COMPLETED PROJECT:
BHADLA (JAISALMER) TO BIKANER TRANSMISSION LINE
189.9 km of 400kV (Quad Moose) line awarded by Rajasthan Rajya Vidyut Prasaran Nigam Limited (RRVPNL) with a completion schedule of 18 months. The line shall be used for evacuation of power from Solar Power plant at Bhadla by Rajasthan government. The contract value being INR 232.88 Cr involving OPGW for communication and erection tonnage of 13099 MT. The line is passing entirely through desert terrain and is being executed under a joint venture with our scope comprising of 101.265 km.
RAPP (7 & 8) – KOTA (PART A) TRANSMISSION LINE
45.233 km of 400kV (Twin Moose) line awarded by Power Grid Corpora on of India Limited (PGCIL) with a stringent completion schedule of 10 months. The line shall be used to evacuate power from Reactor no. 7 & 8 of Rajasthan Atomic Power Plant (RAPP), Kota. The contract value being INR 40.47 Cr and erection tonnage of 1858 MT. This line has been built entirely on rocky terrain independently by M/s Skipper Limited.
ALLAHABAD - KANPUR TRANSMISSION LINE
146.363 km of 400kV (Twin Moose) line awarded by Power Grid Corpora on of India Limited (PGCIL) with a completion schedule of 22 months. The contract value being INR 105.78 Cr. The line involved the Crossing of River Yamuna with the help of specially designed River Crossing Towers of 142 m height each and weight of 239.715 MT. The crossing span across the river Yamuna being 1.053 km. The total erection tonnage in the project being 7158 MT. The said project was executed under a joint venture with our scope being 70 km of the line which includes the Yamuna river crossing.
PANCHKULA- PATIAYALA TRANSMISSION LINE
65.494 KM of 400 KV D/C Twin MOOSE Transmission Line awarded by Power Grid Corporation of India Limited (PGCIL), with a completion schedule of 18 months. The contract value being INR 55.42 CR.
13
TRANSMISSION LINE IN PACKAGE 3
359.195 km of 132 kV & 220 kV lines were awarded by U ar Pradesh Power Transmission Corpora on Limited (UPPTCL) under Southern and Western Zone. We have completed 283.02 km of the lines in this package. The lines of this package are built to increase the Total Transfer Capacity of these regions, their progress are being monitored by CM’s Office and also some lines are catering to the energy requirement of the Dedicated Freight Corridor monitored by PM’s Office. The contract value being INR 143.370 Cr and involved erection tonnage of 7510MT.
UNDER COMPLETION:
JIGMELING – ALIPURDUAR (INDIA PORTION) TRANSMISSION LINE
110 km of 400kV (Quad Moose) line awarded by Power Grid Corpora on of India Limited (PGCIL) with a completion schedule of 23 months. This line is of prime importance as it shall be used to evacuate power from Bhutan and shall contribute to the enhancement bilateral relationship between the two countries. The contract value being INR 203.96 Cr and involved erection tonnage of 12368 MT. The line is passing through low land and also passing through 46 km forest to reach Bhutan. This project is being executed under a joint venture with 56 km in our scope.
RAIGARH - PUGALUR (TW 09) TRANSMISSION LINE
180 km of ±800kV HVDC line awarded by Power Grid Corpora on of India Limited(PGCIL) with a completion schedule of 24 months. This line is of prime importance as it shall be the link between Western Region (Raigarh, Chhattisgarh) to Southern Region (Pugalur, Tamil Nadu) and further to North Trichur (Kerala).The contract value being INR 240.88 Cr and involved erection tonnage of 24965 MT. This project is being executed under a joint venture with 86 km of the line in our scope.
PALAMPUR - HAMIRPUR TRANSMISSION LINE
57 km of 220kV D/C line awarded by Himachal Pradesh Power Transmission Corpora on Limited (HPPTCL) with a completion schedule of 24 months. The line passes through the Dhauladhar Range which is part of a lesser Himalayan chain of mountains. All towers of this line are being designed and tested by us. A special design with Twin Bundle ACSR Moose conductor has been adopted for the line. The contract value being INR 110.68 Cr and involved erection tonnage of approximate 3389 MT. The project is being independently executed by us.
14
CHHATARGARH – LOONKARANSAR TRANSMISSION LINE
77 km of 132 kV D/C line awarded by Rajasthan Rajya Vidyut Prasaran Nigam Limited(RRVPNL) with a completion schedule of 360 days. The line is passing through “The Great Indian Desert” (Thar Desert) in the Bikaner district. The contract value being INR 17.67 Crand involved erection tonnage of 787 MT.
AKAL – JAISALMER 2 TRANSMISSION LINE
75 km of 220 kV D/C line awarded by Rajasthan Rajya Vidyut Prasaran Nigam Limited(RRVPNL) with a completion schedule of 360 days. The line is located close to the “Golden City” of Jaisalmer and passes through Jaisalmer Wind Park which is India’s 2nd largest onshore operational wind farm. The contract value being INR 24.47 Cr and involved erection tonnage of 1341 MT.
TRANSMISSION LINE IN KAITHAL AREA
31.949 km of 220 kV D/C line & 48.259 km of 132 kV lines awarded by Haryana Vidyut Prasaran Nigam Limited (HVPNL) with a completion schedule of 18 months. The lines are located in the vicinity of Kaithal and radiate out to HVPNL’s new substation at Neemwala. The contract value being INR 44.50 Cr and involved erection tonnage of 787 MT.
TRANSMISSION LINE IN PACKAGE 2
551.75 km of 132 kV & 220 kV lines were awarded by U ar Pradesh Power Transmission Corpora on Limited (UPPTCL) under Eastern and Central Zone. We have completed 429.19 km of the lines in this package. These lines are intended to increase the Total Transfer Capacity of these regions. The contract value being INR 169.89 Cr and involved erection tonnage of 12090 MT.
TRANSMISSION LINE IN FATEHGARH (II)- BHADLA (II)
189.5 km of 765KV Hexa Zebra Conductor Transmission line in Rajasthan were awarded by Power Grid Corpora on of India Limited (PGCIL) under TBCB Package. The contract value being INR 523.77 Cr and involved erection tonnage of 24000 MT.
15
RAILWAY VERTCAL
25 kV Railway Over Head Electrification work of 77 Track kM awarded by IRCON Interna onal Limited in connection with Kiul-Gaya doubling project of East Central Railway. The line is to be electrified from Luckeesarai to Sadipur and contract value is INR 30.86 Cr. The overhead lines will cross the major bridges of 700 m span. The work also involves the augmentation of existing SP, SSP & TSS.
25 kV Railway Over Head Electrification work of 27 Track kM of the dedicated railway track of South Eastern Coalfields Limited at Kushmunda Siding near Gevra Road station. The contract value being INR 15.44 Cr, this work also includes the construction of a new switching station to feed the line.
25 kV Railway Over Head Electrification work of 50 Track kM awarded by West Central Railway in connection with Satna - Rewa doubling project of West Central Railway and contract value is INR 21.41 Cr.