TbilisiNovember, 2013
Session 1: Development of container block trainsPresident of JSC “KazTransService” Sultanov Arman Turlykhanovich
АО «Казтранссервис»
Has direct contracts with JSC “NC “KTZ” and the Center of firm transport service —
branch «Russian Railways» OJSC on transport management
22 carrier trucks
National container operator of the Republic of Kazakhstan
Container reloading place at st. Altynkol, 5 jobbing
plants for container
Provides a full range of transport service, organizes container trans, transportation of goods under the principle of “door to door”
3 222 ultra-large containers
Organizes the running of the accelerated main tracker trains;
JSC KazTransService 477 container
flatcars
JSC KazTransService activities
General informaions about the JSC KazTransService
branch «Западный»(7 agencies in the branch, 5 Centers
of transport services)
branch «Северный» (6 agencies in the branch, 5 Centers
of transport service)
branch «Южный» (11 agencies in the branch, 3 Centers of transport
services)
Representation in Moscow (Russian
Federation)
Representation in Beijing and in Xinjiang
(China)
The total volume of container traffic in the Republic of Kazakhstan, thousand TEU
343
432 503 539
Production performance
+26%
+7%
3
404 437+8%+17%
International st. Altynkol are functioning from December 2012. Forthe last 10 month in 2013 at st.Altynkol by company were handled 67705 containers. Container yard daily processes an average 210containers or 3570 tons of cargo. The maximum production capacity -297 containers per day.
The volume of transported cargo for 10 month through the Internationalbutt station Dostyk equaled 91 546. Container yard daily processes anaverage of 110 containers. The maximum production capacity - 450containers per day.
St.Dostyk
St.Altymkol
International butt stations Dostyk and Altynkol.
-33%
+75%
2107
67705182 750
320 947
136 54791 546
Dynamic of organization of container trains in the Republic of the Kazakhstan, units.
JSC KazTransService key projects
Dostyk
Qingdao
Chengdu
Ablyk
Qingdao-Ablykdistance – 6 268 kmspeed – 749 km/day
time – 9 days
Lyanyungan-Alamedindistance – 5 616 kmspeed – 689 km/day
time – 8 days
Alamedin
Itinerary Distance, km Way time, day
Shenzhen-Pardubice 12 360 18
Chengdu-Lodz 6865 15
Qingdao-Ablyk 5962 12
Lianyungang- Alamedin 5616 8
Chzhenchzhou-Hamburg 10522 16
Aksu-Riga 4248 19
Lianyungang-Almaty 5 170 8,5
Lyanyungan -Ablyk 5717 10
LodzPardubice
Shenzhen
Chengdu-Lodzdistance – 9 764 kmspeed– 631 km/day
time – 15 days
Chongqing
Aksu-Rigadistance – 4248 km
time – 19 days
Chzhenchzhou
Altynkol
Lianyungang-Almatydistance – 5 043 km
speed – 689 km/daystime –7 days
Almaty
Riga
AksuHamburg
Lianyungang
Urumchi
JSC KazTransService is a co-founder ofjoint venture YuXinOu (Chongqing)Logistics Co.,Ltd in Chongqing (China) ofthe container transport from Chingchingto the countries of CIS and Europe.
JSC KazTransService is a co-founder ofjoint venture YuXinOu (Chongqing)Logistics Co.,Ltd in Chongqing (China) ofthe container transport from Chingchingto the countries of CIS and Europe.
CQCT
41,1%
СП «YuXinOu (Chongqing) Logistics Co., Ltd»
In 2011: 14 trains (584х40-foot container)In 2012: 38 trains (1662х40-foot container)For 10 month of the year 2013: 34 trains (1540х40-foot container)For container train Chongqing – Duisburg provided preliminary declaration,as well as the design of the CIM / SMGS.
Chongqing – Duisburgdistance – 10 769 kmspeed – 677 km/day
time – 15 days
Dostyk
Chongqing
Iletsk
Brest
Duisburg
It is planned to reduce traffic speed to 14 days.
Joint project Chongqing - Duisburg (New Silk Road)
2.Через ст. Достык и Алтынколь для
транзитных универсальных КТК контейнеров установлен понижающий коэффициент 0.7 Shenzhen
6
Urumchi
Qingdao
Lyanyungan
Chongching
Organization of container trains from China to Europe
ChengduChzhenchzhou
Istambul
Aktau port
Dostyk
Poti
Odessa
Baku
3.Construction of JSC “NS” KTZ” Kazkhstani terminal on Lyanyungan port
1.Acquired by JSC “NC”KTZ” 2 “NC”KTZ” 2 dry
cargo ships
Altynkol
2.Through the st. Dostyk and st.Altynkol for transit of universal ultra‐large containers installed
digression coefficient – 0.7
4.Constructing the road “Zhezkazgan‐Beyneu” – length 988 km, which straightens the TRACECA route with access to the
port of Baku through Aktau. Date of completion in December 2014.
Taking into account ongoing works on construction of railroads and improving transport & logistic infrastructure on theterritory of China and participants of TRACECA program, there are opportunity to organize a joint project on carriage of goodsbetween China and Europe by analogy with the joint venture project YuXinOu (Chongqing) Logistics Co., Ltd (route Chongching-Duisburg).
THANK FOR KIND ATTENTION!