Transcript
Page 1: Snowmass’01 M1 Working Group Muon-Based Acceleratorsmcdonald/mumu/snowmasstrans... · 2009. 7. 20. · Snowmass 2001 M1 Working Group: Muon-Based Accelerators Targetry Challenges

Snowmass 2001 M1 Working Group: Muon-Based Accelerators

Snowmass’01 M1 Working Group

Muon-Based Accelerators

Conveners: K.T. McDonald, A.M. Sessler

• A worldwide effort is under way to elucidate the unique particle

physics opportunities presented by intense muon beams and

the neutrino beams derived from their decay.

• Groups in Europe, Japan and the USA are engaged in a

vigorous R&D program aimed at resolving the critical machine

and beam design issues for both a Neutrino Factory based on

a muon storage ring and a Muon Collider.

• To make progress in a time frame compatible with the needs of

the physics program requires support of R&D at a level higher

than present.

— From the Response to the Snowmass’01 M1 Working Group

Charge.

Kirk T. McDonald July 20, 2001 1

Page 2: Snowmass’01 M1 Working Group Muon-Based Acceleratorsmcdonald/mumu/snowmasstrans... · 2009. 7. 20. · Snowmass 2001 M1 Working Group: Muon-Based Accelerators Targetry Challenges

Snowmass 2001 M1 Working Group: Muon-Based Accelerators

Overview of this Plenary Talk

• Rich physics and technology led to joint sessions with

E1, E3, E6, M6, P2, T2, T5, T7, T9.

• Several new ideas emerged at Snowmass’01, but most

discussion was based on prior activities.

• This talk presents three major themes:

1. Introduction to muon-based accelerators:

A Neutrino Factory based on a muon storage ring, and

a Muon Collider at the energy frontier and/or

for S-channel Higgs production.

2. R&D on accelerator physics and technology issues.

3. A staged approach to the physics:

A Neutrino Superbeam Physics Program is the

first stage.

Kirk T. McDonald July 20, 2001 2

Page 3: Snowmass’01 M1 Working Group Muon-Based Acceleratorsmcdonald/mumu/snowmasstrans... · 2009. 7. 20. · Snowmass 2001 M1 Working Group: Muon-Based Accelerators Targetry Challenges

Snowmass 2001 M1 Working Group: Muon-Based Accelerators

Why Muons?

• A muon is a heavy electron.

⇒ Fundamental interest in the properties of the muon and of

its decays.

• Muons live 2.2 μs when at rest.

⇒ Muons of any energy live ≈ 1,000 turns in a 2-T magnetic

field.

⇒ Can use rings to accelerate, store and collide muons.

Why Now?

• mμ = 205me ⇒ Initial state radiation suppressed in μ+μ−

collisions.

⇒ Precision leptonic initial states up to 100 TeV.

• Muon decay, μ → νμeνe, provides well-known fluxes of

νμ, νe (νμ, νe) in equal amounts.

⇒ Neutrino factory.

Kirk T. McDonald July 20, 2001 3

Page 4: Snowmass’01 M1 Working Group Muon-Based Acceleratorsmcdonald/mumu/snowmasstrans... · 2009. 7. 20. · Snowmass 2001 M1 Working Group: Muon-Based Accelerators Targetry Challenges

Snowmass 2001 M1 Working Group: Muon-Based Accelerators

Discovery Potential of a Neutrino Factory

Study II

Study I= 6 × νμ flux @ 3/4 the cost.

Non-τ physics can be done with low Eν – and an appropriate

detector.Kirk T. McDonald July 20, 2001 4

Page 5: Snowmass’01 M1 Working Group Muon-Based Acceleratorsmcdonald/mumu/snowmasstrans... · 2009. 7. 20. · Snowmass 2001 M1 Working Group: Muon-Based Accelerators Targetry Challenges

Snowmass 2001 M1 Working Group: Muon-Based Accelerators

Targetry Challenges

• Maximal production of soft pions → muons in a megawatt

proton beam. Goal: μ/p = 0.1 into the muon storage ring.

• Capture pions in a 20-T solenoid, followed by a 1.25-T decay

channel.

length �cm�

� ��� ��� ���

����

���

��

���

radii

�cm�

PPPP

���������������Hg Pool

SC Coils

Fe Cu CoilsHg Containment

Be Window���������������

• A carbon target is feasible for 1.5-MW proton beam power.

• For Ep>∼ 16 GeV, factor of 2 advantage with high-Z target.

• Static high-Z target would melt, ⇒ Moving target.

• A free mercury jet target is feasible for beam power of 4 MW

(and more).Kirk T. McDonald July 20, 2001 5

Page 6: Snowmass’01 M1 Working Group Muon-Based Acceleratorsmcdonald/mumu/snowmasstrans... · 2009. 7. 20. · Snowmass 2001 M1 Working Group: Muon-Based Accelerators Targetry Challenges

Snowmass 2001 M1 Working Group: Muon-Based Accelerators

BNL E951: Solid Target Tests (5e12 ppp, 24 GeV)

Carbon, aluminum, Ti90Al6V4, Inconel 708, Havar, instrumented

with fiberoptic strain sensors.

Fabry-Perot cavity length

Incoming optical fiberGauge length

Data:

Measured Strain (500 KHz) in the 10-mil Aluminum WindowBeam Intensity = 2.5 TP

-40

-30

-20

-10

0

10

20

30

40

-8 -4 0 4 8 12 16 20

micro-secs

mic

ro-s

trai

ns

ANSYS model:

Predicted Strain in the 10-mil Aluminum WindowBeam Intensity = 2.5 TP with 1mm RMS sigma

-40

-30

-20

-10

0

10

20

30

40

-8 -4 0 4 8 12 16 20

micro-secs

mic

ro-s

trai

ns

Kirk T. McDonald July 20, 2001 6

Page 7: Snowmass’01 M1 Working Group Muon-Based Acceleratorsmcdonald/mumu/snowmasstrans... · 2009. 7. 20. · Snowmass 2001 M1 Working Group: Muon-Based Accelerators Targetry Challenges

Snowmass 2001 M1 Working Group: Muon-Based Accelerators

BNL E951: Studies of Proton Beam + Mercury Jet

ProtonBeam

MercuryJet

1-cm-diameter Hg jet in 2e12 protons at t = 0, 0.75, 2, 7, 18 ms.

Model: vdispersal =Δr

Δt=

rαΔT

r/vsound=

αU

Cvsound ≈ 50 m/s

for U ≈ 100 J/g.

Data: vdispersal ≈ 10 m/s for U ≈ 25 J/g.

vdispersal appears to scale with proton intensity.

The dispersal is not destructive.Kirk T. McDonald July 20, 2001 7

Page 8: Snowmass’01 M1 Working Group Muon-Based Acceleratorsmcdonald/mumu/snowmasstrans... · 2009. 7. 20. · Snowmass 2001 M1 Working Group: Muon-Based Accelerators Targetry Challenges

Snowmass 2001 M1 Working Group: Muon-Based Accelerators

The Neutrino Horn Issue

• 4 MW proton beams are achieved in both the BNL and FNAL

(and CERN) scenarios via high rep rates: ≈ 106/day.

• Classic neutrino horns based on high currents in conductors

that intercept much of the secondary pions will have lifetimes

of only a few days in this environment.

• Consider instead a solenoid horn with conductors at larger

radii than the pions of interest – similar to the neutrino factory

capture solenoid.

• Adiabatic drop in B with z ⇒ p⊥ ∝ √B.

Kirk T. McDonald July 20, 2001 8

Page 9: Snowmass’01 M1 Working Group Muon-Based Acceleratorsmcdonald/mumu/snowmasstrans... · 2009. 7. 20. · Snowmass 2001 M1 Working Group: Muon-Based Accelerators Targetry Challenges

Snowmass 2001 M1 Working Group: Muon-Based Accelerators

Fast Ionization Cooling of Muon Beams

• dE/dx loss cools both PT and PL.

• Multiple scattering heats PT , straggling heats PL.

• With low-Z absorber can have net cooling of PT ,

but PL is heated.

• A magnet + wedge absorber can exchange transverse and

longitudinal phase space.

• Then cool transversely again....

Kirk T. McDonald July 20, 2001 9

Page 10: Snowmass’01 M1 Working Group Muon-Based Acceleratorsmcdonald/mumu/snowmasstrans... · 2009. 7. 20. · Snowmass 2001 M1 Working Group: Muon-Based Accelerators Targetry Challenges

Snowmass 2001 M1 Working Group: Muon-Based Accelerators

Ionization Cooling in Rings?

V. Balbekov et al.

LiH wedge absorber

Liquid hydrogen absorber

Direction of magnetic field

Solenoid coils

Bending magnet

45

Cuts off 1/2 of aperture

45 deg, R = 52 cm

201.25 MHz cavity

6.678 mD 0.619 m

D 1.830 m

1.744 m

0 20 40 60Period number

0

1

2

3

Em

ittan

ce (

cm)

or tr

ansm

issi

on

X−emit. (cm)Y−emit. (cm)Z−emit. (cm)Trans. w/o decayTrans. with decay

0 20 40 60Period number

0

1

2

3

Em

ittan

ce (

cm)

or tr

ansm

issi

on

X−emit. (cm)Y−emit. (cm)Z−emit. (cm)Trans. w/o decayTrans. with decay

A. Garren et al. (Snowmass’01)

0

4

8

12

0 5 10 15 20

Bet

a , m

Z, m

Ring Lattice: Two Adjacent Bending Cells

xy

0.1

0.2

0.3

0.4

0 100 200 300

Geo

met

ric E

mitt

ance

Z, m

Ring Cooler with Wedges: Three Full Turns

X : mm-radY : mm-radZ : cm-rad

Injection/ejection of large-emittance beams under study.

Kirk T. McDonald July 20, 2001 10

Page 11: Snowmass’01 M1 Working Group Muon-Based Acceleratorsmcdonald/mumu/snowmasstrans... · 2009. 7. 20. · Snowmass 2001 M1 Working Group: Muon-Based Accelerators Targetry Challenges

Snowmass 2001 M1 Working Group: Muon-Based Accelerators

A Staged Scenario

• Lessons from Neutrino Factory Feasibility Studies I and II:

– Proton driver upgrade from 1 to 4 MW is cost effective.

– Acceleration of muon beams is expensive.

• These are incorporated in a staged scenario:

1. A Neutrino superbeam from pion decay with 1-4 MWproton driver (+ ≈ 100 kton underground detector).

2. A cooled muon beam at 200 MeV/c: muon EDM physics.

3. A muon storage ring of 1-3 GeV: mini neutrino factory(aimed at the Stage 1 detector), g − 2, ...

4. A Neutrino Factory based on a 20-50 GeV storage ring(+ new 100+ kton detector at longer baseline).

5. A Muon Collider operating as a Higgs factory, or at theenergy frontier.

Kirk T. McDonald July 20, 2001 11

Page 12: Snowmass’01 M1 Working Group Muon-Based Acceleratorsmcdonald/mumu/snowmasstrans... · 2009. 7. 20. · Snowmass 2001 M1 Working Group: Muon-Based Accelerators Targetry Challenges

Snowmass 2001 M1 Working Group: Muon-Based Accelerators

An E1/M1 Snowmass’01 Consensus

• The recent evidence for neutrino oscillations is a profounddiscovery.

• The US should strengthen its lepton flavor research programby expediting construction of a high-intensity conventionalneutrino ”superbeam” fed by a 1 - 4 MW proton source.

• A superbeam physics program will probe the neutrino mixingangles and mass hierarchy and may discover CP violation inthe lepton sector.

• The full program will require neutrino beams at multipleenergies and massive detectors at multiple baselines.

• These facilities will also support a rich program of other im-portant physics, including proton decay, particle astrophysicsand lepton CP- and flavor-violating processes.

• The ultimate laboratory for neutrino oscillation measurementsis a neutrino factory, for which the superbeam facility servesas a strong foundation.

• The development of the additional needed technology forneutrino factories and muon colliders requires a ongoingvigorous R&D effort in which the US should be a leadingpartner.

Kirk T. McDonald July 20, 2001 12

Page 13: Snowmass’01 M1 Working Group Muon-Based Acceleratorsmcdonald/mumu/snowmasstrans... · 2009. 7. 20. · Snowmass 2001 M1 Working Group: Muon-Based Accelerators Targetry Challenges

Snowmass 2001 M1 Working Group: Muon-Based Accelerators

Recommendations

• The most effective way to fully explore the opportunities of

neutrino oscillation physics is to construct a Neutrino Factory.

• Fund accelerator R&D towards a neutrino factory based on a

muon storage ring and a muon collider at a “success-oriented”

level.

• Develop a Neutrino Superbeam Physics Program in the USA

– with an upgrade path to a Neutrino Factory.

Kirk T. McDonald July 20, 2001 13


Top Related