Appendix J Seven Basin States’
Proposals Regarding Colorado River Interim Operations
The seven Colorado River Basin States developed and submitted a Preliminary Proposal Regarding Colorado River Interim Operations to the Secretary of the Department of the Interior (Secretary) in a letter dated February 3, 2006. As a comment on the Draft EIS, the seven Colorado River Basin States revised their preliminary proposal and submitted it to the Secretary in a letter dated April 30, 2007. The full text of the seven Colorado River Basin States’ revised and preliminary proposals regarding the Final EIS are provided in this appendix.
Appendix J
Seven Basin States’ Proposals Regarding
Colorado River Interim Operations
Final EIS – Colorado River Interim Guidelines for Lower Basin Shortages and Coordinated Operations for Lake Powell and Lake Mead
J-1 October 2007
J.1 Revised Basin States’ Proposal – Letter to Secretary of the Interior
Seven Basin States’ Proposals Regarding Colorado River Interim Operations
Appendix J
October 2007 J-2 Final EIS – Colorado River Interim Guidelines for
Lower Basin Shortages and Coordinated Operations for Lake Powell and Lake Mead
Appendix J
Seven Basin States’Proposals Regarding
Colorado River Interim Operations
Final EIS – Colorado River Interim Guidelines for Lower Basin Shortages and Coordinated Operations for Lake Powell and Lake Mead
J-3 October 2007
Seven Basin States’ Proposals Regarding Colorado River Interim Operations
Appendix J
October 2007 J-4 Final EIS – Colorado River Interim Guidelines for
Lower Basin Shortages and Coordinated Operations for Lake Powell and Lake Mead
Appendix J
Seven Basin States’Proposals Regarding
Colorado River Interim Operations
Final EIS – Colorado River Interim Guidelines for Lower Basin Shortages and Coordinated Operations for Lake Powell and Lake Mead
J-5 October 2007
Seven Basin States’ Proposals Regarding Colorado River Interim Operations
Appendix J
October 2007 J-6 Final EIS – Colorado River Interim Guidelines for
Lower Basin Shortages and Coordinated Operations for Lake Powell and Lake Mead
This page left intentionally blank.
Appendix J
Seven Basin States’Proposals Regarding
Colorado River Interim Operations
Final EIS – Colorado River Interim Guidelines for Lower Basin Shortages and Coordinated Operations for Lake Powell and Lake Mead
J-7 October 2007
Attachment A Agreement Concerning Colorado River
Management and Operations
This attachment to Appendix J contains the text of Attachment A to the Revised Basin States’ Proposal.
Seven Basin States’ Proposals Regarding Colorado River Interim Operations
Appendix J
October 2007 J-8 Final EIS – Colorado River Interim Guidelines for
Lower Basin Shortages and Coordinated Operations for Lake Powell and Lake Mead
Appendix J
Seven Basin States’Proposals Regarding
Colorado River Interim Operations
Final EIS – Colorado River Interim Guidelines for Lower Basin Shortages and Coordinated Operations for Lake Powell and Lake Mead
J-9 October 2007
Seven Basin States’ Proposals Regarding Colorado River Interim Operations
Appendix J
October 2007 J-10 Final EIS – Colorado River Interim Guidelines for
Lower Basin Shortages and Coordinated Operations for Lake Powell and Lake Mead
Appendix J
Seven Basin States’Proposals Regarding
Colorado River Interim Operations
Final EIS – Colorado River Interim Guidelines for Lower Basin Shortages and Coordinated Operations for Lake Powell and Lake Mead
J-11 October 2007
Seven Basin States’ Proposals Regarding Colorado River Interim Operations
Appendix J
October 2007 J-12 Final EIS – Colorado River Interim Guidelines for
Lower Basin Shortages and Coordinated Operations for Lake Powell and Lake Mead
Appendix J
Seven Basin States’Proposals Regarding
Colorado River Interim Operations
Final EIS – Colorado River Interim Guidelines for Lower Basin Shortages and Coordinated Operations for Lake Powell and Lake Mead
J-13 October 2007
Seven Basin States’ Proposals Regarding Colorado River Interim Operations
Appendix J
October 2007 J-14 Final EIS – Colorado River Interim Guidelines for
Lower Basin Shortages and Coordinated Operations for Lake Powell and Lake Mead
Appendix J
Seven Basin States’Proposals Regarding
Colorado River Interim Operations
Final EIS – Colorado River Interim Guidelines for Lower Basin Shortages and Coordinated Operations for Lake Powell and Lake Mead
J-15 October 2007
Seven Basin States’ Proposals Regarding Colorado River Interim Operations
Appendix J
October 2007 J-16 Final EIS – Colorado River Interim Guidelines for
Lower Basin Shortages and Coordinated Operations for Lake Powell and Lake Mead
Appendix J
Seven Basin States’Proposals Regarding
Colorado River Interim Operations
Final EIS – Colorado River Interim Guidelines for Lower Basin Shortages and Coordinated Operations for Lake Powell and Lake Mead
J-17 October 2007
Seven Basin States’ Proposals Regarding Colorado River Interim Operations
Appendix J
October 2007 J-18 Final EIS – Colorado River Interim Guidelines for
Lower Basin Shortages and Coordinated Operations for Lake Powell and Lake Mead
Appendix J
Seven Basin States’Proposals Regarding
Colorado River Interim Operations
Final EIS – Colorado River Interim Guidelines for Lower Basin Shortages and Coordinated Operations for Lake Powell and Lake Mead
J-19 October 2007
Seven Basin States’ Proposals Regarding Colorado River Interim Operations
Appendix J
October 2007 J-20 Final EIS – Colorado River Interim Guidelines for
Lower Basin Shortages and Coordinated Operations for Lake Powell and Lake Mead
Appendix J
Seven Basin States’Proposals Regarding
Colorado River Interim Operations
Final EIS – Colorado River Interim Guidelines for Lower Basin Shortages and Coordinated Operations for Lake Powell and Lake Mead
J-21 October 2007
Seven Basin States’ Proposals Regarding Colorado River Interim Operations
Appendix J
October 2007 J-22 Final EIS – Colorado River Interim Guidelines for
Lower Basin Shortages and Coordinated Operations for Lake Powell and Lake Mead
Appendix J
Seven Basin States’Proposals Regarding
Colorado River Interim Operations
Final EIS – Colorado River Interim Guidelines for Lower Basin Shortages and Coordinated Operations for Lake Powell and Lake Mead
J-23 October 2007
Attachment B Proposed Interim Guidelines
for Colorado River Operations
This attachment to Appendix J contains the text of Attachment B to the Revised Basin States’ Proposal.
Seven Basin States’ Proposals Regarding Colorado River Interim Operations
Appendix J
October 2007 J-24 Final EIS – Colorado River Interim Guidelines for
Lower Basin Shortages and Coordinated Operations for Lake Powell and Lake Mead
Appendix J
Seven Basin States’Proposals Regarding
Colorado River Interim Operations
Final EIS – Colorado River Interim Guidelines for Lower Basin Shortages and Coordinated Operations for Lake Powell and Lake Mead
J-25 October 2007
Seven Basin States’ Proposals Regarding Colorado River Interim Operations
Appendix J
October 2007 J-26 Final EIS – Colorado River Interim Guidelines for
Lower Basin Shortages and Coordinated Operations for Lake Powell and Lake Mead
Appendix J
Seven Basin States’Proposals Regarding
Colorado River Interim Operations
Final EIS – Colorado River Interim Guidelines for Lower Basin Shortages and Coordinated Operations for Lake Powell and Lake Mead
J-27 October 2007
Seven Basin States’ Proposals Regarding Colorado River Interim Operations
Appendix J
October 2007 J-28 Final EIS – Colorado River Interim Guidelines for
Lower Basin Shortages and Coordinated Operations for Lake Powell and Lake Mead
Appendix J
Seven Basin States’Proposals Regarding
Colorado River Interim Operations
Final EIS – Colorado River Interim Guidelines for Lower Basin Shortages and Coordinated Operations for Lake Powell and Lake Mead
J-29 October 2007
Seven Basin States’ Proposals Regarding Colorado River Interim Operations
Appendix J
October 2007 J-30 Final EIS – Colorado River Interim Guidelines for
Lower Basin Shortages and Coordinated Operations for Lake Powell and Lake Mead
Appendix J
Seven Basin States’Proposals Regarding
Colorado River Interim Operations
Final EIS – Colorado River Interim Guidelines for Lower Basin Shortages and Coordinated Operations for Lake Powell and Lake Mead
J-31 October 2007
Seven Basin States’ Proposals Regarding Colorado River Interim Operations
Appendix J
October 2007 J-32 Final EIS – Colorado River Interim Guidelines for
Lower Basin Shortages and Coordinated Operations for Lake Powell and Lake Mead
Appendix J
Seven Basin States’Proposals Regarding
Colorado River Interim Operations
Final EIS – Colorado River Interim Guidelines for Lower Basin Shortages and Coordinated Operations for Lake Powell and Lake Mead
J-33 October 2007
Seven Basin States’ Proposals Regarding Colorado River Interim Operations
Appendix J
October 2007 J-34 Final EIS – Colorado River Interim Guidelines for
Lower Basin Shortages and Coordinated Operations for Lake Powell and Lake Mead
Appendix J
Seven Basin States’Proposals Regarding
Colorado River Interim Operations
Final EIS – Colorado River Interim Guidelines for Lower Basin Shortages and Coordinated Operations for Lake Powell and Lake Mead
J-35 October 2007
Seven Basin States’ Proposals Regarding Colorado River Interim Operations
Appendix J
October 2007 J-36 Final EIS – Colorado River Interim Guidelines for
Lower Basin Shortages and Coordinated Operations for Lake Powell and Lake Mead
Appendix J
Seven Basin States’Proposals Regarding
Colorado River Interim Operations
Final EIS – Colorado River Interim Guidelines for Lower Basin Shortages and Coordinated Operations for Lake Powell and Lake Mead
J-37 October 2007
Seven Basin States’ Proposals Regarding Colorado River Interim Operations
Appendix J
October 2007 J-38 Final EIS – Colorado River Interim Guidelines for
Lower Basin Shortages and Coordinated Operations for Lake Powell and Lake Mead
Appendix J
Seven Basin States’Proposals Regarding
Colorado River Interim Operations
Final EIS – Colorado River Interim Guidelines for Lower Basin Shortages and Coordinated Operations for Lake Powell and Lake Mead
J-39 October 2007
Seven Basin States’ Proposals Regarding Colorado River Interim Operations
Appendix J
October 2007 J-40 Final EIS – Colorado River Interim Guidelines for
Lower Basin Shortages and Coordinated Operations for Lake Powell and Lake Mead
Appendix J
Seven Basin States’Proposals Regarding
Colorado River Interim Operations
Final EIS – Colorado River Interim Guidelines for Lower Basin Shortages and Coordinated Operations for Lake Powell and Lake Mead
J-41 October 2007
Seven Basin States’ Proposals Regarding Colorado River Interim Operations
Appendix J
October 2007 J-42 Final EIS – Colorado River Interim Guidelines for
Lower Basin Shortages and Coordinated Operations for Lake Powell and Lake Mead
Appendix J
Seven Basin States’Proposals Regarding
Colorado River Interim Operations
Final EIS – Colorado River Interim Guidelines for Lower Basin Shortages and Coordinated Operations for Lake Powell and Lake Mead
J-43 October 2007
Seven Basin States’ Proposals Regarding Colorado River Interim Operations
Appendix J
October 2007 J-44 Final EIS – Colorado River Interim Guidelines for
Lower Basin Shortages and Coordinated Operations for Lake Powell and Lake Mead
Appendix J
Seven Basin States’Proposals Regarding
Colorado River Interim Operations
Final EIS – Colorado River Interim Guidelines for Lower Basin Shortages and Coordinated Operations for Lake Powell and Lake Mead
J-45 October 2007
Seven Basin States’ Proposals Regarding Colorado River Interim Operations
Appendix J
October 2007 J-46 Final EIS – Colorado River Interim Guidelines for
Lower Basin Shortages and Coordinated Operations for Lake Powell and Lake Mead
Appendix J
Seven Basin States’Proposals Regarding
Colorado River Interim Operations
Final EIS – Colorado River Interim Guidelines for Lower Basin Shortages and Coordinated Operations for Lake Powell and Lake Mead
J-47 October 2007
Attachment C Forbearance Agreement
This attachment to Appendix J contains the text of Attachment C to the Revised Basin States’ Proposal.
Seven Basin States’ Proposals Regarding Colorado River Interim Operations
Appendix J
October 2007 J-48 Final EIS – Colorado River Interim Guidelines for
Lower Basin Shortages and Coordinated Operations for Lake Powell and Lake Mead
Appendix J
Seven Basin States’Proposals Regarding
Colorado River Interim Operations
Final EIS – Colorado River Interim Guidelines for Lower Basin Shortages and Coordinated Operations for Lake Powell and Lake Mead
J-49 October 2007
Seven Basin States’ Proposals Regarding Colorado River Interim Operations
Appendix J
October 2007 J-50 Final EIS – Colorado River Interim Guidelines for
Lower Basin Shortages and Coordinated Operations for Lake Powell and Lake Mead
Appendix J
Seven Basin States’Proposals Regarding
Colorado River Interim Operations
Final EIS – Colorado River Interim Guidelines for Lower Basin Shortages and Coordinated Operations for Lake Powell and Lake Mead
J-51 October 2007
Seven Basin States’ Proposals Regarding Colorado River Interim Operations
Appendix J
October 2007 J-52 Final EIS – Colorado River Interim Guidelines for
Lower Basin Shortages and Coordinated Operations for Lake Powell and Lake Mead
Appendix J
Seven Basin States’Proposals Regarding
Colorado River Interim Operations
Final EIS – Colorado River Interim Guidelines for Lower Basin Shortages and Coordinated Operations for Lake Powell and Lake Mead
J-53 October 2007
Seven Basin States’ Proposals Regarding Colorado River Interim Operations
Appendix J
October 2007 J-54 Final EIS – Colorado River Interim Guidelines for
Lower Basin Shortages and Coordinated Operations for Lake Powell and Lake Mead
Appendix J
Seven Basin States’Proposals Regarding
Colorado River Interim Operations
Final EIS – Colorado River Interim Guidelines for Lower Basin Shortages and Coordinated Operations for Lake Powell and Lake Mead
J-55 October 2007
Seven Basin States’ Proposals Regarding Colorado River Interim Operations
Appendix J
October 2007 J-56 Final EIS – Colorado River Interim Guidelines for
Lower Basin Shortages and Coordinated Operations for Lake Powell and Lake Mead
Appendix J
Seven Basin States’Proposals Regarding
Colorado River Interim Operations
Final EIS – Colorado River Interim Guidelines for Lower Basin Shortages and Coordinated Operations for Lake Powell and Lake Mead
J-57 October 2007
Seven Basin States’ Proposals Regarding Colorado River Interim Operations
Appendix J
October 2007 J-58 Final EIS – Colorado River Interim Guidelines for
Lower Basin Shortages and Coordinated Operations for Lake Powell and Lake Mead
Appendix J
Seven Basin States’Proposals Regarding
Colorado River Interim Operations
Final EIS – Colorado River Interim Guidelines for Lower Basin Shortages and Coordinated Operations for Lake Powell and Lake Mead
J-59 October 2007
Seven Basin States’ Proposals Regarding Colorado River Interim Operations
Appendix J
October 2007 J-60 Final EIS – Colorado River Interim Guidelines for
Lower Basin Shortages and Coordinated Operations for Lake Powell and Lake Mead
Appendix J
Seven Basin States’Proposals Regarding
Colorado River Interim Operations
Final EIS – Colorado River Interim Guidelines for Lower Basin Shortages and Coordinated Operations for Lake Powell and Lake Mead
J-61 October 2007
Seven Basin States’ Proposals Regarding Colorado River Interim Operations
Appendix J
October 2007 J-62 Final EIS – Colorado River Interim Guidelines for
Lower Basin Shortages and Coordinated Operations for Lake Powell and Lake Mead
Appendix J
Seven Basin States’Proposals Regarding
Colorado River Interim Operations
Final EIS – Colorado River Interim Guidelines for Lower Basin Shortages and Coordinated Operations for Lake Powell and Lake Mead
J-63 October 2007
Seven Basin States’ Proposals Regarding Colorado River Interim Operations
Appendix J
October 2007 J-64 Final EIS – Colorado River Interim Guidelines for
Lower Basin Shortages and Coordinated Operations for Lake Powell and Lake Mead
Appendix J
Seven Basin States’Proposals Regarding
Colorado River Interim Operations
Final EIS – Colorado River Interim Guidelines for Lower Basin Shortages and Coordinated Operations for Lake Powell and Lake Mead
J-65 October 2007
Seven Basin States’ Proposals Regarding Colorado River Interim Operations
Appendix J
October 2007 J-66 Final EIS – Colorado River Interim Guidelines for
Lower Basin Shortages and Coordinated Operations for Lake Powell and Lake Mead
Appendix J
Seven Basin States’Proposals Regarding
Colorado River Interim Operations
Final EIS – Colorado River Interim Guidelines for Lower Basin Shortages and Coordinated Operations for Lake Powell and Lake Mead
J-67 October 2007
Seven Basin States’ Proposals Regarding Colorado River Interim Operations
Appendix J
October 2007 J-68 Final EIS – Colorado River Interim Guidelines for
Lower Basin Shortages and Coordinated Operations for Lake Powell and Lake Mead
Appendix J
Seven Basin States’Proposals Regarding
Colorado River Interim Operations
Final EIS – Colorado River Interim Guidelines for Lower Basin Shortages and Coordinated Operations for Lake Powell and Lake Mead
J-69 October 2007
Seven Basin States’ Proposals Regarding Colorado River Interim Operations
Appendix J
October 2007 J-70 Final EIS – Colorado River Interim Guidelines for
Lower Basin Shortages and Coordinated Operations for Lake Powell and Lake Mead
Appendix J
Seven Basin States’Proposals Regarding
Colorado River Interim Operations
Final EIS – Colorado River Interim Guidelines for Lower Basin Shortages and Coordinated Operations for Lake Powell and Lake Mead
J-71 October 2007
Seven Basin States’ Proposals Regarding Colorado River Interim Operations
Appendix J
October 2007 J-72 Final EIS – Colorado River Interim Guidelines for
Lower Basin Shortages and Coordinated Operations for Lake Powell and Lake Mead
This page left intentionally blank.
Appendix J
Seven Basin States’Proposals Regarding
Colorado River Interim Operations
Final EIS – Colorado River Interim Guidelines for Lower Basin Shortages and Coordinated Operations for Lake Powell and Lake Mead
J-73 October 2007
Attachment D Shortage Sharing Agreement between Arizona and Nevada
This attachment to Appendix J contains the text of Attachment D to the Revised Basin States’ Proposal.
Seven Basin States’ Proposals Regarding Colorado River Interim Operations
Appendix J
October 2007 J-74 Final EIS – Colorado River Interim Guidelines for
Lower Basin Shortages and Coordinated Operations for Lake Powell and Lake Mead
Appendix J
Seven Basin States’Proposals Regarding
Colorado River Interim Operations
Final EIS – Colorado River Interim Guidelines for Lower Basin Shortages and Coordinated Operations for Lake Powell and Lake Mead
J-75 October 2007
Seven Basin States’ Proposals Regarding Colorado River Interim Operations
Appendix J
October 2007 J-76 Final EIS – Colorado River Interim Guidelines for
Lower Basin Shortages and Coordinated Operations for Lake Powell and Lake Mead
Appendix J
Seven Basin States’Proposals Regarding
Colorado River Interim Operations
Final EIS – Colorado River Interim Guidelines for Lower Basin Shortages and Coordinated Operations for Lake Powell and Lake Mead
J-77 October 2007
Seven Basin States’ Proposals Regarding Colorado River Interim Operations
Appendix J
October 2007 J-78 Final EIS – Colorado River Interim Guidelines for
Lower Basin Shortages and Coordinated Operations for Lake Powell and Lake Mead
Appendix J
Seven Basin States’Proposals Regarding
Colorado River Interim Operations
Final EIS – Colorado River Interim Guidelines for Lower Basin Shortages and Coordinated Operations for Lake Powell and Lake Mead
J-79 October 2007
J.2 Preliminary Proposal - Letter to Secretary of the Interior
Seven Basin States’ Proposals Regarding Colorado River Interim Operations
Appendix J
October 2007 J-80 Final EIS – Colorado River Interim Guidelines for
Lower Basin Shortages and Coordinated Operations for Lake Powell and Lake Mead
Appendix J
Seven Basin States’Proposals Regarding
Colorado River Interim Operations
Final EIS – Colorado River Interim Guidelines for Lower Basin Shortages and Coordinated Operations for Lake Powell and Lake Mead
J-81 October 2007
Seven Basin States’ Proposals Regarding Colorado River Interim Operations
Appendix J
October 2007 J-82 Final EIS – Colorado River Interim Guidelines for
Lower Basin Shortages and Coordinated Operations for Lake Powell and Lake Mead
This page intentionally left blank.
Appendix J
Seven Basin States’Proposals Regarding
Colorado River Interim Operations
Final EIS – Colorado River Interim Guidelines for Lower Basin Shortages and Coordinated Operations for Lake Powell and Lake Mead
J-83 October 2007
Attachment A Preliminary Proposal Regarding
Colorado River Interim Operations
This attachment to Appendix J contains the text of Attachment A to the Preliminary Basin States’ Proposal.
Seven Basin States’ Proposals Regarding Colorado River Interim Operations
Appendix J
October 2007 J-84 Final EIS – Colorado River Interim Guidelines for
Lower Basin Shortages and Coordinated Operations for Lake Powell and Lake Mead
Appendix J
Seven Basin States’Proposals Regarding
Colorado River Interim Operations
Final EIS – Colorado River Interim Guidelines for Lower Basin Shortages and Coordinated Operations for Lake Powell and Lake Mead
J-85 October 2007
Seven Basin States’ Proposals Regarding Colorado River Interim Operations
Appendix J
October 2007 J-86 Final EIS – Colorado River Interim Guidelines for
Lower Basin Shortages and Coordinated Operations for Lake Powell and Lake Mead
Appendix J
Seven Basin States’Proposals Regarding
Colorado River Interim Operations
Final EIS – Colorado River Interim Guidelines for Lower Basin Shortages and Coordinated Operations for Lake Powell and Lake Mead
J-87 October 2007
Seven Basin States’ Proposals Regarding Colorado River Interim Operations
Appendix J
October 2007 J-88 Final EIS – Colorado River Interim Guidelines for
Lower Basin Shortages and Coordinated Operations for Lake Powell and Lake Mead
Appendix J
Seven Basin States’Proposals Regarding
Colorado River Interim Operations
Final EIS – Colorado River Interim Guidelines for Lower Basin Shortages and Coordinated Operations for Lake Powell and Lake Mead
J-89 October 2007
Seven Basin States’ Proposals Regarding Colorado River Interim Operations
Appendix J
October 2007 J-90 Final EIS – Colorado River Interim Guidelines for
Lower Basin Shortages and Coordinated Operations for Lake Powell and Lake Mead
Appendix J
Seven Basin States’Proposals Regarding
Colorado River Interim Operations
Final EIS – Colorado River Interim Guidelines for Lower Basin Shortages and Coordinated Operations for Lake Powell and Lake Mead
J-91 October 2007
Seven Basin States’ Proposals Regarding Colorado River Interim Operations
Appendix J
October 2007 J-92 Final EIS – Colorado River Interim Guidelines for
Lower Basin Shortages and Coordinated Operations for Lake Powell and Lake Mead
Appendix J
Seven Basin States’Proposals Regarding
Colorado River Interim Operations
Final EIS – Colorado River Interim Guidelines for Lower Basin Shortages and Coordinated Operations for Lake Powell and Lake Mead
J-93 October 2007
Seven Basin States’ Proposals Regarding Colorado River Interim Operations
Appendix J
October 2007 J-94 Final EIS – Colorado River Interim Guidelines for
Lower Basin Shortages and Coordinated Operations for Lake Powell and Lake Mead
Appendix J
Seven Basin States’Proposals Regarding
Colorado River Interim Operations
Final EIS – Colorado River Interim Guidelines for Lower Basin Shortages and Coordinated Operations for Lake Powell and Lake Mead
J-95 October 2007
Seven Basin States’ Proposals Regarding Colorado River Interim Operations
Appendix J
October 2007 J-96 Final EIS – Colorado River Interim Guidelines for
Lower Basin Shortages and Coordinated Operations for Lake Powell and Lake Mead
Appendix J
Seven Basin States’Proposals Regarding
Colorado River Interim Operations
Final EIS – Colorado River Interim Guidelines for Lower Basin Shortages and Coordinated Operations for Lake Powell and Lake Mead
J-97 October 2007
Attachment B Draft Agreement
This attachment to Appendix J contains the text of Attachment B to the Preliminary Basin States’ Proposal.
Seven Basin States’ Proposals Regarding Colorado River Interim Operations
Appendix J
October 2007 J-98 Final EIS – Colorado River Interim Guidelines for
Lower Basin Shortages and Coordinated Operations for Lake Powell and Lake Mead
Appendix J
Seven Basin States’Proposals Regarding
Colorado River Interim Operations
Final EIS – Colorado River Interim Guidelines for Lower Basin Shortages and Coordinated Operations for Lake Powell and Lake Mead
J-99 October 2007
Seven Basin States’ Proposals Regarding Colorado River Interim Operations
Appendix J
October 2007 J-100 Final EIS – Colorado River Interim Guidelines for
Lower Basin Shortages and Coordinated Operations for Lake Powell and Lake Mead
Appendix J
Seven Basin States’Proposals Regarding
Colorado River Interim Operations
Final EIS – Colorado River Interim Guidelines for Lower Basin Shortages and Coordinated Operations for Lake Powell and Lake Mead
J-101 October 2007
Seven Basin States’ Proposals Regarding Colorado River Interim Operations
Appendix J
October 2007 J-102 Final EIS – Colorado River Interim Guidelines for
Lower Basin Shortages and Coordinated Operations for Lake Powell and Lake Mead
Appendix J
Seven Basin States’Proposals Regarding
Colorado River Interim Operations
Final EIS – Colorado River Interim Guidelines for Lower Basin Shortages and Coordinated Operations for Lake Powell and Lake Mead
J-103 October 2007
Seven Basin States’ Proposals Regarding Colorado River Interim Operations
Appendix J
October 2007 J-104 Final EIS – Colorado River Interim Guidelines for
Lower Basin Shortages and Coordinated Operations for Lake Powell and Lake Mead
Appendix J
Seven Basin States’Proposals Regarding
Colorado River Interim Operations
Final EIS – Colorado River Interim Guidelines for Lower Basin Shortages and Coordinated Operations for Lake Powell and Lake Mead
J-105 October 2007
Seven Basin States’ Proposals Regarding Colorado River Interim Operations
Appendix J
October 2007 J-106 Final EIS – Colorado River Interim Guidelines for
Lower Basin Shortages and Coordinated Operations for Lake Powell and Lake Mead
Appendix J
Seven Basin States’Proposals Regarding
Colorado River Interim Operations
Final EIS – Colorado River Interim Guidelines for Lower Basin Shortages and Coordinated Operations for Lake Powell and Lake Mead
J-107 October 2007
Seven Basin States’ Proposals Regarding Colorado River Interim Operations
Appendix J
October 2007 J-108 Final EIS – Colorado River Interim Guidelines for
Lower Basin Shortages and Coordinated Operations for Lake Powell and Lake Mead
Appendix J
Seven Basin States’Proposals Regarding
Colorado River Interim Operations
Final EIS – Colorado River Interim Guidelines for Lower Basin Shortages and Coordinated Operations for Lake Powell and Lake Mead
J-109 October 2007
Seven Basin States’ Proposals Regarding Colorado River Interim Operations
Appendix J
October 2007 J-110 Final EIS – Colorado River Interim Guidelines for
Lower Basin Shortages and Coordinated Operations for Lake Powell and Lake Mead
This page intentionally left blank.