Industrial training Presentation
At U.P. Power Transmission Corporation Limited,
Agra
by
Shivam Anand Vaish 070906074, C / 101
Presentation Date: March 23rd, 20111
-
8/13/2019 Shivam Uppcl
2/14
Introduction
Motivation
Uttar Pradesh is one of the leading States in 400 KV transmission
lines with around 4300 circuit Km length.
The environmental interests in the Taj Trapezium Area
Theme of Training
Exposure to sub station layout
Equipment and maintenance
Introduction to transmission network at 132kV and 220kV
substations in the Taj Trapezium network
2
-
8/13/2019 Shivam Uppcl
3/14
The Taj Trapezium
Districts of Agra, Mathura and Hathras having the majorhistorical monuments.
A more strengthened transmission network to ensure
uninterrupted power supply.
3
-
8/13/2019 Shivam Uppcl
4/14
Proposed Taj Trapezium
4
-
8/13/2019 Shivam Uppcl
5/14
Training Highlights
ELE 499, Project Work / Practice School (2010 2011) Dept of E & E, Manipal Institute of Technology 00
Introduction to single line diagram
132KV substation, Agra Cantt.
132KV substation, Foundry Nagar, Agra
220KV substation, Sikandra, Agra
Symbols:Main bus
Bus coupler
Transfer Bus
Line Isolator (LI)
Circuit Breaker (CB)
Bus Isolator (BI)
Current Transformer
(CT)
Lightning Arrestor (LA)
Potential Transformer
(PT/ CVT)
3 phase Transformer
5
-
8/13/2019 Shivam Uppcl
6/14
132KV Substation Agra Cantt
6
-
8/13/2019 Shivam Uppcl
7/14
132KV Substaion Foundry Nagar, Agra
7
-
8/13/2019 Shivam Uppcl
8/14
220KV Substation, Sikandra
8
-
8/13/2019 Shivam Uppcl
9/14
Maintenance
Transformers
Temperature Supervision
Buccholz Relay
Inhibitors
Breather
Lighting Arrestor
Proper installation and maintenance Periodic leakage current readings
Replacement after 20 operations
9
-
8/13/2019 Shivam Uppcl
10/14
Summary and Conclusions
Basic building blocks of subjects like Power System Analysis and
Switchgear and Protection.
Single line diagrams find applications in almost every study related
to electricity transmission ranging from analysis of grids or study of all
types of faults. Single line diagrams also make the study of 3 phase
circuits easier.
Circuit breakers and relays. During the training I was able to seetheir actual implementation and structure in the substations
ELE 499, Project Work / Practice School (2010 2011) Dept of E & E, Manipal Institute of Technology 0010
-
8/13/2019 Shivam Uppcl
11/14
-
8/13/2019 Shivam Uppcl
12/14
Organizational structure
12
-
8/13/2019 Shivam Uppcl
13/14
Acknowledgements
It was a great experience for me to work on training at UTTAR PRADESH
POWER COOPERATION LIMITED through which provided me with first hand
experience of the working environment in a power transmission company. I wouldlike to thank all people who guided me and have been a constant source of
inspiration throughout the tenure of my training.
I am sincerely grateful to MR. B.S.TRIPATHI (Executive Engg.),
ELECTRICITY TRANSMISSION DIVISION, UPPTCL AGRAwho rendered
me his valuable assistance, constant encouragement and able guidance which madethis training actually possible. Sir was always ready to guide during my visits to
various substations during the training.
I also wish my deep sense of gratitude to Dr. CIJI PEARL KURIAN (HOD, E&E
M.I.T, MANIPAL) for making us realize the importance of a summer training
process as part of the course curriculum.
I would also like to thank all the faculty members who have always been the
background force in whatever I have tried to achieve by constantly inspiring me and
guiding me. I would also like to thank my friends who have always been a
motivation for me in bringing out the best in me.
ELE 499, Project Work / Practice School (2010 2011) Dept of E & E, Manipal Institute of Technology 0013
-
8/13/2019 Shivam Uppcl
14/14
14