Sales & Inventory Operation Planning (SIOP)
XA tools to assist with Forecasting, Material Planning & Cash Flow
Analysis
![Page 2: Sales & Inventory Operation Planning (SIOP) XA tools to assist with Forecasting, Material Planning & Cash Flow Analysis](https://reader036.vdocument.in/reader036/viewer/2022062421/56649cb95503460f94980fe7/html5/thumbnails/2.jpg)
Sales & Operation Planning Data Flow
Forecast – Projection of Future Sales
Feeds Material Planning:Master Production Schedule Planning
MRPAdvanced Planner
Planning Applications create Planned MO’s & PO’s
Cash Flow Analysis:Use Existing AR, COM Orders & Forecast for income
Use Existing AP, PO & Planned Orders for Expenditures
![Page 3: Sales & Inventory Operation Planning (SIOP) XA tools to assist with Forecasting, Material Planning & Cash Flow Analysis](https://reader036.vdocument.in/reader036/viewer/2022062421/56649cb95503460f94980fe7/html5/thumbnails/3.jpg)
XA Forecasting
• Forecast Code in Item Balance record determines:– Build forecast for item– Build forecast and pass to MRP or MPSP
• Codes:– 0 = No Forecast– 1 = Forecast, do not pass to planning– 2 = Forecast, pass to MPSP as requirement and MRP
as reference– 3 = Forecast, pass to MPSP and MRP as requirement
![Page 4: Sales & Inventory Operation Planning (SIOP) XA tools to assist with Forecasting, Material Planning & Cash Flow Analysis](https://reader036.vdocument.in/reader036/viewer/2022062421/56649cb95503460f94980fe7/html5/thumbnails/4.jpg)
Forecast Code
![Page 5: Sales & Inventory Operation Planning (SIOP) XA tools to assist with Forecasting, Material Planning & Cash Flow Analysis](https://reader036.vdocument.in/reader036/viewer/2022062421/56649cb95503460f94980fe7/html5/thumbnails/5.jpg)
Forecasting
• Month End Processing will retrieve booking information from COM
• Move the periods forward by 1 period• Calculate the forecast (using experiential
roughing)• Menu option to pass forecast to MPSP– Updates Demand Interface (DMDIFF) file
![Page 6: Sales & Inventory Operation Planning (SIOP) XA tools to assist with Forecasting, Material Planning & Cash Flow Analysis](https://reader036.vdocument.in/reader036/viewer/2022062421/56649cb95503460f94980fe7/html5/thumbnails/6.jpg)
Forecast Master
• Forecast Master holds:– Sales vs. Forecast for past 12 periods– Forecast for next 12 periods– Seasonality Factor for fluctuating sales– Safety Stock and Reorder Point (option in Tailoring
to update Item Balance record)• System Calculated forecast can be manually
overridden, either at the ‘Annual’ level or in individual periods
![Page 7: Sales & Inventory Operation Planning (SIOP) XA tools to assist with Forecasting, Material Planning & Cash Flow Analysis](https://reader036.vdocument.in/reader036/viewer/2022062421/56649cb95503460f94980fe7/html5/thumbnails/7.jpg)
Forecast Master
Forecast vs. Sales (past)
Future Forecast
![Page 8: Sales & Inventory Operation Planning (SIOP) XA tools to assist with Forecasting, Material Planning & Cash Flow Analysis](https://reader036.vdocument.in/reader036/viewer/2022062421/56649cb95503460f94980fe7/html5/thumbnails/8.jpg)
Forecast in SIOP
• If the Forecast is used as a requirement in the Material & Capacity Planning Applications:– Forecast needs to be an accurate representation
of sales (i.e. not a ‘wish list’)– If there is seasonality within the monthly
forecasts, the Master Schedule will need to be ‘smoothed’
– Need to verify that there is capacity to produce the forecast prior to running material planning
![Page 9: Sales & Inventory Operation Planning (SIOP) XA tools to assist with Forecasting, Material Planning & Cash Flow Analysis](https://reader036.vdocument.in/reader036/viewer/2022062421/56649cb95503460f94980fe7/html5/thumbnails/9.jpg)
Other Forecast Options
• 3rd party forecasting applications can ‘feed’ forecast to material planning– Futurecast– Customer provided forecasts– FD6
• MPSP – put forecast in Demand Interface file (DMDIFF)
• MRP – load forecast to Requirements (REQMTS) file
• Advanced Planner – put forecast into access table
![Page 10: Sales & Inventory Operation Planning (SIOP) XA tools to assist with Forecasting, Material Planning & Cash Flow Analysis](https://reader036.vdocument.in/reader036/viewer/2022062421/56649cb95503460f94980fe7/html5/thumbnails/10.jpg)
Forecast Metrics
• Forecast vs. Sales Shipments by Item/Quantity• Forecast vs. Sales Shipments by dollar• Customer Order fill rate (actual ship date vs.
manufacturing schedule due date)• Forecast vs. Master Schedule Production
![Page 11: Sales & Inventory Operation Planning (SIOP) XA tools to assist with Forecasting, Material Planning & Cash Flow Analysis](https://reader036.vdocument.in/reader036/viewer/2022062421/56649cb95503460f94980fe7/html5/thumbnails/11.jpg)
PLANNING
![Page 12: Sales & Inventory Operation Planning (SIOP) XA tools to assist with Forecasting, Material Planning & Cash Flow Analysis](https://reader036.vdocument.in/reader036/viewer/2022062421/56649cb95503460f94980fe7/html5/thumbnails/12.jpg)
Master Schedule
• Master Schedule needs to be an accurate statement of what is to be built
• Master Schedule should be isolated to Finished Goods (level 0 of the bill of material)– If lower level items are flagged as MPSP items,
their parent items also need to be MPSP items• Master Schedule should be reviewed by
Senior Management within the company– Summarized by Product Family
![Page 13: Sales & Inventory Operation Planning (SIOP) XA tools to assist with Forecasting, Material Planning & Cash Flow Analysis](https://reader036.vdocument.in/reader036/viewer/2022062421/56649cb95503460f94980fe7/html5/thumbnails/13.jpg)
MPSP
• MPS Source Code in Item Balance determines what will be treated as a requirement in MPSP:– F = Forecast only– C/E = Customer Orders only– B/D = Greater of Forecast or CO for the period
(Forecasting Tailoring determines period length weekly/monthly)
– M = no requirements, master schedule is manually entered
![Page 14: Sales & Inventory Operation Planning (SIOP) XA tools to assist with Forecasting, Material Planning & Cash Flow Analysis](https://reader036.vdocument.in/reader036/viewer/2022062421/56649cb95503460f94980fe7/html5/thumbnails/14.jpg)
MPSP Sequence of Events
• Load Forecast to Demand Interface (DMDIFF)• Set Horizon dates• Generate Master Schedule• Test Master Schedule against capacity
constraints (rough cut capacity test)• Work/approve the Master Schedule• Transfer Master Schedule to MRP
![Page 15: Sales & Inventory Operation Planning (SIOP) XA tools to assist with Forecasting, Material Planning & Cash Flow Analysis](https://reader036.vdocument.in/reader036/viewer/2022062421/56649cb95503460f94980fe7/html5/thumbnails/15.jpg)
Resource Profiles
• Resource Master record needs to specify hours/day resource is available
• Resource ID is loaded into Production Facility– ‘Prime Load Code’ determines if resource
constraint is machine or labor time• ‘Resource Profile Build’ job will go through the
indented BOM for the MPSP item to find load in constraining facility and time offset
![Page 16: Sales & Inventory Operation Planning (SIOP) XA tools to assist with Forecasting, Material Planning & Cash Flow Analysis](https://reader036.vdocument.in/reader036/viewer/2022062421/56649cb95503460f94980fe7/html5/thumbnails/16.jpg)
Production Facility Record
![Page 17: Sales & Inventory Operation Planning (SIOP) XA tools to assist with Forecasting, Material Planning & Cash Flow Analysis](https://reader036.vdocument.in/reader036/viewer/2022062421/56649cb95503460f94980fe7/html5/thumbnails/17.jpg)
Resource Test
• Resource test will compare master schedule against ‘Resource Profile’ file
• Resource display will show weekly periods where master schedule has overloaded the constraining facility
• Use date field to determine which Master Schedules are contributing to overload
• No report is available, only inquiry
![Page 18: Sales & Inventory Operation Planning (SIOP) XA tools to assist with Forecasting, Material Planning & Cash Flow Analysis](https://reader036.vdocument.in/reader036/viewer/2022062421/56649cb95503460f94980fe7/html5/thumbnails/18.jpg)
MPSP load to MRP
• When performing an MRP generation question ‘Transfer new orders from MPSP?’ answered ‘Yes’ will bring the master schedule planned orders from MPSP to MRP to generate planned orders through all levels of the bill of material
![Page 19: Sales & Inventory Operation Planning (SIOP) XA tools to assist with Forecasting, Material Planning & Cash Flow Analysis](https://reader036.vdocument.in/reader036/viewer/2022062421/56649cb95503460f94980fe7/html5/thumbnails/19.jpg)
Master Schedule Metrics
• MPSP MO Performance– % of MPSP orders started on time (actual start
date vs. scheduled start date)– % of MPSP orders completed on time (actual
completion date vs. due date)– Quantity completed vs. quantity orders
• MPSP order changes within ‘frozen’ zone (i.e. ‘X’ number of days from start and/or due date)
![Page 20: Sales & Inventory Operation Planning (SIOP) XA tools to assist with Forecasting, Material Planning & Cash Flow Analysis](https://reader036.vdocument.in/reader036/viewer/2022062421/56649cb95503460f94980fe7/html5/thumbnails/20.jpg)
ADVANCED PLANNER
![Page 21: Sales & Inventory Operation Planning (SIOP) XA tools to assist with Forecasting, Material Planning & Cash Flow Analysis](https://reader036.vdocument.in/reader036/viewer/2022062421/56649cb95503460f94980fe7/html5/thumbnails/21.jpg)
Advanced Planner
• ‘Next Generation’ of material and capacity planning
• Download planning information from XA into an Access database
• Planning performed on a PC or Server, eliminating job conflicts
![Page 22: Sales & Inventory Operation Planning (SIOP) XA tools to assist with Forecasting, Material Planning & Cash Flow Analysis](https://reader036.vdocument.in/reader036/viewer/2022062421/56649cb95503460f94980fe7/html5/thumbnails/22.jpg)
Advanced Planner Sequence of Events
• Download data to Access• Load the plan• Review Load to Capacity for work centers (color
coding shows level of capacity problems)• Work daily plans to eliminate capacity overloads• Review Supply vs. Demand (MRP) plan• Upload plan to AS400 (updates PLNORD and
REQMTS files)• Release orders same as MRP
![Page 23: Sales & Inventory Operation Planning (SIOP) XA tools to assist with Forecasting, Material Planning & Cash Flow Analysis](https://reader036.vdocument.in/reader036/viewer/2022062421/56649cb95503460f94980fe7/html5/thumbnails/23.jpg)
Load to Capacity
![Page 24: Sales & Inventory Operation Planning (SIOP) XA tools to assist with Forecasting, Material Planning & Cash Flow Analysis](https://reader036.vdocument.in/reader036/viewer/2022062421/56649cb95503460f94980fe7/html5/thumbnails/24.jpg)
Load to Capacity
• Separate line for each facility– Red – Facility over capacity (total)– Yellow – Facility over capacity for multiple periods– Blue – Facility over capacity for one period– Green – Facility under capacity– Black – Set up time
• Can ‘drill down’ to daily load
![Page 25: Sales & Inventory Operation Planning (SIOP) XA tools to assist with Forecasting, Material Planning & Cash Flow Analysis](https://reader036.vdocument.in/reader036/viewer/2022062421/56649cb95503460f94980fe7/html5/thumbnails/25.jpg)
Daily Load
![Page 26: Sales & Inventory Operation Planning (SIOP) XA tools to assist with Forecasting, Material Planning & Cash Flow Analysis](https://reader036.vdocument.in/reader036/viewer/2022062421/56649cb95503460f94980fe7/html5/thumbnails/26.jpg)
Daily Load
• Use ‘Drop & Drag’ to move order– Will reschedule other operations and, if
‘Operation Where Used’ in BOM is completed, will reschedule material
• Other options available:– Outsource: Have vendor perform operation– Alternate Route: use different process (EPDM)– Offload: move to different facility (only released
MO’s)– Level load: let AVP move load
![Page 27: Sales & Inventory Operation Planning (SIOP) XA tools to assist with Forecasting, Material Planning & Cash Flow Analysis](https://reader036.vdocument.in/reader036/viewer/2022062421/56649cb95503460f94980fe7/html5/thumbnails/27.jpg)
AVP New Functionality vs. MRP
• Customer Orders consume forecast• Unlimited number of calendars, can associate
multiple facilities to a single calendar• Uses routing times (instead of lead time) to
calculate MO start date• Schedules load for each operation based on
operation start/due date; can plan to the minute• Uses Maximum Order Quantity to limit order size• Planned Orders due the day before the
requirement
![Page 28: Sales & Inventory Operation Planning (SIOP) XA tools to assist with Forecasting, Material Planning & Cash Flow Analysis](https://reader036.vdocument.in/reader036/viewer/2022062421/56649cb95503460f94980fe7/html5/thumbnails/28.jpg)
Supply/Demand for Item
![Page 29: Sales & Inventory Operation Planning (SIOP) XA tools to assist with Forecasting, Material Planning & Cash Flow Analysis](https://reader036.vdocument.in/reader036/viewer/2022062421/56649cb95503460f94980fe7/html5/thumbnails/29.jpg)
Save Plan
• Uploads AVP plan to the AS400:– Saves Planned Orders in the PLNORD file– Saves requirements to the REQMTS file
• Use MRP recommendations (PowerLink) or MRP Order Release and Review to create MO’s and PO’s
• Same metrics as MPSP/MRP apply
![Page 30: Sales & Inventory Operation Planning (SIOP) XA tools to assist with Forecasting, Material Planning & Cash Flow Analysis](https://reader036.vdocument.in/reader036/viewer/2022062421/56649cb95503460f94980fe7/html5/thumbnails/30.jpg)
Save Plan
![Page 31: Sales & Inventory Operation Planning (SIOP) XA tools to assist with Forecasting, Material Planning & Cash Flow Analysis](https://reader036.vdocument.in/reader036/viewer/2022062421/56649cb95503460f94980fe7/html5/thumbnails/31.jpg)
CASH FLOW
![Page 32: Sales & Inventory Operation Planning (SIOP) XA tools to assist with Forecasting, Material Planning & Cash Flow Analysis](https://reader036.vdocument.in/reader036/viewer/2022062421/56649cb95503460f94980fe7/html5/thumbnails/32.jpg)
Cash Flow Overview
• The Cistech Cash Flow application was created to provide a future view of income and expenditures for a company
• Cash Flow is written with XA Integrator and runs exclusively in Browser (R6) and PowerLink (R7)
• Works with both AM and IFM financials• Provides both summary data and detail to support
the summary• This application is especially important these days
when cash management is essential to your company’s overall health
![Page 33: Sales & Inventory Operation Planning (SIOP) XA tools to assist with Forecasting, Material Planning & Cash Flow Analysis](https://reader036.vdocument.in/reader036/viewer/2022062421/56649cb95503460f94980fe7/html5/thumbnails/33.jpg)
Time periods are user defined and can be:• Daily • Weekly• Monthly• Quarterly
Sample Screen
![Page 34: Sales & Inventory Operation Planning (SIOP) XA tools to assist with Forecasting, Material Planning & Cash Flow Analysis](https://reader036.vdocument.in/reader036/viewer/2022062421/56649cb95503460f94980fe7/html5/thumbnails/34.jpg)
Income – Existing AR
• Uses the existing invoices in Accounts Receivable (either AM or IFM financials)
• Uses the invoice due date to determine the period for cash receipt
• Past Due invoices will display in a ‘Past Due’ period column
![Page 35: Sales & Inventory Operation Planning (SIOP) XA tools to assist with Forecasting, Material Planning & Cash Flow Analysis](https://reader036.vdocument.in/reader036/viewer/2022062421/56649cb95503460f94980fe7/html5/thumbnails/35.jpg)
Income – Future AR
• ‘Future AR’ is time phased Customer Orders in COM
• Uses the Manufacturing Scheduled Ship Date for each item plus the Customer’s payment days (based on the terms code in the customer master record) to determine date of cash receipt
• Assumes shipment/invoice will occur on the Manufacturing Scheduled Ship Date
![Page 36: Sales & Inventory Operation Planning (SIOP) XA tools to assist with Forecasting, Material Planning & Cash Flow Analysis](https://reader036.vdocument.in/reader036/viewer/2022062421/56649cb95503460f94980fe7/html5/thumbnails/36.jpg)
Income - Forecast
• Forecast needs to be by Customer and Item for most accurate cash flow
• Cistech will provide a custom forecast file/file layout to allow you to populate a forecast file for Cash Flow
• Uses the Customer’s ‘Payment Terms Days’ to age the forecast
![Page 37: Sales & Inventory Operation Planning (SIOP) XA tools to assist with Forecasting, Material Planning & Cash Flow Analysis](https://reader036.vdocument.in/reader036/viewer/2022062421/56649cb95503460f94980fe7/html5/thumbnails/37.jpg)
Income
• Sum of:– Existing Invoices in Accounts Receivable– Aged Customer Orders– Aged Forecast
![Page 38: Sales & Inventory Operation Planning (SIOP) XA tools to assist with Forecasting, Material Planning & Cash Flow Analysis](https://reader036.vdocument.in/reader036/viewer/2022062421/56649cb95503460f94980fe7/html5/thumbnails/38.jpg)
Payments – Existing AP
• Uses the Existing Vendor Invoices in Accounts Payable (either AM or IFM Financials)
• Uses the Payment Due Date on the invoice to determine payment date/period
![Page 39: Sales & Inventory Operation Planning (SIOP) XA tools to assist with Forecasting, Material Planning & Cash Flow Analysis](https://reader036.vdocument.in/reader036/viewer/2022062421/56649cb95503460f94980fe7/html5/thumbnails/39.jpg)
Payments – Future AP
• Ages the existing Purchase Orders to determine payment date
• Takes the ‘Due to Stock Date’ plus the vendor’s Payment Days from the Terms Code specified on the Purchase Order– Uses the ‘Offset Days’
• For Blanket Items, uses the Due to Stock Date for each release
![Page 40: Sales & Inventory Operation Planning (SIOP) XA tools to assist with Forecasting, Material Planning & Cash Flow Analysis](https://reader036.vdocument.in/reader036/viewer/2022062421/56649cb95503460f94980fe7/html5/thumbnails/40.jpg)
Payment – MRP Plan
• P-Plan orders from MRP planned order (PLNORD) file are used to calculate future payments
• Vendor specified as ‘Primary Vendor’ in Item Balance record will be the Vendor whose terms are used to calculate offset payment days
• Vendor Master record holds Terms Code
![Page 41: Sales & Inventory Operation Planning (SIOP) XA tools to assist with Forecasting, Material Planning & Cash Flow Analysis](https://reader036.vdocument.in/reader036/viewer/2022062421/56649cb95503460f94980fe7/html5/thumbnails/41.jpg)
Sample Screen
Summary and detail are both provided and can easily be copied to Excel
![Page 42: Sales & Inventory Operation Planning (SIOP) XA tools to assist with Forecasting, Material Planning & Cash Flow Analysis](https://reader036.vdocument.in/reader036/viewer/2022062421/56649cb95503460f94980fe7/html5/thumbnails/42.jpg)
SIOP Summary
• Use Sales Forecast as the beginning point for developing Master Schedule
• Use Planning applications to create material and capacity plan
• Use Cash Flow analysis to determine company’s cash requirements based on existing orders and plan
• Use Metrics to determine success of SIOP plan
![Page 43: Sales & Inventory Operation Planning (SIOP) XA tools to assist with Forecasting, Material Planning & Cash Flow Analysis](https://reader036.vdocument.in/reader036/viewer/2022062421/56649cb95503460f94980fe7/html5/thumbnails/43.jpg)
CISTECH SIOP OFFERINGS– Education (Forecasting, COM, MRP, MPSP, AVP)– Upcoming “AVP JumpStart” Engagements
• Free Webinars on AVP functionality• Classroom Education opportunities• On-site AVP “JumpStart” Consulting Engagements
– CISTECH’s Cash Flow Analysis Tool– QuickLook consulting program for SIOP
• 1-2 day review of your current SIOP Process• Executive wrap up session to provide vision and implementation plan
for SIOP improvements
CONTACT INFORMATIONBrock Miller Ben McCormick
[email protected] [email protected] 704-814-0016
![Page 44: Sales & Inventory Operation Planning (SIOP) XA tools to assist with Forecasting, Material Planning & Cash Flow Analysis](https://reader036.vdocument.in/reader036/viewer/2022062421/56649cb95503460f94980fe7/html5/thumbnails/44.jpg)
THANK YOU FOR ATTENDING!