SAUSALITO FERRY TERMINAL IMPROVEMENTS PROJECT
Illustrative Evolution of Project ChangesMarch 2, 2016
March 2, 2016 Sausalito Ferry Terminal Improvements Project Page 1 of 67
FERRY LANDING NEEDS TO BE REPLACED
• To keep facilities structurally sound• To bring passenger access to vessels into compliance with current ADA requirements• To bring passenger access to vessels into compliance with current ADA requirements• Improve operational efficiencies• Upgrade emergency preparedness
March 2, 2016 Sausalito Ferry Terminal Improvements Project Page 2 of 67
MAY 3, 2011 ‐ CITY COUNCIL MEETING
March 2, 2016 Sausalito Ferry Terminal Improvements Project Page 3 of 67
December 2, 2014 – CITY COUNCIL MEETING
March 2, 2016 Sausalito Ferry Terminal Improvements Project Page 4 of 67
December 2, 2014 – CITY COUNCIL MEETING
March 2, 2016 Sausalito Ferry Terminal Improvements Project Page 5 of 67
December 2, 2014 – CITY COUNCIL MEETING
Float length = 150’
Access Pier idth 25’
Gangway length = 90’
Float width = 53’
width = 25’
GangwayGangway width ≈ 21’
Max gangwayMax gangway height = 12’
March 2, 2016 Sausalito Ferry Terminal Improvements Project Page 6 of 67
December 2, 2014 – CITY COUNCIL MEETING
March 2, 2016 Sausalito Ferry Terminal Improvements Project Page 7 of 67
December 2, 2014 – CITY COUNCIL MEETING
SUMMARY• Proposed Float – 150 feet long x 53 feet wide• Proposed Gangway – Curved arched truss 90 feet long x 21 feet wide x 12 feet high• Proposed Access Pier – 96 feet long x 25 feet wide• Proposed Gate Roll up doors• Proposed Gate – Roll up doors• Proposed Railing – Same as on existing Landside Pier• Proposed Colors – White and blue• Proposed Belvederes – per BCDC request
March 2, 2016 Sausalito Ferry Terminal Improvements Project Page 8 of 67
MARCH 11, 2015 – PC/HLB STUDY SESSIONALTERNATIVES PRESENTED FOR PC/HLB TO CHOOSEALTERNATIVES PRESENTED FOR PC/HLB TO CHOOSE
l ’ dAlternative 1 – 25’ Wide Access Pier
Alternative 2 – 21’ Wide Access Pier
Preferred by PC/HLBPreferred by PC/HLB
March 2, 2016 Sausalito Ferry Terminal Improvements Project Page 9 of 67
MARCH 11, 2015 – PC/HLB STUDY SESSIONALTERNATIVES PRESENTED FOR PC/HLB TO CHOOSEALTERNATIVES PRESENTED FOR PC/HLB TO CHOOSE
Alternative 1 – 12’ Tall Arched Top ChordChord
Alternative 2 – 10.8’ Tall Arched Top Chord & Lowered
Alternative 3 – 9’ Tall Flat Top Chord Truss
Preferred by PC/HLB
March 2, 2016 Sausalito Ferry Terminal Improvements Project Page 10 of 67
MARCH 11, 2015 – PC/HLB STUDY SESSIONALTERNATIVES PRESENTED FOR PC/HLB TO CHOOSEALTERNATIVES PRESENTED FOR PC/HLB TO CHOOSE
Alternative 1 – Swing Gate with Curved Roof Structure Cover
Alternative 2 – Swing Gate with Curved Top Alternative 3 – Simple Swing GatePreferred By PC/HLB
March 2, 2016 Sausalito Ferry Terminal Improvements Project Page 11 of 67
MARCH 11, 2015 – PC/HLB STUDY SESSIONALTERNATIVES PRESENTED FOR PC/HLB TO CHOOSEALTERNATIVES PRESENTED FOR PC/HLB TO CHOOSE
Alternative 1 ‐White
Alternative 2 – Gray
Preferred by PC/HLB
Alternative 3 BlueAlternative 3 ‐ Blue
March 2, 2016 Sausalito Ferry Terminal Improvements Project Page 12 of 67
APRIL 1, 2015 – APRIL 29, 2016 PC/HLB HEARINGS PREFERRED OPTIONPC/HLB HEARINGS PREFERRED OPTION
– From PC/HLB Joint Study Session, PC’s, HLB’s, and Sausalito Residents’ comments of discretionary items were taken into considerationcomments of discretionary items were taken into consideration
• Reduce width of access pier – Reduced from 25’ to 21’• Reduce height of gangway – Reduced from 12’ to 9’
B t St d S i d M h 24 b itt l GGBHTD bl t d– Between Study Session and March 24 submittal, GGBHTD was able to reduce height to 8’
• Gray or darker color is preferred by most • Use simple gate• Keep railing similar to existing
– March 24, 2015 – GGBHTD submitted drawings and renderings of preferred g g pproject option
March 2, 2016 Sausalito Ferry Terminal Improvements Project Page 13 of 67
APRIL 1, 2015 – APRIL 29, 2015 PC/HLB HEARINGS PREFERRED OPTIONPC/HLB HEARINGS PREFERRED OPTION
March 2, 2016 Sausalito Ferry Terminal Improvements Project Page 14 of 67
APRIL 1, 2015 – APRIL 29, 2015PC/HLB HEARINGS PREFERRED OPTIONPC/HLB HEARINGS PREFERRED OPTION
March 2, 2016 Sausalito Ferry Terminal Improvements Project Page 15 of 67
APRIL 1, 2015 – APRIL 29, 2015 PC/HLB HEARINGS PREFERRED OPTIONPC/HLB HEARINGS PREFERRED OPTION
March 2, 2016 Sausalito Ferry Terminal Improvements Project Page 16 of 67
APRIL 1, 2015 – APRIL 29, 2015 PC/HLB HEARINGS PREFERRED OPTIONPC/HLB HEARINGS PREFERRED OPTION
March 2, 2016 Sausalito Ferry Terminal Improvements Project Page 17 of 67
APRIL 1, 2015 – APRIL 29, 2015PC/HLB HEARINGS PREFERRED OPTIONPC/HLB HEARINGS PREFERRED OPTION
March 2, 2016 Sausalito Ferry Terminal Improvements Project Page 18 of 67
APRIL 1, 2015 – APRIL 29, 2015 PC/HLB HEARINGS PREFERRED OPTIONPC/HLB HEARINGS PREFERRED OPTION
SUMMARY• Proposed Float – 150 feet long x 53 feet wide• Proposed Gangway – Flat top chord truss 90 feet long x 18.3 feet wide x 8 feet high• Proposed Access Pier – 96 feet long x 21 feet wide• Proposed Gate Simple swing gate• Proposed Gate – Simple swing gate• Proposed Railing – Same as on existing Landside Pier• Proposed Colors – Gray• Proposed Belvederes – per BCDC request
March 2, 2016 Sausalito Ferry Terminal Improvements Project Page 19 of 67
JUNE 24, 2015 – NOVEMBER 14, 2015 COMMUNITY MEETINGS
• Marin County Supervisor Kate Sears, y p ,Mayor Thomas Theodores, Vice Mayor Jill Hoffman, City Residents, and GGBHTD participated in stakeholder meetings
• June 27, 2015 @ Bay Model, Sausalito• October 10, 2015 @ City Hall, Sausalito• November 14 2015 @ City Hall Sausalito• November 14, 2015 @ City Hall, Sausalito
March 2, 2016 Sausalito Ferry Terminal Improvements Project Page 20 of 67
NOVEMBER 14, 2015 – COMMUNITY MEETINGDESIGN CHANGESDESIGN CHANGES
Simple Steel Girder GangwaySimple Steel Girder Gangway
March 2, 2016 Sausalito Ferry Terminal Improvements Project Page 21 of 67
NOVEMBER 14, 2015 – COMMUNITY MEETINGDESIGN CHANGESDESIGN CHANGES
Simple Steel Girder Gangway – Low Tide
March 2, 2016 Sausalito Ferry Terminal Improvements Project Page 22 of 67
NOVEMBER 14, 2015 – COMMUNITY MEETINGDESIGN CHANGESDESIGN CHANGES
Simple Steel Girder Gangway – High Tide
March 2, 2016 Sausalito Ferry Terminal Improvements Project Page 23 of 67
NOVEMBER 14, 2015 – COMMUNITY MEETINGDESIGN CHANGESDESIGN CHANGESTransparent Swing Gate
March 2, 2016 Sausalito Ferry Terminal Improvements Project Page 24 of 67
NOVEMBER 14, 2015 – COMMUNITY MEETINGDESIGN CHANGESDESIGN CHANGESTransparent Swing Gate
March 2, 2016 Sausalito Ferry Terminal Improvements Project Page 25 of 67
GUIDE TO RENDERINGS:
Vi i d bView points requested by community
March 2, 2016 Sausalito Ferry Terminal Improvements Project Page 26 of 67
VIEW 1‐ EXISTING (EDGE OF GABRIELSON PARK)
March 2, 2016 Sausalito Ferry Terminal Improvements Project Page 27 of 67
VIEW 1 – PROPOSED (EDGE OF GABRIELSON PARK)
March 2, 2016 Sausalito Ferry Terminal Improvements Project Page 28 of 67
VIEW 2 – EXISTING & PROPOSED (GABRIELSON PARK)
March 2, 2016 Sausalito Ferry Terminal Improvements Project Page 29 of 67
VIEW 3 – EXISTING (YACHT CLUB)
March 2, 2016 Sausalito Ferry Terminal Improvements Project Page 30 of 67
VIEW 3 – PROPOSED (YACHT CLUB)
March 2, 2016 Sausalito Ferry Terminal Improvements Project Page 31 of 67
VIEW 4 – EXISTING (YACHT CLUB PARKING LOT)
March 2, 2016 Sausalito Ferry Terminal Improvements Project Page 32 of 67
VIEW 4 – PROPOSED (YACHT CLUB PARKING LOT)
March 2, 2016 Sausalito Ferry Terminal Improvements Project Page 33 of 67
VIEW 5 – EXISTING (PLAZA NORTH END)
March 2, 2016 Sausalito Ferry Terminal Improvements Project Page 34 of 67
VIEW 5 – PROPOSED (PLAZA NORTH END)
March 2, 2016 Sausalito Ferry Terminal Improvements Project Page 35 of 67
VIEW 6 – EXISTING (MID PLAZA)
March 2, 2016 Sausalito Ferry Terminal Improvements Project Page 36 of 67
VIEW 6 – PROPOSED (MID PLAZA)
March 2, 2016 Sausalito Ferry Terminal Improvements Project Page 37 of 67
VIEW 7 – EXISTING (PLAZA SOUTH END)
March 2, 2016 Sausalito Ferry Terminal Improvements Project Page 38 of 67
VIEW 7 – PROPOSED (PLAZA SOUTH END)
March 2, 2016 Sausalito Ferry Terminal Improvements Project Page 39 of 67
VIEW 8 – EXISTING (BRIDGEWAY)
March 2, 2016 Sausalito Ferry Terminal Improvements Project Page 40 of 67
VIEW 8 – PROPOSED (BRIDGEWAY)
March 2, 2016 Sausalito Ferry Terminal Improvements Project Page 41 of 67
EXISTING LIGHTING
March 2, 2016 Sausalito Ferry Terminal Improvements Project Page 42 of 67
PROPOSED LIGHTING – OVERVIEW
March 2, 2016 Sausalito Ferry Terminal Improvements Project Page 43 of 67
PROPOSED LIGHTING – EYE LEVEL: DOORS OPEN
March 2, 2016 Sausalito Ferry Terminal Improvements Project Page 44 of 67
PROPOSED LIGHTING – EYE LEVEL: DOORS CLOSED & LIGHTS OFF
March 2, 2016 Sausalito Ferry Terminal Improvements Project Page 45 of 67
COLOR OPTIONS – GRAY (GALVANIZED STEEL)
March 2, 2016 Sausalito Ferry Terminal Improvements Project Page 46 of 67
COLOR OPTIONS – DARK GRAY
March 2, 2016 Sausalito Ferry Terminal Improvements Project Page 47 of 67
COLOR OPTIONS – WHITE
March 2, 2016 Sausalito Ferry Terminal Improvements Project Page 48 of 67
COLOR OPTIONS – BLUE
March 2, 2016 Sausalito Ferry Terminal Improvements Project Page 49 of 67
COLOR OPTIONS – GREEN
March 2, 2016 Sausalito Ferry Terminal Improvements Project Page 50 of 67
COLOR OPTIONS – BLACK
March 2, 2016 Sausalito Ferry Terminal Improvements Project Page 51 of 67
COLOR OPTIONS – INTERNATIONAL ORANGE
March 2, 2016 Sausalito Ferry Terminal Improvements Project Page 52 of 67
NOVEMBER 14, 2015 – COMMUNITY MEETING PROPOSED DESIGNPROPOSED DESIGN
SUMMARY• Proposed Float – 150 feet long x 53 feet widep g• Proposed Gangway – Steel Girder 90 feet long x 16 feet wide x 6.7 feet high• Proposed Access Pier – 96 feet long x 21 feet wide
P d G t Si l t t i t• Proposed Gate – Simple transparent swing gate• Proposed Railing – Same as on existing Landside Pier• Proposed Colors – Gray• Proposed Belvederes – per BCDC request
March 2, 2016 Sausalito Ferry Terminal Improvements Project Page 53 of 67
NEW RENDERINGS
• After Community Meetings, the GGBHTD continued to produce more renderings to help clarify the float operations.
• Float length decreased from 150’‐0” to 146’‐6”Float length decreased from 150 0 to 146 6
March 2, 2016 Sausalito Ferry Terminal Improvements Project Page 54 of 67
PROPOSED FLOAT
March 2, 2016 Sausalito Ferry Terminal Improvements Project Page 55 of 67
FLOAT – MAIN COMPONENTS
Hydraulic Gangplank
Hydraulic Gangplank
Boarding Platform
Boarding ApronGangway
Fixed Landing
Hydraulic Gangplank
Hydraulic Gangplankgp gp
March 2, 2016 Sausalito Ferry Terminal Improvements Project Page 56 of 67
FLOAT – ADA COMPONENTS
Flat Landing
Ramp Ramp Flat Landing
Ramp Ramp
Flat Landing
RampRamp
RAMPS NO MORE THAN 1:12 SLOPE AT ALL TIDES AND FERRY BOARDING CONFIGURATIONS
March 2, 2016 Sausalito Ferry Terminal Improvements Project Page 57 of 67
FLOAT – LOWERED FOR ARRIVAL OF SPAULDING CLASS
March 2, 2016 Sausalito Ferry Terminal Improvements Project Page 58 of 67
FLOAT – RAISED FOR ARRIVAL OF CATAMARAN CLASS
March 2, 2016 Sausalito Ferry Terminal Improvements Project Page 59 of 67
FLOAT OPERATIONS – SPAULDING CLASS VESSELFLOAT OPERATIONS – SPAULDING CLASS VESSEL
March 2, 2016 Sausalito Ferry Terminal Improvements Project Page 60 of 67
FLOAT OPERATIONS – CATAMARAN CLASS VESSELFLOAT OPERATIONS – CATAMARAN CLASS VESSEL
March 2, 2016 Sausalito Ferry Terminal Improvements Project Page 61 of 67
FLOAT DIMENSIONS – LENGTH SHORTENED• Float length shortened from 150 feet to 145 feet 6 inches• Float length shortened from 150 feet to 145 feet 6 inches
145’–6”
53’–0”
March 2, 2016 Sausalito Ferry Terminal Improvements Project Page 62 of 67
SUMMARY
Existing Float’ l ’ d110’ long x 42’ wide
March 2016
Proposed Float
145.5’ long x 53’ wide
March 2, 2016 Sausalito Ferry Terminal Improvements Project Page 63 of 67
SUMMARY
Existing Gangway70’ long x 5 9’ wide x 3 5’ above walking surface
December 2014 Proposed Gangway90’ long x 21’ wide x 9 1’ above walking surface70 long x 5.9 wide x 3.5 above walking surface 90 long x 21 wide x 9.1 above walking surface
March 2016 Proposed Gangway90’ long x 16’ wide x 3.5’ above walking surface
March 2015 Proposed Gangway90’ long x 18.3’ wide x 5.1’ above walking surface
March 2, 2016 Sausalito Ferry Terminal Improvements Project Page 64 of 67
SUMMARY
Existing Access Pierg96.5’ long x 8.5’ wide
December 2014 Proposed Access Pier
96’ long x 25’ wide
March 2016 Proposed Access Pier
96’ long x 21’ wide
March 2, 2016 Sausalito Ferry Terminal Improvements Project Page 65 of 67
SUMMARY
Existing GateSteel Swing Gate with Diamond Pattern Grating
December 2014 Proposed GateRollup DoorsSteel Swing Gate with Diamond Pattern Grating Rollup Doors
March 2016 Proposed GateSimple Transparent Swing Gate
March 2015 Proposed GateSimple Swing Gate with Grating
March 2, 2016 Sausalito Ferry Terminal Improvements Project Page 66 of 67
SUMMARYEXISTING PROPOSED
DECEMBER 2014PROPOSED MARCH 2015
PROPOSED MARCH 2016
FLOAT 110’ long x 42’ wide 150’ long x 53’ wide 150’ long x 53’ wide 145.5’ long x 53’ wide
GANGWAY 70’ long x 5 9’ wide x 90’ long x 21’ wide x 90’ long x 18 3’ wide x 90’ long x 16’ wide xGANGWAY 70 long x 5.9 wide x 5.8’ high
90 long x 21 wide x 12’ high
90 long x 18.3 wide x 8’ high
90 long x 16 wide x 6.7’ high
ACCESS PIER 96.5’ long x 8.5’ wide 96’ long x 25’ wide 96’ long x 21’ wide 96’ long x 21’ wide
LANDSIDE PIER 95’ long x 20.5’ wide No change to existing No change to existing No change to existing
BELVEDERES None Yes, per BCDC Yes, per BCDC Yes, per BCDC
GATE Swing gate with steel grating
Roll up doors Simple swing gate with steel grating
Simple transparentswing gate
• Color, lighting and bench design to be determined by City
COLOR Gray, blue White, blue Gray Gray
Color, lighting and bench design to be determined by City
March 2, 2016 Sausalito Ferry Terminal Improvements Project Page 67 of 67