - OTSQ Runway 18/36 – Open DaytimeQ Runway 28 ILS – OTSQ Runway 10 VASI – OTSQ Runway 10 GPS Approach – OTSQ Runway 10 Circling - OTS
![Page 5: Runway 10/28 – Open Phase 1 QRunway 18/36 – Open 25 ... 10 Presentation-rev3.0.pdf · W/IN RUNWAY 18/36 RSA [NIGHT WORK 90 MIN.PPR NOTAM] RUNWAY 10-28 CLOSED RESURFACING 5,000’,](https://reader033.vdocument.in/reader033/viewer/2022050606/5fad802d4088c47ce354cd94/html5/thumbnails/5.jpg)
INSTALL PAPI[NIGHT WORK]
RUNWAY 18-36CLOSED 2300-0600 HOURS
EST. 2 NIGHTS
CONSTRUCT PAVED SHOULDERSWITHIN RSA OF BOTH RUNWAYS
[NIGHT WORK]
CONSTRUCT 115’ EXTENSIONRUNWAY 10-28
RESURFACING 5,000’,RECONSTRUCTION OF 800’
PAVEMENT, RESURFACE SHOULDERS,NEW DISTANCE REMAINING SIGNS,
NEW EDGE LIGHTING SYSTEM,TEMPORARY MARKINGS
Phase 514 Calendar Days
9/15-9/29/17
Q Runway 10/28 – CLOSEDQ Runway 10/28 Lights - OTSQ Runway 18/36 – OpenQ Runway 28 ILS – OTSQ Runway 10 VASI – OTSQ Runway 10 GPS Approach – OTSQ Runway 10 Circling - OTS
![Page 6: Runway 10/28 – Open Phase 1 QRunway 18/36 – Open 25 ... 10 Presentation-rev3.0.pdf · W/IN RUNWAY 18/36 RSA [NIGHT WORK 90 MIN.PPR NOTAM] RUNWAY 10-28 CLOSED RESURFACING 5,000’,](https://reader033.vdocument.in/reader033/viewer/2022050606/5fad802d4088c47ce354cd94/html5/thumbnails/6.jpg)
PAVEMENT CURING(~20 Days After Paving)
9/27-10/17/17
RUNWAY 10-28NO RUNWAY GROOVING ORPOROUS FRICTION COURSE
Q Runway 10/28 – OpenQ Runway 10/28 Lights - AvailableQ Runway 18/36 – OpenQ Runway 28 ILS – AvailableQ Runway 10 PAPI – AvailableQ Runway 10 GPS Approach – OTSQ Runway 10 Circling - Available
ILS FLIGHT CHECKEST. 9/29/17
PAPI FLIGHT CHECKEST. 9/29/17
![Page 7: Runway 10/28 – Open Phase 1 QRunway 18/36 – Open 25 ... 10 Presentation-rev3.0.pdf · W/IN RUNWAY 18/36 RSA [NIGHT WORK 90 MIN.PPR NOTAM] RUNWAY 10-28 CLOSED RESURFACING 5,000’,](https://reader033.vdocument.in/reader033/viewer/2022050606/5fad802d4088c47ce354cd94/html5/thumbnails/7.jpg)
Phase 616 Calendar Days
(~20 Days After Paving)10/17-11/2/17
GROOVE & PAINT RUNWAY 10-28(~20 DAYS AFTER PAVING)
RUNWAY 10-28CLOSED 2300-0600 HOURS
90 MINUTE PPR
Q Runway 10/28 – DAYTIMEQ Runway 10/28 Lights - AvailableQ Runway 18/36 – OpenQ Runway 28 ILS – AvailableQ Runway 10 PAPI – AvailableQ Runway 10 GPS Approach – OTSQ Runway 10 Circling - Available
![Page 8: Runway 10/28 – Open Phase 1 QRunway 18/36 – Open 25 ... 10 Presentation-rev3.0.pdf · W/IN RUNWAY 18/36 RSA [NIGHT WORK 90 MIN.PPR NOTAM] RUNWAY 10-28 CLOSED RESURFACING 5,000’,](https://reader033.vdocument.in/reader033/viewer/2022050606/5fad802d4088c47ce354cd94/html5/thumbnails/8.jpg)
Phase 710 Calendar Days
9/13-9/23/17
REMOVE TEMPORARY FENCE ANDCOMPLETE PERIMETER ROAD WORK
Q Runway 10/28 – OpenQ Runway 10/28 Lights - AvailableQ Runway 18/36 – OpenQ Runway 28 ILS – AvailableQ Runway 10 PAPI – AvailableQ Runway 10 GPS Approach – OTSQ Runway 10 Circling - Available
![Page 9: Runway 10/28 – Open Phase 1 QRunway 18/36 – Open 25 ... 10 Presentation-rev3.0.pdf · W/IN RUNWAY 18/36 RSA [NIGHT WORK 90 MIN.PPR NOTAM] RUNWAY 10-28 CLOSED RESURFACING 5,000’,](https://reader033.vdocument.in/reader033/viewer/2022050606/5fad802d4088c47ce354cd94/html5/thumbnails/9.jpg)
Phase 821 Calendar Days
9/29-10/20/17
CONSTRUCT MALSR SYSTEM ANDSERVICE ROAD
CONSTRUCT PRIVACY FENCE
Q Runway 10/28 – OpenQ Runway 10/28 Lights - AvailableQ Runway 18/36 – OpenQ Runway 28 ILS – AvailableQ Runway 10 PAPI – AvailableQ Runway 10 GPS Approach – OTSQ Runway 10 Circling - Available
![Page 10: Runway 10/28 – Open Phase 1 QRunway 18/36 – Open 25 ... 10 Presentation-rev3.0.pdf · W/IN RUNWAY 18/36 RSA [NIGHT WORK 90 MIN.PPR NOTAM] RUNWAY 10-28 CLOSED RESURFACING 5,000’,](https://reader033.vdocument.in/reader033/viewer/2022050606/5fad802d4088c47ce354cd94/html5/thumbnails/10.jpg)
POST CONSTRUCTIONQ Approach Published
(1 Mi.+ Minimums)Dec 2017
Q MALSR OperationalEarly 2018 – Pending Tree
ClearingQ Approach Amendment
(3/4 Mi. Minimums)March 2018
Q Runway 10/28 – OpenQ Runway 10/28 Lights - AvailableQ Runway 18/36 – OpenQ Runway 28 ILS – AvailableQ Runway 10 PAPI – AvailableQ Runway 10 GPS Approach – OTS
until Dec 2017Q Runway 10 Circling - Available