Download - STP SPecifiucations
-
8/19/2019 STP SPecifiucations
1/186
Volume-01
Page - 1
Signature of
SCOPE OF WORK
The scope of work for the bidder under this project includes Design, Construction,
erection, testing and commissioning of 1 !"D #TP based on #e$uential %atch
&eactor Technolog' (#%&) including cost of all associated ci*il, mechanical,
electrical and instrumentation items of work etc+ including miscellaneous worksassociated with plant on turnke' basis, with a defect liabilit' period of months
after the date of commissioning . Trial run for / months+ #cope of work also
includes . ! of plant for 'ears after trial run+
The *arious components for which the bidder has to submit his technical proposal
and price bid are gi*en in section below+ The bidder shall prepare his bid on the
basis of technical specifications for Ci*il ork, 2lectrical . !echanical works+
5.3 Component
i) Design . Construction of complete s'stem including ci*il, electrical . mechanical
works for all the units and all the ancillar' structures as per detailed technical
specification++
ii) Pro*iding and construction of 1 mld #TP based on #%& technolog'+ 3ncluding all
interconnecting piping works, necessar' building works mentioned in la'out plan,
all electrical . mechanical works+
i*) peration . maintenance of 1 mld capacit' #TP, #ewage Pumping #tation all
electro-mechanical e$uipment and allied works for 'ears+
*) The contractor shall be responsible for taking electric connection as per re$uirement
for which the re$uisite fee shall be paid b' the contractor itself and the same will bereimbursed afterwards b' !C4+ #imilarl', the electric bills shall be paid b'
contractor and thereafter reimbursed b' !C4
*i) The contractor shall be responsible for getting en*ironment clearance from
Pollution control board for which the re$uisite fee shall be paid b' the contractor
and the same will be reimbursed afterwards b' !C4
*ii) Pro*iding $ualified and e5perienced consultant e5clusi*el' to !C4 who will assist
them for checking and appro*al of design and drawing and also for e5ecution of
work+ The scope of work of consultant shall be defined separatel' in this *olume+
The contractor shall submit a panel of consultants after award of the job and !C4
shall select appropriate consultant from the panel+ Pa'ment of consultants6 fees
would be the responsibilit' of contractor, which shall be ma5imum up to 17 of
price $uoted for #TP+ 4owe*er, being a principal emplo'er, !C4 shall ha*e rightto ensure timel' pa'ment to consultant b' the contractor for which successful
bidders shall submit proof of pa'ments to !C4 while raising the bill+
The consultant shall ha*e e5perience of designing and detailed engineering of
minimum nos+ of sewage treatment plants up to minimum 8+0 !"D capacities in
last 10 'ears+ 4e should also ha*e an e5perience of three 'ears in operation and
maintenance of sewage treatment plant of 8+0 !"D or more in last 1 'ears+ 4e
-
8/19/2019 STP SPecifiucations
2/186
Volume-01
Page -
Signature of
should ha*e the following technical personnel for the design 9 appro*al of the
engineering9 drawing+
✓ Process engineer 9 2n*ironmental 2ngineer : The 2ngineer shall be post graduate inthe en*ironmental engineering with min+ 1 'ears of e5perience in the design of
sewage 9 water 9 waste water treatment plants+
✓ #tructural 2ngineer: The 2ngineer shall be post graduate in the structuralengineering with minimum 1 'ears of e5perience in the design of sewage 9 water 9
waste water treatment plants+
✓ !echanical 2ngineer: The 2ngineer shall be post graduate in the mechanicalengineering with minimum 10 'ears of e5perience in the design of sewage 9 water 9
waste water treatment plants+
✓ 2lectrical92lectronics9 instrumentation 2ngineer : The engineer shall be graduate inthe electrical 9 instrumentation engineering with minimum 10 'ears of e5perience
in the design9 e5ecution of sewage 9 water 9 waste water treatment plants+
;n' other 3tems which ha*e not been specificall' mentioned in specifications but are
necessar' for construction of the Plant as per good engineering practice, safet' norms and
successful operation and guaranteed performance of the entire Plant shall be deemed to be
included within #cope of ork and shall be pro*ided b' the Contractor without an' e5tra
cost to the 2mplo'er+
The %idders are ad*ised to *isit the #TP site before $uoting for the proposed #TP+ !C4 is
reser*ed the right for ph'sical *erification for the credentials pro*ided b' the bidder if
re$uired+ 3n such case all the e5penses shall be borne b' the bidder+
The abo*e works shall be completed within 1 months from the commencement date
including / months trial run and including monsoon period and . ! for
-
8/19/2019 STP SPecifiucations
3/186
Volume-01
Page - /
Signature of
• #uppl' of peration . !aintenance manual including manufacturer manual of the
e$uipment supplied+
•
Detailed structural drawings of all the structures+
• ;ll &CC structures shall be in !- and designed as per latest rele*ant 3# Codes+
• Proper earth$uake anal'sis of o*er ground structures should be carried out+ hile
designing these structures under seismic condition due attention to be paid towards
//+/7 o*er stressing of structural materials and 7 o*erestimation of net bearing
capacit' of soil+
• hile designing retaining walls effect of sub-soil water, possible surcharge and
seismic effect of retained earth mass to be considered+
• %earing capacit' of soil at the site of #TP is assumed about 10 @ 0 !T 9 #$m,
howe*er the contractor shall get it tested and account for the same in *arious
structural design+
• The contractor shall make all arrangement for the water for construction purposes
and shall get water tested at his own cost+
• The contractor shall make own arrangements for power suppl' for construction
purposes . for testing purposes howe*er department shall assist him for obtaining
such Power connection+
• During the trial run period of #TP, the bidder shall pro*ide all the re$uired man-
power, consumables, repair and up-keep of ci*il, electrical, mechanical and
instrumentation works within the #TP, and also 2lectricit' charges during Trial &un
period shall be borne b' the contractor+
• During the trial run period, the bidder shall install and operate a generator set of
ade$uate capacit' to cater to the minimum load of the #TP and the pumping station
in case of power failures 9 load shedding+
• The bidder 9 tenderer shall suppl' all e$uipment drawings, Technical specification9
Catalogue of all electrical, mechanical and instrumentation works associated with
#TP+
-
8/19/2019 STP SPecifiucations
4/186
-
8/19/2019 STP SPecifiucations
5/186
Volume-01
Page -
Signature of
• Carr'ing out . confirming the detailed topographical sur*e' along finali?ed
Bra*it' main9&ising main alignment, and treatment plant site, and establishing
bench marks at least two locations within the #TP site and one at s pumping station
site+
• The contractor will also pro*ide luminous painted warning 9 caution notice boards
with flickering light arrangements, where the work is in progress+
• The sub-soil water is likel' to be encounter during e5ca*ation at the #TP site+ The
Contractor is ad*ised to carr' out its own in*estigations and gather information on
the water table9subsoil conditions+ The suitable and appro*ed dewatering s'stem
should be adopted for e5ecution of work+ >othing e5tra shall be paid on this
account+
• The sub-soil water pumped will be drained off to the proper disposal pointscontractor will ha*e to make arrangements to disposal off the pumped sub-soil
water to satisfaction of 2ngineer in charge9!C4 and nothing e5tra for dewatering
of sub-soil water drain etc+ will be paid+
• 3f as result of e5ca*ation of trenches, the underground ser*ices such as water,
mains, electric-poles, cables, telephone cables and sewer lines etc+, become e5posed
and un-supported it will be the responsibilit' of the contractor to make suitable .
necessar' arrangement for supporting and to keep them functional such
arrangement will be done as per directions of the 2ngineer-in-Charge 9 !C4+ >o
pa'ment for supporting such utilit' ser*ices will be made b' the !C4+ ;n'damage caused to the abo*e mentioned underground ser*ices due to negligence of
the contractor or otherwise shall be made good b' the contractor at his own cost+
• The contractor shall ha*e to make his own arrangements for labour camp site and
its hutments+ n completion of work, these shall be remo*ed b' the contractor,
failing which the !C4 will arrange to dismantle the same at the risk and cost of
the contractor and the dismantled material will become the propert' of the !C4
for which the contractor shall ha*e no legal claim+ The e5penditure so incurred
will be reco*ered from the dues of the contractor+ The contractor shall also be
responsible for keeping all h'gienic conditions in his labour camp 9 hutments as
desired b' "ocal 4ealth ;uthorities+
• The contractor shall take all precautions for the safet' of e5isting nearb'9adjoining
main or lateral sewers and dewatering e$uipment shall be kept as a standb' in
*iew the e5isting sewer lines+
• The contractor will pro*ide a board indicating the name of work, name of
contractor, name of di*ision, cost of work, date of start, date of completion
-
8/19/2019 STP SPecifiucations
6/186
Volume-01
Page - <
Signature of
telephone number etc+, at site at his own cost and nothing will be paid b' the
!C4 on this account+
• ;ll the ci*il works under this contract shall be e5ecuted in conformit' of PD,
CPD specifications, CP422 Buidelines and rele*ant9applicable %3# codes
(latest re*isions), with up to date correction slips+• The contractor will be solel' responsible for an' mishaps, during the e5ecution
of the work+ The contractor must get his labour insured before the start of work,
for the entire period of completion of work+
• The contractor shall not disturb9damage or pull down an' hedge, tree, building
etc within the site or his area of operation without the written permission of the
2ngineer-in-Charge here*er there is an' clash among the certain clauses of the
conditions of contract, general conditions, special conditions and general notes 9
rules and directions for the guidance of the contractor, etc+ the most stringent will
go*ern for which the decision of the 2ngineer in Charge 9 !C4 shall be final .
binding+
8 ELIGIBILI! CRIERI"#
The contractor meeting following re$uirement will onl' be considered:
(a) The bidder should ha*e successfull' completed and commissioned during past fi*e
'ears i+e+ after 1st ;pril, 00A one #TP9#TP of minimum 8+0 !"D capacit'
#e$uential %atch &eactor (#%&) Technolog' along with successful operation .
maintenance of #TP for at least one 'ear as on date of receipt of Pre$ualification
document+
>ote :-
Certificate issued b' Bo*t+ of 3ndia, #tate Bo*t+, nion Territor', Bo*t+
ndertakings, ;utonomous %odies shall onl' be considered+
Note :-
i. Experience certificate as referred above should include work order no. and
date, amount, date of start, actual date of completion, year of
commissioning, duration of O! with specific mention of successful O!
period of "#$. %idder may also provide details of various components of
"#$ completed by him. %idder shall also enclose copy of work order for
construction of "#$ and O! $art
ii. Experience certificate submitted by firm as &oint-venture, shall not be
considered
iii. 'or the purpose of O! experience for a minimum period of ( year,
bidder may submit certificate for other "#$ of same criteria, which may
not have been constructed or completed by him.
iv. 'or the purpose of bid evaluation, if the owner)owner*s representatives feel
necessary to visit a specific or all such plants as mentioned above by the
-
8/19/2019 STP SPecifiucations
7/186
Volume-01
Page - 8
Signature of
bidder, the bidder shall make necessary arrangements for the same. #he cost
of such visits shall be borne by the owner.
Financia$ Criteria#%
(b) The bidder should ha*e completed at least one similar nature work in last Three
financial 'ears (including current 'ear, if opted b' the bidder) of *alue not less
than 0 7 of the 2stimated Cost of the work (bid cost) updated to present price
le*el
&' SIE (ISI#
The bidder is ad*ised to *isit and e5amine the #ite of orks and its surroundings
and obtain for itself on its own responsibilit' all information that ma' be
necessar' for preparing the bid and entering into a contract for the design-build
and completion of the orks+ The bidder has to make his own assessment of the
scope of work under this tender and no claims whatsoe*er shall be entertained
for lack of understanding of the scope and 9 or implications arising out of it+ The
costs of *isiting the #ite 9 testing if re$uired or an' other cost shall be at the
bidderEs own e5pense+
The bidder and an' of its personnel or agents will be granted permission b' the
2mplo'er to enter upon its premises and lands for the purpose of such
inspection, but onl' upon the e5press condition that the bidder, its personnel and
agents, will release and indemnif' the 2mplo'er and its personnel and agents
from and against all liabilit' in respect thereof and will be responsible for death
or personal injur', loss of or damage to propert' and an' other loss, damage,
costs and e5penses incurred as a result of the inspection+
The 2mplo'er ma' conduct a site *isit concurrentl' with the pre-bid meeting, if
possible+
The bidder is e5pected to e5amine carefull' the contents of the %id document+
Failure to compl' with the re$uirements of bid submission will be at the bidderEs
own risk+
-
8/19/2019 STP SPecifiucations
8/186
Volume-01
Page - /1
Signature of
'). FOR*" "+, SIG+I+G OF BI,#
The original cop' of the bid shall be t'ped or written in indelible ink, and shall
be signed b' a person or persons dul' authori?ed to sign on behalf of the bidder, ;ll pages of the bid where entries or amendments ha*e been made
shall be initialed b' the person or persons signing the bid+
The bid shall contain no alterations, omissions or additions, e5cept those to
compl' with instructions issued b' the 2mplo'er, or as necessar' to correct
errors made b' the bidder, in which case such corrections shall be initialed
b' the person or persons signing the bid+
'- I*POR"+#%
The bidder must ensure that all the information re$uired in the documents is
furnished b' him complete in all respects+ 4e would not be allowed to withdraw
an' document, of to rectif' an' information furnished therein, after submitting
the bid+
3f an' information is found incorrect, the offer of the bidder shall be rejected and
action be taken as per rules+
%idder must do paging of all enclosure of bid documents+
' *O,IFIC"IO+ / WI0,R"W"L OF BI,S#
>o !odification . withdrawal of %id will be permitted after submission of bid+
-
8/19/2019 STP SPecifiucations
9/186
SPECI"L CO+,IIO+S OF CO+R"C 1Part 2"4
&. ,EFI+IIO+S
*C06 means the !unicipal Council, 4ingoli++ 3t is the 25ecuting ;genc' of the Project+
7*ateria$87 means things of all kinds (other than e$uipment) intended to form or
forming part of the permanent works, including the suppl' of materials to be supplied b'
the contractor under the contract+
7E9uipment7 means the apparatus, machiner', articles and things of all kinds to be
pro*ided under the contract or intended to form or forming part of the permanent works+
7Contractor8 ,ocument87 means the calculations, computer programs and other
software, drawings, manuals, models and other documents of the technical nature supplied
b' the contractor under the contract as described in sub clause GContractors DocumentsH+
7Specification87 means the specifications according to which the works are to be
e5ecuted as referred to in the agreement documents and an' other specifications agreed
thereon+
Contract price6 means the sum $uoted in the tender subject to such additions thereto or
deduction there from as ma' be made under the pro*isions contained in the contract and
as defined in Volume 3V of tender Document+
'. *O+0L! REPORS "+, *EEI+GS
*O+0L! REPORS
!onthl' progress reports shall be prepared b' the Contractor and submitted to !C4 in
si5 copies+ The first report shall co*er the period up to the end of the first calendar month
following the commencement date+ &eports shall be submitted monthl' thereafter, each
within 8 da's after the last da' of the month to which it relates+
&eporting shall continue until the contractor has completed all work+
2ach &eport shall include the issues desired b' the 2ngineer in Charge, which shall be an'
of the following:
• Charts (P2&T . CP!) 9 detailed descriptions of progress, including each
stage of design Contractor6s Document, procurement, manufacturing,deli*er' to site of construction, direction, testing, commissioning and the
trial operation
• Photographs showing status of manufacture and of progress on the site
• For the manufacture of each main item of e$uipment and materials, the
name of the manufacturer, manufacture location, percentage progress, and
the actual or e5pected dates of:
• Commencement of manufacturing
-
8/19/2019 STP SPecifiucations
10/186
• Contractor inspections,
-
8/19/2019 STP SPecifiucations
11/186
• Tests and
• #hipment and arri*al at the site
• Copies of $ualit' assurance documents, test results and certificates of
materials
•
Comparisons of actual and planned progress, with the details of an' e*entsor circumstances which ma' jeopardi?e the completion in accordance with
the contract, and the measures being (or to be) adopted to o*ercome dela's+
• ;n' other issues deemed necessar' b' the 2ngineer in Charge
*eeting
!eetings shall be held in the office of !C4, with prior notice gi*en b' 2ngineer in
Charge+ The proposed agenda for the meetings shall be e5changed at least 1 week in
ad*ance+ 3t is re$uired that a decision-maker of the Contractor is present at the meetings so
that binding decisions can be taken about outstanding issues+ Benerall', the following
issues shall be discussed:
➢ Progress of the work, difficulties
➢ re*ision of time schedule
➢ Pa'ment issues
➢ Disputes
➢ Claims
➢ ;n' other issue deemed necessar' b' contractor or !C4
3. 0E CO+R"COR
C>T&;CT&E# B2>2&;" %"3B;T3>#:
The contractor shall design the complete s'stem of treatment plants including planning design and construction of all units, e5ecute and complete the works
in accordance with the contract, and shall remed' an' defects in the works+
The contractor shall conduct sur*e' . *erif' the le*els of the proposed
s'stem(s)
3n addition to the abo*e, the contractor is also re$uired to confirm the a*ailabilit'
of the material re$uired for the contract in the time schedule gi*en herein
after, so as to complete the job within the prescribed time+ >o time e5tension
shall be pro*ided on this account+ 3f re$uired under such circumstances, the
contract after prior appro*al of !C4 shall be allowed to use superior t'pe of
material so as to complete the job within the prescribed time+ >o additional
pa'ments shall be made on account of use of superior $ualit' material, on this
account+
The Contractor shall pro*ide the e$uipment and ContractorEs Documents
specified in the contract, and all ContractorEs personnel, goods, consumables
and other things and ser*ices, whether of a temporaril' or permanent nature,
re$uired in and for this design, e5ecution, completion and remed'ing of
defects including . ! period for 'ears+
-
8/19/2019 STP SPecifiucations
12/186
The works shall include an' work, which is necessar' to satisf' the !C4Es
re$uirements, or is implied b' the contract, and all works, which (although
not mentioned in the contract) are necessar' for the completion, or safe and
proper operation of the works+
The Contractor shall be responsible for the ade$uac', stabilit' and the safet' of all site operations, of all methods of construction and of all the works+
The Contractor shall pro*ide all facilities including con*e'ance re$uired for
*erification of sur*e' data, super*ision, $ualit' control tests, tests for
material, e$uipment and e$uipment(s), and9or all other facilities otherwise
referred in the conditions of contract(s) and9or otherwise necessar' to
complete the works with due super*ision of 2ngineer-in-charge+ The testing
of material, $ualit' control tests, etc+ ma' be got done through go*ernment-
recogni?ed labs after appro*al of 2ngineer-in- charge+
The Contractor shall, whene*er re$uired b' the !C4, submit details of the
arrangements and methods, which the contractor proposes to adopt for e5ecution of the works+ >o significant alteration to the arrangements and
methods shall be made without this ha*ing pre*iousl' been notified to the
!C4+
The contractor shall also establish an acceptable and decent office premises for
the clientEs site office at the suitable location adjacent to the contractorEs site
office nearb' with necessar' amenities as ma' be re$uired in running the site
office+
Contractor: Repreentati;e#
The contractor shall appoint the ContractorEs &epresentati*e and shall gi*e them
all authorit' necessar' to act on the contractorEs behalf under the contract+
nless the ContractorEs &epresentati*e is named in the Contract, the Contractor
shall, prior to the Commencement Date, submit to the !C4 for consent the
name and particulars of the person the Contractor proposes to appoint
as ContractorEs
&epresentati*e+ 3f consent is withheld or subse$uentl' re*oked, or if the appointed
person fails to act as the ContractorEs &epresentati*e, the Contractor shall similarl'
submit the name and particulars of another suitable person for such appointment+
The Contractor shall not, without the prior consent of the !C4, re*oke the
appointment of the ContractorEs &epresentati*e or appoint a replacement+
The ContractorEs &epresentati*e shall, on behalf of the Contractor, recei*e instructions+
The ContractorEs &epresentati*e ma' delegate an' powers, functions and
authorit' to an' person, and ma' at an' time re*oke the delegation+ ;n'
delegation or re*ocation shall not to take effect until the !C4 has recei*ed
prior notice signed b' the ContractorEs &epresentati*e, naming the person
-
8/19/2019 STP SPecifiucations
13/186
and specif'ing the powers, functions and authorit' being delegated or
re*oked+
hene*er ser*ices of contractor staff are found 9 noticed unsatisfactor' b' the
!C4, the' shall be remo*ed 9 terminated b' the contractor immediatel' as
per direction of 2ngineer in Charge+
Setting Out#
The contractor shall set out the works in relation to original points, lines and le*els of
reference specified in the contract+ The contractor shall be responsible for the correct
positioning of all parts of the works, and shall rectif' an' error in the positions, le*els, the
dimensions or alignment of the works+
ure8#
The contractor shall:
(a) Take care for the safet' of all personEs entitled to be on the site,
(b) Choose reasonable efforts to keep the site and work clear of unnecessar'
obstruction so as to a*oid danger to these persons,
(c) Pro*ide fencing, lighting, guarding and watching of the works until completion
and its taking o*er b' the !C4 at end of . ! period+
(d) Pro*ide an' temporar' works (including road wa's, foot wa's, guards and
fences) which ma' be necessar', because of the e5ecution of works, for the use
and protection of the public and of owners and occup' a ser*er adjacent land+
?ua$it= "urance#
3n addition to the pro*isions of clause Beneral conditions of contract, the contractor shall
institute a $ualit' assurance s'stem to demonstrate compliance with re$uirements of the
contract+ The s'stem shall be in accordance with the details stated in the contract and the
=ualit' ;ssurance Programme will be got appro*ed from the competent authorit'+ The
!C4s shall be entitled to audit an' aspect of the s'stem+
Tenderer must *isit the work site and see for himself the site and ground conditions in all
respects including a*ailabilit' of labour (skilled and unskilled), approaches, a*ailabilit' of
water, electricit', materials, and all other matters affecting the work before submitting the
tender+
wner will not, therefore, after acceptance of the tender, pa' an' e5tra charges for an'
reason whatsoe*er in case Contractor find later on to ha*e misjudged the site and other
conditions+
@n%ForeeenaA$e ,ifficu$tie#
The contractor shall be deemed to ha*e obtained all necessar' information as to risk,
contingencies and other circumstances that ma' influence or affect the works i+e
-
8/19/2019 STP SPecifiucations
14/186
(a) b' signing the contract, the contractor accepts the total responsibilit' for ha*ing
sustained all difficulties and costs of successfull' completing the works: and
(b) the contract price shall not be adjusted to take account of an' unforeseen
difficulties or costs+
Rig Faci$itie8
(a) The Contractor shall bear all costs and charges for special and9or temporar' rights
of a', which he ma' re$uire, including those for access to the site+ The
contractor shall also obtain, at risk and costs, an' additional facilities outside the
site which he ma' re$uire further purposes of the works+
1A4 Contractor shall make his own arrangement for ater suppl'9electricit' at his own
cost and nothing e5tra shall be paid b' the !C4
The contractor shall not interfere unnecessaril' or improperl' with:
(a) the con*enience of the public, or
(b) in the access to and use and occupation of all roads, e5isting electric and other
land, irrespecti*e of whether the' are public or in the possession of the !C4
or others+
(c) with the e5isting amenities, whether natural of man made+ >o tree shall be
felled without permission of the 2ngineer6s &epresentati*e and clearance of the
site shall generall' be kept to the minimum necessar' for the works and
temporar' works+
Securit= of t
-
8/19/2019 STP SPecifiucations
15/186
For the purpose of constructing Contractor6s 'ard, godown, site office, staff $uarters, etc+
the contractor ma' utili?e the land and e5isting buildings 9 structures allocated to him b'
!C4 after obtaining re$uisite permission from the 2ngineer in Charge+ ;ll e5penses
3n connection with purchase or construction or maintenance or remo*al etc+ of such items
shall be borne b' the Contractor+
!C4 ma' allocate the land and buildings for use b' the Contractor according to its
possibilities onl'+ 3f the land or buildings are not a*ailable or are insufficient for the
purposes of the Contractor6s establishment, additional land or buildings will ha*e to be
procured9rented b' the Contractor himself at his own cost and e5penses as per his
re$uirement+
&eco*er' of rent towards the use of building b' contractor for office9store9residence
pro*ided b' the !C4 shall be done on fair rent assessment basis+
Works to be kept clear of water:
The Contractor shall keep the works well drained until the 2ngineer certifies that thewhole of the works is substantiall' complete and shall ensure that so far as is practicable,
all work is carried out in the dr'+ 25ca*ated areas shall be kept well drained and free from
standing water+
The Contractor shall construct, operate and maintain all temporar' dams, water-courses
and other works of all kinds including pumping and well-point dewatering that ma' be
necessar' to e5clude water from the works while the' are in progress and till the' are
handed o*er to the De*elopment ;uthorit'+ This refers mainl' to surface water that ma'
enter into the e5ca*ated construction work+ >o separate pa'ment will be made for such
dewatering works 9 measures+ price $uoted b' Contractor will be deemed to ha*e co*ered
e5penses for such dewatering works 9 increase+ #uch temporar' works shall not be
remo*ed without the appro*al of the 2ngineer6s &epresentati*e+
>otwithstanding an' appro*al b' the 2ngineer6s &epresentati*e of the Contractor6s
arrangements for the e5clusion of water, the Contractor shall be responsible for the
sufficienc' thereof and for keeping the orks safe at all times, particularl' during an'
floods and for making good at his own e5pense an' damage to the works including an'
that ma' be attributable to floods+ ;n' loss of production or additional costs of an' kind
that ma' result from floods shall be at the Contractor6s own risk+
). ORG"+I"IO+ O+ 0E SIE
Contractor Office#
The Contractor shall ha*e an office(s) near the site(s), and shall during office hours on allworking da's ha*e a clerk or some other authori?ed person alwa's present at such office,
upon whom a notice ma' be ser*ed+ #er*ice of an' notice left with such clerk or
authori?ed person shall be deemed good, ser*ed upon the Contractor+
Contractor: Staff#
-
8/19/2019 STP SPecifiucations
16/186
The Contractor shall emplo' for the e5ecution of work onl' such persons as are skilled
and e5perienced in all acti*ities re$uired for the completion of the orks, from
reconnaissance, design, manufacturing, e5ecution and testing to commissioning+ The
2ngineer in Charge shall be at libert' to object to and re$uire the Contractor to remo*e
from the ork an' person who in the opinion of the 2ngineer in Charge misconducts
himself or is incompetent
-
8/19/2019 STP SPecifiucations
17/186
Volume-01
Page - 0
Signature of
or negligent in the proper performance of his duties+ #uch person shall not again be
emplo'ed without permission of the 2ngineer in Charge+
The Contractor shall emplo' labour in sufficient number to maintain the re$uired rate of
progress and $ualit' to ensure workmanship of the degree specified in the Contract+
Site BooD8#
ithin se*en da's of the receipt of the order to take up work, the contractor shall suppl'
at his own cost, a work order book ha*ing machine numbered pages in duplicate, to the
2ngineer in charge or his representati*e+ This book shall be kept at the site of work under
the custod' of the clientEs representati*e+ Directions or instructions to be issued to the
contractor from the inspecting officers of the client or b' 2ngineer in charge of the work
or his superior officer shall be entered therein with the dated signature (e5cept when such
directions or instructions are gi*en b' separate letters)+ The contractor or his authori?ed
representati*e shall regularl' note these entries in the work order %ook and also record
therein the action taken or being taken b' him in compliance thereon+ The contractor or
his authori?ed representati*e ma' take awa' for his own record, the duplicate pages of thework order %ook, which will be carbon copies of the original pages, after putting up his
signature+ The work order %ook shall not be remo*ed from the site of work e5cept with
the written permission of the 2ngineer in charge+
5. ,ESIG+ "+, ,R"WI+GS
Genera$ ,e8ign OA$igation8#
The Contractor shall be deemed to ha*e scrutini?ed, prior to submission of bid, the !C4Es
re$uirements (including design criteria . drawings . calculations, if an') for their
correctness, accurac', structural safet' and soundness+ The Contractor shall be responsible
for the correctness, accurac' of all designs and for safet' . soundness of all structures
constructed under this contract+
The details of materials indicated in the tender document are the minimum re$uirement,
and no reduction9alteration shall be permissible unless the 2ngineer-in-charge is satisfied
that such changes are necessar'+
Contractor:8 ,ocument8 / SuAmi88ion Proce>ure for ,etai$e> ,e8ign /
Eecution ,raing8#
The ContractorEs Documents shall comprise the technical documents specified in the
!C4s re$uirements, Documents &e$uired to satisf' all regulator' appro*als and I;s %uilt
DocumentsJ and peration . !aintenance !anuals+ The ContractorEs Documents shall
be written in the language for communications defined in contract+
3f errors, omissions, ambiguit', inconsistencies, inade$uacies or other defects are found in
the Contractors Documents, these and the works shall be corrected at the ContractorEs
cost, notwithstanding an' consent for appro*al under this clause+
4'draulics of plant 9B; drawings9nit si?ing etc+ are gi*en in the tender document+
4owe*er the contractor ma' check to ensure soundness of the designs . successful
completion of the project+ The contractor is re$uired to carr' out the soil in*estigation for
-
8/19/2019 STP SPecifiucations
18/186
Volume-01
Page - 1
Signature of
important structure and to submit the detailed structural designs and e5ecution drawings
of all ci*il, mechanical and electrical engineering works+ 4e will also submit the detailed
s'stem and working drawings as well as performance cur*es and data for all h'draulic,
mechanical, electro-mechanical and electrical e$uipment+
3f an' changes are desired b' him in the gi*en designs . drawings, such changes, dul'done in the drawings with a detailed note justif'ing the proposed changes, shall be
submitted for appro*al+ >o work shall be commenced on site on the basis of designs .
drawings not appro*ed b' 23C and9or those not accepted b' the contractor+
The drawings shall be sufficient in details and the scale has to be chosen accordingl' in
co- ordination with the engineer in charge+
"ppro;a$ Proce>ure#
;s soon as practicable after acceptance of his tender and in an' case before starting work
on site, the Contractor shall submit for the appro*al of #uperintending 2ngineer (P42) a
detailed programme of work in the form of a P2&T 9 CP! >etwork and a bar chart
together with a description of his proposed methods of working+ The programme shall
take into account, the importance of completing the *arious parts of the works in
accordance with Clause for time for completion of the Contract+
The contractor shall submit designs, working drawings and documents etc+, done as per
the re$uirement of the tender documents to the !C4 or his authori?ed representati*e+ The
following shall be the procedure for submission and appro*al of design, e5ecution
drawings . contractor6s documents:
The Contractor shall submit three copies of design9drawings9contractor6s documents along
with the rele*ant 3# codes 9 manuals and soft cop' of design+ Calculations of design in
soft cop' shall be on e5cel sheet with stepwise e5planation of formulas, *arious
assumptions, calculations etc+ to arri*e at results of design+ 3n the soft cop' of submissionsformulas . calculations shall not be kept hidden+ ithout such submission no design .
drawing will be accepted+ ;ll the submitted papers are to be signed b' the Contractor or
his authori?ed representati*es+
The !C4 will re*iew the submissions and if found fit for appro*al, will appro*e them
and return one cop' to the Contractor within 1 da's dul' signed in token of appro*al+
3n case the design9drawings etc+ are not found fit for appro*al, the !C4 will mark the
comments on them and return two copies to the Contractor within 1 da's and the same
shall be repeated till the submissions are finall' appro*ed as per scope of work .
specifications+ The contractor in such cases shall submit the re*ised and corrected
submissions within 1 da's to the receipt of comments from !C4
+
-
8/19/2019 STP SPecifiucations
19/186
n receipt of appro*ed submissions, the Contractor shall submit four () additional copies
of the appro*ed submissions (designs, drawings, data sheets etc+) to the #uperintending
2ngineer (P42) for reference and records+
>o designs 9 drawings with corrections made after taking the prints will be accepted+
The appro*al along with alterations in drawings9designs b' the #uperintending 2ngineer
(P42) shall not relie*e the Contractor of his responsibilit' in terms of the Contract for
soundness of the designs+ The Contractor shall be responsible for the structural safet' of
all the components of the ork+
,i8crepancie8 Beteen ,raing8 "n> Specification8
The drawing anne5ed with the tender documents are for indicati*e purpose onl'+ The
actual drawing and designs are to be submitted b' the tenderer+ 3n case of discrepancies
between drawings and specifications or data sheets arising from the meaning, dimensions
or $ualit' of the materials and e$uipment for the due and proper e5ecution of the ork,
Contractor's Undertaking
The design, the Contractor6s Documents, the e5ecution and the completed works shall
compl' with the rele*ant standards, building, construction and en*ironmental laws, law as
applicable to the product being produced from the works, and other standards specified in
the (o$ume I Scope of WorD / eco material will be supplied b' !C4
Samp$e8#
The contractor shall submit samples to the 2ngineer-3n-Charge at his cost, for their inspection prior to dispatch for re*iew in accordance with the procedure
laid down in ContractorEs Documents described in rele*ant sub-clause+
3nspection and testing of pumps, motors, bulk meters, *al*es, control panels
etc+ shall be done in the factor' before dispatch of the material+
-
8/19/2019 STP SPecifiucations
20/186
The !C46s Personnel or authori?ed representati*e shall at all reasonable times:
(a) ha*e full access to all parts of the site and to all places from which natural materials are
being obtained, and
(b) during production, an effecti*e and construction (at the site and, to the e5tent specified inthe contract, elsewhere), be entitled to e5amine, inspect, measure and test the materials
and workmanship, and to take the progress of manufacture of e$uipment and production
and manufacture of materials+
2$uipment of similar kind to be used in the contract shall be of same make
unless specificall' appro*ed b' the 2ngineer-in-Charge+ nless specific
appro*al of the 2ngineer- in-Charge is obtained, all e$uipment of one kind,
to be used in the project, shall be offered for inspection in one lot+ 3f such
e$uipment are offered in different piece meal lots, the cost of inspection of
material in smaller lots will be reco*ered from the contractor, and the dela'
caused to the project on this ground, shall solel' be attributed to the account
of the contractor+
The cost of samples including transportation6s as well as of the testing shall be
borne b' the contractor for the followings:
(a) The collection . suppl' of the samples and carr'ing out of such tests is pro*ided for or
clearl' intended in the contract, will be carried out either at site of work or manufacturerEs
place or at laboratories at a place appro*ed b' the 2ngineer in charge+
(b) The collection . suppl' of the samples and the carr'ing out of such tests if not pro*ided
for or clearl' intended in the contract but on testing, the material is found defecti*e and
has to be rejected+
e8ting(i) The Contractor shall pro*ide all apparatus, assistance, documents and other
information, electricit', e$uipment, fuel, consumables, estimates, labour, materials,
and suitabl' $ualified and e5perienced staff in relation to suppl' of material and
are necessar' to carr' out the specified test efficientl'+ The Contractor shall agree,
with the !C49third part', the time and place for the specified testing of an'
e$uipment, materials and other parts of the works+
(ii) The !C4 ma', *ar' the location or details of specified test, or instruct the
Contractor to carr' out additional tests+ 3f these *aried or additional tests show that
the tested e$uipment, materials or other workmanship is not in accordance with the
contract than cost of testing to carr' out in this *ariation shall be borne b' the
contractor, notwithstanding other pro*isions of the contract+
(iii) 2ngineer-3n-Charge (client) or its representati*e shall ha*e the right to inspect and 9
-
8/19/2019 STP SPecifiucations
21/186
or to test the Boods for confirm their conformit' to the Contract+ The Technical
#pecifications shall specif' what inspections and tests the Purchaser re$uires and
where the' are to be conducted+ 3f not specified or notwithstanding an' mention,
the contractor shall submit the inspection plan of all major bought-out items for
appro*al with 23C specif'ing the stages of inspection as per manufacturer6s $ualit'
plan and shall arrange to carr' out the inspection along with 23C or it6srepresentati*e at manufacturer6s works as per the appro*ed plan+ The 23C
Purchaser shall notif' the Contractor in writing of the identif'ing of an'
representati*es retained for these purposes+ ;ll the e5penses *i?+ lodging .
boarding, transportation, all facilities as re$uired shall be borne b' the successful
tenderer+
(i*) The testing of materials and work where necessar' shall be carried out in
accordance with the most recent standards or Tentati*e #tandard !ethods of %ureau
of 3ndian #tandards institution current on the date fi5ed for opening of the tender+ 3f
no such standard e5ists for a particular test, the standard method as laid down b' the
%ritish #tandard 3nstitution or b' ;merican ;ssociation of #tate 4ighwa' officials
or the ;merican #ociet' or other suitable organi?ation for testing of materials, will be used at the discretion of the 2ngineer in charge+ 4e ma' also adopt an' other
suitable method at his discretion+
(*) The Contractor shall promptl' forward dul' certified reports of the tests to the
!CV4+ hen the specified test has been passed, the !C4 shall endorse the
ContractorEs test certificate, or issue a certificate to him, to that effect+
(*i) The contractor shall establish a small laborator' at site where routine testing of
materials of concrete, asphalt etc+ can be done to the e5tent feasible+ 4e shall
indicate in his tender the scope of laborator' that he intends to establish on work
site+ The charges for the same shall be born b' the contractor+
The testing of material during construction acti*ities on time to time basis shall also be
carried out from the appro*ed laborator'9 Testing #tation as per the schedule decided b'
the 2ngineer-3n-Charge and at the cost of contractor+
(*ii) Contractor 8
-
8/19/2019 STP SPecifiucations
22/186
-
8/19/2019 STP SPecifiucations
23/186
The 2ngineer in charge will pro*ide an authori?ation for packing and shipment after
inspection and9or appro*al of the material9e$uipment+
3f the Contractor packs and ships material9 e$uipment without appro*al or authori?ation of
the 2ngineer-in-Charge, it can be refused if it is not matching with the specifications of
the Contract+ ;ll costs resulting from this are to be borne b' the Contractor+ TheContractor has then to pro*ide the material9 e$uipment, which is matching with the
Contract+
&& CO*PLEIO+ OF 0E WORK
ime for Comp$etion
The whole of the ork, including mobili?ation, reconnaissance, in*estigations, design,
manufacturing, transportation, construction, installation . testing, commissioning, trial
runs, and demobili?ation has to be completed within a period of A months calculated from
the commencement date, which is 10 da's after the written order to commence the ork+
The duration of the performance run, tests and trial run is included in the completion
period, defined in Beneral Conditions of Contract++ The contractor shall submit a detailedtime schedule for all the acti*ities to be completed under the contract+ 3f re$uired this
schedule shall be updated in each monthl' meeting+ 4owe*er, this time schedule shall not
bear an' implications on the pro*isions of clause of Beneral Conditions of Contract+
Comp$etion of WorD an> Fu$$= Commi88ioning
(i) 3mmediatel' after the ph'sical completion, the work of testing and commissioning
the entire s'stem on design conditions as per the procedure of test gi*en in Volume
3 I#cope of ork . Technical #pecificationsJ shall be taken up+ nce the entire
s'stem has been successfull' tested and commissioned and trial run of three
months as per the conditions of contract, the . ! period shall commence+ ;fter
successful completion of the trial run period of three month, and remo*al of all*isible defects to the satisfaction of 2ngineer-in-Charge, the work shall be treated
as ICompletedJ+
nless otherwise pro*ided in the contract, after the successful completion of the
testing and three month trial run for the entire s'stem, the 2ngineer-in-charge shall
issue a certificate of ICompletion of orkJ+ The date of Certificate notif'ing
ICompletion of orkJ will be used for the final pa'ment as per clause < and 8 of
Beneral Conditions of Contract+ From this date of certificate for ICompletion of
orkJ, the peration . !aintenance period shall commence+
(ii) 3n case &aw #ewage is not made a*ailable b' the 2mplo'er than completion
period as defined in 11++(i) shall be e5tended appropriatel'+
,efect8 LiaAi$it= Perio>
The defect liabilit' period shall be of months, from the date of issue of the certificate
for Completion of works The Contractor shall operate . be responsible for satisfactor'
performance . maintenance of the #TP under all design and operation conditions for the
duration of the defects liabilit' period, e5cept for damage due to unprecedented natural
calamities+ During the defect liabilit' period the contract has to
-
8/19/2019 STP SPecifiucations
24/186
pro*ide for additional training of the !C4 staff and ha*e to carr' out the operational,
maintenance and repair acti*ities+
Constructional defect such as defects due to premature use of materials, works not
e5ecuted in accordance with the Contract, hidden faults in material and e$uipment not
disco*ered during inspection and testing, fault in design, manufacturing, erection and inconstruction shall be pointed out b' the 23C and shall ha*e to be rectified b' the
contractor during this period+ The cost for repair material, spare arts, transport, repairs,
tests and repair staff shall ha*e to be borne b' the contractor+ 3f the Contractor fails to
rectif' the defect within a period of 1 da's after aforesaid notice, the 2ngineer in Charge
ma' forfeit the securit' deposit or an amount thereof re$uired for the rectification through
a third part' without prejudice to an' other right the !C4 ma' ha*e against the
Contractor in respect of his failure to remed' such defects+
3n the case of dela'ed ICompletion of orkJ not caused b' the Contractor, the defects
liabilit' period shall be e5tended accordingl' but not more than three (/) 'ears after the
total ph'sical completion of the entire ork, whiche*er is earlier+
&'. "S%B@IL ,R"WI+GS
The submission of the as-built drawings for the e$uipment is the precondition for the final
pa'ment+ The final drawings shall be submitted in one reproducible set and copies on
linen bound in an album of an appro*ed si?e+ The contractor shall submit all the
completion drawings and appro*ed design calculations on CD &! 9 DVD in two copies
with proper director' structure+
The contractor shall prepare, and keep up to date, a complete set of Kas builtK records of
the e5ecution of the works, showing the e5act as built locations, si?es and details of the
works as e5ecuted+ The records shall be kept on the site and shall be used e5clusi*el' for the purpose of this sub clause+ Two copies shall be supplied to the !C4 before the
commencement of the tests on completion+
3n addition, the contractor shall carr'out the Videograph', still photographs prior to start
of work, during construction period and up to completion of the work up to the
satisfaction of 23C+ The prepared album of photograph9 *ideo cassette shall be submitted
to 23C along with the ;s built drawings+
The contractor shall suppl' to the !C4 as built drawings of the works, showing all works
as e5ecuted, and submit them to the !C4 for re*iew under sub clause GContractors
DocumentsH+ The Contractor shall obtain the consent of the !C4 as to their si?e, the
references s'stem, and other rele*ant details+
Prior to the issue of Completion of works certificate, the contractor shall pro*ide to the
!C4 the specified numbers and t'pes of copies of the rele*ant as built drawings, in
accordance with the !C46s re$uirements+ The Completion of works shall not be
considered until the !C4 has recei*ed the ;s %uilt Drawings+
&3. OPER"IO+ "+, *"I+E+"+CE *"+@"LS
-
8/19/2019 STP SPecifiucations
25/186
Prior to the commencement of the tests on completion, the contractor shall suppl' to the
!C4 pro*isional operation . maintenance manuals in sufficient detail as specified in
(o$ume I 2Scope of orD / ec
-
8/19/2019 STP SPecifiucations
26/186
Volume-01
Page - 0
Signature of
3f an' e5tra item crops up during the progress of works, the same shall be carried out b'
the contractor, after appro*al of 2ngineer-in-charge and he shall be paid at the rate fi5ed
b' the 2ngineer-in-charge as per the rate anal'sis based on current market rates or current
%#& whiche*er is less+
;ll pa'ments shall be subjected to the following limitations:
&-.& Se9uence of e;ent in ca8e of 8upp$= of materia$#
#e$uence of e*ents shall be decided in the monthl' re*iew meetings, and material
re$uirement for subse$uent / months shall be decided and made part of the monthl'
reports+ Pa'ment for suppl' of items in consonance with the agreed se$uencing of
material will onl' be made, so that material does not remain unutili?ed for more than /
months, for which pa'ment of suppl' has been made+
Pa'ment of material and e$uipment shall be done for the price $uoted for respecti*e items
in the Volume 33 I#chedule of PricesJ of the tender document and as pro*ision gi*en
herein after+
&. ,E,@CIO+S
Statutor= ,e>uction8 #
The !C4 is re$uired to make statutor' deductions at source from all running bills and
final bill as in force through rele*ant statutes in force from time to time at the rates
prescribed therein+
Otuction#
;n' other deductions to reco*er an' reduction in rates or an' other !C4Es claims accrued
as per the contract or in respect to an' other liabilities arising, shall be deducted from
subse$uent interim pa'ments or final pa'ments or from the securities with the !C4+
&8. +O+ "PPLIC"BLE CL"@SES OF GE+ER"L CO+,IIO+S OF
CO+R"C
The clauses of Beneral conditions of contract bearing nos+ ;, 10, 10%, 10C, 1, 1;, ,
, /0, /8,, 8 and table for schedule of material to be supplied b' the deptt+ 3f
a*ailable, (referred to in clause 10) of Beneral Conditions of contract shall not be
applicable+ >o pa'ment in respect of price *ariation shall be applicable under this
contract+
&. "ES "+, ,@IES
;ll ta5es, duties, le*ies applicable b' an' act of the Bo*ernment of 3ndia and9or #tate of &ajasthan and9or of the "ocal bodies on the compan' or its personnel, during the period of
work in progress shall be of the Contractor+ ;ll goods manufactured9procured and
supplied b' the contractor and the work e5ecuted under this contract, responsibilit' of
pa'ment of sales ta5, surcharge, octroi and an' other ta5 and le*ies in force, responsibilit'
of pa'ment of all such ta5es, duties, le*ies shall be of the contractor+
3n respect of goods and materials procured b' the Contractor, for use in works under the
contract, #ales Ta5 will be paid b' the Contractor himself+ %ut in respect of all such goods
-
8/19/2019 STP SPecifiucations
27/186
-
8/19/2019 STP SPecifiucations
28/186
Volume-01
Page - 1
Signature of
pro*isions, than the sales ta5 for such cases shall be paid b' the 2ngineer in Charge on
behalf of the contractor and the amount so paid shall be deducted from the intermediate
pa'ments of the contractor+
'J. PERFOR*"+CE G@"R"+EE OF E?@IP*E+
The bidder shall guarantee that the performance of each pump set, motor, electrical
mechanical electro-magnetic, automation . instrumentation e$uipments shall compl'
with the re$uirements gi*en in the specifications+ 4e shall also guarantee that the
e$uipments will operate satisfactoril' at the time of commissioning and shall be at the
desired le*el of efficiencies during . ! period and also at the time of handing o*er+
'&. *C0S RIG0 O RECIF!
The !C4 retains the right to rectif', at the cost of Contractor, to perform an' of these
materials or work obligations on default of the Contractor+
''. *"KES OF E?@IP*E+
The 2$uipment(s) used b' the bidder for the project shall be one of the makes as gi*en inthe Volume @3 of the tender document +The makes of other e$uipments9material to be used
shall be got appro*ed from 23C+
'3. I*E SC0E,@LE FOR CO+R"C "CI(IIES
For completion of the job in the prescribed time it is essential to maintain a timel' and
logical se$uencing of the contract acti*ities+ 3n *iew of the abo*e the contractor shall
submit a plan for appro*al of !C4+
To adhere to the e5ecution schedule appro*ed b' the !C4, the contractor shall also
deplo' the re$uired T.P as directed b' 2ngineer in Charge+ The time schedule so
pro*ided and appro*ed b' competent authorit' shall ha*e no bearing on clause of
Beneral Conditions of Contract+
'). I+S@R"+CE
The contractor shall ha*e to pro*ide a minimum insurance of man power and e$uipments+
This insurance co*er should start from the date of starting of work and should be *alid up
to end of e5ecution period+ The responsibilit' of timel' pa'ment of the premium as well
as that of lodging claims as and when situation arises will be that of contractor+
"cci>ent or InHur= to Contractor8 Emp$o=ee8
The !C4 shall not be liable for, or in respect of an' damages or compensation pa'able b'
law in respect of, or in conse$uence of an' accident or injur' to an' person in the
emplo'ment of the contractor (other than accident or injur' as ma' be attributable to the
!C4 or its emplo'ees) . the contractor shall indemnif' the !C4 against all such
damages and compensations and against all actions, suits, claims, cost or e5penses arising
there from+ The contractor shall ensure against such liabilities and shall continue such
insurance during the whole of the time that an' persons are emplo'ed b' him on the
works+
Part= In8urance
-
8/19/2019 STP SPecifiucations
29/186
Volume-01
Page -
Signature of
%efore commencing the e5ecution of the work, the contractor shall insure and indemnif'
the !C4 against all damages, loss or injur' and an' actions, suits, claims, demands, costs
and
e5penses arising there from which ma' occur to an' propert' including that of !C4) b',
or arising out of the e5hibition of an' work for which shall be occasion b' the negligence
of the contractors6 emplo'ees or b' defecti*e design, materials or workmanship, or froman' other cause for which the contractor ma' be held liable under the contract+
"ppro;a$ B= = on Contractor8 Fai$ure to In8ure
3f the contractor fails to effect on keep in force the insurances referred to or an' of theinsurance which he ma' be re$uired to effect under the term of the contract then and in
an' such case the !C4 ma' effect and keep in force an' such insurance and pa' such
premium or premiums as ma' be necessar' for the purpose, and from time to time deduct
the amount so paid b' the !C4 as aforesaid, from an' mone's due or which ma' become
due to the contractor or reco*er the same as a debt due from the contractor+
'5. +IG0 WORK#
#ubject to an' pro*isions to the contrar' contained in the contract, no work shall be
carried out after office hours without the written permission of the 2ngineer-in-charge
e5cept when the work is una*oidable or absolutel' necessar', for sa*ing life or propert'
or for the safet' of the work, in which case, the contractor shall immediatel' inform the
2ngineer-in-charge or his &epresentati*e, pro*ided alwa's that the pro*ision of this clauseshall not be applicable in the case of an' work which it is customar' to carr' out b'
double or rotar' shifts in which case sufficient ad*ance notice shall be gi*en of the
intention to work at night to the 2ngineer-in-charge+ ;fter making all re$uisite
arrangements and management of areas, materials and e$uipment6s, re$uired under an'
emergenc' etc+ *ertime to super*isor' staff of the client in such cases shall ha*e to be
howe*er borne b' the contractor+
The contractor shall also carr' on work after office hours if so re$uired b' the 2ngineer-
in-charge, subject to obtaining appro*al in writing, for e5pediting the progress on the
works or for an' other reasons of technical safet'+
hene*er an' work is re$uired to be carried out at night in the interest of structural safet'or an' other reason with e5press appro*al of the 2ngineer-in-charge or his representati*e
authori?ed to super*ise, ade$uate lighting and other arrangement shall be made in ad*ance
b' the contractor for proper e5ecution and super*ision of such work+ The contractor shall
not be howe*er entitled to an' e5tra pa'ments for night work+
'-. RESP"SS#
-
8/19/2019 STP SPecifiucations
30/186
Volume-01
Page - /
Signature of
The contractor shall at all times be responsible for an' damages due to trespass committed
b' his agents and work people in carr'ing out the work, unless authori?ed b' the
2ngineer-in-charge in writing in which case, all repair work shall be done b' the
contractor at his own cost to restore the original condition+
-
8/19/2019 STP SPecifiucations
31/186
'. PER*IS LICE+SES PRIORIIES CERIFIC"ES EC.#
The contractor shall make his own arrangements at his own cost, if re$uired+
(a) To obtain permits, licenses, $uota certificates, foreign e5change etc+ for an'
materials or items of work etc+ if re$uired b' him+
(b) To obtain rail and other priorities for transport of his plants, tools e$uipments,stores, machiner', materials, labour staff etc+
(c) To arrange with ci*il suppl' authorities for release of controlled goods if so,
for his labour and staff+
The client will not undertake to arrange for these but will render reasonable help within its
competence without accepting an' responsibilit' for dela' if an'+
'8. S"FE! *E"S@RES "+, SER(ICES
The Contractor shall be responsible for the safet' of all workmen and other persons
entering or in the works and shall take all measures necessar' to ensure their
safet' to the appro*al of the 2ngineer6s &epresentati*e+ &eference in these
respects shall also be made to the Conditions of Contract and safet' pro*isions
but in particular, such measures shall include the following:
a4 Pro;i8ion of proper 8afet= an> emergenc= regu$ation8 fire ga8 an>
e$ectric 8 Ao togeting pro;i8ion of amp$e 8tan>A= generating
an> pumping p$ant
>4 Pro;i8ion an> maintenance of 8uitaA$e $ige a>e9uate
i$$umination of orD8 it< appropriate 8pare8 an> 8tan>A= e9uipment
e4 Pro;i8ion an> maintenance of 8afe 8oun> mec maintenance of 8afe 8oun> rope8 8$ing8 pu$$e=8 an>
ot
-
8/19/2019 STP SPecifiucations
32/186
The Contractor shall submit for the appro*al of the 2ngineer6s &epresentati*e
detailed proposals under (a) abo*e+ hen the regulations ha*e been appro*ed
and before the work started, the Contractor shall distribute copies in 2nglish or
in other languages as appropriate to all his emplo'ees and to the 2ngineer6s
&epresentati*e+
The Contractor shall ensure that all his emplo'ee are full' con*ersant with the
regulation, emergenc' and rescue procedures, etc+ and the Contractor shall
enforce the rule that an' emplo'ee committing a serious breach of such a
regulations shall be instantl' dismissed and shall not be re-emplo'ed+
Contractor shall pro*ide and maintain at his own e5penses all lights, guards, fencing
and necessar' watchmen when and where necessar' or add as re$uired b'
wner 9 2ngineer for the protection of the works or for the safet' and
con*enience of those emplo'ed on the works and the public+ Contractor shall
also pro*ide at his cost traffic barricades, men for di*erting and controlling
traffic, necessar' sign boards for di*ersion of traffic+ 3n the e*ent of failure on
the part of Contractor, wner man with or without notice to Contractor put up a
fence or impro*e a fence alread' put up or pro*ide and9or impro*e the lighting
or adopt such other measures as he ma' deem necessar', and all the cost of such
work and procedures as ma' be adopted b' wner 9 2ngineer shall be borne b'
Contractor+ !aintenance of ade$uate warning and general lighting at nights at
place of work is essential+
' "CCI,E+ LI"BILIIES#
The contractor shall be responsible for all liabilities under workman compensation act, as
under:
(a) n occurrence of accident, resulting in death of workman emplo'ed b' the
contractor or which is so serious as is likel' to result in death of such
workman who meet with accident, the contractor shall within hours of
incidence, will intimate in writing to 2ngineer in charge of such incidence+The contractor shall indemnif' client, against all losses9damages sustained
b' the client resulting directl' or indirectl' from his failure to gi*e such
intimation to client including penalties9fines if an', pa'able b' client as a
conse$uence of clientEs failure to gi*e notice under workmans compensation
act or otherwise to confirm the pro*ision of this act in regard to such
accidents+
(b) 3n case when such compensations as abo*e becomes pa'able under
workmans compensation act, whether b' contractor or b' client as principal
emplo'er, it shall be lawful for the 2ngineer in charge to retain out of
mone' due and pa'able to the contractor, such sum or sums of mone' as
ma' in the opinion of the 2ngineer in charge be sufficient to meet such a
liabilit', the opinion of the 2ngineer in charge shall be final in regard to allmatters arising under this clause+
/0+ The Contractor shall ha*e to maintain account of steel, cement and other materials
that ma' be brought b' him on site+ This account shall be regularl' maintained and
kept open for inspection b' !C4 staff+ atering of all the items shall be done as
per instructions+ !i5ing of concrete shall be done b' concrete mi5er machine+
-
8/19/2019 STP SPecifiucations
33/186
;rrangements of bringing *ibrator for &+C+C+ work if re$uired shall ha*e to be
made b' the Contractor+
/1+ The &+C+C+ or specified work shall not be done on #unda' and holida' e5cept in
-
8/19/2019 STP SPecifiucations
34/186
emergenc' or when technical re$uirements are such that continuit' of work should
be maintained and that too will be with prior permission of the competent authorit'
/+ ctroi e5emption passes shall not be gi*en for an' material re$uired for this work+
//+ Contractor will be full' responsible for compliance of the *arious pro*isions under Contract "abor ;ct, 1A80 and the &ules frames there under+ The Contractor should
obtain necessar' permissions, license . registrations from labour commissioner, as
per labour law+
/+ The bidder shall note that if the information re$uired to be furnished b' him either
at the stage of pre$ualification or at the stage of bidding are not pro*ided in time
and9or if it is deliberatel' concealed and such information has come to the notice of
!C4 at an' stage prior to award of ork and whether or not negati*el' affecting
bidders competenc' the !C4 reser*e the right to out rightl' reject the bid though
he is pre-$ualified in the absence of such information+
-
8/19/2019 STP SPecifiucations
35/186
SPECIFIC"IO+S FOR OPER"IO+ "+, *"I+E+"+CE OF SP
&. SCOPE OF WORK FOR O/* OF ERI"R! CO**O+ EFFL@E+
RE"*E+ PL"+.
The contractor shall include in his scope operation and maintenance of entire #TP for
fi*e 'ears after successful completion of performance tests, trail run and
commissioning of the #TP at his own cost+ During this period client shall suppl' onl'
raw sewage and power to the contractor+ Contractor shall include cost of manpower,
material, chemicals etc+ consumables, spare parts, tools, tackles, etc+ as re$uired for
proper smooth and trouble free operation of the plant+
CO+R"COR 0"S O I+C@R "LL 0E COSS "ES (" ,@IES
R"+SPOR"IO+ L"BO@R *"C0I+I+G WEL,I+G REP"IRI+G
REPL"CI+G "+, *"KI+G GOO, "+! "+, "LL P"RS M PL"+
E?@IP*E+ CO+S@*"BLES *OORS P@*PS GE"R @+IC"P"CIOR L SWIC0GE"R LIG0I+G S!SE* C"BLES
C0E*IC"LS CO+S@*"BLES EC.
The Contractor will be held responsible for . ! and satisfactor' performance of
the #TP+ !ajor components and works shall include the following but not limited
to:
a) perate the plant efficientl' for fi*e 'ears including all manpower, consumables,
spare parts or components, labor, transportation, and other charges, e5cept for cost
of power and suppl' of raw sewage+ Power cost would be borne b' client+ The
contractor shall deposit the electricit' charges to the LVV>" and the same shall bereimbursed from !C4+
b) perate and maintain all units and e$uipments of the #TP as per the re$uirement of
the process to meet continuousl' and consistentl' desired treated sewage
characteristics in conformit' with specifications maintain all e$uipment in good
working condition as per the . ! manual as prepared b' the contractor and dul'
appro*ed b' client6s engineer in charge+
c) ;ttend breakdown of ci*il, mechanical, electrical, piping and instrumentation
works and maintain the plant and e$uipment through out the Contract Period+
d) The operation and maintenance ser*ice pro*ided b' the Contractor for the period
specified in the Contract shall ensure the continuous operation of the Plant and that
the breakdown or deterioration in performance, under normal operating conditions,
of an' items of Plant and e$uipment and component parts thereof is kept to a
minimum+
-
8/19/2019 STP SPecifiucations
36/186
e) The Contractor shall adhere to the manufacturers6 recommendations with respect to
e$uipment maintenance, consumables, the t'pes and grades of lubricants to be
used, fre$uenc' of lubrication, adjustments to be made regularl' and recommended
spares to be held in store+
f) !aintaining "ogbooks 9 &ecords of the work carried out to keep them in good
working condition+ 4e shall obtain appro*al of the format of logbooks and records
from 2mplo'er+
g) #ubmission of weekl' and monthl' . ! report+
h) Carr' out regular sampling at fre$uenc' as mutuall' agreed with engineer in charge,
carr' out anal'sis of the same in plants laborator' or laborator' appro*ed b' client,
if re$uired b' engineer-in-charge and result recording of raw and treated sewage as
per the procedures laid out b' the wner and in conformit' with standard methods
and submitting the test result to client+ Cost for the same shall be borne b'
contractor+
i) The contractor shall hand o*er the plant back to client on e5pir' of his contract in
full' working condition satisf'ing the re$uirement of treated sewage+ ;ll the
electrical, mechanical and instrumentation including standb' shall be in perfect
working condition+
wner en*isages to operate this plant for hours dail' basis i+e+ in three shifts dail'+
Following minimum manpower with specified e5perience and $ualification shall
be deplo'ed b' the contractor as a minimum during .! period for each shift:
#> Designation =ualification 25perience >o ofPersonnel
1 Chemist ! #c / 'ears of
astewater
Testing
01
Plant perator 3T3 or rele*ant /- 'ears
e5perience of
operating
pumping
machiner' 9
#TP
01
/ 2lectrician 3T3 or rele*ant / 'ears in
similar plant
01
4elper 10 th #Td Pass - do - 01
O"L PERSO++EL
PER S0IF
0
3n addition to abo*e minimum manpower the contractor shall depute necessar' wireman
-
8/19/2019 STP SPecifiucations
37/186
9 fitter or an' other technician as re$uired for carr'ing our pre*enti*e maintenance on
regular basis as per the schedule mentioned in .! manual to be submitted b'
contractor the proper operation and maintenance of the #TP and as recommended b'
the e$uipment manufacturer+ Further the' shall also be deputed to carr' out
breakdown maintenance of the plant as and when re$uired but not later than hours
from the date of intimation about the fault b' engineer in charge to the contractor+
-
8/19/2019 STP SPecifiucations
38/186
Contractor shall also demonstrate of ha*ing a*ailable with him the ser*ices of the
e5pert technical9process person ha*ing $ualification in %+2+ or !+2+
(2n*ironment) and ha*ing minimum / 'ears e5perience+ The said technical
person shall *isit site at least once in a fortnight to o*ersee the plant operation
and instruct the staff as re$uired to impro*e the performance+ The *isit shall be
logged in the site register+
;s per agreement, the >o+ of staff in each shift should alwa's remain present
otherwise penalt' towards absence of an' staff shall be le*ied and reco*ered
from the contractor+ The arrangement of relie*er for weekl' off9holida'9lea*e
etc+ shall be made b' the contractor+ ;bsence on an' ground like weekl' off or
holida' shall not be considered+ The presence of staff in each shift should be
marked in register to be maintained at office of 2ngineer of the Client at #TP
which shall be considered as final+ The contractor6s staff must mark their
presence in this register+ The contractor ma' maintain a separate register for his
own purpose+ 3f a man on the dut' remains absent and there will not be an'
replacement in his place, the contractor will be penalised at the rate of &s+ 009- per man per da' upto no $imit+
The Contractor shall emplo' all the re$uired staff (and in no case less than the
number specified in the tender which is mandator') within 8 da's of award of
the Contract, otherwise full pa'ment will not be made+ 3n such case, the
commencement of the Contract Period and pa'ment thereof shall be reckoned
onl' from the date of emplo'ment of full numbers of staff+ 3f at an' stage it is
felt necessar' that additional manpower o*er and abo*e the specified minimum
manpower is re$uired for the proper operation of the treatment plant, contractor
shall emplo' necessar' additional manpower at no e5tra cost within 8 da's from
the date of issue of notice b' engineer-in-charge+
>o e$uipment shall remain idle or un-repaired or damaged or unutili?ed for the
period e5ceeding working da's from the date of intimation b' engineer in
charge to contractor in that effect+ 3f an' e$uipment is not repaired, rectified and
or replaced within / da's, the contractor shall be penali?ed it< no $imit at ta= of >e$a= per eac< in>i;i>ua$ e9uipment of t
-
8/19/2019 STP SPecifiucations
39/186
'. ;ll Central 9 #tate Bo*ernment 9 #emi-Bo*ernment 9 "ocal %od'6s rules and
regulation pertaining to this contract, all legal formalities pertaining to pro*ident fund,
factor' act, all legal formalities shall be followed and obser*ed b' the Contractor
without an' e5tra cost to the 2mplo'er+ Please note that failure in compl'ing so, all
liabilities arising as per laws will be to the Contractor6s account+
>o accommodation 9 guesthouse 9 transportation facilit' will be pro*ided b' the
2mplo'er9 2mplo'er to the Contractor+ >o staff or an' person shall reside in the
plant premises and an' such person found shall be dri*en out immediatel'+
Li9ui>ate> >amage8 #
For the $uantit' of treated sewage
3f the pumped sewage $uantit' parameters do not meet the output standards, then
li$uidated damages shall be pa'able as per (furnished at the end of this section)+
The treated sewage $uantit' le*els shall be calculated on the basic a*erage o*er
the rele*ant period of hours+
3t is understood that li$uidated damages are not a penalt' but represents a
reasonable estimate of fair compensation which are pa'able without proof of
actual damage for a failure to meet the stipulated conditions which otherwise
is impracticable or e5tremel' difficult to fi5 the actual damages resulting
from failure of the contractor to meet such output standards+
#ilt 9 #ludge 9 #creening 9 Brit remo*al
3f the contractor fails to remo*e silt 9 sludge 9 screening 9 grit etc+ in the treatment
plant from the date of receipt of letter from the emplo'er, then the
silt9sludge9screenings9grit shall be remo*ed b' the emplo'er b' engaging other
agencies and the cost will be reco*ered from the contractor+
-
8/19/2019 STP SPecifiucations
40/186
Volume-01
Page -
-
8/19/2019 STP SPecifiucations
41/186
Volume-01
Page -
-
8/19/2019 STP SPecifiucations
42/186
TECHNICAL SPECI?ICATIONS O? CONTACT
DESI0N PAA7ETES
SE*A0E ?LO*
i. Particu!ar ii. A&era"e f!o( Pea) factor i&.Pea) f!o(
STP 1: 7LD m2 ,sec. 2.55 m2 ,sec.
CAPACIT
Ca/acit+ of STP 1: 7LD
PE?O7ANCE CHAACTEISTICS O? TEAT7ENT PLANT
Desi"ne# out!et Parameters
Parameter
BOD
COD
TSS
?aeca! Co!iform
Tota!! Nitro"en as N
Pos/ate Tota! as P
.5 LIST O? TENDE DA*IN0S ?O 1: 7LD STP
S. No. Tit!e of Dra(in"s for 1 7LD STP No. of D(".
1 INDEF 7AP O? 1: 7LD STP SITE 51
Ao&e #ra(in"s are on!+ conce/tua!$ Bi##ers are a#&ise# to refer to ao&e
#ra(in"s for reference /ur/ose on!+. Detai!e# #esi"n % /re/aration of
#etai!e# en"ineerin" #ra(in"s inc!u#in" ci&i!$ e!ectrica!$ mecanica!$
instrumentation etc. a!! com/!ete is (itin te sco/e of te i##er.
POCESS DESCIPTION O? GAIOUS UNITS O? CO77ON E??LUENT
TEAT7ENT PLANT
1 7LD STP ca/acit+ com/rises of te fo!!o(in" /rocess units.
1: 7LD
1 Co!!ection sum/
In!et Camer
2 ?ine Screen Canne!
6 Detritor tan)
: Distriution Camer
; SB Basin
4 S!u#"e Sum/9 Construction of a centrifu"e
/!ant to an#!e te stai!ie#
s!u#"e from 1 7LD STP
3 Treate# Eff!uent Dis/osa! /i/e
u/to C*
Te In!et Camer (i!! recei&e te ra( se(a"e to /ass it furter to screen
canne! an# suse
-
8/19/2019 STP SPecifiucations
43/186
matters are tra//e# an# remo&e# (ereas in Detritor tan)$ "rit is remo&e#. Te
se(a"e a&in" een treate# for screenin" an# "rit remo&a! is ten treate#
io!o"ica!!+ in
-
8/19/2019 STP SPecifiucations
44/186
SB asins. Treate# eff!uent is fina!!+ #is/ose# in /ro/ose# c!ear (ater .C.C.
tan) of cum fitte# (it /um/in" maciner+ of suita!e #ut+ con#ition as
a//ro&e# + En"ineer in car"e for furter /um/in" te c!ear (ater for
orticu!ture /ur/ose+.Te s!u#"e form SB asins are #e(atere# usin" Centrifu"e efore #is/osa!.
Co!!ection Sum/
Tra//in" of se(er (ater from existin" se(er of sie ;55 mm #ia. Near Nara+an
Sin" Circ!e an# construction of sum/ (e!! (it /ro&ision of s!uice "ate inc!u#in"
/um/in" an# screen arran"ement at STP site.
In!et Cam'er
Te in!et camer is /ro&i#e# aea# of screen canne! to recei&e te se(a"e
from te co!!ection sum/. An CC /!atform at te to/ of te (a!! is /ro&i#e#
for te o/eration of te "ates. Staircase, !a##er % rai!in"s sa!! e /ro&i#e#
as /er reusta!e a!uminium (eir /!ate an#
#istriute# to in#i&i#ua! SB asins + canne!s. Automatica!!+ o/erate#
0ates sa!! e insta!!e# at te S/!itter ox out!ets for f!o( iso!ation.
An CC (a!) (a+ /!atform at te to/ is /ro&i#e# for te o/eration /ur/ose.Staircase, !a##er % rai!in"s sa!! e /ro&i#e# as /er re
-
8/19/2019 STP SPecifiucations
45/186
- Te SB s+stem is o/erate# in a atc reactor mo#e$ (ic
e!iminates a!! te inefficiencies of te continuous /rocesses. A atc
reactor is a /erfect reactor$ (ic ensures 155J treatment. ?our
-
8/19/2019 STP SPecifiucations
46/186
mo#u!es are /ro&i#e# to ensure continuous treatment. Te com/!ete
/rocess ta)es /!ace in a sin"!e reactor$ (itin (ic a!! io!o"ica!
treatment ste/s ta)e /!ace se O=gen Contro$
Te SB /rocess uses measurement of #isso!&e# ox+"en DO !e&e!s in te
asin to enance treatment efficienc+ an# o/timise /o(er consum/tion. Te
DO concentration in te asin is continuous!+ monitore# usin" a DO sensor.
Once DO !e&e! is measure# in te asins$ a &aria!e fre
-
8/19/2019 STP SPecifiucations
47/186
After te re Operation an> contro$
Te com/!ete SB /!ant o/eration is contro!!e# automatica!!+ trou" a PLCs+stem$ (ic is a ma>or factor in re#ucin" o/eratin" costs. Tis a!so
/re&ents ma!=o/eration of te &arious set /rocess /arameters (itin te
/!ant. A!! )e+ functions !i)e$ AS$ s!u#"e (astin"$ aeration intensit+$ c+c!e
time contro!$ #ecantin" rate etc are automatica!!+ contro!!e# as (e!! as #ata
!o""e#. Com/!ete istorica! recor#s of /!ant o/eration are a&ai!a!e on touc
of a utton.
&. 2.; C!ear (ater tan)
Treate# eff!uent is fina!!+ #is/ose# in /ro/ose# c!ear (ater .C.C. tan) of
255.55 cum fitte# (it /um/in" maciner+ of suita!e #ut+ con#ition as
a//ro&e# + En"ineer in car"e for furter /um/in" te c!ear (ater for
orticu!ture /ur/ose
&i. 2.4 S!u#"e Sum/ % Pum/ House
Te s!u#"e (it#ra(n from te SB asins is co!!ecte# in te sum/ of te
S!u#"e Pum/in" Station. S!u#"e /um/s (i!! e /ro&i#e# in te S!u#"e
Pum/in" Station (it necessar+ &a!&es an# /i/in". Te /um/ ouse (i!!
a&e risin" main CI D,? from /um/in" station u/ to Centrifu"e. Te s!u#"e
(i!! e /um/e# to te Centrifu"e for #e(aterin". A Cain /u!!e+ !oc) a!on"
(it "ir#er arran"ement sa!! e /ro&i#e# in te Centrifu"e ui!#in" to !ift
te Centrifu"e for maintenance.
Pro&ision sa!! e ma#e for rai!in" a!on" stairs an# /!atform as /er
re
-
8/19/2019 STP SPecifiucations
48/186
Tis sa!! inc!u#e te interconnectin" /i/e!ines et(een #ifferent units of te
7PS % STP as "i&en e!o(
Descri/tion 7ateria!
Air /i/in" ao&e (ater !e&e!$ eturn s!u#"e !ine
ao&e (ater !e&e!$ Sur/!us s!u#"e !ine ao&e
(ater !e&e!
E/ox+ Painte#
Air /i/in" e!o( (ater !e&e!$ eturn s!u#"e !ine
e!o( (ater !e&e!$ Sur/!us s!u#"e !ine e!o(
(ater !e&e!
SS 256
S!u#"e /um/ ouse to Centrifu"e DI =4 D,?
?i!trate Pi/e Centrifu"e to ?i!trate sum/ S* /i/e
?i!trate sum/ to Di&ision ox DI =4 D,?
A!! interconnectin" canne!s (ere&er reos. Tis
ui!#in" sa!! a&e (or)in" s/ace for te /!ant incar"e$ secretaria! staff.
Toi!et sa!! e /ro&i#e# (it site office ui!#in" (it one seat an# t(o
urina! as /art of office ui!#in".
Te ui!#in" sa!! e a CC frame# structure (it ric) (a!!s % CC roof s!a. Te interna! !i"tin"$ interna! (ater su//!+ % sanitation an# >oiner+
sa!! e #one as /er te P*D s/ecification. A!! oter ui!#in" com/onents
, materia!s f!oorin"$ #oors$ (in#o(s$ /!asterin" etc. sa!! e as /er P*D
s/ecifications.
xi. 6. O/erations Bui!#in"s
O/erations Bui!#in"s inc!u#e 7ain E!ectrica! Pane! 7EP oom$ for te
o/erationa! contro! an# mana"ement of /um/in" station % STP.
Te O/erations ui!#in" sa!! e a CC frame# structure (it ric) (a!!s
% CC roof s!a com/!ete (it interna! !i"tin"$ interna! (ater su//!+ %
sanitation$ etc. as /er P*D s/ecifications. A!! oter ui!#in" com/onents ,
materia!s f!oorin"$ #oors$ (in#o(s$ /!asterin" etc. sa!! e as /er P*Ds/ecifications.
6.2 Interconnectin" Pi/in" an# Ga!&es
A!! Pi/in" inc!u#in" Ga!&es$ S/ecia!s an# oter A//urtenances$ Auxi!iaries
an# Accessories re
-
8/19/2019 STP SPecifiucations
49/186
-
8/19/2019 STP SPecifiucations
50/186
xii. 6.6 O/en Transformer ar#
An o/en to s)+ transformer +ar# sa!! e /ro&i#e# near te 7EP room. CC
/!atform for Transformer$ Ca!e Trenc an# ?!at Bric) !ine# ?!oor to e
/ro&i#e# for area. 7i!# Stee! "ate (it 0I (ire mes fencin" a!on" te +ar#
sa!! e /ro&i#e# for te safet+ reasons. A!! te man#ator+ an# safet+
re
-
8/19/2019 STP SPecifiucations
51/186
A#e
-
8/19/2019 STP SPecifiucations
52/186
2245. CC Staircase$ 355 mm (i#e$ sa!! e /ro&i#e# for access from te
"roun# !e&e! to te to/ of te Unit % to te o/eratin" /!atform.
Particu!ars 1: 7LD STP
A&era"e ?!o(
Pea) ?actorPea) ?!o(
Numer of Units
A//roac Ge!ocit+ at A&era"e ?!o(
m,sec
Ge!ocit+ trou" Screen at A&era"e
?!o( m,sec
Ge!ocit+ trou" Screen at Pea) ?!o(
m,sec
7in ?reeoar#
7OC
?!at ar sie
C!ear s/acin" of f!at ars
a( Se(a"e Pum/in"
Se(a"e from existin" ;55mm se(er !ine sa!! enter into /ro/ose#
sum/ (e!! of te a( Se(a"e Pum/in" Station after screenin".
Te *et *e!! sa!! 'e circu!ar in sa/e an# sa!! 'e #esi"ne# for
an a&era"e f!o( of 1 7LD for STP. Te ca/acit+ of te sum/ *e!!
sa!! 'e )e/t suc tat te #etention time in te sum/ *e!! sa!!
'e minimum : minutes of /ea) f!o( an# sa!! not excee# 25
minutes at a&era"e f!o(. ?o!!o(in" criterias sa!! 'e consi#ere#
to sie te Sum/ *e!!
1. Pum/ of te minimum #ut+,ca/acit+ sa!! run for at !east : minutes
consi#erin" no inf!o(.
. Te ca/acit+ of te Sum/ sa!! e so )e/t tat (it an+ comination of
inf!o( an# /um/in"$ te o/eratin" c+c!e for an+ Pum/ sa!! not e !ess tan
: minutes.
2. Te arran"ement of te Pum/s sa!! e as /er /um/ 7anufacturers #ata i.e.
s/acin" et(een Pum/s$ minimum s/ace et(een Pum/ an# *a!! etc.
6. Te Si#e *ater De/t Li&e Li
-
8/19/2019 STP SPecifiucations
53/186
Te Pum/s sa!! 'e su'mersi'!e (it centrifu"a!$ non=c!o" t+/e
#esi"n. Te s/ee# of Pum/s sa!! not 'e more tan 1:55 P7. Te
-
8/19/2019 STP SPecifiucations
54/186
im/e!!er sou!# 'e of a non=c!o" #esi"n (it smoot /assa"e an#
so!i# an#!in" ca/a'i!it+ of 155 mm.
Te Pum/s sa!! a&e Automatic Cou/!in" Arran"ement at
#iscar"e en# for remo&a! an# a 0ui#e Pi/e an# Cain in SS 256
sa!! 'e /ro&i#e# for remo&a! an# !o(erin" of Pum/s. Pum/ sa!!
run smoot (itout un#ue noise an# &i'ration. Gi'ration sa!! 'e
!imite# as /er BS 6;4: Part I.
Te motors sa!! 'e s
-
8/19/2019 STP SPecifiucations
55/186
Duc) foot en# CI
0ui#e Pi/e
Liftin" cain
SS
SS
= 256
= 256
Q?asteners 7S (it 0I coatin"
1. H+#rostatic Testin" A!! Pressure Parts of Pum/s /rior to assem!+ sa!! e
su>ecte# to +#rostatic test to te satisfaction of Executi&e En"ineer at 1.:
times te maximum /ressure otaine# (it te #e!i&er+ &a!&e c!ose# an#
suction /ressure at maximum or t(ice te (or)in" /ressure (ice&er is
i"er for a #uration of 15 minutes.
. Ba!ancin" Test Im/e!!er an# Pum/ otatin" assem!+ sa!! e
#+namica!!+ a!ance#.
2. Performance Test Eac Pum/ sa!! e teste# for fu!!