Download - Site Folder Flexi BSC Pengayoman 3.doc
-
7/27/2019 Site Folder Flexi BSC Pengayoman 3.doc
1/58
FLEXI BSC_3000_Site Folder
PENGAYOMAN 3 / UPD 057
FLEXI BSCSite Folder
Rev01Project Name:MAKASSARMODERNIZATION 2GTELKOMSEL PROJECT
Site Name / Site Number:
PENGAYOMAN 3
/ UPD 057Maneja
1 Site Acceptance/Completion Certificate
2 Outstanding Tasks
3 Site Survey Report
4 Site Drawings
5 Site Inventory
6 Factory Test Report
7 Installation Checklist
8 Commissioning Checklist
9 Integration Checklist
10 Customer-Specific Data/SiteAssessment Report
11Additional Documents/SupportDocuments
Copyright Nokia Siemens Networks Page 1 (58)183089629.doc.doc
http://var/www/apps/conversion/tmp/scratch_4/Site%20Folder%20Flexi%20BSC%20Pengayoman%203.dochttp://var/www/apps/conversion/tmp/scratch_4/Site%20Folder%20Flexi%20BSC%20Pengayoman%203.doc -
7/27/2019 Site Folder Flexi BSC Pengayoman 3.doc
2/58
FLEXI BSC_3000_Site Folder
PENGAYOMAN 3 / UPD 057
TABLE OF CONTENTS
1. SITE ACCEPTANCE/COMPLETION CERTIFICATE 42. OUTSTANDING TASKS 5
3. SITE SURVEY REPORT 6
4. SITE DRAWINGS 7
5. SITE INVENTORY 8
5.1 CHANGES TO SITE INVENTORY 8
6. FACTORY TEST REPORT (OPTIONAL) 10
7. INSTALLATION CHECKLIST 117.1 CHECKING THE AVAILABILITY OF DOCUMENTS AND TOOLS NEEDED FOR
INSTALLATION 12
7.2 PREPARING THE EQUIPMENT ROOM 12
7.3 UNPACKING AND INSPECTING EQUIPMENT 13
7.4 PREPARING THE CABINET FOR INSTALLATION 13
7.5 INSTALLING THE CABINET ON THEIR OWN FEET 14
7.6 INSTALLING THE CABINET ON FLOOR RAILS 14
7.7 MOUNTING THE CABINET ON FLOOR RAILS 167.8 INSTALLING THE SIDE CABLE CONDUIT (SCC) 16
7.9 GROUNDING (EARTHING) THE CABINET 17
7.10 CONNECTING THE SITE POWER SUPPLY 17
7.11 ATTACHING AND FILLING IN THE LABELS AND STICKERS 17
7.12 INSTALLING THE INTERNAL CABLES 18
7.13 REPLACING FAN TRAYS (FTRB-A OR FTRB) 18
7.14 CREATING A TEMPORARY ESD-PROTECTED ARE (EPA) FOR FIELDWORK19
7.15 EQUIPPING CARTRIDGES WITH PLUG-IN UNITS 197.16 CABLING TO ENVIRONMENT 20
7.17 INSTALLING THE EXAU-A OR EXAU 22
7.18 FINISHING 22
7.19 FLEXI BSC (3000) INSTALLATION CERTIFICATE OF COMPLETION 22
8. COMMISSIONING CHECKLIST 24
8.1 FLEXI BSC COMMISSIONING LOG 25
Copyright Nokia Siemens Networks Page 2 (58)183089629.doc.doc
http://var/www/apps/conversion/tmp/scratch_4/Site%20Folder%20Flexi%20BSC%20Pengayoman%203.dochttp://var/www/apps/conversion/tmp/scratch_4/Site%20Folder%20Flexi%20BSC%20Pengayoman%203.doc -
7/27/2019 Site Folder Flexi BSC Pengayoman 3.doc
3/58
FLEXI BSC_3000_Site Folder
PENGAYOMAN 3 / UPD 057
8.2 FLEXI BSC (3000) COMMISSIONING CERTIFICATE OF COMPLETION 41
9. INTEGRATION 42
9.1 PREPARING THE INTEGRATION 43
9.2 CREATING THE A-INTERFACE AND TCSM 43
9.3 SYNCHRONIZATION OF A INTERFACE 45
9.4 CREATION OF ABIS INTERFACE 45
9.5 BASE STATION INITIALIZATION 46
9.6 CREATION OF TRANSMISSION CONNECTIONS 46
9.7 CONNECTION OF BSC TO OMC(NMS) 47
9.8 TEST TRANSACTION 49
9.9 FINISHING 53
9.10 FLEXI BSC (3000) INTEGRATION CERTIFICATE OF COMPLETION 54
10. CUSTOMER-SPECIFIC DATA AND SITE ASSESSMENT REPORT 55
11. ADDITIONAL DOCUMENTS 57
11.1 DOCUMENTATION CHECKLIST 57
Copyright Nokia Siemens Networks Page 3 (58)183089629.doc.doc
http://var/www/apps/conversion/tmp/scratch_4/Site%20Folder%20Flexi%20BSC%20Pengayoman%203.dochttp://var/www/apps/conversion/tmp/scratch_4/Site%20Folder%20Flexi%20BSC%20Pengayoman%203.doc -
7/27/2019 Site Folder Flexi BSC Pengayoman 3.doc
4/58
FLEXI BSC_3000_Site Folder
PENGAYOMAN 3 / UPD 057
1. SITE ACCEPTANCE/COMPLETION CERTIFICATE
Upon completing each phase of work, the supervisor is responsible for documenting that status in aCertificate of Completion and placing it in this section of the Site Folder. Doing so certifies that:
Work has been completed to the required standard.
All documentation has been completed.
Test results are within NSN specifications.
Customer-specific parameters have been applied.
Outstanding Fault Reports and SDRs have been noted in Section 2.
Without a Certificate of Completion, the next phase of work cannot begin. Only when a Certificate of
Completion has been produced for each phase of work can the Site Acceptance Certificate be completed.A NSN Networks Customer Operations Representative and Customer Representative must complete thisform upon system acceptance.
Original: Customer
Copy: Accounting
Copy: Project Manager
Copyright Nokia Siemens Networks Page 4 (58)183089629.doc.doc
http://var/www/apps/conversion/tmp/scratch_4/Site%20Folder%20Flexi%20BSC%20Pengayoman%203.dochttp://var/www/apps/conversion/tmp/scratch_4/Site%20Folder%20Flexi%20BSC%20Pengayoman%203.doc -
7/27/2019 Site Folder Flexi BSC Pengayoman 3.doc
5/58
FLEXI BSC_3000_Site Folder
PENGAYOMAN 3 / UPD 057
2. OUTSTANDING TASKS
Item Description of Outstanding Work Raised by: Completed by:
Sign.: Sign.:1 Name: Name:
Date: Date:
Sign.: Sign.:
2 Name: Name:
Date: Date:
Sign.: Sign.:
3 Name: Name:
Date: Date:
Sign.: Sign.:
4 Name: Name:
Date: Date:
Sign.: Sign.:5 Name: Name:
Date: Date:
Sign.: Sign.:
6 Name: Name:
Date: Date:
Sign.: Sign.:
7 Name: Name:
Date: Date:
Sign.: Sign.:
8 Name: Name:
Date: Date:
Sign.: Sign.:
9 Name: Name:
Date: Date:
Sign.: Sign.:
10 Name: Name:
Date: Date:
Sign.: Sign.:
11 Name: Name:
Date: Date:
Sign.: Sign.:
12 Name: Name:
Date: Date:
Sign.: Sign.:
13 Name: Name:Date: Date:
Sign.: Sign.:
14 Name: Name:
Date: Date:
Sign.: Sign.:
15 Name: Name:
Date: Date:
Copyright Nokia Siemens Networks Page 5 (58)183089629.doc.doc
http://var/www/apps/conversion/tmp/scratch_4/Site%20Folder%20Flexi%20BSC%20Pengayoman%203.dochttp://var/www/apps/conversion/tmp/scratch_4/Site%20Folder%20Flexi%20BSC%20Pengayoman%203.doc -
7/27/2019 Site Folder Flexi BSC Pengayoman 3.doc
6/58
FLEXI BSC_3000_Site Folder
PENGAYOMAN 3 / UPD 057
3. SITE SURVEY REPORT
The purpose of the Site Survey is to check the progress of any applicable Civil Works and identify anyshortcomings or potential problems prior to installation.
When applicable, Civil Works must be completed before the site will be considered ready for the NSNNetworks Installation Team to begin the installation project.
It is the responsibility of the Installation Supervisor to determine whether a site is ready for installation,and whether a Site Survey Report is necessary for this project. A site could be rejected by NSN if:
Safety to personnel may be compromised.
Civil work is not of the required standard.
Insufficient utilities exist.
Copyright Nokia Siemens Networks Page 6 (58)183089629.doc.doc
http://var/www/apps/conversion/tmp/scratch_4/Site%20Folder%20Flexi%20BSC%20Pengayoman%203.dochttp://var/www/apps/conversion/tmp/scratch_4/Site%20Folder%20Flexi%20BSC%20Pengayoman%203.doc -
7/27/2019 Site Folder Flexi BSC Pengayoman 3.doc
7/58
FLEXI BSC_3000_Site Folder
PENGAYOMAN 3 / UPD 057
4. SITE DRAWINGS
Site-specific drawings that apply to NSN equipment installation are developed by NSN Site Engineeringand contain site-specific installation information, such as:
Site layout (equipment room floor layout)
Site Power cabling layout
Site ground cabling layout
Site communications cabling layout
Copyright Nokia Siemens Networks Page 7 (58)183089629.doc.doc
http://var/www/apps/conversion/tmp/scratch_4/Site%20Folder%20Flexi%20BSC%20Pengayoman%203.dochttp://var/www/apps/conversion/tmp/scratch_4/Site%20Folder%20Flexi%20BSC%20Pengayoman%203.doc -
7/27/2019 Site Folder Flexi BSC Pengayoman 3.doc
8/58
FLEXI BSC_3000_Site Folder
PENGAYOMAN 3 / UPD 057
5. SITE INVENTORY
This section includes the following:
The Equipment Packing Lists
The Installation Hardware List
The serial numbers of the Installation Hardware List are recorded on completion of commissioning andmay be added to the Site Folder either as a paper copy or on diskette.
5.1 Changes to Site Inventory
Record all differences and replacements in the following table:
NEW UNIT OLD UNIT NSNFAULT
REPORT NO.Name / Version Serial Number Name / Version Serial Number
Copyright Nokia Siemens Networks Page 8 (58)183089629.doc.doc
http://var/www/apps/conversion/tmp/scratch_4/Site%20Folder%20Flexi%20BSC%20Pengayoman%203.dochttp://var/www/apps/conversion/tmp/scratch_4/Site%20Folder%20Flexi%20BSC%20Pengayoman%203.doc -
7/27/2019 Site Folder Flexi BSC Pengayoman 3.doc
9/58
FLEXI BSC_3000_Site Folder
PENGAYOMAN 3 / UPD 057
Notes on Inventory Lists:
Copyright Nokia Siemens Networks Page 9 (58)183089629.doc.doc
http://var/www/apps/conversion/tmp/scratch_4/Site%20Folder%20Flexi%20BSC%20Pengayoman%203.dochttp://var/www/apps/conversion/tmp/scratch_4/Site%20Folder%20Flexi%20BSC%20Pengayoman%203.doc -
7/27/2019 Site Folder Flexi BSC Pengayoman 3.doc
10/58
FLEXI BSC_3000_Site Folder
PENGAYOMAN 3 / UPD 057
6. FACTORY TEST REPORT (OPTIONAL)
Factory Test Reports may be enclosed on diskette and be optional documents, if its available can bestored at Section 11 (Additional and support documents) due to no. of pages are not fit to foldertemplate. The factory test report is available for only some equipments and be sent together withequipment when delivered.
Copyright Nokia Siemens Networks Page 10 (58)183089629.doc.doc
http://var/www/apps/conversion/tmp/scratch_4/Site%20Folder%20Flexi%20BSC%20Pengayoman%203.dochttp://var/www/apps/conversion/tmp/scratch_4/Site%20Folder%20Flexi%20BSC%20Pengayoman%203.doc -
7/27/2019 Site Folder Flexi BSC Pengayoman 3.doc
11/58
FLEXI BSC_3000_Site Folder
PENGAYOMAN 3 / UPD 057
7. INSTALLATION CHECKLIST
The Installation Team is to carry out the BSC Installation in accordance with the BSC User Manual. TheInstallation Team Supervisor is responsible for:
Ensuring that each team member has the correct tools, installation materials, and User Manual.
Checking the delivery against the packing list and placing it in Section 5 of the Site Folder.
Completing this checklist, including the signature and date.
Completing the necessary Site Deficiency Reports.
Completing the necessary Fault Reports.
Informing the Installation Manager/Site Manager of work progress, including any problems as
they arise. Completing the Certificate of Completion and placing it in Section 1 of the Site Folder.
Copyright Nokia Siemens Networks Page 11 (58)183089629.doc.doc
http://var/www/apps/conversion/tmp/scratch_4/Site%20Folder%20Flexi%20BSC%20Pengayoman%203.dochttp://var/www/apps/conversion/tmp/scratch_4/Site%20Folder%20Flexi%20BSC%20Pengayoman%203.doc -
7/27/2019 Site Folder Flexi BSC Pengayoman 3.doc
12/58
FLEXI BSC_3000_Site Folder
PENGAYOMAN 3 / UPD 057
7.1 Checking the availability of documents and tools needed for installation
INSTALLATION PHASE AND RELATED DOCUMENTS COMPLETED
Check the availability of documents needed for installation. Acquiremissing documents.
See: Installing FLEXI BSC and TCSM3i, section about the installationof FLEXI BSC and TCSM3i
OK
Check the availability of the tools needed for installation. Acquiremissing tools.
See: Installing FLEXI BSC and TCSM3i, section about the installationof FLEXI BSC and TCSM3i
OK
7.2 Preparing the Equipment Room
INSTALLATION PHASE AND RELATED DOCUMENTS COMPLETED
Ensure that all basic work such as installation of lighting, fireextinguishing and air conditioning equipment has been completed.
See: Installing FLEXI BSC and TCSM3i, section Unpacking andchecking the equipment
OK
Check against the floor plan for the site that all cableshelves and grating separate from the equipment itselfare ready.
See: Installing FLEXI BSC and TCSM3i, section Unpacking and
checking the equipment
OK
Ensure that the site power supply system has been properly installedand that it is ready for use.
See: Installing FLEXI BSC and TCSM3i, section Unpacking andchecking the equipment
OK
Ensure the ventilation equipments has been properly installed andthat the temperature in the room is within the limits allowed for theDX200 equipment.
See: Installing FLEXI BSC and TCSM3i, section Unpacking andchecking the equipment, and Installation Site requirements for BSC andTCSM, section Ventilation in the equipment room.
OK
Make the needed additional holes in raised floors and correct installationfloor plan.
Ensure that the premised are properly cleaned.
See: Installing FLEXI BSC and TCSM3i, section Unpacking andchecking the equipment
OK
Finally, cover the gangways in the equipment room with protectivematerial for the duration of the installation work.
See: Installing FLEXI BSC and TCSM3i, section Unpacking andchecking the equipment
OK
Copyright Nokia Siemens Networks Page 12 (58)183089629.doc.doc
http://var/www/apps/conversion/tmp/scratch_4/Site%20Folder%20Flexi%20BSC%20Pengayoman%203.dochttp://var/www/apps/conversion/tmp/scratch_4/Site%20Folder%20Flexi%20BSC%20Pengayoman%203.doc -
7/27/2019 Site Folder Flexi BSC Pengayoman 3.doc
13/58
FLEXI BSC_3000_Site Folder
PENGAYOMAN 3 / UPD 057
INSTALLATION PHASE AND RELATED DOCUMENTS COMPLETED
If find any defects in the site itself or the facility, notify the party
responsible and ensure that corrective actions will be takenimmediately.
See: Installing FLEXI BSC and TCSM3i, section Unpacking andchecking the equipment
OK
7.3 Unpacking and Inspecting Equipment
INSTALLATION PHASE AND RELATED DOCUMENTS COMPLETED
Check visually the transport packages for external damages. Recordthe possible damages.
See: Installing FLEXI BSC and TCSM3i, section Unpacking andchecking the equipment
OK
Remove equipment from the transport packages. Check the number ofcases against the Packing List. Record shortcomings.
See: Installing FLEXI BSC and TCSM3i, section Unpacking andchecking the equipment
Packing list / Dispatch Note
OK
Unpack the cases. OK
Inspect the equipment for external and internal damages. Record thepossible damages
See: Installing FLEXI BSC and TCSM3i, section Unpacking andchecking the equipment
OK
If there are any problems with the shipment, notify the NSN s projectlogistic in your area immediately
OK
7.4 Preparing the cabinet for installation
INSTALLATION PHASE AND RELATED DOCUMENTS COMPLETED
Remove the grounding cables between the door and the cabinetframe.
See: Installing FLEXI BSC and TCSM3i, section Preparing the cabinetfor installation
OK
Remove the doors from the cabinet for the duration of the installation.
See: Installing FLEXI BSC and TCSM3i, section Preparing the cabinetfor installation
OK
Copyright Nokia Siemens Networks Page 13 (58)183089629.doc.doc
http://var/www/apps/conversion/tmp/scratch_4/Site%20Folder%20Flexi%20BSC%20Pengayoman%203.dochttp://var/www/apps/conversion/tmp/scratch_4/Site%20Folder%20Flexi%20BSC%20Pengayoman%203.doc -
7/27/2019 Site Folder Flexi BSC Pengayoman 3.doc
14/58
FLEXI BSC_3000_Site Folder
PENGAYOMAN 3 / UPD 057
7.5 Installing the cabinet on their own feet
INSTALLATION PHASE AND RELATED DOCUMENTS COMPLETED
Study the floor plan.
See: Engineering for FLEXI BSC and TCSM3i, section Equipment roomlayout
OK
Adjust all four feet of the cabinet (or cabinets) to an initial height ofabout 50mm (2 inch).
See: Installing FLEXI BSC and TCSM3i, section Unpacking andchecking the equipment
OK
Place the cabinet to its final place according to the floor plan.
See: Installing FLEXI BSC and TCSM3i, section installing the cabinet ontheir own feet
OK
Level off the cabinet in the width and depth direction using the spiritlevel as a reference.
See: Installing FLEXI BSC and TCSM3i, section installing the cabinet ontheir own feet
OK
If two or more FLEXI BSCor TCSM3i are installed, repeat the stepmentioned above.
See: Installing FLEXI BSC and TCSM3i, section installing the cabinet ontheir own feet
OK
Attached the base cabinet (BSCC) and extension cabinet (BSCD) byusing bolts for attachment
OK
Attach the Cabling cabinet to the BSCC, the BSCD, or the TCSA cabinetusing bolts for attachment. OK
When installing the TCSM3i for combined BSC3i/TCSM3i installationoption, attach the TCSA cabinet to the BSC part by using bolts forattachment, be it the BSCC cabinet or the BSCD cabinet.
OK
In a row consisting of several network elements, attach the networkelement firmly to one another, but do not use any bolts for attachment
OK
7.6 Installing the cabinet on floor rails
INSTALLATION PHASE AND RELATED DOCUMENTS COMPLETED
Study the floor plan.
See: Engineering for FLEXI BSC and TCSM3i, section Equipment roomlayout
OK
Determine the insertion points on the floor for the attachment screws forfirst rail
See: Installing FLEXI BSC and TCSM3i, section Installing the cabinetson floor rails
OK
Copyright Nokia Siemens Networks Page 14 (58)183089629.doc.doc
http://var/www/apps/conversion/tmp/scratch_4/Site%20Folder%20Flexi%20BSC%20Pengayoman%203.dochttp://var/www/apps/conversion/tmp/scratch_4/Site%20Folder%20Flexi%20BSC%20Pengayoman%203.doc -
7/27/2019 Site Folder Flexi BSC Pengayoman 3.doc
15/58
FLEXI BSC_3000_Site Folder
PENGAYOMAN 3 / UPD 057
INSTALLATION PHASE AND RELATED DOCUMENTS COMPLETED
Drill the holes for the screws and lodge a wedge anchor in each hole.
See: Installing FLEXI BSC and TCSM3i, section Installing the cabinetson floor rails
OK
Repeat the procedure mentioned above for the other rails.
See: Installing FLEXI BSC and TCSM3i, section Installing the cabinetson floor rails
OK
Place the rails to their final places and level them off.
See: Installing FLEXI BSC and TCSM3i, section Installing the cabinetson floor rails
OK
In IBN installation, mount the insulation tube in the first hole, followedby the insulation washer, the washer and the attachment screws. Screw
in the screw slowly.Repeat the procedure mentioned above to all attachment points for bothrails.
See: Installing FLEXI BSC and TCSM3i, section Installing the cabinetson floor rails
OK
After attaching all screws, tighten them.
See: Installing FLEXI BSC and TCSM3i, section Installing the cabinetson floor rails
OK
In IBN installation, check the attachment screws are not electricallyconnected to the rail.
See: Installing FLEXI BSC and TCSM3i, section Installing the cabinets
on floor rails
OK
Insert the cabinet attachment pieces inside the floor rails
See: Installing FLEXI BSC and TCSM3i, section Installing the cabinetson floor rails
OK
Place the support bars crosswise to the rails, each bar on a pair ofcabinet attachment pieces
See: Installing FLEXI BSC and TCSM3i, section Installing the cabinetson floor rails.
OK
Move the support bars to approximately their final positions lengthwiseon the rails.
See: Installing FLEXI BSC and TCSM3i, section Installing the cabinetson floor rails.
OK
Copyright Nokia Siemens Networks Page 15 (58)183089629.doc.doc
http://var/www/apps/conversion/tmp/scratch_4/Site%20Folder%20Flexi%20BSC%20Pengayoman%203.dochttp://var/www/apps/conversion/tmp/scratch_4/Site%20Folder%20Flexi%20BSC%20Pengayoman%203.doc -
7/27/2019 Site Folder Flexi BSC Pengayoman 3.doc
16/58
FLEXI BSC_3000_Site Folder
PENGAYOMAN 3 / UPD 057
7.7 Mounting the cabinet on floor rails
INSTALLATION PHASE AND RELATED DOCUMENTS COMPLETED
Remove the feet from the cabinet.
See: Installing FLEXI BSC and TCSM3i, section installing the cabinet onfloor rails
OK
Place the installation ramp in front of the rail, between the support barsfor the cabinet and press the support bars against the sides of the ramp
See: Installing FLEXI BSC and TCSM3i, section Installing the cabinetson floor rails
OK
Roll the cabinet along the ramp onto the support bars.
See: Installing FLEXI BSC and TCSM3i, section Installing the cabinetson floor rails
OK
Loosely attach the cabinet to the attachment pieces using M10x40 hexbolts.
See: Installing FLEXI BSC and TCSM3i, section Installing the cabinetson floor rails
OK
Push the cabinet sideways along the rails to its final position.
See: Installing FLEXI BSC and TCSM3i, section Installing the cabinetson floor rails
OK
Attach the base cabinet (BSCC) and the extension cabinet (BSCD), orthe TCSA cabinet by using bolts for attachment.
See: Installing FLEXI BSC and TCSM3i, section Installing the cabinets
on floor rails
OK
Attach the Cabling cabinet to the BSCC, the BSCD, or the TCSAcabinet using bolts for attachment
OK
When installing the TCSM3i for combined BSC3i/TCSM3i installationoption, attach the TCSA cabinet to the BSC part by using bolts forattachment, be it the BSCC cabinet or the BSCD cabinet.
OK
In a row consisting of several network elements, attach the networkelement firmly to one another, but do not use any bolts for attachment
OK
7.8 Installing the Side Cable Conduit (SCC)
INSTALLATION PHASE AND RELATED DOCUMENTS COMPLETED
Install two mounting brackets in the upper and lower holes of the cabinetusing screws, washers and nuts.
See: Installing FLEXI BSC and TCSM3i, section installing the Side CableConduit (SCC)
OK
Install the conduit panel on the mounting bracket using washers andscrews
See: Installing FLEXI BSC and TCSM3i, section installing the Side CableConduit (SCC)
OK
Copyright Nokia Siemens Networks Page 16 (58)183089629.doc.doc
http://var/www/apps/conversion/tmp/scratch_4/Site%20Folder%20Flexi%20BSC%20Pengayoman%203.dochttp://var/www/apps/conversion/tmp/scratch_4/Site%20Folder%20Flexi%20BSC%20Pengayoman%203.doc -
7/27/2019 Site Folder Flexi BSC Pengayoman 3.doc
17/58
FLEXI BSC_3000_Site Folder
PENGAYOMAN 3 / UPD 057
7.9 Grounding (earthing) the cabinet
INSTALLATION PHASE AND RELATED DOCUMENTS COMPLETED
Install the main ground cable to the grounding connector.
See: Installing FLEXI BSC and TCSM3i, section Grounding the cabinet
OK
Measure and cut a 25mm2 (AWG4) cables which connect the networkelement to the main ground bar of the site (one cable per networkelement).
See: Installing FLEXI BSC and TCSM3i, section Grounding the cabinet
OK
Install the NEBS-compliant cable bracket to the grounding connector.
See: Installing FLEXI BSC and TCSM3i, section Grounding the cabinet
OK
Install the grounding lug, with a cable crimped to it, to the groundingbracket with two M6 hex socket screws.
See: Installing FLEXI BSC and TCSM3i, section Grounding the cabinet
OK
Make sure and cut a 25mm2 (AWG4) cables which connect the networkelement to the main ground bar of the site (one cable per networkelement).
See: Installing FLEXI BSC and TCSM3i, section Grounding the cabinet
OK
7.10 Connecting the site power supply
INSTALLATION PHASE AND RELATED DOCUMENTS COMPLETED
Install the earth comb panels (CPGOs) on the top of the BSCC cabinetin the holes on the right-hand side (see from the front) of the connectorpanel (CPRJ45-A or CPRJ45) with four Allen-head screws.
See: Installing FLEXI BSC and TCSM3i, section Connecting the powersupply
OK
Connect the main supply cables from the rectif iers to the four powerconnector blocks (PSCG3-B) on the top structure of the cabinet.
See: Installing FLEXI BSC and TCSM3i, section Connecting the powersupply
OK
7.11 Attaching and filling in the labels and stickers
INSTALLATION PHASE AND RELATED DOCUMENTS COMPLETED
Attach labels (the network element identification sticker and cabinetidentification and positioning sticker)
See: Installing FLEXI BSC and TCSM3i, section Attaching identificationstickers and marking labels.
OK
Copyright Nokia Siemens Networks Page 17 (58)183089629.doc.doc
http://var/www/apps/conversion/tmp/scratch_4/Site%20Folder%20Flexi%20BSC%20Pengayoman%203.dochttp://var/www/apps/conversion/tmp/scratch_4/Site%20Folder%20Flexi%20BSC%20Pengayoman%203.doc -
7/27/2019 Site Folder Flexi BSC Pengayoman 3.doc
18/58
FLEXI BSC_3000_Site Folder
PENGAYOMAN 3 / UPD 057
INSTALLATION PHASE AND RELATED DOCUMENTS COMPLETED
Fill in the labels.
See: Installing FLEXI BSC and TCSM3i, section Attaching identificationstickers and marking labels.
OK
7.12 Installing the internal cables
INSTALLATION PHASE AND RELATED DOCUMENTS COMPLETED
Check that the cabling lists are available.
See: Installing FLEXI BSC and TCSM3i, section Installing the internalcables
OK
Install the internal cabling according to the cable lists.See: Installing FLEXI BSC and TCSM3i, section Installing the internalcables
OK
7.13 Replacing Fan Trays (FTRB-A or FTRB)
INSTALLATION PHASE AND RELATED DOCUMENTS COMPLETED
Remove cable form the FTRB-A or FTRB
See: Installing FLEXI BSC and TCSM3i, section Installing and replacingFan Trays.
OK
Pull the FRTB-A or FTRB out of the shelf.
See: Installing FLEXI BSC and TCSM3i, section Installing and replacingFan Trays.
OK
Insert the FTRB-A or FTRB into the shelf : slide the locks on the front ofthe FTRB-A or FTRB towards each other and push the Fan Tray gentlyinto its shelf (position 2 and 4) until it clicks into place
See: Installing FLEXI BSC and TCSM3i, section Installing and replacingFan Trays.
OK
Connect cables into FTRB-A or FTRB:
- Connect the power cable from connector P7 in the corresponding
PDFU-B (S11.5 onwards) PDFU-A (S11 or S10.5) to the backconnector of the FTRB.
- Connect the alarm cabling from CLOC-B to the back connector ofthe FTRB-A or FTRB.
- Connect grounding cable from the shelf to the FTRB-A or FTRB.
See: Installing FLEXI BSC and TCSM3i, section Installing and replacingFan Trays.
OK
Copyright Nokia Siemens Networks Page 18 (58)183089629.doc.doc
http://var/www/apps/conversion/tmp/scratch_4/Site%20Folder%20Flexi%20BSC%20Pengayoman%203.dochttp://var/www/apps/conversion/tmp/scratch_4/Site%20Folder%20Flexi%20BSC%20Pengayoman%203.doc -
7/27/2019 Site Folder Flexi BSC Pengayoman 3.doc
19/58
FLEXI BSC_3000_Site Folder
PENGAYOMAN 3 / UPD 057
7.14 Creating a temporary ESD-protected are (EPA) for fieldwork
INSTALLATION PHASE AND RELATED DOCUMENTS COMPLETED
Create a temporary ESD protected area (EPA
See: Installing FLEXI BSC and TCSM3i, section Creating a temporaryESD protected area (EPA) for fieldwork
OK
7.15 Equipping cartridges with plug-in units
INSTALLATION PHASE AND RELATED DOCUMENTS COMPLETED
Check the following;
- PROM versions of the plug-in units
-Interchangeability codes of the plug-in units
- Jumper connections on the plug-in units
See: Installing FLEXI BSC and TCSM3i, section Equipping thecartridges with plug-in units.
OK
Familiarize yourself with precautions to be taken.
See: Installing FLEXI BSC and TCSM3i, section Equipping thecartridges with plug-in units.
OK
Ensure that you are working in an electrostatic free environment
See: Installing FLEXI BSC and TCSM3i, section Equipping thecartridges with plug-in units.
OK
Handle the plug-in units with care at all installation phasesSee: Installing FLEXI BSC and TCSM3i, section Equipping thecartridges with plug-in units.
OK
Mount the WDU (Hard Disk with HDPU-A).
See: Installing FLEXI BSC and TCSM3i, section Equipping thecartridges with plug-in units.
OK
Mount the FDU (Magneto Optical Disk Drive with ODPU-A).
See: Installing FLEXI BSC and TCSM3i, section Equipping thecartridges with plug-in units.
OK
Check the code of the plug-in unit positions. Record and correct thedifferences according to jumper setting instructions.
See: Installing FLEXI BSC and TCSM3i, section Equipping thecartridges with plug-in units.
See also: Site documents Equipment list for BSC3i,Equipment list forTCSM3i
OK
Install the EMC shielding springs.
See: Installing FLEXI BSC and TCSM3i, section Equipping thecartridges with plug-in units.
OK
Copyright Nokia Siemens Networks Page 19 (58)183089629.doc.doc
http://var/www/apps/conversion/tmp/scratch_4/Site%20Folder%20Flexi%20BSC%20Pengayoman%203.dochttp://var/www/apps/conversion/tmp/scratch_4/Site%20Folder%20Flexi%20BSC%20Pengayoman%203.doc -
7/27/2019 Site Folder Flexi BSC Pengayoman 3.doc
20/58
FLEXI BSC_3000_Site Folder
PENGAYOMAN 3 / UPD 057
INSTALLATION PHASE AND RELATED DOCUMENTS COMPLETED
Use the EDS wrist strap earthing device.
-Insert the plug-in units (including I/O devices) in the cartridgesafter checking of identification labels.
- Leave the plug-in unit unconnected.
See: Installing FLEXI BSC and TCSM3i, section Equipping thecartridges with plug-in units.
OK
Install the power supply units.
See: Installing FLEXI BSC and TCSM3i, section Equipping thecartridges with plug-in units.
OK
Switch power supply units on. Check the functions of the units from the LEDindications.
See: Installing FLEXI BSC and TCSM3i, section Equipping thecartridges with plug-in units.
OK
7.16 Cabling to environment
INSTALLATION PHASE AND RELATED DOCUMENTS COMPLETED
CPGO in TCSM3i for combined BSC3i/TCSM3i installation option OK
The STM-1/OC-3 interfaces are cables from the SFPS1L modulesequipped to the front connectors of the ETS2 plug-in units to thegrounding outlet CPGO a the cabinet top, and through the CPGO tothe customer network
See: Connector Panels and External Cables in FLEXI BSC and TCSM3iSection CPGO
See also: Site documents interconnection Cables in TCSM3i,andCabling instruction for TCSM3i
OK
CPGO in FLEXI BSC660 OK
Prepare E1/T1 (PCM) and X.25 cables and possible external alarm inputcable going through the CPGO panel to proper length and installconnectors
See: Connector Panels and External Cables in FLEXI BSC and TCSM3iSection CPGO
See also: Site documents interconnection Cables in FLEXI BSC andTCSM3i,and Cabling instruction for FLEXI BSC and TCSM3i
OK
Settle and tie E1/T1 (PCM) and X.25 and incoming external alarmcables going through the CPGO panel neatly.
See: Connector Panels and External Cables in FLEXI BSC and TCSM3iSection CPGO
See also: Site documents interconnection Cables in FLEXI BSC andTCSM3i,and Cabling instruction for FLEXI BSC and TCSM3i
OK
Copyright Nokia Siemens Networks Page 20 (58)183089629.doc.doc
http://var/www/apps/conversion/tmp/scratch_4/Site%20Folder%20Flexi%20BSC%20Pengayoman%203.dochttp://var/www/apps/conversion/tmp/scratch_4/Site%20Folder%20Flexi%20BSC%20Pengayoman%203.doc -
7/27/2019 Site Folder Flexi BSC Pengayoman 3.doc
21/58
FLEXI BSC_3000_Site Folder
PENGAYOMAN 3 / UPD 057
INSTALLATION PHASE AND RELATED DOCUMENTS COMPLETED
Ground and tie the outgoing cables (E1/T1, X.25, alarm) in the
grounding element of CPGO panel.See: Connector Panels and External Cables in FLEXI BSC and TCSM3iSection CPGO
See also: Site documents interconnection Cables in FLEXI BSC andTCSM3i,and Cabling instruction for FLEXI BSC and TCSM3i
OK
Cut the cable to proper length and connect them to the DDF.
See: Connector Panels and External Cables in FLEXI BSC and TCSM3iSection CPGO
See also: Site documents interconnection Cables in FLEXI BSC andTCSM3i,and Cabling instruction for FLEXI BSC and TCSM3i
OK
CPRJ45-A in S12 first delivery of FLEXI BSC1000/2000, and CPRJ45in upgrade deliveries in FLEXI BSC660 OK
Prepare the cabling going to the CPRJ45 panel (Lan, LPT/VDU,Synchronization, alarm and external alarm unit interface)
See: Connector Panels and External Cables in FLEXI BSC and TCSM3iSection CPGO
See also: Site documents interconnection Cables in FLEXI BSC andTCSM3i,and Cabling instruction for FLEXI BSC and TCSM3i
OK
E1/T1 (PCM) balance trunk cable panels CPETS-E and CPETS-F OK
Prepare and cable the balanced trunk going to the connector panelsCPETS-E and CPETS-F either at the cabinet top or in the Cabling
cabinet.See: Connector Panels and External Cables in FLEXI BSC and TCSM3iSection CPGO
See also: Site documents interconnection Cables in FLEXI BSC andTCSM3i,and Cabling instruction for FLEXI BSC and TCSM3i
OK
E1/T1 (PCM) balance trunk cable panels CPETC-E and CPETC-F OK
Prepare and cable the balanced trunk going to the connector panelsCPETC-E and CPETC-F either at the cabinet top or in the Cablingcabinet.
See: Connector Panels and External Cables in FLEXI BSC and TCSM3iSection CPGO
See also: Site documents interconnection Cables in FLEXI BSC andTCSM3i,and Cabling instruction for FLEXI BSC and TCSM3i
OK
Copyright Nokia Siemens Networks Page 21 (58)183089629.doc.doc
http://var/www/apps/conversion/tmp/scratch_4/Site%20Folder%20Flexi%20BSC%20Pengayoman%203.dochttp://var/www/apps/conversion/tmp/scratch_4/Site%20Folder%20Flexi%20BSC%20Pengayoman%203.doc -
7/27/2019 Site Folder Flexi BSC Pengayoman 3.doc
22/58
FLEXI BSC_3000_Site Folder
PENGAYOMAN 3 / UPD 057
7.17 Installing the EXAU-A or EXAU
INSTALLATION PHASE AND RELATED DOCUMENTS COMPLETED
Mount the External Alarm Unit on the wall and connect the alarm cable.
See: Installing FLEXI BSC and TCSM3i, section Installing the ExternalAlarm Unit (EXAU/-A)
OK
7.18 Finishing
INSTALLATION PHASE AND RELATED DOCUMENTS COMPLETED
Remove all temporary markings. OK
Check the corrections in drawings used during the installation. OK
Reinstall the doors
See: Installing FLEXI BSC and TCSM3i, section Finishing the installation
OK
Connect the grounding cables between the doors and the cabinet frame.
See: Installing FLEXI BSC and TCSM3i, section Finishing the installation
OK
Clean the installation site OK
Fill in the Installation Certificate of Completion OK
7.19 FLEXI BSC (3000) InstallationCertificate of Completion
Customer Name: TELKOMSEL Site Address:
Contract PO# HOT 2G Mod. Mksr #3 3332010 JL. PENGAYOMAN NO.1Delivery Ref. KELURAHAN BUAKANA
Site Name: PENGAYOMAN 3 KECAMATAN PANAKUKANG
Site Number: UPD 057 MAKASSAR SULAWESI SELATAN
INSTALLATION STAGECHECKED(INITIALS)
COMMENTS
Checking the availability of documents and tools OK
Copyright Nokia Siemens Networks Page 22 (58)183089629.doc.doc
http://var/www/apps/conversion/tmp/scratch_4/Site%20Folder%20Flexi%20BSC%20Pengayoman%203.dochttp://var/www/apps/conversion/tmp/scratch_4/Site%20Folder%20Flexi%20BSC%20Pengayoman%203.doc -
7/27/2019 Site Folder Flexi BSC Pengayoman 3.doc
23/58
FLEXI BSC_3000_Site Folder
PENGAYOMAN 3 / UPD 057
Unpacking and checking the equipment OK
Preparing the cabinet for installation OK
Installing the cabinet on its own feet OK
Installing the cabinet on floor rails OK
Installing the Side Cable Conduit OK
Grounding (earthing) the cabinet OK
Connecting the station power supply OK
Attaching and filling in the labels and stickers OK
Installing the internal cables OK
Replacing the Fan trays OK
Creating a temporary ESD protected area OK
Equipping the cartridges with plug-in units OK
Cables to environment OK
Installing the External Alarm Unit OK
Finishing OK
NSN hereby states that the whole of supplies detailed above have been inspected, tested and unlessotherwise stated conform to the specified requirements in the contract or order identified above.
NSN Site Representative (print name):
NSN Site Representative (signature): Date:
Customer Representative (print name):
Customer Site Representative (signature): Date:
Copyright Nokia Siemens Networks Page 23 (58)183089629.doc.doc
http://var/www/apps/conversion/tmp/scratch_4/Site%20Folder%20Flexi%20BSC%20Pengayoman%203.dochttp://var/www/apps/conversion/tmp/scratch_4/Site%20Folder%20Flexi%20BSC%20Pengayoman%203.doc -
7/27/2019 Site Folder Flexi BSC Pengayoman 3.doc
24/58
FLEXI BSC_3000_Site Folder
PENGAYOMAN 3 / UPD 057
8. COMMISSIONING CHECKLIST
The Commissioning Engineer is to carry out all commissioning tests in accordance with the FLEXI BSCCommissioning Procedure, using the FLEXI BSC User Manual and other approved reference material.Customer-specific parameters are to be used where applicable. A signed Certificate of Completion forthe installation work must be included in Section 1 of the Site Folder, certifying that the installation workhas been completed to the required standard. The Commissioning Engineer is responsible for:
Checking the quality of the installation.
Correcting any installation problems/faults or deficiencies.
Familiarization with current Technical Notes.
Commissioning the FLEXI BSC system in preparation for integration.
Completing this checklist, including signature and date.
Completing the necessary Site Deficiency Reports.
Completing the necessary Fault Reports.
Informing the Site Manager of work progress, including any problems as they arise.
Completing the Certificate of Completion and placing it in Section 1 of the Site Folder.
Thecommissioningstartswithinitialinspectionsduringwhich theconditionof thehardwareandsoftwareischecked.Aftertheseinspections,theorderofthe testscanbedeterminedfreely.Thetester
markstheresultsofthetestsinthetest logs.
Reading the instructions is recommended before starting the tests.
After the tests, fill in the Commissioning Checklist.
Copyright Nokia Siemens Networks Page 24 (58)183089629.doc.doc
http://var/www/apps/conversion/tmp/scratch_4/Site%20Folder%20Flexi%20BSC%20Pengayoman%203.dochttp://var/www/apps/conversion/tmp/scratch_4/Site%20Folder%20Flexi%20BSC%20Pengayoman%203.doc -
7/27/2019 Site Folder Flexi BSC Pengayoman 3.doc
25/58
FLEXI BSC_3000_Site Folder
PENGAYOMAN 3 / UPD 057
8.1 FLEXI BSC Commissioning log
Table 1: BSS specifications
Customer : TELKOMSEL
BSC name : FLEXI BSC PENGAYOMAN 3
BCS Software release (xx.yy.-zz) : SE0602PP (CIDE00SX 1.15-0)
Checked by :
Date :
Approved by :
Date :
Table 2: Preparation of Commissioning. See Measurement devices and tools
Commissioning phase Completed
Check that the necessary measurement devices andtools are available
OK
OK = everything is in order NOK = something is wrong
Table 3: Inspecting FLEXI BSC internal cabling
Commissioning phase Completed
Compare the internal cabling with Interconnection Cables List in the SiteSpecific Documents.
OK
OK = everything is in order NOK = something is wrong
Table 4: Inspecting FLEXI BSC hardware functioning
Commissioning phase Completed
Compare the interchange ability codes of the plug-in units and cartridges with BSC and
TCSM Hardware Revision List in the Site Specific Documents.
OK
Check the jumpers and EPROM versions of plug-in units and cartridges by comparingthem to the version list. Tick the box in the following tables when ready. Connect ETcables after checking the units.
OK
OK = everything is in order NOK = something is wrong
Table 5: Inspecting strappings, DIP switches, memory, and EPROMs of OMU
Copyright Nokia Siemens Networks Page 25 (58)183089629.doc.doc
http://var/www/apps/conversion/tmp/scratch_4/Site%20Folder%20Flexi%20BSC%20Pengayoman%203.dochttp://var/www/apps/conversion/tmp/scratch_4/Site%20Folder%20Flexi%20BSC%20Pengayoman%203.doc -
7/27/2019 Site Folder Flexi BSC Pengayoman 3.doc
26/58
FLEXI BSC_3000_Site Folder
PENGAYOMAN 3 / UPD 057
Unit CPU jumpers CPU DIPswitches
CPU FLASH CPUmemory
MBIF DIPswitches
AS7jumpers
OMU OK OK 3.11-0 & 3.12-0 1073MB OK NIU
Unit AS7 DIPswitches
AC25jumpers
AC25 EPROM HWATjumpers
SEROjumpers
OPDUjumpers
OMU OK OK OK OK OK OK
Unit OPDU DIPswitches
OMU N/A
OK = everything is in order NOK = something is wrong NIU = Not in Use
VER xx.xx = FLASH or EPROM version xxx MB = Amount of CPU memory
Table 6: Inspecting strappings, DIP switches, memory, and EPROMs of MCMU's
Unit CPU jumpers CPU DIP switches CPU FLASH CPU memory SWPRO jumper ESB jumpers
MCMU0 OK OK 3.11-0 & 3.12-0 1073MB NIU NIU
MCMU1 OK OK 3.11-0 & 3.12-0 1073MB NIU NIU
Unit ESB EPROM ESB DIP switches SWPRO EPROMs ADMODD DIPswiches
MCMU0 OK OK OK OK
MCMU1 OK OK OK OK
OK = everything is in order NOK = something is wrong NIU = Not in Use
VER xx.xx = FLASH or EPROM version xxx MB = Amount of CPU memory
Table 7: Inspecting strappings of GSWP
Unit SW256B jumpers DIP swicth
GSW2KB 0 NIU OK
GSW2KB 1 NIU OK
OK = everything is in order NOK = something is wrong NIU = Not in Use
Table 8: Inspecting strappings, DIP switches, memory, and EPROMs of BCSU's
Unit CPU CPU DIP CPU FLASH CPU MBIF DIP AS7
Copyright Nokia Siemens Networks Page 26 (58)183089629.doc.doc
http://var/www/apps/conversion/tmp/scratch_4/Site%20Folder%20Flexi%20BSC%20Pengayoman%203.dochttp://var/www/apps/conversion/tmp/scratch_4/Site%20Folder%20Flexi%20BSC%20Pengayoman%203.doc -
7/27/2019 Site Folder Flexi BSC Pengayoman 3.doc
27/58
FLEXI BSC_3000_Site Folder
PENGAYOMAN 3 / UPD 057
jumpers switches memory switches jumpers
BCSU0 OK OK 3.11-0 & 3.12-0 OK OK OK
BCSU1 OK OK 3.11-0 & 3.12-0 OK OK OK
BCSU2 OK OK 3.11-0 & 3.12-0 OK OK OK
BCSU3 OK OK 3.11-0 & 3.12-0 OK OK OK
BCSU4 OK OK 3.11-0 & 3.12-0 OK OK OK
BCSU5 N/A N/A N/A N/A N/A N/A
BCSU6 N/A N/A N/A N/A N/A N/A
BCSU7 N/A N/A N/A N/A N/A N/A
BCSU8 N/A N/A N/A N/A N/A N/A
BCSU9 N/A N/A N/A N/A N/A N/A
BCSU10 N/A N/A N/A N/A N/A N/A
Unit AS7 DIPswitches
PCUjumpers
PCU DIP switches PCU FLASH
BCSU0 OK OK OK 2.4-0
BCSU1 OK OK OK 2.4-0
BCSU2 OK OK OK 2.4-0
BCSU3 OK OK OK 2.4-0
BCSU4 OK OK OK 2.4-0
BCSU5 N/A N/A N/A N/A
BCSU6 N/A N/A N/A N/A
BCSU7 N/A N/A N/A N/A
BCSU8 N/A N/A N/A N/A
BCSU9 N/A N/A N/A N/A
BCSU10 N/A N/A N/A N/A
Copyright Nokia Siemens Networks Page 27 (58)183089629.doc.doc
http://var/www/apps/conversion/tmp/scratch_4/Site%20Folder%20Flexi%20BSC%20Pengayoman%203.dochttp://var/www/apps/conversion/tmp/scratch_4/Site%20Folder%20Flexi%20BSC%20Pengayoman%203.doc -
7/27/2019 Site Folder Flexi BSC Pengayoman 3.doc
28/58
FLEXI BSC_3000_Site Folder
PENGAYOMAN 3 / UPD 057
OK = everything are on order NOK = something is wrong NIU = Not in Use
VER xx.xx = FLASH or EPROM version xxx MB = Amount of CPU memory
Table 9: Inspecting strappings and EPROMs of ET's
Unit ETC-0 ETC-1 ETC-2 ETC-3 ETC-4 ETC-5
ET16 SLOT 1 OK OK OK N/A N/A N/A
ET16 SLOT 2 OK OK OK N/A N/A N/A
ET16 SLOT 3 OK OK OK N/A N/A N/A
ET16 SLOT 4 OK OK OK N/A N/A N/A
ET16 SLOT 5 OK OK OK N/A N/A N/A
ET16 SLOT 6 OK OK OK N/A N/A N/A
ET16 SLOT 7 OK OK OK N/A N/A N/A
ET16 SLOT 8 OK OK OK N/A N/A N/A
ET16 SLOT 9 N/A OK N/A N/A N/A N/A
OK = everything is in order NOK = something is wrong
NIU = Not in use VER xx.xx = EPROM version
Unit GTIC 0 GTIC 1
ETS2 SLOT 1 OK NIU
ETS2 SLOT 2 OK NIU
ETS2 SLOT 3 NIU NIU
ETS2 SLOT 4 NIU NIU
ETS2 SLOT 5 NIU NIU
ETS2 SLOT 6 NIU NIU
ETS2 SLOT 7 NIU NIU
ETS2 SLOT 8 NIU NIU
Table 10: Inspecting strappings and EPROMs of clock equipment
Unit CLOC jumpers CLOC EPROM TON FIA EPROM Cartridge jumpers
CLS 0 OK OK OK OK
CLS 1 OK OK OK OK
Copyright Nokia Siemens Networks Page 28 (58)183089629.doc.doc
http://var/www/apps/conversion/tmp/scratch_4/Site%20Folder%20Flexi%20BSC%20Pengayoman%203.dochttp://var/www/apps/conversion/tmp/scratch_4/Site%20Folder%20Flexi%20BSC%20Pengayoman%203.doc -
7/27/2019 Site Folder Flexi BSC Pengayoman 3.doc
29/58
FLEXI BSC_3000_Site Folder
PENGAYOMAN 3 / UPD 057
CLAB 0 OK OK OK OK
CLAB 1 OK OK OK OK
CLAB 2 NIU NIU NIU NIU
CLAB 3 NIU NIU NIU NIU
CLAB 4 NIU NIU NIU NIU
CLAB 5 NIU NIU NIU NIU
OK = everything is in order NOK = something is wrong NIU = Not in Use
VER xx.xx = EPROM version
Table 11: Testing power supply
Commissioning phase Completed
Measure the supply voltage from the PDE powersupply lines:
OK
Nominal voltage: -48V to -60V -52 V
Tolerance: -40.5V to -72V OK
OK = everything is in order NOK = something is wrong
Table 12: Testing peripheral units
Commissioning phase Completed
Check that the settings of VDU are as follows: OK
Baud Rate: 9600 OK
Data Bits: 7 OK
Copyright Nokia Siemens Networks Page 29 (58)183089629.doc.doc
http://var/www/apps/conversion/tmp/scratch_4/Site%20Folder%20Flexi%20BSC%20Pengayoman%203.dochttp://var/www/apps/conversion/tmp/scratch_4/Site%20Folder%20Flexi%20BSC%20Pengayoman%203.doc -
7/27/2019 Site Folder Flexi BSC Pengayoman 3.doc
30/58
FLEXI BSC_3000_Site Folder
PENGAYOMAN 3 / UPD 057
Commissioning phase Completed
Stop Bits: 2 OK
Parity: Even OK
Page Length: 23 OK
Line Length: 80 OK
Check that the settings of the printer are as follows:
Baud Rate: 9600 OK
Data Bits: 7 OK
Stop Bits: 2 OK
Parity: Even OK
Page Length: 65 OK
Line Length: 80 OK
OK = everything is in order NOK = something is wrong
Table 13: Monitoring start-up of units
Commissioning phase Completed
Loading of OMU OK
Loading of MCMU's OK
Loading of BCSU's OK
OK = everything is in order NOK = something is wrong
Table 14: Opening the first MML session in the BSC
Commissioning phase Completed
USERNAME OK
PASSWORD OK
Copyright Nokia Siemens Networks Page 30 (58)183089629.doc.doc
http://var/www/apps/conversion/tmp/scratch_4/Site%20Folder%20Flexi%20BSC%20Pengayoman%203.dochttp://var/www/apps/conversion/tmp/scratch_4/Site%20Folder%20Flexi%20BSC%20Pengayoman%203.doc -
7/27/2019 Site Folder Flexi BSC Pengayoman 3.doc
31/58
FLEXI BSC_3000_Site Folder
PENGAYOMAN 3 / UPD 057
OK = everything is in order NOK = something is wrong
Table 15: Verifying the BSC's SW version
Commissioning phase Completed
Print out all SW builds installed in the disk OK
Perform verification for each build and compare the printout with theDelivery Catalogue.
OK
OK = everything is in order NOK = something is wrong
Table 16: Inspecting the BSC's I/O system
Commissioning phase Completed
Display all I/O devices OK
OK = everything is in order NOK = something is wrong
Table 17: Testing the BSC's Ethernet Message Bus connections
Commissioningphase Completed
Unit EMB address (Hex)
OMU 00 OK
MCMU 0 04 OK
MCMU 1 05 OK
BCSU 0 30 OK
BCSU 1 31 OK
BCSU 2 32 OK
BCSU 3 33 OK
BCSU 4 34 OK
BCSU 5 N/A N/A
BCSU 6 N/A N/A
BCSU 7 N/A N/A
BCSU 8 N/A N/A
BCSU 9 N/A N/A
Copyright Nokia Siemens Networks Page 31 (58)183089629.doc.doc
http://var/www/apps/conversion/tmp/scratch_4/Site%20Folder%20Flexi%20BSC%20Pengayoman%203.dochttp://var/www/apps/conversion/tmp/scratch_4/Site%20Folder%20Flexi%20BSC%20Pengayoman%203.doc -
7/27/2019 Site Folder Flexi BSC Pengayoman 3.doc
32/58
FLEXI BSC_3000_Site Folder
PENGAYOMAN 3 / UPD 057
Commissioningphase Completed
Unit EMB address (Hex)
BCSU 10 N/A N/A
OK = everything is in order NOK = something is wrong NIU =Not in Use
Table 18: Testing the wired alarms
Unit Alarm no 2757 Alarm no 2758 Alarm no 2759 Alarm no 3146
MCMU 0 N/A OK N/A OK
MCMU 1 N/A OK N/A OK
BCSU 0 N/A OK N/A OK
BCSU 1 N/A OK N/A OK
BCSU 2 N/A OK N/A OK
BCSU 3 N/A OK N/A OK
BCSU 4 N/A OK N/A OK
BCSU 5 N/A OK N/A OK
BCSU 6 N/A OK N/A OK
BCSU 7 N/A N/A N/A N/A
BCSU 8 N/A N/A N/A N/A
BCSU 9 N/A N/A N/A N/A
BCSU 10 N/A N/A N/A N/A
PDFU 0(1) OK NIU OK OK
PDFU 1(1) OK NIU OK OK
PDFU 2(1) NIU NIU NIU NIU
PDFU 3(1) NIU NIU NIU NIU
PDFU 0(2) NIU NIU NIU NIU
Copyright Nokia Siemens Networks Page 32 (58)183089629.doc.doc
http://var/www/apps/conversion/tmp/scratch_4/Site%20Folder%20Flexi%20BSC%20Pengayoman%203.dochttp://var/www/apps/conversion/tmp/scratch_4/Site%20Folder%20Flexi%20BSC%20Pengayoman%203.doc -
7/27/2019 Site Folder Flexi BSC Pengayoman 3.doc
33/58
FLEXI BSC_3000_Site Folder
PENGAYOMAN 3 / UPD 057
Unit Alarm no 2757 Alarm no 2758 Alarm no 2759 Alarm no 3146
PDFU 1(2) NIU NIU NIU NIU
PDFU 2(2) NIU NIU NIU NIU
PDFU 3(2) NIU NIU NIU NIU
FTRB 0(1) OK OK NIU NIU
FTRB 1(1) OK OK NIU NIU
FTRB 2(1) OK OK NIU NIU
FTRB 3(1) OK OK NIU NIU
FTRB 0(2) NIU NIU NIU NIU
FTRB 1(2) NIU NIU NIU NIU
FTRB 2(2) NIU NIU NIU NIU
FTRB 3(2) NIU NIU NIU NIU
GSWB 0 OK OK NIU OK
GSWB 1 OK OK NIU OK
CLOC 0 OK OK NIU OK
CLOC 1 NIU NIU NIU NIU
CLAC 0 OK OK NIU OK
CLAC 1 OK OK NIU OK
CLAC 2 NIU NIU NIU NIU
CLAC 3 NIU NIU NIU NIU
CLAC 4 NIU NIU NIU NIU
CLAC 5 NIU NIU NIU NIU
LANU 0 NIU OK NIU OK
LANU 1 NIU OK NIU OK
LANU 2 NIU NIU NIU NIU
LANU 3 NIU NIU NIU NIU
GTIC 0 OK OK NIU OK
Copyright Nokia Siemens Networks Page 33 (58)183089629.doc.doc
http://var/www/apps/conversion/tmp/scratch_4/Site%20Folder%20Flexi%20BSC%20Pengayoman%203.dochttp://var/www/apps/conversion/tmp/scratch_4/Site%20Folder%20Flexi%20BSC%20Pengayoman%203.doc -
7/27/2019 Site Folder Flexi BSC Pengayoman 3.doc
34/58
FLEXI BSC_3000_Site Folder
PENGAYOMAN 3 / UPD 057
Unit Alarm no 2757 Alarm no 2758 Alarm no 2759 Alarm no 3146
GTIC 1 NIU NIU NIU NIU
ETC 0 OK OK NIU OK
ETC 1 OK OK NIU OK
ETC 2 OK OK NIU OK
ETC 3 OK OK NIU OK
ETC 4 NIU NIU NIU NIU
ETC 5 NIU NIU NIU NIU
OK = everything is in order NOK = something is wrong NIU =Not in Use
Test the external alarms by creating one external alarm and connecting alarm inputs one by one to this alarm.Test the alarm inputs by wiring them one by one.
Table 19: Testing the external alarms
Alarm Completed Alarm Completed
AEI00 MAIN FAILLURE OK AEI01 BATTERY FUSE FAILURE OK
AEI02 MODULE RECT FAILURE OK AEI03 LOAD FUSE FAILURE OK
AEI04 DOOR OPEN OK AEI05 GENSET RUNNING OK
AEI06 GENSET FAIL OK AEI07 BATTERY LOW VOLTAG OK
AEI08 HIGH TEMPERATURE OK AEI09 BATTERY CHARGING OK
AEI10AC BURGLAR OK AEI11 GROUNDING BURGLAR OK
AEI12 NIU AEI13 NIU
AEI14 NIU AEI15 NIU
AEI16 NIU AEI17 NIU
AEI18 NIU AEI19 NIU
AEI20 NIU AEI21 NIU
AEI22 NIU AEI23 NIU
OK = everything is in order NOK = something is wrong
Table 20: Testing alarm outputs
Copyright Nokia Siemens Networks Page 34 (58)183089629.doc.doc
http://var/www/apps/conversion/tmp/scratch_4/Site%20Folder%20Flexi%20BSC%20Pengayoman%203.dochttp://var/www/apps/conversion/tmp/scratch_4/Site%20Folder%20Flexi%20BSC%20Pengayoman%203.doc -
7/27/2019 Site Folder Flexi BSC Pengayoman 3.doc
35/58
FLEXI BSC_3000_Site Folder
PENGAYOMAN 3 / UPD 057
Alarm Completed Alarm Completed
AEO00 OK AEO01 OK
AEO02 OK AEO03 OK
AEO04 OK AEO05 OK
AEO06 OK AEO07 OK
AEO08 OK AEO09 OK
AEO10 OK AEO11 OK
AEO12 NIU AEO13 NIU
AEO14 NIU AEO15 NIU
OK = everything is in order NOK = something is wrong
Table 21: Testing the recovery from complete power break in the system
Commissioning phase Completed
Disconnect the power from the system OK
Connect the power to the system OK
OK = everything is in order NOK = something is wrong
Table 22: Testing power break in the PDFU
Commissioning phase Completed
Remove the fuse. Wait until the recovery measures have been completed and connectthe fuse. Repeat for all fuses.
OK
OK = everything is in order NOK = something is wrong
Table 23: Testing fuse fault in the power cable
Copyright Nokia Siemens Networks Page 35 (58)183089629.doc.doc
http://var/www/apps/conversion/tmp/scratch_4/Site%20Folder%20Flexi%20BSC%20Pengayoman%203.dochttp://var/www/apps/conversion/tmp/scratch_4/Site%20Folder%20Flexi%20BSC%20Pengayoman%203.doc -
7/27/2019 Site Folder Flexi BSC Pengayoman 3.doc
36/58
FLEXI BSC_3000_Site Folder
PENGAYOMAN 3 / UPD 057
Commissioning phase Completed
Disconnect the power from each of the PDFU one by one OK
OK = everything is in order NOK = something is wrong
Table 24: Testing the state transition and unit diagnostics of the BSC's units
Commissioning phase Completed
Testing the state transition and diagnostics of all units. Tick the box in thefollowing tables when ready.
OK
OK = everything is in order NOK = something is wrong
Table 25: Testing the state transition and unit diagnostics of computer units
Unit MCMU 0 WO state MCMU 1 WO state
OMU OK OK
MCMU 0 SP OK
MCMU 1 OK OK
BCSU 0 OK OK
BCSU 1 OK OK
BCSU 2 OK OK
BCSU 3 OK OK
BCSU 4 OK OK
BCSU 5 OK OK
BCSU 6 NIU NIU
BCSU 7 NIU NIU
BCSU 8 NIU NIU
BCSU 9 NIU NIU
BCSU 10 NIU NIU
CLS 0 OK OK
CLS 1 OK OK
CLAB 0 NIU NIU
Copyright Nokia Siemens Networks Page 36 (58)183089629.doc.doc
http://var/www/apps/conversion/tmp/scratch_4/Site%20Folder%20Flexi%20BSC%20Pengayoman%203.dochttp://var/www/apps/conversion/tmp/scratch_4/Site%20Folder%20Flexi%20BSC%20Pengayoman%203.doc -
7/27/2019 Site Folder Flexi BSC Pengayoman 3.doc
37/58
FLEXI BSC_3000_Site Folder
PENGAYOMAN 3 / UPD 057
Unit MCMU 0 WO state MCMU 1 WO state
CLAB 1 NIU NIU
CLAB 2 NIU NIU
CLAB 3 NIU NIU
CLAB 4 NIU NIU
CLAB 5 NIU NIU
EMB 0 OK OK (SP)
EMB 1 OK (SP) OK
SBUS 0 NIU NIU
SBUS 1 NIU NIU
SWU 60 OK OK
SWU 61 OK OK
STMU 32 OK OK
STMU 36 OK OK
STMU 38 OK OK
STMU 40 NIU NIU
ET16 (512-527) OK OK
ET16 (528-543) OK OK
ET16 (544-559) OK OK
ET16 (560-575) OK OK
ET16 (576-591) OK OK
ET16 (592-607) OK OK
SET 0 OK OK
SET 1 OK OK
SET 2 OK OK
Copyright Nokia Siemens Networks Page 37 (58)183089629.doc.doc
http://var/www/apps/conversion/tmp/scratch_4/Site%20Folder%20Flexi%20BSC%20Pengayoman%203.dochttp://var/www/apps/conversion/tmp/scratch_4/Site%20Folder%20Flexi%20BSC%20Pengayoman%203.doc -
7/27/2019 Site Folder Flexi BSC Pengayoman 3.doc
38/58
FLEXI BSC_3000_Site Folder
PENGAYOMAN 3 / UPD 057
Unit MCMU 0 WO state MCMU 1 WO state
SET 3 OK OK
SET 64 OK OK
SET 65 OK OK
SET 66 OK OK
SET 67 OK OK
SET 128 OK OK
SET 129 OK OK
OK = everything is in order NOK = something is wrong NIU =Not in Use
Table 26: Checking the switchover and the alarms from the clock synchronization unit
Commissioning phase Completed
Check the alarms from the clock units OK
Test the switchover of the clock units with MML OK
Test the switchover of the clock units with the front panel switch / (and) byremove power cable
OK
OK = everything is in order NOK = something is wrong
Table 27: Checking the BSC's hardware configuration
Commissioning phase Completed
Print the hardware configuration and compare it to the Hardware List in SiteSpecific Documentation.
OK
OK = everything is in order NOK = something is wrong
Table 28: Checking the ESB switch
Unit Local reset and hot swap Built-in self test Completed
MCMU0 OK OK OK
Copyright Nokia Siemens Networks Page 38 (58)183089629.doc.doc
http://var/www/apps/conversion/tmp/scratch_4/Site%20Folder%20Flexi%20BSC%20Pengayoman%203.dochttp://var/www/apps/conversion/tmp/scratch_4/Site%20Folder%20Flexi%20BSC%20Pengayoman%203.doc -
7/27/2019 Site Folder Flexi BSC Pengayoman 3.doc
39/58
FLEXI BSC_3000_Site Folder
PENGAYOMAN 3 / UPD 057
Unit Local reset and hot swap Built-in self test Completed
MCMU1 OK OK OK
LANU0 OK OK OK
LANU1 OK OK OK
LANU2 OK OK OK
LANU3 OK OK OK
OK = everything is in order NOK = something is wrong
Table 29: Copying additional software
Commissioning phase Completed
Install the customer specific diskette OK
Install Change Deliveries OK
Set the time zone OK
Restart the systemOK
OK = everything is in order NOK = something is wrong
BSC Commissioned by
Signature :
Name in block letters
Date
Copyright Nokia Siemens Networks Page 39 (58)183089629.doc.doc
http://var/www/apps/conversion/tmp/scratch_4/Site%20Folder%20Flexi%20BSC%20Pengayoman%203.dochttp://var/www/apps/conversion/tmp/scratch_4/Site%20Folder%20Flexi%20BSC%20Pengayoman%203.doc -
7/27/2019 Site Folder Flexi BSC Pengayoman 3.doc
40/58
FLEXI BSC_3000_Site Folder
PENGAYOMAN 3 / UPD 057
Copyright Nokia Siemens Networks Page 40 (58)183089629.doc.doc
http://var/www/apps/conversion/tmp/scratch_4/Site%20Folder%20Flexi%20BSC%20Pengayoman%203.dochttp://var/www/apps/conversion/tmp/scratch_4/Site%20Folder%20Flexi%20BSC%20Pengayoman%203.doc -
7/27/2019 Site Folder Flexi BSC Pengayoman 3.doc
41/58
FLEXI BSC_3000_Site Folder
PENGAYOMAN 3 / UPD 057
8.2 FLEXI BSC (3000) Commissioning Certificate of Completion
Customer Name: TELKOMSEL Site Address:
Contract Number: PO# HOT 2G Mod. Mksr #3 JL. PENGAYOMAN NO.1
Delivery Number: Ref. KELURAHAN BUAKANA
Site Name: PENGAYOMAN 3 KECAMATAN PANAKUKANG
Site Number: UPD 057 MAKASSAR SULAWESI SELATAN
SOFTWARE RELEASE: CHANGE NOTES/CN SETS:
SOFTWARE VERSION/ BUILD:
INSTALLATION STAGECHECKED
(INITIALS)
COMMENTS
Checking hardware functional of BSC3i OK
Opening the first MML session in BSC3i OK
Monitoring the FLEXI BSC start-up OK
Checking the I/O system of BSC3i OK
Checking the EMB in BSC3i OK
Checking the clock equipment in BSC3i OK
Checking the hardware configuration of BSC3i OK
Checking the maintenance system of BSC3i OK
Checking the ESB switch in BSC3i OK
Verifying the software version of BSC3i OK
Copying additional software and setting the time zone inBSC3i
OK
NSN hereby states that the whole of supplies detailed above have been inspected, tested and unless otherwise stated conform
to the specified requirements in the contract or order identified above.
NSN Site Representative
(print name):
NSN Site Representative(signature): Date:
Customer Representative(print name):
Customer SiteRepresentative (signature): Date:
Copyright Nokia Siemens Networks Page 41 (58)183089629.doc.doc
http://var/www/apps/conversion/tmp/scratch_4/Site%20Folder%20Flexi%20BSC%20Pengayoman%203.dochttp://var/www/apps/conversion/tmp/scratch_4/Site%20Folder%20Flexi%20BSC%20Pengayoman%203.doc -
7/27/2019 Site Folder Flexi BSC Pengayoman 3.doc
42/58
FLEXI BSC_3000_Site Folder
PENGAYOMAN 3 / UPD 057
9. INTEGRATION
The FLEXI BSC Integration Engineer is to carry out all integration tests in accordance with the FLEXIBSC User Manual and other approved Integration Procedure. The Integration Engineer is to ensure thata signed Certificate of Completion is produced, certifying that the FLEXI BSC system has beencommissioned and is ready for Integration. The Integration Engineer is responsible for:
Clearing any Installation/Commissioning problems, faults or deficiencies.
Familiarization with current Technical Notes.
Checking that Site Folder documentation is complete.
Completing this checklist including signature and date.
Completing the necessary Site Deficiency Reports.
Completing the necessary Fault Reports.
Informing the Site Manager of work progress, including any problems as they arise.
Completing the Certificate of Completion and placing it in Section 1 of the Site Folder.
Copyright Nokia Siemens Networks Page 42 (58)183089629.doc.doc
http://var/www/apps/conversion/tmp/scratch_4/Site%20Folder%20Flexi%20BSC%20Pengayoman%203.dochttp://var/www/apps/conversion/tmp/scratch_4/Site%20Folder%20Flexi%20BSC%20Pengayoman%203.doc -
7/27/2019 Site Folder Flexi BSC Pengayoman 3.doc
43/58
FLEXI BSC_3000_Site Folder
PENGAYOMAN 3 / UPD 057
9.1 Preparing the integration
Integration phase Completed
Check the deficiencies noticed during commissioning. OK
Check that necessary measurement devices and tools are available. OK
Check that necessary documentation is available. OK
9.2 Creating the A-interface and TCSM
Integration phase Completed
Create A interface ET with command WUC.
ET 256 CRC4 on off OK
ET 1665 CRC4 on off OK
ET 1666 CRC4 on off OK
ZWUC:TCSM,1664: TR 3T,0:;
ZWUC:TCSM,1665: TR 3T,0:;
ZWUC:TCSM,1666: TR 3T,0:;
Create the TCSM3I with commands WT_, WUC and USC.
TR3_PXSX ZWTU:TCSM,1664:1C2-0:; OK
TRZ_PXSX ZWTP:TCSM,1664:TR3T,0,1,::GENERAL,8,1664,TSL,1::;
OK
T55_PXSX ZWUC:TCSM,1664:TR3T,0:; OK
E16TCSSX ZWGC:1664,1:POOL=28:BCSU,0:; OK
Through connect the signalling channel with remote command ZWGS, ZWGA
PCM TSL 3392>1-31 - -> TCSM 1664 TC PCM-TSL TSL 1-8 OK
PCM TSL 3393>1-31 - -> TCSM 1664 TC PCM-TSL TSL 9-16 OK
PCM TSL 3394>1-31 - -> TCSM 1664 TC PCM-TSL TSL 17-24 OK
PCM TSL 3395>1-31 - -> TCSM 1664 TC PCM-TSL TSL 25-30 OK
PCM TSL 3396>1-31 - -> TCSM 1665 TC PCM-TSL TSL 1-8 OK
PCM TSL 3397>1-31 - -> TCSM 1665 TC PCM-TSL TSL 9-16 OK
PCM TSL 3398>1-31 - -> TCSM 1665 TC PCM-TSL TSL 17-24 OK
Copyright Nokia Siemens Networks Page 43 (58)183089629.doc.doc
http://var/www/apps/conversion/tmp/scratch_4/Site%20Folder%20Flexi%20BSC%20Pengayoman%203.dochttp://var/www/apps/conversion/tmp/scratch_4/Site%20Folder%20Flexi%20BSC%20Pengayoman%203.doc -
7/27/2019 Site Folder Flexi BSC Pengayoman 3.doc
44/58
FLEXI BSC_3000_Site Folder
PENGAYOMAN 3 / UPD 057
PCM TSL 3399>1-31 - -> TCSM 1665 TC PCM-TSL TSL 25-30 OK
PCM TSL 3400>1-31 - -> TCSM 1666 TC PCM-TSL TSL 1-8 OKOK
PCM TSL 3401>1-31 - -> TCSM 1666 TC PCM-TSL TSL 9-16 OKPCM TSL 3402>1-31 - -> TCSM 1666 TC PCM-TSL TSL 17-24 OK
PCM TSL 3403>1-31 - -> TCSM 1666 TC PCM-TSL TSL 25-30 OK
Set cyclic redundancy check of TCSM3I on or off. For ET1E the DBLF checking is setby strapping and for ET2E it is set by MML (commands YEI andYEC).
A interface (TCSM23I- MSC) CRC4 on off OK
A interface (BSC TCSM3I) CRC4 on off OK
Create Message Transfer Part (MTP) (command class N and command group OB).
Signalling link number: 0,1,2,3
External PCM - TSL: 287,1055,543,607
Parameter set number: 5
Local signalling point code (H/D): D4364 / 11OC
Local signalling point name: FB-PENGAYOMAN 3 OK
Signalling network: N/A
MSC signalling point code (H/D): D4124 / 101C
MSC signalling point name MSS UPD 3
MGW signalling point code (H/D): D4053 / FD5
MGW signalling point name MGW UPD4
Create Signalling Connection Control Part (SCCP) (command class N).
Create A interface circuit group for the MSC (speech circuits) with command RCC.
Circuit group name: MUPD3,UPD5_2,UPD5_3 OK
Circuit group number: 1 , 2 , 3
Line signalling parameter (LSI): AINO
HSCSD Circuit group name :
HSCSD Circuit group number :
Copyright Nokia Siemens Networks Page 44 (58)183089629.doc.doc
http://var/www/apps/conversion/tmp/scratch_4/Site%20Folder%20Flexi%20BSC%20Pengayoman%203.dochttp://var/www/apps/conversion/tmp/scratch_4/Site%20Folder%20Flexi%20BSC%20Pengayoman%203.doc -
7/27/2019 Site Folder Flexi BSC Pengayoman 3.doc
45/58
FLEXI BSC_3000_Site Folder
PENGAYOMAN 3 / UPD 057
Add circuits to the circuit group with command RCA.
ET - PCM CRCT 2 1&& - 31 CCS PCM 1 OK1664 CRCT 3 - 1&& - 31 CCS PCM 2 OK
CRCT 4 - 1&& - 31 CCS PCM 3 OK
ET - PCM CRCT 1 - 1&& - 31 CCS PCM 4 OK
1665 CRCT 2 - 1&& - 31 CCS PCM 5 OK
CRCT 3 - 1&& - 31 CCS PCM 6 OK
ET - PCM CRCT 1 - 1&& 31 CCS PCM 7 OK
1667 CRCT 2 - 1&& 31 CCS PCM 8 OK
CRCT 3 - 1&& - 31 CCS PCM 9 OK
CCS PCM
9.3 Synchronization of A interface
Integration phase Completed
Check the synchronization on A-interface.
2M1 ET
2M2 ET
2M3 ET
2M4 ET
9.4 Creation of Abis interface
Integration phase Completed
Create Abis interface.
PCM 294 & 310
OK
Copyright Nokia Siemens Networks Page 45 (58)183089629.doc.doc
http://var/www/apps/conversion/tmp/scratch_4/Site%20Folder%20Flexi%20BSC%20Pengayoman%203.dochttp://var/www/apps/conversion/tmp/scratch_4/Site%20Folder%20Flexi%20BSC%20Pengayoman%203.doc -
7/27/2019 Site Folder Flexi BSC Pengayoman 3.doc
46/58
FLEXI BSC_3000_Site Folder
PENGAYOMAN 3 / UPD 057
CRC on off BCF-0001TAMALATE
Location Area Code (LAC): 19009 Cell Identity (CI): 32871
9.5 Base Station Initialization
Integration phase Completed
Create and initialize BTS (command class E).
Mobile Country Code (MCC): 510Use BTSSW
Mobile Network Code (MNC): 10In BTSFLASH
BTS SW package: 3.3-3 BTS_3033.014 FLEXI_EP3MP3
Directory in BSC: /PACK_0
BTS SW package: 3.3-35 BTS_3033.016 FLEXI_EP3MP3
Directory in BSC: /PACK_1
BTS SW package:
Directory in BSC:
BTS SW package:
Directory in BSC:
BTS SW package:
Directory in BSC:
BTS SW package:
Directory in BSC:
BTS SW package:
Directory in BSC:
9.6 Creation of Transmission connections
Integration phase Completed
Copyright Nokia Siemens Networks Page 46 (58)183089629.doc.doc
http://var/www/apps/conversion/tmp/scratch_4/Site%20Folder%20Flexi%20BSC%20Pengayoman%203.dochttp://var/www/apps/conversion/tmp/scratch_4/Site%20Folder%20Flexi%20BSC%20Pengayoman%203.doc -
7/27/2019 Site Folder Flexi BSC Pengayoman 3.doc
47/58
FLEXI BSC_3000_Site Folder
PENGAYOMAN 3 / UPD 057
Create the service channel with commands QWC. N/A
Service channel number PCM TSLService channel number PCM TSL
BSS Integration Manuals /2/ ETSI (4.1.3.) and /3/ ANSI (9.2.)
Add equipments to the service channel with commands QWC and QWS. N/A
Service ch. no. Device name: address:
Service ch. no. Device name: address:
Service ch. no. Device name: address:
Service ch. no. Device name: address:
9.7 Connection of BSC to OMC(NMS)
Integration phase Completed
Set BSC name and location with command QNM.
BSC name:
BSC location:
Set date and time correct (command group DC).
Set system authorities (command group IA). N/A
User_id Password Authorities 250
User_id Password Authorities
EITHER creates an analog X.25 connection (command class Q). N/A
Interface type:
Bit rate:
OR create a digital X.25 connection (command class Q).
Physical channel number:
PCM TSL
Copyright Nokia Siemens Networks Page 47 (58)183089629.doc.doc
http://var/www/apps/conversion/tmp/scratch_4/Site%20Folder%20Flexi%20BSC%20Pengayoman%203.dochttp://var/www/apps/conversion/tmp/scratch_4/Site%20Folder%20Flexi%20BSC%20Pengayoman%203.doc -
7/27/2019 Site Folder Flexi BSC Pengayoman 3.doc
48/58
FLEXI BSC_3000_Site Folder
PENGAYOMAN 3 / UPD 057
Through connected signalling channel in TCSM2:
PCM TSL -> PCM - TSL
Create OSI connections (command class Q).
SNPA ADDRESS
Created applications:
CMISE VFS VTP TPU PAD
Create the MSW connection (command class Q).
Name:
Location:
Set up the logical file that is used for buffered events in the BSC with command IIS.
Set up SYSOP1 user authorities with commands IAH and IOM. N/A
Restart the OMU with command USU.
Integration phase Completed
Create redundant connections (command class Q): N/A
EITHER creates an analog X.25 connection.
Interface type:
Bit rate:
Copyright Nokia Siemens Networks Page 48 (58)183089629.doc.doc
http://var/www/apps/conversion/tmp/scratch_4/Site%20Folder%20Flexi%20BSC%20Pengayoman%203.dochttp://var/www/apps/conversion/tmp/scratch_4/Site%20Folder%20Flexi%20BSC%20Pengayoman%203.doc -
7/27/2019 Site Folder Flexi BSC Pengayoman 3.doc
49/58
FLEXI BSC_3000_Site Folder
PENGAYOMAN 3 / UPD 057
OR create a digital X.25 connection:
Physical channel number:
PCM TSL
Through connected signalling channel in TCSM2:
PCM TSL -> PCM - TSL
9.8 Test Transaction
9.8.1 LOCATION BLOCKINGOF TRX
Integration phase Completed
Check the status of the signalling network. N/A
Check the current alarms of the system. N/A
Check that the TRX and the BTS to be tested are in working state and operative. N/A
Lock the TRX locally from the BTS OMU MMI. N/A
Unlock the TRX locally from the BTS OMU MMI. N/A
Check any new alarms in the system. N/A
Check that the expected results are fulfilled:
- Alarm concerning a TRX lock.
- When the TRX is locked locally an announcement concerning this state is also sentto the BSC, and the BSC MML also shows that the TRX is locked and not available for
traffic.
N/A
9.8.2 SUPERVISIONOF TCSM3I
Integration phase Completed
Verify that transmission is working correctly and there are no transmission alarmsactive in the BSC.
OK
Copyright Nokia Siemens Networks Page 49 (58)183089629.doc.doc
http://var/www/apps/conversion/tmp/scratch_4/Site%20Folder%20Flexi%20BSC%20Pengayoman%203.dochttp://var/www/apps/conversion/tmp/scratch_4/Site%20Folder%20Flexi%20BSC%20Pengayoman%203.doc -
7/27/2019 Site Folder Flexi BSC Pengayoman 3.doc
50/58
FLEXI BSC_3000_Site Folder
PENGAYOMAN 3 / UPD 057
Check the settings of the TCSM with remote MML ZDDT. Check that the TCSM2hardware configuration matches the hardware in the racks. Use the service terminalcommand ZGT. If necessary, delete extra hardware with command ZGD (HW createdby the system by default is maximum configuration).
OK
Cause a channel fault to the transcoder unit for example by pulling out a TR16 plug-inunit.
N/A
Check any new alarms in the system. N/A
Check that the expected result is fulfilled:
- Alarm 2952 Transcoder plug-in unit failure is active.
N/A
9.8.3 LOCATIONUPDATING/IMSI ATTACH
Integration phase Completed
Supply the PIN to the mobile station. OK
Check any new alarms in the system. OK
Check that the expected result is fulfilled:
- The mobile station finds the network and ends on service state.
OK
9.8.4 MS TO MS CALL
Integration phase Completed
Make a call from subscriber A (the calling subscriber) to subscriber B (the calledsubscriber).
OK
Make subscriber B answers the call. OK
Verify speech quality. OK
Clear the call at subscriber As mobile station. OK
Check that TCH are released after the hang-up. OK
Copyright Nokia Siemens Networks Page 50 (58)183089629.doc.doc
http://var/www/apps/conversion/tmp/scratch_4/Site%20Folder%20Flexi%20BSC%20Pengayoman%203.dochttp://var/www/apps/conversion/tmp/scratch_4/Site%20Folder%20Flexi%20BSC%20Pengayoman%203.doc -
7/27/2019 Site Folder Flexi BSC Pengayoman 3.doc
51/58
FLEXI BSC_3000_Site Folder
PENGAYOMAN 3 / UPD 057
Check any new alarms in the system. OK
Check that the expected result is fulfilled:- The call succeeds and speech quality is good.
OK
9.8.5 MS TO MS CALL, B BUSY
Integration phase Completed
Make a call from subscriber A to subscriber B (subscriber B is busy). OK
Clear the call at subscriber As MS after observing the busy tone at subscriber As MS. OK
Check that there are no hanging resources. OK
Check any new alarms in the system. OK
Check that the expected result is fulfilled:
- Subscriber A receives the busy tone.
OK
9.8.6 MS TO MS CALL, A SUBSCRIBER IMSI
Integration phase Completed
Make a call from subscriber A to subscriber B. OK
Answer the call at subscriber Bs MS. OK
Subscriber A makes IMSI detach. OK
Check any new alarms in the system. OK
Check that the expected results are fulfilled:
- There are no hanging resources.
- The call is set up as required and subscriber A releases the call.
OK
Copyright Nokia Siemens Networks Page 51 (58)183089629.doc.doc
http://var/www/apps/conversion/tmp/scratch_4/Site%20Folder%20Flexi%20BSC%20Pengayoman%203.dochttp://var/www/apps/conversion/tmp/scratch_4/Site%20Folder%20Flexi%20BSC%20Pengayoman%203.doc -
7/27/2019 Site Folder Flexi BSC Pengayoman 3.doc
52/58
FLEXI BSC_3000_Site Folder
PENGAYOMAN 3 / UPD 057
8.7 Successful Handover: Free TCH
Integration phase Completed
Check that there are free TCH in the BTS where the subscriber A will move. N/A
Make a call from subscriber A to subscriber B. N/A
Answer the call at subscriber Bs MS. N/A
Make a handover to subscriber A. N/A
Verify speech quality. N/A
Check any new alarms in the system. N/A
Check that the expected result is fulfilled:
- The call succeeds and speech quality is good all the time.
N/A
9.8.7 UNSUCCESSFUL HANDOVER: NOFREE TCHIntegration phase Completed
Check that there are no free TCH in the BTS where the subscriber A will move. N/A
Make a call from subscriber A to subscriber B. N/A
Answer the call at subscriber Bs MS. N/A
Make a handover attempt to subscriber A. N/A
Check any new alarms in the system. N/A
Check that the expected result is fulfilled:
- The handover fails and the call is released by the network.
N/A
Copyright Nokia Siemens Networks Page 52 (58)183089629.doc.doc
http://var/www/apps/conversion/tmp/scratch_4/Site%20Folder%20Flexi%20BSC%20Pengayoman%203.dochttp://var/www/apps/conversion/tmp/scratch_4/Site%20Folder%20Flexi%20BSC%20Pengayoman%203.doc -
7/27/2019 Site Folder Flexi BSC Pengayoman 3.doc
53/58
FLEXI BSC_3000_Site Folder
PENGAYOMAN 3 / UPD 057
9.9 Finishing
Integration phase Completed
Fill in the BSC Integration Certificate of Completion. OK
Complete the BSC Site Folder. OK
BSC Integrated by
Signature :
Name in block letters :
Date :
Copyright Nokia Siemens Networks Page 53 (58)183089629.doc.doc
http://var/www/apps/conversion/tmp/scratch_4/Site%20Folder%20Flexi%20BSC%20Pengayoman%203.dochttp://var/www/apps/conversion/tmp/scratch_4/Site%20Folder%20Flexi%20BSC%20Pengayoman%203.doc -
7/27/2019 Site Folder Flexi BSC Pengayoman 3.doc
54/58
FLEXI BSC_3000_Site Folder
PENGAYOMAN 3 / UPD 057
9.10 FLEXI BSC (3000) IntegrationCertificate of Completion
Customer Name: TELKOMSEL Site Address:
Contract Number: PO# HOT 2G Mod. Mksr #2 JL. PENGAYOMAN NO.1
Delivery Number: Ref. KELURAHAN BUAKANA
Site Name: PENGAYOMAN 3 KECAMATAN PANAKUKANG
Site Number: UPD 057 MAKASSAR SULAWESI SELATAN
INTEGRATION STAGE CHECKED
(INITIALS)
COMMENTS
Preparation of Integration OK
Creation of A interface and TCSM OK
Synchronization of A interface OK
Creation of Abis interface OK
Base Station Initialization OK
Creation of transmission connections OK
Connection of BSC to OMC(NMS) OK
Test Transactions OK
Finishing OK
NSN hereby states that the whole of supplies detailed above have been inspected, tested and unlessotherwise stated conform to the specified requirements in the contract or order identified above.
NSN Site Representative (print name):
NSN Site Representative (signature): Date:
Customer Representative (print name):
Customer Site Representative (signature): Date:
Copyright Nokia Siemens Networks Page 54 (58)183089629.doc.doc
http://var/www/apps/conversion/tmp/scratch_4/Site%20Folder%20Flexi%20BSC%20Pengayoman%203.dochttp://var/www/apps/conversion/tmp/scratch_4/Site%20Folder%20Flexi%20BSC%20Pengayoman%203.doc -
7/27/2019 Site Folder Flexi BSC Pengayoman 3.doc
55/58
FLEXI BSC_3000_Site Folder
PENGAYOMAN 3 / UPD 057
10. CUSTOMER-SPECIFIC DATA AND SITE ASSESSMENT REPORT
Customer-Specific Data is placed following this page. Suggested information to be placed in thissection:
General Site information and Contact Information
SITE INFORMATION
BUILDING NAME: TTC 1
CUSTOMER SITENAME: PENGAYOMAN 3
SITE ADDRESS:JL. PENGAYOMAN NO.1 .
KELURAHAN BUAKANA.
KECAMATAN PANAKUKANG.
MAKASSAR SULAWESI SELATAN.
SITE ACCESSINFORMATION
CUSTOMER KEYS:
NAME:
TEL.
NSNS SUPERVISOR:
NAME:
TEL.
Copyright Nokia Siemens Networks Page 55 (58)183089629.doc.doc
http://var/www/apps/conversion/tmp/scratch_4/Site%20Folder%20Flexi%20BSC%20Pengayoman%203.dochttp://var/www/apps/conversion/tmp/scratch_4/Site%20Folder%20Flexi%20BSC%20Pengayoman%203.doc -
7/27/2019 Site Folder Flexi BSC Pengayoman 3.doc
56/58
FLEXI BSC_3000_Site Folder
PENGAYOMAN 3 / UPD 057
Site Assessment Report
The Site assessment Report is the last report to check overall site situation together with customer andmutual agree and sign whether site is implemented following standards, nothing damages impact to thebuilding structure. Any open issues which both NSN and customer accept to do later on after the siteassessment done.
Copyright Nokia Siemens Networks Page 56 (58)183089629.doc.doc
http://var/www/apps/conversion/tmp/scratch_4/Site%20Folder%20Flexi%20BSC%20Pengayoman%203.dochttp://var/www/apps/conversion/tmp/scratch_4/Site%20Folder%20Flexi%20BSC%20Pengayoman%203.doc -
7/27/2019 Site Folder Flexi BSC Pengayoman 3.doc
57/58
FLEXI BSC_3000_Site Folder
PENGAYOMAN 3 / UPD 057
11. ADDITIONAL DOCUMENTS
All additional documentation is to be placed following this page.
11.1 Documentation Checklist
In this section, consist of all stored documents which number of pages are either out of control or vary upto the configurations and available documents supporting following project documentationsrequirements. The hard copies (printed out version to attached to the site folder) or all soft copies (incase using this folder template to prepare the site folder at the beginning or attached soft files with filledup information after work done) is available in this section
HARD COPIES/SOFT FILESCHECKED(INITIALS)
Site Acceptance Certificate Form, Document support inSection 1
OK
Site Survey Report Form, Document support in Section 3 OK
Site Drawings, Documents support in Section 4 OK
HW inventory file / Equipment Packing List , Documentssupport in Section 5
OK
Operational HW database OK
HW inventory file / Equipment Packing List OK
MMI test log file OK
Site Assessment Report / Site Visit, Documents support inSection 10
OK
Copyright Nokia Siemens Networks Page 57 (58)183089629.doc.doc
http://var/www/apps/conversion/tmp/scratch_4/Site%20Folder%20Flexi%20BSC%20Pengayoman%203.dochttp://var/www/apps/conversion/tmp/scratch_4/Site%20Folder%20Flexi%20BSC%20Pengayoman%203.doc -
7/27/2019 Site Folder Flexi BSC Pengayoman 3.doc
58/58
FLEXI BSC_3000_Site Folder
PENGAYOMAN 3 / UPD 057
DOCUMENT REVISION HISTORY
DATE VERSION ORIGINATOR CHANGE NOTICENUMBER/NOTES