Transcript
Page 1: S1 02 SECOND FLR FRAMING PLAN - Christenson Corporation · 2016. 3. 2. · block solid within floor framing below posts. all beams to bear on walls below unless otherwise noted. carefully

THIS DRAWING IS ONLY A SCHEMATIC

DIAGRAM OF THE

FRAMING. MANY FRAMING MEMBERS

ARE NOT SHOWN. SOME

EXAMPLES ARE AS FOLLOWS: (NOT

ALL INCLUSIVE EXAMPLE

LIST)

SOME RIM JOSTS ARE SHOWN BUT NOT

ALL.

CURVED AREAS DO NOT SHOW ALL

BLOCKING OR FRAMING

REQUIRED.

MOST BLOCKING AND BRIDGING IS

NOT SHOWN

THE TERMINATION AND EXACT LENGTH

OF EACH MEMBER

MUST BE VERIFIED WITH SPECIFIC

CONDITIONS IN THE

FIELD.

BLOCKING AND OR ADDITIONAL FLOOR

JOISTS FOR FIRST

FLOOR WALL SUPPORT ARE NOT

SHOWN.

ALL WORK TO COMPLY STRICTLY WITH

I-JOIST MANUFACTURES

RECOMMENDATIONS

COORDINATE PLACEMENT OF FLOOR

JOISTS THAT ARE NEAR THE

RIM JOIST AREA WITH THE

INSTALLATION OF INSULATION.

BLOCK SOLID WITHIN FLOOR FRAMING

BELOW POSTS.

ALL BEAMS TO BEAR ON WALLS BELOW

UNLESS OTHERWISE

NOTED.

CAREFULLY INSTALL I-JOISTS

TIGHTLY TO CONCRETE BLOCK

WALLS WHERE CONCRETE BLOCK RISES

ABOVE FLOOR JOISTS.

COMPLETELY GLUE ENDS OF ALL

JOISTS AT THIS ABBUTTMENT.

(LATERAL EARTH LOADS ARE

TRANSFERRED THROUGH THE FLOOR

JOISTS AND PLYWOOD SHEATHING)

GENERAL NOTES

1.

A

B

C

D

2.

E

3

4.

5.

6.

KEY

DENOTES GRIDLINE

GRIDLINES ARE CRITICAL)

(DIMENSIONS FROM THESE

RAFTERS

JOISTS AND

AND GIRDERS

FLUSH WD BEAMS

UNDER FRAMING

WOOD BEAMS

STEEL BEAMS

PLANS

NOT CALLED OUT ON THE FRAMING

CONCENTRATED LOADS AND ARE

ADDITIONAL STUDS ARE REQ.’D FOR

NOTE

JOIST HANGER SYMBOL

DWLD. TO FTG.

COUPLER. 2 - #4 VERT. REBAR

& THRD. ROD EXTENSION w/

USP PHD5 w/ 5/8" x 16" A. BOLT

INDICATES POST OR BEAM HOLDOWNS

*

POST/COLUMN SYMBOL

BEARING PLATE SYMBOL

#

INDICATES VERTICAL REBAR

WALL BELOW

TO FLOOR FRAMING OR

STRAPS AT WALL CORNERS

INDICATES 4 - USP MSTA24

Plan

Framing

Floor

Second

S 1.2

1Second Floor Framing Plan

" = 1’-0"41SCALE: s_fp200, a_fp100, r_fpgrid, r_fpsect

N

E

S

W

E

AT 2

Copyright Architects2TEA

E

2724 West 43rd St

Mpls. MN 55410

612 . 929 . 2800

Fax . 929 . 2820

Architects

Sheet Title

Drawing Title

Project Name

Printing D

ate:

7/31/2013

8:5

4:1

0 P

MPenta

ble:

99_

master co

mbo p

en.tbl

Sheet

Location:

T:\

00proj\

A_E\C

hriste

nson\0__

CA

D\IN

-P

RO

CESS\0_S

HEET\S1_02_SE

CO

ND F

LR F

RA

MIN

G P

LA

N.d

gn

$U

SE

RN

AM

E$

Printe

d B

y:

ChristensonResidence

4925 Thomas Ave So

Minneapolis, MN

55410

BID SET 07. 31. 13

5"

LV

L R

AFTE

R RIM

24"

LV

L

2 - 2

4"

LV

L H

EA

DE

R

POST

W 6 x 2

0

4 - 2x6

POST

2 - 14" LVL

NO

TC

H 1

4"

LV

L’s O

VE

R T

OP

POST

POST

2 - 2

4"

LV

L - F

LU

SH

POST

POST

ABO

VE

POST

ABO

VE

POST

ABO

VE

POST

ABO

VE

NOTES:

PSL PO

ST

"41

" x 5

415

@ 1

9.2 O.C.

w/ H

AN

GE

RS

24"

FLO

OR T

RU

SSES

PSL POST "4

1

" x 5

415

"4

1"

TO 9

87

11

TA

PE

R F

RO

M

CONTIN. 2 - 24" LVL RIM

2 - 2x10

2 - 24" LVL

GIRDER TRUSS

w/ HD 17112 HANGERS

14" LVL @ 19.2" O.C.

GIRDER TRUSS

GIRDER TRUSS

2 - 24" LVL RIM

3 - 2

4"

LV

L

" LVL RAFTER RIM417

FLUSH

BOTTOM

W12 x 22 -

CO

NT.

24" FLOOR TRUSSES @ 19.2" O.C. w/ HANGERS

24" FLOOR TRUSSES @ 19.2" O.C. w/ HANGERS

4 - 2x6

2 - 2

x8

GIR

DE

R O

R 2 - 2

4"

LV

L

POST2

- 2x4

AR

CHIT

EC

TU

RA

L G

RA

DE (24F - V

4)

" G

LU

LA

M - D

RO

PPE

D

21

" x 2

2

43

6

2 - 24" LVL RIM

LV

L’s

UPT

UR

NE

D

GIRDER TRUSS

2- 2

4"

LV

L

POST

2- 24" LVL RIM CANTILEVERED

" LV

L8

72 - 1

1

" LV

L8

72 - 1

1

" LV

L8

72 - 1

1

" LV

L8

72 - 1

1

TO

P F

LU

SH w/ H

D17112 H

AN

GE

RS

" LV

L

@ 1

9.2 O.C. -

87

11

TO

P F

LU

SH w/ H

D17112 H

AN

GE

RS

" LV

L

@ 1

9.2 O.C. -

87

11

" LV

L8

72 - 1

1

TO

P F

LU

SH w/ H

D17112 H

AN

GE

RS

" LV

L

@ 1

9.2 O.C. -

87

11

POST

ABO

VE

PSL PO

ST

"41

" x 5

415

16"

O.C.

w/ H

AN

GE

RS

2x8 - T

OP F

LU

SH

WDW

DOOR

" LVL

21

2- 5

POST

" LVL

21

2- 5

3- 2x4

POST

ABO

VE

ABO

VEPOST

PSL PO

ST

"41

" x 5

415

" LV

L T

OP-FLU

SH B

LO

CKS

41

2- 7

" LV

L H

EA

DE

R8

72- 1

1

1.

AT POSTS ABOVE.

BLOCK IN FLOOR TRUSS CAVITY

w/ 8d NAILS @ 4" O.C.

" PLYWOOD2

1ALL EXTERIOR WALLS MIN. 2.

3.

HANGERS

HD412

PLATES

AT BEAM TO WALL

2 - USP RT7A TIES

HANGERS

HD412

CONT.

CO

NT.

CO

NT.

CO

NT.

CO

NT. CONT.

SPACE

MECH. CHASE

MAINTAIN

w/ 6 - 16d NAILS BOTH ENDS AT LAPS.

CONT. 2 - 2x6 WALL TOP PLATE

TRUSSES TO BLOCKS @CHIMNEY.

-GLUE & NAIL SUBFLOOR &

FIRST 3 TRUSS SPACES.

FULL HEIGHT BLOCKS IN

350 PLF S.L.

250 PLF D.L.

ABOVE

BRG. WALL

HEIGHT POSTS -SEE DETAIL

CROSS BLOCKING TO FULL

" LVL87

2- 2x6 POSTS w/3- 11

TO CLG. BLOCKING

ATTACH POSTS

FLANGE TO POST

" x 6" LAGS @BTM.2

12-

FLANGE TO POST

" x 6" LAGS @BTM.2

12-

TO-WALL PLATES

TIES AT BEAM-

2 - USP RT7A

TO-WALL PLATES

TIES AT BEAM-

2 - USP RT7A

TOP & BOTTOM

w/ 2- USP MP3 CLIPS

FULL HGT. @STAIR

" x 7" PSL2

12- 3

CHASE SPACE

MAINTAIN MECH.

USP-PBS66

1-SIDED PLATE

UNDER 2x8 FRAMING

MECH CHASE

BELOW STRUCTURE

MECH. CHASE

ON BAY

CENTERED

JOIST SPACE

TOP OF STEEL

12" THICKNESS OVER

CANT. TRUSSES @

POST

ABO

VE

POST

" PS

L

21

" x 9

415

POST

" PS

L

21

" x 9

415 PO

ST

" PS

L

21

" x 9

415

*SEE SOUTH ELEV. FOR ADD’L STRUCT. DETAILS

SW2 BELOW SW2 BELOWSW2 BELOW

" LV

L

215

" x

43

1- 1" LV

L

215

" x43

1- 1

USP HD416IF HGR.

*

*

POST TO BEAM

STRAPS EACH AT

2- USP LFTA6

SW

TOP & BOTTOM w/ 8-16d NAILS PER FT.

USP PHD5 HOLDOWN. ATTACH WALL PLATES

BELOW w/ 4 - USP MSTA24 STRAPS EACH OR

O.C. ATTACH END POSTS TO FRAMING

PLYWOOD BOTH FACES w/ 8d NAILS @ 4"

" 2

1ALL INTERIOR SHEAR WALLS MIN.

SW

2

GIR

DE

R T

RU

SS

GIR

DE

R T

RU

SS

CHORDS = 7400 LBS.

GIRDER AT TOP & BTM.

AXIAL WIND LOAD ON

*

*

*

*

THD610

USP

UP TRUSSES

RUN PLYWD

GIR

DE

R T

RU

SS - A

LIG

N w/ F

AC

E O

F W

ALL

CO

NT.

" LVL’s - TOP FLUSH873 - 11

THD610

USP

*

SW

2

FA

CE O

F W

ALL

-A

LIG

N W

ITH

" LV

L8

73- 1

1

WELDED WEB STIFFS, BOTH FACES

" FULL HEIGHT16

3-PROVIDE

WELDED TO BEAM

" TOP PL. BOLTED OR2

1w/

" COLUMN83HSS 3 x 3 x

-BEAR 2- 24" LVL 2" ONTO TOP PL.

-BEAR 3- 24" LVL 6" ONTO TOP PL.

" x 6" LAGS21w/ 4-

LAG-BOLTED TO BEAM BOTTOMS

" x 8" WELDED TOP PL.41w/ 1" x 5

" COLUMN83HSS 3 x 3 x

CANTED

2x8 RAFTERS @ 24"

OR EQUAL

HANGER

USP HD412

FRAMING IN NON-DUCT AREAS

RUN PLYWOOD ONTO FLOOR

*

SW

2

SW2

SW

2

*

*

SW

2

HD48 HGR.

3 - 2

x6

POST3

- 2x6

POST

BRG. WALL ABOVE

24" FLOOR TRUSSES @ 19.2" O.C. w/ HANGERS

RECESSED CANS

DIM’S FOR

4800 lbs S.L.

2400 lbs D.L.

*

SW

2ABOVE

FLOOR

BALCONY

LINE OF

2 - 2

x8 T

OP-FLU

SH

POST ABOVE

GIRDER TRUSS

GIRDER TRUSS

GIRDER TRUSS

GIRDER TRUSS

POST ABOVE 500# D.L. +1000# L.L.

POST ABOVE 500# D.L. +1000# L.L.

400# L.L.

200# D.L.

POST ABOVE

800# L.L.

400# D.L.

POSTS ABOVE

POST ABOVE 2400# D.L. 4800# L.L.

BRG WALLS ABOVE 180 PLF D.L. 210 PLF L.L.

POST ABOVE 200# D.L. + 400# L.L.

STRAPS ACROSS TRUSSES

3- USP LSTA24 HORIZ.

(2 - LOCATIONS)

BLOCKS AND SOLID CMU

AT CHIMNEY TO

HORIZ. STRAPS

2 -SIMPSON MSTAM36

GIRDER TRUSS

GIRDER TRUSS

400 PLF S.L.

300 PLF D.L.

ABOVE

BRG. WALL

4- 2

x6

SW

2

2- MP9 CLIPS

BRG. WALL 260 PLF D.L. + 320 PLF S.L.

CENTER ON WEST WDW GROUP

2- MP9 CLIPS

POST. PLACE CAP AT INSIDE FACE OF BEAM.

2- USP MP3 CLIPS AT UNDERSIDE OF BEAM TO

" LVL PSL POST w/ USP PBES44 CAP + 87" x 112

13

CO

NT.

##

# #

OUTSIDE FACE OF WALL ABOVE

" LVL8711

" LVL8711

2x10 L

ED

GE

R

5"

LV

L R

AFTE

R RIM

" LVL RAFTER RIM417

" LVL RAFTER RIM417

" LVL RAFTER RIM417 " LVL RAFTER RIM4

17

" LV

L R

AFTE

R RIM

41

7

" LV

L R

AFTE

R RIM

41

7

2x12 @24" O.C.

2x6’s SISTERED

-VFY. CLEARANCES

FIREPLACE FLUE

-SEE DET. 2/A4.5

ROOF @ 16" O.C.

2x6 EAVE FRAMING AT LOW

-SEE DET. 2/A4.5

ROOF @ 16" O.C.

2x6 EAVE FRAMING AT LOW

2200# L.L.

1000# D.L.+

POST ABOVE

CO

NT.

CO

NT.

CO

NT.

CO

NT.

#

USP HD414IF HGR.

4- 2

x6

AT LVL & MP5 CLIPS AT PLATES.

1- 14" LVL, USP MP9 CLIPS TO POSTS

1- 2x6 PLATE TOP & BOTTOM w/

BETWEEN UPPER & LOWER WDWS:

PSL POST

" 41

" x 9

215

+ 1600# S.L.

1200# D.L.

POST A

BOVE

+ 1600# S.L.

1200# D.L.

POST A

BOVE

w/ 2 - USP MP3 CLIPS EA.

ATTACH TO WALL PLATE

GLUE & NAIL SUBFLOOR.

THIS ENTIRE SIDE WALL.

FIRST 2 SPACES AT 4’-0" O.C.

FULL HEIGHT BLOCKS IN

CLIPS EA. (TYPICAL)

ATTACH w/ 2 -USP MP5

TAILS & BEAR ON PLATES.

BIRDSMOUTH CUT RAFTER

E

D

C

B

AA

B

C

D

D

1

1 2

2

3

3

4

4

5

5

6

6

7

7

77’-4"

POINT

WORKING

A4.1

1

A2.3

1

A2.2

1

A2.1

2

A3.1

1

A3.2

1

A2.1

1

A3.1

1

A3.2

1

A3.3

1

bs_e100 bs_e500

bs_s100bs_s100

bs_n100 bs_n100

4’-0"21’-0""8711’-1"8

111’-1024’-4"5’-0"

8’-0"

8’-0"

"8

74’-5

"8

19’-6

30’-0"

A3.3

2

bs_e500

A3.1

1

A3.2

1

bs_s100

bs_n100

A4.1

1

A3.3

1

bs_e100 bs_e500

A3.1

1

A3.2

1

bs_s100

bs_n100

A3.3

2

bs_e500

A4.2

3

A4.2

1

A4.2

4

Q

bs_e500

A3.3

1

bs_e550

A4.3

4

A4.2

1

B

L

A

A

A

A

P1 P2

C

B

L

L

M

BMM

N

B

L

L

5 F

T. A

LLO

WA

BLE B

AY W

DW. P

ROJ.

3 F

T. A

LLO

WA

BLE R

OO

F O

VER

HA

NG

Ericb
Typewritten Text
2
Ericb
Stamp
Ericb
Stamp
Ericb
Typewritten Text
7-31-13
Ericb
Stamp

Top Related