SELİN CORPORATE GROUP
2019
Shareholdings and Fields of Activity
Environmental Noise and Vibration Measurements Accredited Laboratory on
Dust-Subsided Dust-Passive Sampling-Air Quality Flue Gas Measurement
OHS Measurements Noise Mapping
Building Acoustics Studies
Environmental Consultancy OHS Consultancy
EIA and ESIA Consultancy Environmental-OHS-Social Services on International Standarts
Energy Efficiency Consultancy Technical Consultancy for Environmental and OHS Litigation
Air Quality Modelling
Wind Energy Projects (WPP) Field Determination for WPP’s- Wind Measurement Station Installation –
Wind Measurements- Technical Analysis- Pre-license and Licence
Operations
Organization Chart
Personnel Information
NO OF TOTAL WORKERS: 20
EXPERIENCE YEAR: 8 - 53
Women %45
Man %55
Administrative Staff %25
TEKNİK PERSONEL
75%
Technical Staff %75
Personnel Information
Academic Advisors
Milestones 1993 Establishment of Selin Consultancy in Ankara
1996 Starting to preparation of EIA reports
1999 Obtaining EIA Qualification Certificate
2001 The first Environmental Management Plan preparing by a private company in Turkey (Melen Great İstanbul Potable Water Project)
2002 The first Special Provisioning Project for Potable Water Basin in Turkey (Bayındır Dam Basin)
2002 Starting to give 3th Party Audit Service on HSE (Limak-Fernas)
2004 Completion of the Project about Monitoring and Protection of Sea Turtle Populations in Special Environmental Protection Areas
2004 HSE Consultancy of Turkey's first underground gas storage facility’s construction and getting permits sı (TPAO North Marmara and Değirmenköy Underground Gas Storage Project)
2005 First international HSE Consultancy (BTC Project)
2006 Establishment of Selin Laboratory Co. Inc.
Milestones
2008 The first overseas project (HSE Consultancy in accordance with International Standarts for Katar-Doha UMM BAB and Mesaieed Gas Supply Project of Fernas Co. Inc. )
2009 HSE and ESIA Consultancy in accordance with IFC Standarts and equatorial principles for Energy Investments of Enerjisa
2009 The first pasture transformation and rehabilitation project in Turkey (Ankara-Sivas High Speed Train Project)
2013 Start-up of Selin 3-4-5 and Deniz 1 energy companies for wind power plant investment
2013 Evaluation of the Enerjisa Kavşakbendi and HEPP Project as the best construction site of Adana Province according to audit report of Ministry of Labor and Social Security and Provincial Directorate of Environment and Urbanization
2014 The first fish carrying project in Turkey approved by Ministry of Agriculture and Livestock (Enerjisa/Köprü-Menge Dams)
2014 Implementation of independent HSE audit and environmental monitoring-measurement studies in Georgia Shuakhevi HEPP Project under the supervision of Mott Macdonald
Milestones
2015 Environmental audit and measurements studies in TANAP Project on behalf of Lot1-Fernas Co. Inc., Lot2-Sicim-Yüksel-Akkord Partnership, Lot3-Tekfen (Practical waste management studies were done in Tekfen-Lot 3)
2015 Introduction of third party HSE audit and consultancy services in accordance with IFC and EBRD Standarts (Real Estate and Health Investments of Rönesans Holding Co.)
2015 Obtaining Environmental Consultancy Qualification Certificate
2016 Establishment of ESMS and preparing 3 years of AMR according to IFC and EBRD Standarts for Akfen Renewable Co. Inc.
2017 Acquisition of pre-license for three investments in wind power plant contests
2017 Preparing Local Community Emergency Response Plan for İstanbul Grand Airport Project Co Inc. (Prepared plan is integrated into Emergency Response Plan of Turkey by Prime Ministry Disaster and Emergency Management Presidency)
2017 Development of the project for the reduction of dust during blasting and transportation in mining operations (This is the first project in Turkey)
2018 Providing HSE Consultancy Service to all SPP and ETL Contractors of Akfen Ren. Co. Inc. in accordance with IFC and EBRD Standarts
Services: HSE Consultancy
3th Party HSE and Social Consultancy, documentation and sites audits and reporting Site consultancy services with full time HSE experts Providing Environmental Officer services and obtaining Environmental Permit Environmental monitoring Establishment and implementation of Waste Management System Services under the SEVESO directives HSE trainings Preparation of action plans, risk assessments, emergency response plans Due diligence reports GAP analysis Environmental feasibility Basin planing and determining special judgment Fish carrying between the downstream and upstream during the breeding periods Fire consultancy Carbon certification consultancy
Services: Consultancy on International Standards
Establishment of Environmental-Social and Public Relations Management System Establishment of Land Acquisition Management System Establishment of Corporate Permissions Management System Establishment of Human Resources Management System Annual Monitoring and Auditing of Environmental, Social, Occupational Health and Safety Performance Preparation of Annual Monitoring Reports Environmental and Social Management Plan Biodiversity Action Plan Cultural Heritage Management Plan Traffic Management Plan Local Community Emergency Response Plan Off Site Emergency Response Plan Site audits and consultancy of prepared plans
Services: Consultancy on EIA and ESIA
Preparation of EIA/PIF according to Turkish legislation Preparation of Environmental and Social Impact Assessment Report according to standards of international finance institutions Preparation of Environmental Management Plans Preparation of ing Nature Recovery Plan Preparation of ing Ecosystem Assessment Report Preparation of Bird Survey Report for wind farm projects Environmental preliminary surveys for investments Air quality modelling studies by using AERMOD, ISCST programmes Biological monitoring Preparation of Downstream Water Use Right Report Preparation of Soil Conservation Project Permission to use agricultural land and pasture land Pasture improvement and pasture transformation projects
Services: Social Consultancy
Solution of disputes between firms due to contradiction between legislation Conducting the studies of the public elucidation and informing and organizing information meetings by
identifying the project stakeholders Due diligence on socio-economic conditions Preparation of Social Impact Analysis Report Field studies, preparation of surveys and brochures Preparation and implementation of Resettlement Action Plans Preparing and implementing social management and monitoring plans to minimize impacts Social consultancy services in pre-construction, construction and operation stages of investments Conducting public relations during construction activities
Services: Environmental and Work Accident Consultancy
Technical and legal due diligence
Technical consultancy on environmental and work accident cases
Follow-up of the litigation process in the Administrative, Legal and Criminal Courts and providing
consultancy services
Taking active duty in 15 cases during administrative proceedings
Services: Energy efficiency
Establishment of ISO 50001 energy management system
Making Building Energy Survey
Making Industrial Energy Survey
Preparation of Building Energy Identification Document
Preparation of Productivity Enhancing Project
Provinces Service Provided
Provinces
Countries Service Provided
Countries
References
Melen System, Great Istanbul Drinking Water Stage II. Project / 2001 (ALKE-ATAÇ PARTNERSHIP, ALSİM ALARKO-ROSNEFTEGAZSTROY JSC, LİMAK)
• Preperation of Environmental Management Plan between pipeline construction of Melen -Kıncıllı Village • Preperation of Environmental Management Plan and environmental monitoring studies for Cumhuriyet
Water Treatment Plant • Preperation of Environmental Management Plan between pipeline construction of Cumhuriyet-
Osmankuyu/Kağıthane
References
Bakü-Tiflis-Ceyhan Crude Oil Pipeline Project / 2002-2006 (ALSİM ALARKO, FERNAS, LİMAK, ÖZTAŞ)
• Preparation of Environmental Documents in Procurement Preparation Stage for Pump Stations, and Pressure
Reducing Stations in Lot A, Lot B, Lot C • HSE Trainings for Lot A, Lot B ve IPT2 PİG Station Workers, Site Management of HSE Team, HSE Consultancy,
Preparation of HSE Documents, Environmental Monitoring Studies
References
Due Diligence for LİMAK Hotels / 2006 (LARA-ATLANTİS-ARCADİA-LİMRA)
• Making and Revizing Fire Risk Assessments for hotels • Determining fire areas and taking special precautions for there • Preparation of Fire Directives • Implementation of Emergency Plans for Fire Risk, Completion of Deficiencies
References
Construction of TPAO North Marmara and Değirmenköy Underground Natural Gas Storage Facilities and Surface Facilities / 2004-2010
(LURGI – FERNAS PARTNERSHIP) • 3 th Party HSE Consultancy • Environmental Monitoring Studies • Taking Permits for Construction and Environmental
References
Construction of Gas Supply Project in Katar-Doha UMM BAB and Mesaieed / 2008 (FERNAS CONSTRUCTION) Türkmenistan-Balkanabat Doğalgaz Çevrim Santrali İnşaatı / 2009 (ÇALIK ENERGY)
• 3 th Party HSE Consultancy acoording to local legislation and international standarts • Preparation of HSE Documents • Control of document-recording system • Giving trainings
References
Kavşakbendi HEPP– Yamanlı HEPP – Doğançay HEPP – Çambaşı HEPP – Köprü Dam and HEPP – Arkun Dam and HEPP Construction / 2009-2014
(ENERJİSA AND ALL SUBCONTRUCTORS) • Preparation of HSE Managament Plans according to IFC Performance Standards and National Legislation • Site studies with full time HSE professionals (2-9 specialists), montly 3th party audits by Selin Central Office
Specialists • Preparation and participation for IFC audits • Taking environmental permits • Execution of document-recording system • HSE trainings for total of 4.500 workers • Measurement and Monitoring Studies
References
Ankara – Sivas High Speed Railway Construction between Yerköy-Yozgat-Sivas / 2009-2013 (CMBE – CENGİZ – LİMAK – MAPA – KOLİN PARTNERSHIP)
• Site studies with full time HSE professionals and montly 3th party audits by Selin Central Office Specialists • Taking environmental permits • Execution of document-recording system • HSE trainings • Environmental monitoring studies • Preparation of pasture improvement and transformation projects, approved by the competent authority
References
OMV Samsun Natural Gas Power Plant Power Transmission Line and Switchyard Construction / 2011-2012 (GÜNGÖR ELECTRICITY CO.INC.)
• Site studies with full time HSE professionals and montly 3th party audits by Selin Central Office Specialist
according to local legislation and international standarts • Execution of document-recording system • HSE trainings • Measurement and Monitoring Studies
References
Construction of Dağpazarı and BARES Wind Power Plants / 2011-2013 (ENERJİSA)
• Site studies with full time HSE professionals and montly 3th party audits by Selin Central Office according to
local legislation and IFC Performance Standarts • Preparation and participation for IFC audits • Execution of document-recording system • HSE trainings
References
Construction and Operation Stage of 8 Wind Power Plant / 2012-2014 (POLAT ENERGY )
• 3th party audits by Selin Central Office Specialist according to local legislation and International Standarts • Preparation for bank audits and participation in audits • Controlling of document-recording system • HSE trainings
References
Köprü Dam and HEPP– Menge Dam and HEPP / 2013 (ENERJİSA)
• Implementing of capturing, transporting and releasing method since interrupted by upstream and
downstream migration of fishes in high crest elevated dams • Natural cycle was provided by transporting 2611 fishes in Köprü Dam, 1973 fishes in Menge Dam
References
Construction and Operation of Underground Natural Gas Storage Facilities- BOTAŞ Salt Lake/ 2013-Cont. (TCC CHINA TIANCHEN ENGINEERING CORPORATION)
• Site studies with full time HSE professionals and montly 3th party audits by Selin Central Office • Legal Service of Environmental Officer and Environmental Permit • HSE Trainings
References
Gürcistan – Shuakhevi HEPP Construction / 2014-Cont. (AGE BATUM LLC.)
• Independent montly HSE audits according to IFC Performance Standarts and local legislation under the supervision of the Mott MacDonald
• Preparation of Environmental Management Plan and Habitat Plan • Carrying out environmental monitoring activities on a monthly basis (Dust-noise measurements and
wastewater analysis) • HSE Trainings
References
Construction of Osmaniye Natural Gas Combined Cycle Power Plant / 2015-Cont. (KAYALI ENERGY CO. INC.)
• Independent HSE audits on 6 months basis acoording to UKEF (United Kingdom Export Finance) Standards • Carrying out environmental monitoring activities on a monthly basis (Air quality, dust, noise measurements) • Revizing all Management Plans and also preparation of Griveance Mechanism • Preparation of Waste Management Plan and approval by local authority
References
Construction of Integrated Health Campuses in Adana, Yozgat, Elazığ, Bursa, İkitelli Construction of 4 Malls
Construction of Presidential Complex of Turkey– Malatya Main Jet Base National Intelligence Organization Campus – Vakıfbank Service Building
2015-Cont. (RÖNESANS HOLDING)
• Independent montly 3th Party HSE audits according to IFC Performance Standarts and local legislation • Preparation of HSE Dcuments according to IFC Performance Standarts • Controlling of document-recording system • HSE trainings
References
Trans Anatolian Natural Gas Pipeline Project Construction (TANAP )/ 2015-2018 (FERNAS CONS. CO.INC., SICIM-YÜKSEL-AKKORD PARTNERSHIP, TEKFEN CONS . CO.INC. )
• LOT-1 Environmental Analysis-Measurement and Monitoring Services • LOT-2 Environmental Analysis-Measurement and Monitoring Services • LOT-3 Waste Management, Environmental Analysis-Measurement and Monitoring Services with
Environmental Officer
References
Operations of HEPP – SPP and Construction of HEPP – SPP – WPP – ETL / 2016-Cons. (AKFEN RENEWABLE ENERGY)
• Preparation of Environmental and Social Management System according to IFC and EBRD Performance Standarts
• Preparation of Annual Monitoring Reports for 2016,2017 and 2018 years according to IFC and EBRD Performance Standarts
• Preparation of Off Site Emergency Response Plans and Traffic Management Plans for 18 HEPP and SPP Projects according to IFC and EBRD Performance Standarts
References
Construction of İstanbul Grand Airport/ 2017 (İGA AIRPORT CONSTRUCTION PARTNERSHIP COMMERCIAL ENTERPRISE)
• Preparation of Local Community Emergency Response Plan • Integration of the prepared plan into the Istanbul Provincial Emergency Plan by Directorate of Disaster and
Emergency Management (AFAD)
References
References
Preparation of Strategic Noise Map and Noise Action Plan / 2014-2018 (GENERAL DIRECTORATE OF HIGHWAYS– DİYARBAKIR METROPOLITAN MUNICIPALITY
KAYSERİ METROPOLITAN MUNICIPALITY)
• Preparing strategic noise maps of various highways in Bursa region • Preparing strategic noise maps of various highways in İzmir region • Preparing strategic noise maps of highways in Diyarbakır region • Preparation of noise action plan in Kayseri Province
Certificates
Certificates
Certificates
Certificates
References
References
References
SELİN CONSTRUCTION TOURISM
CONSULTANCY INDUSTRY AND TRADE CO. LTD.