PR
OJEC
T:SH
EET
TITL
E:
MODELED BY:
DESIGNED BY:
PM REVIEW:
QA/QC REVIEW:
DATE:
SEAL:
SCALE:
Unless Noted Otherwise
ACI JOB #
SHEET NO.
HARD COPY IS INTENDED TO BE24" x 36" WHEN PLOTTED
SCALE(S) INDICATED ANDGRAPHIC QUALITY MAY NOT
BE ACCURATE FOR ANY OTHERSIZES
95
We
st M
ain
Str
ee
t
Be
nto
n H
arb
or, M
I. 4
90
23
T 26
9.9
27.2
295
F 26
9.9
27.1
017
Ba
ttle
Cre
ek
Be
nto
n H
arb
or
Ma
nis
tee
So
uth
Ha
ve
n
AB
ON
MA
RC
HE
Eng
ine
erin
g, A
rch
itec
ture
, La
nd
Su
rve
yin
gC
OP
YR
IGH
T 2
016
- A
BO
NM
AR
CH
E C
ON
SULT
AN
TS, IN
C.
ab
on
ma
rch
e.c
om
Go
she
n
Ho
ba
rt
Lafa
ye
tte
So
uth
Be
nd
Va
lpa
rais
o
12" = 1'-0"
O:\
Pro
jec
ts\
2016\
16-1
322 S
t. J
ose
ph
Pu
blic
Sc
ho
ols
HS R
ailin
g R
ep
airs\
CA
D\
_A
rch
\R
evit\
16-1
322 S
JHS S
tad
ium
Ra
ilin
gs.
rvt
3/8
/2017 5
:02:5
6 P
M
ST.
JO
SEP
H P
UB
LIC
SC
HO
OLS
HIG
H S
CH
OO
L STA
DIU
M R
AIL
ING
S
25
21
STA
DIU
M D
RIV
E
ST.
JO
SEP
H,
MI
49
08
5
TITL
E S
HEET
Author
3-7-2017
16-1322
T1.1
JMS
TITLE SHEETS
T1.1 TITLE SHEET
ST. JOSEPH PUBLIC SCHOOLS
DRAWINGS PREPARED FOR:
HIGH SCHOOL STADIUM RAILING REPAIRS
ST. JOSEPH PUBLIC SCHOOLS
3275 LINCOLN AVE.
ST. JOSEPH, MI 49085
PROJECT ADDRESS
2522 STADIUM DRIVE
ST. JOSEPH, MI 49085 NOT TO SCALE1
LOCATION MAP
ARCHITECTURAL DRAWINGS
A1.1 HOME BLEACHER RAILING REPAIRS
A1.2 VISITOR BLEACHER RAILING REPAIRS
SHEET INDEX
NO. REVISION DESCRIPTION BY DATE
99' - 10" 9' - 2" 76' - 0" 9' - 2" 99' - 10"
14
' -
0"
4' -
0"
5' -
6"
59
' -
8"
11' - 6"
152' - 10"
38
' -
8"
26' - 8"
18
' -
6"
294' - 0"
65
' -
2"
180' - 2"
11' - 6"
34' - 0"
59
' -
8"
1. BID PACKAGE ONE:
PREP REPAIR AT PATCH AREAS BEFORE APPLICATION OF PATCH MATERIAL WITH HIGH
PRESSURE WASH AS RECOMMENDED BY THE MANUFACTURER OF THE PATCH
MATERIAL. REMOVE LOOSE PIECES OF CONCRETE AND APPLY COMPATIBLE
BONDING AGENT TO EXPOSED PIPING EMBEDDED IN CONCRETE.
FILL IN VOIDS/ MISSING CONCRETE WITH PATCH MATERIAL MATCHING EXISTING
WALL PROFILE, INCLUDING CHAMFERED EDGES AND CORNERS.
APPLY BASE CURING COMPOUND AFTER EACH PATCH IS INSTALLED.
REMOVE LOOSE OR FRACTURED CONCRETE BEFORE PREP-WORK - SEE LOCATIONS
3 AND 25
2. BID PACKAGE TWO:
REMOVE EXISTING RAILING COVER PLATES, CUT VERTICAL RAILING FLUSH WITH TOP
OF CONCRETE WALL
INSTALL NEW VERTICAL RAILING FITTINGS AROUND VERTICAL RAILINGS AFTER PATCH
MATERIAL IS INSTALLED AND CURED.
SEE SHEET A1.2 FOR DETAILS
GENERAL NOTES
PR
OJEC
T:SH
EET
TITL
E:
MODELED BY:
DESIGNED BY:
PM REVIEW:
QA/QC REVIEW:
DATE:
SEAL:
SCALE:
Unless Noted Otherwise
ACI JOB #
SHEET NO.
HARD COPY IS INTENDED TO BE24" x 36" WHEN PLOTTED
SCALE(S) INDICATED ANDGRAPHIC QUALITY MAY NOT
BE ACCURATE FOR ANY OTHERSIZES
95
We
st M
ain
Str
ee
t
Be
nto
n H
arb
or, M
I. 4
90
23
T 26
9.9
27.2
295
F 26
9.9
27.1
017
Ba
ttle
Cre
ek
Be
nto
n H
arb
or
Ma
nis
tee
So
uth
Ha
ve
n
AB
ON
MA
RC
HE
Eng
ine
erin
g, A
rch
itec
ture
, La
nd
Su
rve
yin
gC
OP
YR
IGH
T 2
016
- A
BO
NM
AR
CH
E C
ON
SULT
AN
TS, IN
C.
ab
on
ma
rch
e.c
om
Go
she
n
Ho
ba
rt
Lafa
ye
tte
So
uth
Be
nd
Va
lpa
rais
o
As indicated
O:\
Pro
jec
ts\
2016\
16-1
322 S
t. J
ose
ph
Pu
blic
Sc
ho
ols
HS R
ailin
g R
ep
airs\
CA
D\
_A
rch
\R
evit\
16-1
322 S
JHS S
tad
ium
Ra
ilin
gs.
rvt
3/8
/2017 5
:02:5
5 P
M
ST.
JO
SEP
H P
UB
LIC
SC
HO
OLS
HIG
H S
CH
OO
L STA
DIU
M R
AIL
ING
S
25
21
STA
DIU
M D
RIV
E
ST.
JO
SEP
H,
MI
49
08
5
HO
ME B
LEA
CH
ER
RA
ILIN
G R
EP
AIR
S
GNF
3-7-2017
16-1322
A1.1
JMS
N SCALE: 1/16" = 1'-0"
HOME BLEACHER PLAN VIEW
1
23456257
8
9
23
24
1011121315
14
1618
17
1920
21
22
NO. REVISION DESCRIPTION BY DATE
PHOTO 1 PHOTO 2 PHOTO 3 PHOTO 4 PHOTO 5 PHOTO 6PHOTO 7 PHOTO 8
PHOTO 9
PHOTO 18PHOTO 17PHOTO 16PHOTO 15PHOTO 14PHOTO 13PHOTO 12PHOTO 11PHOTO 10
PHOTO 19 PHOTO 20 PHOTO 21 PHOTO 22 PHOTO 23 PHOTO 24 PHOTO 25
99' - 2" 11' - 4" 99' - 2"
37
' -
10
"
1. BID PACKAGE ONE:
PREP REPAIR AT PATCH AREAS BEFORE APPLICATION OF PATCH MATERIAL WITH HIGH
PRESSURE WASH AS RECOMMENDED BY THE MANUFACTURER OF THE PATCH
MATERIAL. REMOVE LOOSE PIECES OF CONCRETE AND APPLY COMPATIBLE
BONDING AGENT TO EXPOSED PIPING EMBEDDED IN CONCRETE.
FILL IN VOIDS/ MISSING CONCRETE WITH PATCH MATERIAL MATCHING EXISTING
WALL PROFILE, INCLUDING CHAMFERED EDGES AND CORNERS.
APPLY BASE CURING COMPOUND AFTER EACH PATCH IS INSTALLED.
REMOVE LOOSE OR FRACTURED CONCRETE BEFORE PREP-WORK - SEE LOCATIONS
D, E, G, K, P AND A1
2. BID PACKAGE TWO:
REMOVE EXISTING RAILING COVER PLATES, CUT VERTICAL RAILING FLUSH WITH TOP
OF CONCRETE WALL
INSTALL NEW VERTICAL RAILING FITTINGS AROUND VERTICAL RAILINGS AFTER PATCH
MATERIAL IS INSTALLED AND CURED.
SEE DETAILS THIS SHEET
GENERAL NOTES
4" 1
/4"3
1/2
"
6"
4"
4"
1
A1.2
2
A1.2
1
A1.2
4" 4"
1"
4"
1"
6"
1"
1"
2
A1.2
4"
6"3
"
PR
OJEC
T:SH
EET
TITL
E:
MODELED BY:
DESIGNED BY:
PM REVIEW:
QA/QC REVIEW:
DATE:
SEAL:
SCALE:
Unless Noted Otherwise
ACI JOB #
SHEET NO.
HARD COPY IS INTENDED TO BE24" x 36" WHEN PLOTTED
SCALE(S) INDICATED ANDGRAPHIC QUALITY MAY NOT
BE ACCURATE FOR ANY OTHERSIZES
95
We
st M
ain
Str
ee
t
Be
nto
n H
arb
or, M
I. 4
90
23
T 26
9.9
27.2
295
F 26
9.9
27.1
017
Ba
ttle
Cre
ek
Be
nto
n H
arb
or
Ma
nis
tee
So
uth
Ha
ve
n
AB
ON
MA
RC
HE
Eng
ine
erin
g, A
rch
itec
ture
, La
nd
Su
rve
yin
gC
OP
YR
IGH
T 2
016
- A
BO
NM
AR
CH
E C
ON
SULT
AN
TS, IN
C.
ab
on
ma
rch
e.c
om
Go
she
n
Ho
ba
rt
Lafa
ye
tte
So
uth
Be
nd
Va
lpa
rais
o
As indicated
O:\
Pro
jec
ts\
2016\
16-1
322 S
t. J
ose
ph
Pu
blic
Sc
ho
ols
HS R
ailin
g R
ep
airs\
CA
D\
_A
rch
\R
evit\
16-1
322 S
JHS S
tad
ium
Ra
ilin
gs.
rvt
3/8
/2017 5
:02:5
6 P
M
ST.
JO
SEP
H P
UB
LIC
SC
HO
OLS
HIG
H S
CH
OO
L STA
DIU
M R
AIL
ING
S
25
21
STA
DIU
M D
RIV
E
ST.
JO
SEP
H,
MI
49
08
5
VIS
ITO
R B
LEA
CH
ER
RA
ILIN
G R
EP
AIR
S
Author
3-7-2017
16-1322
A1.2
JMS
NO. REVISION DESCRIPTION BY DATE
1 Revision 1 Date 1
N SCALE: 1/16" = 1'-0"
VISITOR BLEACHER PLAN VIEW
PHOTO A PHOTO B PHOTO C PHOTO D PHOTO E PHOTO FPHOTO G PHOTO H
PHOTO I
PHOTO MPHOTO LPHOTO KPHOTO J
PHOTO A1 PHOTO B1 PHOTO C1 PHOTO D1
PHOTO N PHOTO O PHOTO P
AB
C
D
E
O
F
GH
I
J
K
L
M
N P
A1B1C1
D1
SCALE: 1" = 1'-0"
SECTION VIEW
SCALE: 1" = 1'-0"
RAILING PLAN VIEW
EXPLODED BASE VIEW ISOMETRIC VIEW
SCALE: 1" = 1'-0"
RAILING SIDE VIEW
1
DETAIL KEYNOTES
1 EXISTING PRECAST CONCRETE WALL
2 EXISTING 1.5" I.D. ALUMINUM RAILING
3 SAW-CUT VERTICAL RAILING FLUSH WITH TOP OF CONCRETE WALL
4 2" DIA. x .25" ALUMINUM RAILING SECTION, CUT IN HALF, WELD TO 4" x 4" x .25"
THICK ALUM. BASE PLATE - SHOP PAINT TO MATCH EXISTING RAILINGS
5 1/4" DIA. HOLE, ONE SIDE - FOR SCREW FASTENER
6 1/2" DIA. HOLES FOR ANCHOR BOLTS
7 CONCRETE PATCH AREA - CLEAN AREA W/ HIGH PRESSURE WASH, APPLY BONDING
AGENT TO ALUMINUM RAIL BEFORE APPLYING PATCH MATERIAL
8 1/4" x 3" STAINLESS STEEL EPOXY ANCHORS WITH 3/8" DIA. PILOT HOLE
9 SEALANT AT PERIMETER
2
6
7
8
9
1
2
1
1
2
33
4
44
4
4
5
6