Download - SPC Standards Update
SSPC Standards Update NSRP SP-3 Panel
William L. Shoup SSPC Executive Director
NSRP 2012
February 2012 Orlando, Florida
Learning Objectives Update on standards of interest to the Navy community •Revisions in Progress
> SSPC-WJ 1, 2, 3, 4 Waterjetting Standards > SSPC-PA 2 DFT measurement > SSPC-SP 11, Power Tool Cleaning Bare Metal > SSPC-SP 15, Commercial Grade Power Tool Cleaning > SSPC-Guide 15, Field Methods for Retrieval and Analysis
of Soluble Salts on Steel and Other Nonporous Substrates > SSPC-QP 1, Evaluating Qualifications of Industrial/Marine Painting
Contractors (Field Application) > SSPC-AB 1, Mineral and Slag Abrasives > SSPC-AB 2, Cleanliness of Recycled Ferrous Metallic Abrasive Work Mix
•New Standards in Development > Wet Abrasive Blast Cleaning Standards > Determining Compliance to Steel Profile Range > Selecting Coatings for Galvanized Steel Substrates
SSPC-SP 12/NACE No. 5 Surface Preparation by Waterjetting
(revision) • Current SP 12/NACE No. 5 will be broken
into separate standards based on level of cleanliness > SSPC/NACE WJ 1 – Clean to Bare Substrate > SSPC/NACE WJ 2 – Very Thorough Cleaning –
most commonly referenced in Navy specifications
> SSPC/NACE WJ 3 – Thorough Cleaning > SSPC/NACE WJ 4 -- Light Cleaning
Revised Waterjetting Standards • Definitions of cleanliness unchanged • Description of flash rust levels unchanged • Added non-mandatory appendices for
assessing levels of flash rust: > wipe test (based on NSRP Flash Rust
Evaluation Guidelines) > tape test (based on ISO dust level test)
Revised Waterjetting Standards
• Specific recommended levels of nonvisible contaminants removed from non-mandatory appendix > Replaced with more general discussion of nonvisible contamination
• Examples of language for specifying level of nonvisible contaminants provided in non-mandatory appendix > “Immediately prior to the application of the coating, the surface
extract shall not contain more than xx µg/cm2 of the specific contaminant (e.g., chloride) when tested with a [specified method].”
> “Immediately prior to the application of the coating, the conductivity of the surface extract shall not exceed xx µS/cm when tested with a [specified method].”
• Expected release date – April 15, 2012
SSPC-PA 2, Procedure for Determining Conformance to Dry Coating Thickness
Requirements (revision)
• Includes options to specify more or less stringent compliance requirements for coating thickness depending on project > Default compliance requirements for DFT same
as current version unless otherwise specified • Revised language for assessing
nonconformities • Added appendices for measuring DFT on
edges, pipe exterior
PA 2 Options for Specifier Thickness Gage Reading Spot
Reading Area Measurement
Level 1
Minimum Unrestricted As specified As specified
Maximum Unrestricted As specified As specified
Level 2
Minimum Unrestricted As specified As specified
Maximum Unrestricted 120% of maximum As specified
Level 3 DEFAULT (same as current PA 2 requirement) Minimum Unrestricted 80% of minimum As specified
Maximum Unrestricted 120% of maximum As specified
Level 4
Minimum Unrestricted 80% of minimum As specified
Maximum Unrestricted 150% of maximum As specified
Level 5
Minimum Unrestricted 80% of minimum As specified
Maximum Unrestricted Unrestricted Unrestricted
SSPC-PA 2, Procedure for Determining Conformance to Dry Coating Thickness
Requirements (revision) • Current version of PA 2 requires measurement of every
100 ft2 area painted during work shift if a nonconforming area is identified
• Revised language for determining extent of nonconforming areas painted during a work shift is: > Take spot measurements at 5 ft. intervals radiating in 8 equally
spaced directions from non-conforming area > Each spot measurement must comply with project requirements > Stop measuring in a given direction when 2 consecutive
measurements are in compliance > (Worst case scenario may result in measurement of entire
surface area coated in work shift) > Document areas of nonconformity
• Expected release date: April 1, 2012
NO
OK
OK
STOP
OK NO
OK
OK
STOP
OK
OK STOP
OK
OK
OK STOP OK
STOP
OK
OK
OK
OK
STOP
OK
OK
OK
OK
NO OK
OK OK
OK
STOP
OK
STOP
OK
Dashed line indicates boundary of area painted during work shift
OK STOP
5 ft area preceding a nonconfor-ming spot must be remeasured after corrections are made
5 ft NO
OK
OK
STOP
OK
OK
STOP
OK STOP OK
STOP
OK
OK
Dashed line indicates boundary of area painted during work shift
Suspect area preceding a nonconforming spot must be remeasured after corrections are made
OK
NO
STOP
OK
OK
(Limit of area coated during work shift)
5 ft
5 ft
STOP OK
5 ft
Dashed line indicates boundary of area painted during work shift
Dashed line indicates boundary of area painted during w
ork shift Das
hed
line
indi
cate
s bo
unda
ry o
f are
a pa
inte
d du
ring
wor
k sh
ift
(Limit of area coated during work shift)
STOP
(Limit of area coated during work shift)
SSPC-SP 11, Power Tool Cleaning to Bare Metal (revision)
• No change in SP 11 cleanliness definition or minimum 1 mil profile requirement
• Profile measurement method default now ASTM D 4417 Method B (depth micrometer) unless otherwise specified
• Compressed air used for tools must be verified clean in accordance with ASTM D 4285 (“blotter test”)
SSPC-SP 11, Power Tool Cleaning to Bare Metal (revision)
• Tools reclassified to include the wire bristle impact tool
• Feathering of existing coating is required unless otherwise specified
• Expected release date May 1, 2012
SSPC-SP 15, Commercial Grade Power Tool Cleaning
(revision) • No change in existing SP 15 cleanliness
definition or profile requirement • Parallel language to SSPC-SP 11 will be
adopted for SP 15 > Use ASTM D 4417 Method B unless otherwise
specified > Tool descriptions and feathering requirements
same as revised SP 11 • Expected release date: May 15, 2012
SSPC Guide 15, Field Methods for Retrieval and Analysis of Soluble Salts on Steel and
Other Nonporous Substrates (revision)
• Reorganization based on methodology of measurement techniques
• Revision includes descriptions of new fully automated one-step meters
• ASTM, ISO references have been updated • Expected release date: August 1, 2012
SSPC-QP 1, Evaluating Qualifications of Industrial/Marine Painting Contractors –
Field Application (revision)
• Added definition and training requirements for Environmental Health and Safety Manager
• Requires implementation of Coating Application Specialist (CAS) certification as part of QP 1 unless otherwise specified
• Added clarifications to training requirements for QC inspectors and QC Supervisors
• Expected release date: March 15, 2012
SSPC-AB 1, Mineral and Slag
Abrasives (revision) • Appendix B to address Navy requirements
from MIL-A-22262 added • Appendix B is mandatory when called out in
project specification > Includes requirements for friability, radioactivity,
soluble and total metal content, TCLP, others > Reviewed by Navy personnel
• Requirements for QC of recyclable work mix in separate Appendix A
• Still undergoing committee review • Expected release date December 1, 2012
SSPC-AB 2, Cleanliness of Recycled Ferrous Metallic Abrasives (revision)
• Revision started August 2011 • Committee discussing simplification of
sampling requirements for testing work mix • May reference new standard for
determining compliance with steel profile requirements
• Some discussion of lowering conductivity limit (not decided yet)
• Expected release March 1, 2013
Wet Abrasive Blast Cleaning Standards (new)
• 5 standards parallel organization of dry blasting standards
• Define cleanliness levels for steel surfaces prepared using wet abrasive blast cleaning > Cleanliness levels identical to the dry blast cleaning
standards > Flash rust levels (same definitions as in WJ
standards) included > Appendices for evaluating flash rust and for
information on nonvisible contaminants included (same as WJ standards)
• Expected release date March 1, 2013
Determining Compliance with Specified Profile Range (new)
• ASTM Methods from D 4417 and D 7127 establish number of instrument readings required
• SSPC standard provides requirements for frequency (how often to take readings) and location (where to take readings) that are not addressed by ASTM standards
• Example: Take 3 readings at XX locations on surface YY times during surface prep process
• Committee still deciding values for XX and YY
Determining Compliance with Specified Profile Range (new)
• Nonmandatory appendix provides an option for specifying number of measurements > Contractor must prepare a 2 x 2 area at jobsite for
acceptance by owner’s rep > Document list of production parameters (pressure,
nozzle size, abrasive size, etc.) > Measurements required if any changes occur during
production work > Measurements required after completion of
production work • Expected release date November 1, 2012
Selecting Coatings for Galvanized Steel Substrates (new)
• Guide for selecting coatings to overcoat galvanized surfaces
• Coatings to protect galvanizing from aggressive environments
• Assumes that the decision to galvanize the substrate has already been made
Selecting Coatings for Galvanized Steel Substrates (new)
• Coating selection based on > Service environment of structure (agents that
attack galvanizing) > Condition of galvanized substrate (new, aged
sound, or deteriorated galvanizing) > Extent and degree of surface preparation
required for optimum coating performance (washing only, spot or large area cleaning using blasting or power tools)
Expected release date October 1, 2012
Questions and Comments Welcome
William L. Shoup SSPC 1/877-281-7772 ext. 2230 [email protected]