ActivityID
ActivityDescription
SUBAOrigDurTarget 1Orig Dur
RemDur% Early
StartEarlyFinish
TotalFloat
Elementary & Middle SchoolGeneral
201 Notify Site Biologist 0 17JAN12A
10 Mobilization - Earthwork 3 02FEB12* 06FEB12 4
5 Construction Duration 411* 02FEB12 16SEP13 0
30 SWPPP Duration (calendar days) 593* 02FEB12 16SEP13 0
2 Notice of Award 0 28MAR12* 6
1 N.T.P. 0 09APR12* 0
20 Mobilization 10 09APR12 20APR12 0
99960 Substantial Completion - Middle School 0 13JUN13 25
99970 Punchlist 40 22JUL13 16SEP13 0
99950 Substantial Completion - Elementary School 0 19JUL13 0
99980 Project Contigency Time (Calendar Days) 0 17SEP13 16SEP13 0
Acceptance / Closeout
99990 Final Acceptance 0 16SEP13 0
99999 Project Closeout 40 19AUG13 14OCT13 0
100000 Project Complete 0 14OCT13 0
SubmittalsProcurements 99000 Start Critical Submittals 0 28MAR12 6
Structural Steel 99020 Prep/Sub Steel Shop Drawings 35 28MAR12 15MAY12 47
99022 Rev/Apv Steel Shop Drawings 10 16MAY12 30MAY12 47
99028 Fab/Del Structural Steel Embeds 30 31MAY12 12JUL12 47
Concrete Footing Embeds 99040 Prep/Sub Concrete Footing Embeds/Anchor Bolts 5 28MAR12 03APR12 6
99042 Rev/Apv Concrete Footing Embeds/Anchor Bolts 10 04APR12 17APR12 6
99048 Fab/Del Concrete Footing Embeds/Anchor Bolts 1 18APR12 18APR12 6
2012 2013J F M A M J J A S O N D J F M A M J J A S O N D JFEB
Notify Site Biologist
Mobilization - Earthwork
Construction Duration
SWPPP Duration (calendar days)
Notice of Award
N.T.P.
MobilizationSubstantial Completion - Middle School
PunchlistSubstantial Completion - Elementary School
Project Contigency Time (Calendar Days)
Final Acceptance
Project Closeout
Project Complete
Start Critical Submittals
Prep/Sub Steel Shop Drawings
Rev/Apv Steel Shop Drawings
Fab/Del Structural Steel Embeds
Prep/Sub Concrete Footing Embeds/Anchor Bolts
Rev/Apv Concrete Footing Embeds/Anchor Bolts
Fab/Del Concrete Footing Embeds/Anchor Bolts
© Primavera Systems, Inc.
Start Date 09JAN12Finish Date 14OCT13Data Date 09JAN12Run Date 21FEB12 12:17
Early Bar
Progress Bar
Critical Activity
BS07
Bakersfield City School District
New Elementary & Middle School
Bid Schedule
Sheet 1 of 43 Lundgren Management 661-257-1805Date Revision Checked Approved
Sheet 2 of 43
ActivityID
ActivityDescription
SUBAOrigDurTarget 1Orig Dur
RemDur% Early
StartEarlyFinish
TotalFloat
Earthwork / Site UtilitiesEarthwork 1000 Start Earthwork 0 07FEB12 4
1020 Clear & Grub Site 3 07FEB12 09FEB12 6
1040 Survey Site 5 07FEB12 13FEB12 4
1060 Earthwork / Grade Site 30 14FEB12 26MAR12 4
1080 Construct Building Pads 10 20MAR12 02APR12 4
1100 EarthworkComplete 0 02APR12 4
Underground Utilities 1200 Install Site Main Storm Drainage 20 09APR12 04MAY12 167
1210 Install Site Sewer Mains 20 09APR12 04MAY12 167
1220 Install Site Water Mains 20 09APR12 04MAY12 170
1230 Install Main Fire Lines 20 12APR12 09MAY12 167
1240 Install Irrigation Mains 20 12APR12 09MAY12 167
1215 Install Site Sewer Laterals 10 07MAY12 18MAY12 211
1205 Install Site Storm Drainage Laterals 10 07MAY12 18MAY12 216
1225 Install Site Water Laterals 10 07MAY12 18MAY12 216
1235 Install Lateral Fire Lines 10 10MAY12 23MAY12 213
1245 Install Irrigation Laterals 10 10MAY12 23MAY12 213
1250 Install Site Main Electrical Conduits 20 10MAY12 07JUN12 167
1275 Install Grease Trap 5 21MAY12 25MAY12 211
1255 Install Site Lateral Electrical Conduits 20 08JUN12 06JUL12 183
1265 Install Site Drainage 10 12FEB13 25FEB13 60
Site Power 1400 Install Main Power Feeds 5 08JUN12 14JUN12 221
1420 F,R,P Transformer/Switchgear Pads 3 09JUL12 11JUL12 206
1440 Set Main Transformer / Switchgear 2 12JUL12 13JUL12 206
1460 Wire & Terminations 15 16JUL12 03AUG12 206
Retaining Wall @ N.E. Perimeter 1500 Excav. for Wall Ftg @ N. & E. Perimeter 3 23APR12 25APR12 11
1520 Form, Rebar Pour Wall Ftg @ N. & E. Perimeter 5 24APR12 30APR12 11
1540 Construct Retaining Wall @ N.& E. Perimeter 20 01MAY12 29MAY12 11
1560 Install Drainage & Waterproofing N.E. Retaining 4 30MAY12 04JUN12 11
1580 Bkfl @ N.E. Perimeter Retaining Wall 2 05JUN12 06JUN12 11
1600 Install Chain Link Fence @ N.E. Retaining Wall 5 07JUN12 13JUN12 33
Retaining Wall @ South Perimeter 1700 Excav. for Wall Ftg @ South Perimeter 3 07JUN12 11JUN12 11
2012 2013J F M A M J J A S O N D J F M A M J J A S O N D JFEB
Start Earthwork
Clear & Grub Site
Survey Site
Earthwork / Grade Site
Construct Building Pads
EarthworkComplete
Install Site Main Storm Drainage
Install Site Sewer Mains
Install Site Water Mains
Install Main Fire Lines
Install Irrigation Mains
Install Site Sewer Laterals
Install Site Storm Drainage Laterals
Install Site Water Laterals
Install Lateral Fire Lines
Install Irrigation Laterals
Install Site Main Electrical Conduits
Install Grease Trap
Install Site Lateral Electrical Conduits
Install Site Drainage
Install Main Power Feeds
F,R,P Transformer/Switchgear Pads
Set Main Transformer / Switchgear
Wire & Terminations
Excav. for Wall Ftg @ N. & E. Perimeter
Form, Rebar Pour Wall Ftg @ N. & E. Perimeter
Construct Retaining Wall @ N.& E. Perimeter
Install Drainage & Waterproofing N.E. Retaining
Bkfl @ N.E. Perimeter Retaining Wall
Install Chain Link Fence @ N.E. Retaining Wall
Excav. for Wall Ftg @ South Perimeter
Sheet 2 of 43
Sheet 3 of 43
ActivityID
ActivityDescription
SUBAOrigDurTarget 1Orig Dur
RemDur% Early
StartEarlyFinish
TotalFloat
1720 Form, Rebar Pour Wall Ftg @ South Perimeter 5 08JUN12 14JUN12 11
1740 Construct Retaining Wall @ South Perimeter 15 15JUN12 06JUL12 11
1760 Install Drainage & Waterproofing South Retaining 3 09JUL12 11JUL12 11
1780 Bkfl @ South Perimeter Retaining Wall 2 12JUL12 13JUL12 11
1800 Install Chain Link Fence @ South Retaining Wall 5 16JUL12 20JUL12 11
Retaining Walls @ Bus Drop-off 1900 Excav. for Wall Ftgs @ Bus Drop-off 3 16JUL12 18JUL12 142
1920 Form, Rebar Pour Wall Ftgs @ Bus Drop-off 4 17JUL12 20JUL12 142
1940 Construct Retaining Walls @ Bus Drop-off 12 23JUL12 07AUG12 142
1960 Install Drainage & Waterproofing @ Bus Drop-off 3 08AUG12 10AUG12 142
1980 Bkfl @ Bus Drop-off Retaining Walls 2 13AUG12 14AUG12 142
Paving / Hardscape / Fence & ScreensPaving 2000 Final Grade @ Parking Lots 2 22MAR13 25MAR13 52
2120 Rough-in Site Lighting - Parking Lots 3 26MAR13 28MAR13 72
2020 Install Curbs & Gutters - Parking Lots 8 26MAR13 04APR13 52
2040 Install Base @ Parking Lots 3 05APR13 09APR13 57
2140 Install Site Lighting - Parking Lots 4 05APR13 10APR13 67
2160 Install Concrete Flatwork @ Parking Lots 5 05APR13 11APR13 66
2060 Initial Asphalt Course @ Parking Lots 2 10APR13 11APR13 57
2080 Final Asphalt Lift @ Parking Lots 2 12APR13 15APR13 64
2090 Final Asphalt Lift @ Offsite Roadways 2 16APR13 17APR13 65
2100 Wheel Stops, Striping & Signage @ Parking Lot 3 16APR13 18APR13 64
Bus Drop-off 2200 Final Grade for Bus Drop-off 2 26MAR13 27MAR13 58
2320 Rough-in Site Lighting - Bus Drop-off 2 26MAR13 27MAR13 75
2220 Install Curbs & Gutters @ Bus Drop-off 6 05APR13 12APR13 52
2240 Install Base @ Bus Drop-off 2 15APR13 16APR13 52
2340 Install Site Lighting - Bus Drop-off 3 15APR13 17APR13 63
2360 Install Concrete Flatwork @ Bus Drop-off 5 15APR13 19APR13 61
2260 Intial Asphalt Course @ Bus Drop-off 2 17APR13 18APR13 52
2280 Final Asphalt Lift @ Bus Drop-off 2 19APR13 22APR13 52
2300 Striping & Signage @ Bus Drop-off 2 23APR13 24APR13 60
Admin / Multipurpose Area 3000 Fine Grade for Hardscape - Admin/MP Area 5 05FEB13 11FEB13 39
3010 Install Flagpole Footing 3 12FEB13 14FEB13 75
3020 Ftgs for Planters & Decorative Walls - Admin/MP 8 12FEB13 21FEB13 39
2012 2013J F M A M J J A S O N D J F M A M J J A S O N D JFEB
Form, Rebar Pour Wall Ftg @ South Perimeter
Construct Retaining Wall @ South Perimeter
Install Drainage & Waterproofing South Retaining
Bkfl @ South Perimeter Retaining Wall
Install Chain Link Fence @ South Retaining Wall
Excav. for Wall Ftgs @ Bus Drop-off
Form, Rebar Pour Wall Ftgs @ Bus Drop-off
Construct Retaining Walls @ Bus Drop-off
Install Drainage & Waterproofing @ Bus Drop-off
Bkfl @ Bus Drop-off Retaining Walls
Final Grade @ Parking Lots
Rough-in Site Lighting - Parking LotsInstall Curbs & Gutters - Parking Lots
Install Base @ Parking Lots
Install Site Lighting - Parking LotsInstall Concrete Flatwork @ Parking Lots
Initial Asphalt Course @ Parking Lots
Final Asphalt Lift @ Parking LotsFinal Asphalt Lift @ Offsite Roadways
Wheel Stops, Striping & Signage @ Parking Lot
Final Grade for Bus Drop-off
Rough-in Site Lighting - Bus Drop-offInstall Curbs & Gutters @ Bus Drop-off
Install Base @ Bus Drop-off
Install Site Lighting - Bus Drop-offInstall Concrete Flatwork @ Bus Drop-off
Intial Asphalt Course @ Bus Drop-off
Final Asphalt Lift @ Bus Drop-offStriping & Signage @ Bus Drop-off
Fine Grade for Hardscape - Admin/MP Area
Install Flagpole Footing
Ftgs for Planters & Decorative Walls - Admin/MP
Sheet 3 of 43
Sheet 4 of 43
ActivityID
ActivityDescription
SUBAOrigDurTarget 1Orig Dur
RemDur% Early
StartEarlyFinish
TotalFloat
3040 Construct Planters & Decorative Walls - Admin/MP 15 12FEB13 04MAR13 50
3030 Construct H/C Ramp & Stairs - Admin/MP Area 12 22FEB13 11MAR13 39
3060 Set Utility Screen Supports - Admin/MP Area 5 12MAR13 18MAR13 40
3050 Set Covered Walkway Supports - Admin/MP Area 6 12MAR13 19MAR13 39
3070 Concrete Flatwork - Admin/MP Area 12 20MAR13 04APR13 39
3090 Install Flagpole 2 05APR13 08APR13 40
3080 Install Handrails - Admin/MP Area 3 05APR13 09APR13 39
3130 Install School Signs/Monuments 5 05APR13 11APR13 77
3110 Install W-I Fencing & Gates - Admin/MP Area 12 10APR13 25APR13 39
Kindergaten / Elem Classroom Area 3200 Fine Grade for Hardscape - Elem Area 3 04APR13 08APR13 25
3230 Construct Planters Footings- Elem Area 5 09APR13 15APR13 25
3250 Set Covered Walkway Supports - Elem Area 5 09APR13 15APR13 37
3260 Set Utility Screen Supports - Elem Area 5 09APR13 15APR13 37
3240 Construct Planters - Elem Area 12 16APR13 01MAY13 25
3270 Concrete Flatwork - Elem Area 10 02MAY13 15MAY13 25
3280 Install Bike Rack 2 16MAY13 17MAY13 33
3310 Install W-I Fencing & Gates - Elem Area 10 16MAY13 30MAY13 25
Middle School Classroom Area 3400 Fine Grade for Hardscape - Middle School Area 5 14JAN13 18JAN13 50
3450 Set Covered Walkway Supports -Middle School Area 6 21JAN13 28JAN13 69
3460 Set Utility Screen Supports - Middle School Area 7 21JAN13 29JAN13 68
3430 Construct Planter Footings - Middle School Area 10 21JAN13 01FEB13 50
3440 Construct Planters - Middle School Area 15 04FEB13 22FEB13 50
3470 Concrete Flatwork - Middle School Area 12 25FEB13 12MAR13 50
3480 Install Bike Rack 2 13MAR13 14MAR13 89
3510 Install W-I Fencing & Gates - Middle School Area 10 31MAY13 13JUN13 25
Play Areas 3800 Fine Grade for Hardscape - Play Areas 3 13MAR13 15MAR13 50
3810 Construct Ball Wall Footings 5 18MAR13 22MAR13 60
3840 Install Footings for Playground Equipment 5 18MAR13 22MAR13 73
3820 Construct Ball Walls 15 18MAR13 05APR13 50
3870 Concrete Flatwork - Play Areas 10 08APR13 19APR13 50
3890 Asphalt Paving - Play Areas 3 22APR13 24APR13 50
3910 Install Playground Equipment 10 25APR13 08MAY13 50
Play Fields 4000 Fine Grade @ Play Fields 8 01FEB13* 12FEB13 41
2012 2013J F M A M J J A S O N D J F M A M J J A S O N D JFEB
Construct Planters & Decorative Walls - Admin/MPConstruct H/C Ramp & Stairs - Admin/MP Area
Set Utility Screen Supports - Admin/MP Area
Set Covered Walkway Supports - Admin/MP Area
Concrete Flatwork - Admin/MP Area
Install Flagpole
Install Handrails - Admin/MP Area
Install School Signs/MonumentsInstall W-I Fencing & Gates - Admin/MP Area
Fine Grade for Hardscape - Elem Area
Construct Planters Footings- Elem Area
Set Covered Walkway Supports - Elem Area
Set Utility Screen Supports - Elem Area
Construct Planters - Elem Area
Concrete Flatwork - Elem Area
Install Bike RackInstall W-I Fencing & Gates - Elem Area
Fine Grade for Hardscape - Middle School Area
Set Covered Walkway Supports -Middle School Area
Set Utility Screen Supports - Middle School Area
Construct Planter Footings - Middle School Area
Construct Planters - Middle School AreaConcrete Flatwork - Middle School Area
Install Bike RackInstall W-I Fencing & Gates - Middle School Area
Fine Grade for Hardscape - Play Areas
Construct Ball Wall FootingsInstall Footings for Playground Equipment
Construct Ball Walls
Concrete Flatwork - Play Areas
Asphalt Paving - Play Areas
Install Playground Equipment
Fine Grade @ Play Fields
Sheet 4 of 43
Sheet 5 of 43
ActivityID
ActivityDescription
SUBAOrigDurTarget 1Orig Dur
RemDur% Early
StartEarlyFinish
TotalFloat
4040 Install Footings for Play Field Equipment 5 13FEB13 19FEB13 41
4020 Irrigation @ Play Fields 6 13FEB13 20FEB13 50
4070 Concrete Flatwork - Play Fields 10 13FEB13 26FEB13 46
4110 Install Play Field Equipment 10 20FEB13 05MAR13 41
4030 Seeding @ Play Fields 5 06MAR13 12MAR13 41
4050 Landscaping Maintenance @ Play Fields 90 13MAR13 18JUL13 41
4090 Plants & Trees @ Play Fields 8 15MAY13 24MAY13 78
Fencing, Irrigation & Landscaping 4200 Install Chain Link Fencing 10 12APR13 25APR13 79
4220 Install Irrigation @ Campus Areas 12 14JUN13 01JUL13 33
4240 Landscaping @ Campus Area 20 02JUL13 30JUL13 33
SignageSignage 4600 Signage - Buildings & Site 10 02MAY13 15MAY13 45
Bldg. A - MultipurposeMilestones 5000 Start Building A - Multipurpose 0 09APR12 0
5010 Building A - Multipurpose Duration 324* 09APR12 19JUL13 0
9990 Building A - Multipurpose Complete 0 19JUL13 0
Foundations / Underground 5100 Excavate Footings 6 09APR12 16APR12 0
5120 Rebar Footings & Stem Walls 12 11APR12 26APR12 0
5160 Form Footings & Stem Walls 10 17APR12 30APR12 3
5180 Install Electrical Sleeves & Stub-ups 5 24APR12 30APR12 4
5200 Install Plumbing Sleeves & Stub-ups 5 24APR12 30APR12 4
5320 Install Mechanical Sleeves & Stub-ups 5 24APR12 30APR12 4
5140 Layout / Install Anchor Bolts 6 27APR12 04MAY12 0
5220 Pour Footings & Stem Walls 5 07MAY12 11MAY12 0
5240 Strip Forms 5 14MAY12 18MAY12 0
5260 Install Underslab Plumbing 10 14MAY12 25MAY12 11
5280 Install Underslab Electrical Conduits 12 17MAY12 04JUN12 11
Structure / Slab-on-Grade 5500 Construct Initial CMU Courses for Slabs-on-Grade 15 21MAY12 11JUN12 0
5520 Bkfl/Compact at Initial CMU Courses 6 12JUN12 19JUN12 0
5540 Vapor Barrier & Sand @ Slabs-on-Grade 4 20JUN12 25JUN12 0
5560 Rebar for Slabs-on-grade 6 26JUN12 03JUL12 0
5580 Pour Slabs-on-Grade 3 05JUL12 09JUL12 0
2012 2013J F M A M J J A S O N D J F M A M J J A S O N D JFEB
Install Footings for Play Field Equipment
Irrigation @ Play Fields
Concrete Flatwork - Play Fields
Install Play Field Equipment
Seeding @ Play FieldsLandscaping Maintenance @ Play Fields
Plants & Trees @ Play Fields
Install Chain Link FencingInstall Irrigation @ Campus Areas
Landscaping @ Campus Area
Signage - Buildings & Site
Start Building A - Multipurpose
Building A - Multipurpose DurationBuilding A - Multipurpose Complete
Excavate Footings
Rebar Footings & Stem Walls
Form Footings & Stem Walls
Install Electrical Sleeves & Stub-ups
Install Plumbing Sleeves & Stub-ups
Install Mechanical Sleeves & Stub-ups
Layout / Install Anchor Bolts
Pour Footings & Stem Walls
Strip Forms
Install Underslab Plumbing
Install Underslab Electrical Conduits
Construct Initial CMU Courses for Slabs-on-Grade
Bkfl/Compact at Initial CMU Courses
Vapor Barrier & Sand @ Slabs-on-Grade
Rebar for Slabs-on-grade
Pour Slabs-on-Grade
Sheet 5 of 43
Sheet 6 of 43
ActivityID
ActivityDescription
SUBAOrigDurTarget 1Orig Dur
RemDur% Early
StartEarlyFinish
TotalFloat
5600 Construct CMU Walls to Full Height 50 10JUL12 19SEP12 0
5620 Scaffolding for CMU 3 13JUL12 17JUL12 44
5640 Set Frames @ CMU Walls 5 13JUL12 19JUL12 42
5610 Install Steel in Masonry Walls 10 14AUG12 27AUG12 15
5650 Set Embeds @ CMU Walls 6 12SEP12 19SEP12 0
5660 Erect. Align & Weld-out Structural Steel 15 20SEP12 10OCT12 0
5680 Install & Weld Steel Decks 8 11OCT12 22OCT12 0
5720 Install Deck Penetrations 3 23OCT12 25OCT12 0
5700 Rebar & Pour @ Blockouts @ Structural Steel 3 23OCT12 25OCT12 32
5740 Install Plywood Roof Sheathing 5 26OCT12 01NOV12 0
Exterior 6000 Exterior Framing 20 26OCT12 27NOV12 32
6020 Set Roof Curbs 4 30OCT12 02NOV12 36
6060 Install Drain & Plumbing Risers 5 02NOV12 08NOV12 44
6040 Set HVAC Units 3 05NOV12 07NOV12 50
6080 Plywood Wall Sheathing 8 16NOV12 29NOV12 32
6100 Install Window Frames 8 28NOV12 07DEC12 43
6120 Install Storefronts 12 28NOV12 13DEC12 39
6160 Install Exterior Door Frames 4 30NOV12 05DEC12 45
6140 Insulation Board / Flashing 5 30NOV12 06DEC12 32
6180 Install Roofing System 5 07DEC12 13DEC12 32
6220 Flashings & Sealants 6 07DEC12 14DEC12 41
6200 Glazing 5 14DEC12 20DEC12 44
6240 Lath & Flashing for Plaster 10 14DEC12 28DEC12 39
6260 Install Metal Roof 10 14DEC12 28DEC12 32
6400 Install Solatubes / Flashing 8 31DEC12 10JAN13 89
6280 Plaster 25 31DEC12 04FEB13 39
6340 Paint @ Exterior 5 05FEB13 11FEB13 102
Rough-ins 6500 Install MEP Hangers 5 02NOV12 08NOV12 0
6520 Layout & Install Top Track 5 09NOV12 16NOV12 0
6540 Insulation @ Metal Decks 6 19NOV12 28NOV12 21
6560 Interior Framing 30 19NOV12 03JAN13 0
6580 Rough-in Fire Sprinkler Mains 10 29NOV12 12DEC12 21
6600 Rough-in Overhead Plumbing 5 13DEC12 19DEC12 21
6620 Rough-in Fire Suppression System 4 04JAN13 09JAN13 21
6640 Set Interior Door & Window Frames 6 04JAN13 11JAN13 23
2012 2013J F M A M J J A S O N D J F M A M J J A S O N D JFEB
Construct CMU Walls to Full Height
Scaffolding for CMU
Set Frames @ CMU Walls
Install Steel in Masonry Walls
Set Embeds @ CMU Walls
Erect. Align & Weld-out Structural Steel
Install & Weld Steel Decks
Install Deck Penetrations
Rebar & Pour @ Blockouts @ Structural Steel
Install Plywood Roof Sheathing
Exterior Framing
Set Roof Curbs
Install Drain & Plumbing Risers
Set HVAC Units
Plywood Wall Sheathing
Install Window Frames
Install Storefronts
Install Exterior Door Frames
Insulation Board / Flashing
Install Roofing System
Flashings & Sealants
Glazing
Lath & Flashing for Plaster
Install Metal Roof
Install Solatubes / Flashing
Plaster
Paint @ Exterior
Install MEP Hangers
Layout & Install Top Track
Insulation @ Metal Decks
Interior Framing
Rough-in Fire Sprinkler Mains
Rough-in Overhead Plumbing
Rough-in Fire Suppression System
Set Interior Door & Window Frames
Sheet 6 of 43
Sheet 7 of 43
ActivityID
ActivityDescription
SUBAOrigDurTarget 1Orig Dur
RemDur% Early
StartEarlyFinish
TotalFloat
6660 Rough-in In-Wall Plumbing 12 04JAN13 21JAN13 13
6680 R-I Overhead Mechanical Units, Piping & Ducts 15 04JAN13 24JAN13 12
6700 Rough-in In-wall Electrical 25 04JAN13 07FEB13 0
6720 Rough-in Overhead Electrical Conduits 12 11JAN13 28JAN13 12
6740 Install In-wall Insulation 4 08FEB13 13FEB13 0
Interior Finishes 7000 Plywood @ Electrical Room 2 14FEB13 15FEB13 54
7020 Drywall 12 14FEB13 01MAR13 0
7040 Tape & Finish Drywall 20 15FEB13 14MAR13 0
7060 Install Cold Storage Room 10 04MAR13 15MAR13 28
7080 Ceramic Tile 15 04MAR13 22MAR13 65
7120 Set Panelboards 3 15MAR13 19MAR13 35
7140 Install Countertop Roll-up Doors 5 15MAR13 21MAR13 29
7050 Veneer Plaster @ Hard Lid Ceilings 10 15MAR13 28MAR13 0
7220 Pull wires & Terminate 10 20MAR13 02APR13 35
7100 Prime Paint 4 27MAR13 01APR13 0
7720 Grind, Seal & Stripe Concrete Floors 20 29MAR13 25APR13 36
7180 Install Stainless Steel Wall Panels @ Kitchen 4 02APR13 05APR13 10
7160 Install T-Bar Grid 4 02APR13 05APR13 32
7200 Install Platform Folding Panel 5 02APR13 08APR13 17
7240 Install Cabinetry & Casework 10 02APR13 15APR13 0
7260 Install Ventilation Hoods @ Kitchen 3 08APR13 10APR13 10
7840 Install Solatube Drops & Diffusers 4 08APR13 11APR13 44
7280 Install Fire Sprinkler Drops & Heads 5 08APR13 12APR13 43
7300 Install Mechanical Drops, Grills & Registers 6 08APR13 15APR13 42
7340 Install Lighting & L.V. Electrical Devices 12 08APR13 23APR13 32
7270 Finish Fire Suppression System 2 11APR13 12APR13 18
7320 Install Welded Seam Resilient Flooring @ Kitchen 10 11APR13 24APR13 10
7360 Install Fiberglass Reinforced Panels 2 16APR13 17APR13 10
7380 Install Tack Wall / Vinyl Wall Panels 3 16APR13 18APR13 9
7400 Hang Doors 7 16APR13 24APR13 0
7440 Install Acoustical Ceiling Panels 2 24APR13 25APR13 36
7460 Install Gynasium Equipment 6 24APR13 01MAY13 32
7420 Interior Glazing 5 25APR13 01MAY13 0
7450 Install Door Hardware 5 25APR13 01MAY13 42
7500 Install Acoustical Wall Panels 3 02MAY13 06MAY13 39
7480 Finish Paint 5 02MAY13 08MAY13 0
2012 2013J F M A M J J A S O N D J F M A M J J A S O N D JFEB
Rough-in In-Wall Plumbing
R-I Overhead Mechanical Units, Piping & Ducts
Rough-in In-wall Electrical
Rough-in Overhead Electrical Conduits
Install In-wall Insulation
Plywood @ Electrical Room
Drywall
Tape & Finish Drywall
Install Cold Storage Room
Ceramic Tile
Set Panelboards
Install Countertop Roll-up Doors
Veneer Plaster @ Hard Lid Ceilings
Pull wires & Terminate
Prime PaintGrind, Seal & Stripe Concrete Floors
Install Stainless Steel Wall Panels @ Kitchen
Install T-Bar Grid
Install Platform Folding Panel
Install Cabinetry & Casework
Install Ventilation Hoods @ Kitchen
Install Solatube Drops & DiffusersInstall Fire Sprinkler Drops & Heads
Install Mechanical Drops, Grills & Registers
Install Lighting & L.V. Electrical Devices
Finish Fire Suppression SystemInstall Welded Seam Resilient Flooring @ Kitchen
Install Fiberglass Reinforced Panels
Install Tack Wall / Vinyl Wall Panels
Hang Doors
Install Acoustical Ceiling Panels
Install Gynasium Equipment
Interior Glazing
Install Door Hardware
Install Acoustical Wall Panels
Finish Paint
Sheet 7 of 43
Sheet 8 of 43
ActivityID
ActivityDescription
SUBAOrigDurTarget 1Orig Dur
RemDur% Early
StartEarlyFinish
TotalFloat
7820 Install Gynasium Bleachers 10 02MAY13 15MAY13 32
7540 Install Projection Screens / Projector Mounts 2 09MAY13 10MAY13 35
7740 Install Roof Ladder & Hatch 2 09MAY13 10MAY13 35
7560 Install Drinking Fountains 2 09MAY13 10MAY13 38
7580 Install Stage Curtain 4 09MAY13 14MAY13 36
7660 Finish Mechanical Controls 5 09MAY13 15MAY13 10
7680 Finish Electrical 5 09MAY13 15MAY13 10
7600 Install Handrails 5 09MAY13 15MAY13 32
7620 Install Plumbing Fixtures 6 09MAY13 16MAY13 32
7640 Install Flooring 10 09MAY13 22MAY13 27
7700 Install Kitchen & Serving Equipment 15 09MAY13 30MAY13 0
7760 Toilet Partitions & Accessories 2 17MAY13 20MAY13 32
7780 Touch-up Paint 3 23MAY13 28MAY13 27
Clean-up / Punchlist 9960 Clean-Up Bldg. A 3 29MAY13 31MAY13 27
9940 Start-up & Test Systems 10 31MAY13 13JUN13 0
9950 Commissioning 15 14JUN13 05JUL13 0
9980 Punchlist Bldg. A 10 08JUL13 19JUL13 0
Bldg. B - Administration - Middle SchoolMilestones 10000 Start Bldg. B - Middle School Administration 0 16APR12 25
10010 Bldg. B - Middle School Administration Duration 238* 16APR12 26MAR13 25
14990 Bldg. B - Middle School Administration Complete 0 26MAR13 25
Foundations / Underground 10100 Excavate Footings 5 16APR12 20APR12 25
10120 Rebar Footings & Stem Walls 10 17APR12 30APR12 25
10160 Form Footings & Stem Walls 8 26APR12 07MAY12 25
10140 Layout / Install Anchor Bolts 5 02MAY12 08MAY12 25
10180 Install Electrical Sleeves 2 04MAY12 07MAY12 26
10200 Install Plumbing Sleeves 2 04MAY12 07MAY12 26
10320 Install Mechanical Sleeves 2 04MAY12 07MAY12 26
10220 Pour Footings & Stem Walls 5 09MAY12 15MAY12 25
10240 Strip Forms 3 16MAY12 18MAY12 32
10260 Install Underslab Plumbing 10 16MAY12 30MAY12 25
10280 Install Underslab Electrical Conduits 12 21MAY12 06JUN12 25
Structure / Slab-on-Grade 10520 Bkfl/Compact at Stem Walls 5 21MAY12 25MAY12 32
2012 2013J F M A M J J A S O N D J F M A M J J A S O N D JFEB
Install Gynasium BleachersInstall Projection Screens / Projector Mounts
Install Roof Ladder & Hatch
Install Drinking Fountains
Install Stage Curtain
Finish Mechanical Controls
Finish Electrical
Install Handrails
Install Plumbing Fixtures
Install FlooringInstall Kitchen & Serving Equipment
Toilet Partitions & Accessories
Touch-up Paint
Clean-Up Bldg. A
Start-up & Test Systems
Commissioning
Punchlist Bldg. A
Start Bldg. B - Middle School Administration
Bldg. B - Middle School Administration DurationBldg. B - Middle School Administration Complete
Excavate Footings
Rebar Footings & Stem Walls
Form Footings & Stem Walls
Layout / Install Anchor Bolts
Install Electrical Sleeves
Install Plumbing Sleeves
Install Mechanical Sleeves
Pour Footings & Stem Walls
Strip Forms
Install Underslab Plumbing
Install Underslab Electrical Conduits
Bkfl/Compact at Stem Walls
Sheet 8 of 43
Sheet 9 of 43
ActivityID
ActivityDescription
SUBAOrigDurTarget 1Orig Dur
RemDur% Early
StartEarlyFinish
TotalFloat
10540 Vapor Barrier & Sand @ Slabs-on-Grade 3 07JUN12 11JUN12 25
10560 Rebar for Slabs-on-grade 6 12JUN12 19JUN12 25
10580 Pour Slabs-on-Grade 3 20JUN12 22JUN12 25
10660 Erect. Align & Weld-out Structural Steel 15 25JUN12 16JUL12 25
10620 Wall Framing 18 17JUL12 09AUG12 25
10680 Roof Framing 12 02AUG12 17AUG12 25
10740 Install Plywood Roof Sheathing 8 20AUG12 29AUG12 25
Exterior 11050 Set Switchgear 2 25JUN12 26JUN12 106
11000 Exterior Framing 15 20AUG12 11SEP12 43
11020 Set Roof Curbs 4 22AUG12 27AUG12 40
11040 Set HVAC Units 2 28AUG12 29AUG12 55
11080 Plywood Wall Sheathing 10 29AUG12 13SEP12 43
11060 Install Drain & Plumbing Risers 2 30AUG12 31AUG12 50
11100 Install Window Frames 10 12SEP12 25SEP12 95
11120 Install Storefronts 10 12SEP12 25SEP12 95
11140 Insulation Board 3 14SEP12 18SEP12 43
11160 Install Exterior Door Frames 4 14SEP12 19SEP12 99
11180 Install Roofing System 6 19SEP12 26SEP12 43
11220 Flashings & Sealants 6 19SEP12 26SEP12 53
11200 Glazing 5 26SEP12 02OCT12 98
11240 Lath & Flashing for Plaster 8 26SEP12 05OCT12 95
11260 Install Metal Roof 10 27SEP12 10OCT12 43
11280 Plaster 25 08OCT12 09NOV12 95
11400 Install Solatubes 4 11OCT12 16OCT12 100
11340 Paint @ Exterior 4 13NOV12 16NOV12 103
Rough-ins 11500 Install MEP Hangers 3 30AUG12 03SEP12 25
11520 Layout & Install Top Track 4 04SEP12 11SEP12 25
11540 Insulation @ Metal Decks 4 12SEP12 17SEP12 27
11560 Interior Framing 20 12SEP12 09OCT12 25
11580 Rough-in Fire Sprinkler Mains 10 18SEP12 01OCT12 27
11600 Rough-in Overhead Plumbing 6 02OCT12 09OCT12 27
11640 Set Interior Door & Window Frames 8 10OCT12 19OCT12 36
11680 R-I Overhead Mechanical Units, Piping & Ducts 12 10OCT12 25OCT12 27
11660 Rough-in In-wall Plumbing 12 10OCT12 25OCT12 28
11700 Rough-in In-wall Electrical 15 10OCT12 30OCT12 25
2012 2013J F M A M J J A S O N D J F M A M J J A S O N D JFEB
Vapor Barrier & Sand @ Slabs-on-Grade
Rebar for Slabs-on-grade
Pour Slabs-on-Grade
Erect. Align & Weld-out Structural Steel
Wall Framing
Roof Framing
Install Plywood Roof Sheathing
Set Switchgear
Exterior Framing
Set Roof Curbs
Set HVAC Units
Plywood Wall Sheathing
Install Drain & Plumbing Risers
Install Window Frames
Install Storefronts
Insulation Board
Install Exterior Door Frames
Install Roofing System
Flashings & Sealants
Glazing
Lath & Flashing for Plaster
Install Metal Roof
Plaster
Install Solatubes
Paint @ Exterior
Install MEP Hangers
Layout & Install Top Track
Insulation @ Metal Decks
Interior Framing
Rough-in Fire Sprinkler Mains
Rough-in Overhead Plumbing
Set Interior Door & Window Frames
R-I Overhead Mechanical Units, Piping & Ducts
Rough-in In-wall Plumbing
Rough-in In-wall Electrical
Sheet 9 of 43
Sheet 10 of 43
ActivityID
ActivityDescription
SUBAOrigDurTarget 1Orig Dur
RemDur% Early
StartEarlyFinish
TotalFloat
11720 Rough-in Overhead Electrical Conduits 12 17OCT12 01NOV12 27
11740 Install In-wall Insulation 4 31OCT12 05NOV12 25
Interior Finishes 12000 Plywood @ Electrical Room 2 06NOV12 07NOV12 64
12020 Drywall 12 06NOV12 26NOV12 25
12040 Tape & Finish Drywall 15 09NOV12 04DEC12 25
12080 Ceramic Tile 12 27NOV12 12DEC12 80
12120 Set Panelboards 2 05DEC12 06DEC12 48
12100 Prime Paint 4 05DEC12 10DEC12 25
12220 Pull wires & Terminate 10 07DEC12 20DEC12 48
12160 Install T-Bar Grid 4 11DEC12 14DEC12 64
12240 Install Cabinetry & Casework 15 11DEC12 02JAN13 25
12280 Install Fire Sprinkler Drops & Heads 6 17DEC12 24DEC12 68
12300 Install Mechanical Drops, Grills & Registers 6 17DEC12 24DEC12 68
12840 Install Solatube Drops & Diffusers 6 17DEC12 24DEC12 68
12340 Install Lighting & L.V. Electrical Devices 10 21DEC12 07JAN13 60
12380 Install Tack Wall / Vinyl Wall Panels 3 03JAN13 07JAN13 33
12400 Hang Doors 6 03JAN13 10JAN13 25
12440 Install Acoustical Ceiling Panels 2 08JAN13 09JAN13 60
12420 Interior Glazing 5 11JAN13 17JAN13 25
12450 Install Door Hardware 6 11JAN13 18JAN13 59
12480 Finish Paint 5 18JAN13 24JAN13 25
12560 Install Drinking Fountains 2 25JAN13 28JAN13 56
12540 Install Projection Screens / Projector Mounts 3 25JAN13 29JAN13 52
12740 Install Roof Ladder & Hatch 4 25JAN13 30JAN13 51
12620 Install Plumbing Fixtures 5 25JAN13 31JAN13 51
12660 Finish Mechanical Controls 6 25JAN13 01FEB13 27
12640 Install Flooring 6 25JAN13 01FEB13 49
12680 Finish Electrical 8 25JAN13 05FEB13 25
12760 Toilet Partitions & Accessories 2 01FEB13 04FEB13 51
12780 Touch-up Paint 3 06FEB13 08FEB13 47
Clean-up / Punchlist 14940 Start-up & Test Systems 10 06FEB13 19FEB13 25
14960 Clean-Up Bldg. B 3 11FEB13 13FEB13 47
14950 Commissioning 15 20FEB13 12MAR13 25
14980 Punchlist Bldg. B 10 13MAR13 26MAR13 25
2012 2013J F M A M J J A S O N D J F M A M J J A S O N D JFEB
Rough-in Overhead Electrical Conduits
Install In-wall Insulation
Plywood @ Electrical Room
Drywall
Tape & Finish Drywall
Ceramic Tile
Set Panelboards
Prime Paint
Pull wires & Terminate
Install T-Bar Grid
Install Cabinetry & Casework
Install Fire Sprinkler Drops & Heads
Install Mechanical Drops, Grills & Registers
Install Solatube Drops & Diffusers
Install Lighting & L.V. Electrical Devices
Install Tack Wall / Vinyl Wall Panels
Hang Doors
Install Acoustical Ceiling Panels
Interior Glazing
Install Door Hardware
Finish Paint
Install Drinking Fountains
Install Projection Screens / Projector Mounts
Install Roof Ladder & Hatch
Install Plumbing Fixtures
Finish Mechanical Controls
Install Flooring
Finish Electrical
Toilet Partitions & Accessories
Touch-up Paint
Start-up & Test Systems
Clean-Up Bldg. B
Commissioning
Punchlist Bldg. B
Sheet 10 of 43
Sheet 11 of 43
ActivityID
ActivityDescription
SUBAOrigDurTarget 1Orig Dur
RemDur% Early
StartEarlyFinish
TotalFloat
Bldg. C - ClassroomMilestones 15000 Start Bldg. C Middle School Classroom 0 30APR12 45
15010 Bldg. C Middle School Classroom Duration 193* 30APR12 05FEB13 38
19990 Bldg. C - Middle School Classroom Complete 0 05FEB13 38
Foundations / Underground 15100 Excavate Footings 4 30APR12 03MAY12 70
15120 Rebar Footings & Stem Walls 8 01MAY12 10MAY12 70
15160 Form Footings & Stem Walls 5 08MAY12 14MAY12 71
15180 Install Electrical Sleeves 2 11MAY12 14MAY12 72
15200 Install Plumbing Sleeves 2 11MAY12 14MAY12 72
15320 Install Mechanical Sleeves 2 11MAY12 14MAY12 72
15140 Layout / Install Anchor Bolts 4 11MAY12 16MAY12 70
15220 Pour Footings & Stem Walls 4 17MAY12 22MAY12 70
15240 Strip Forms 2 23MAY12 24MAY12 74
15260 Install Underslab Plumbing 3 23MAY12 25MAY12 70
15300 Install Underslab Mechanical Piping 3 23MAY12 25MAY12 76
15280 Install Underslab Electrical Conduits 6 29MAY12 05JUN12 70
Structure / Slab-on-Grade 15520 Bkfl/Compact at Stem Walls 3 25MAY12 30MAY12 74
15540 Vapor Barrier & Sand @ Slab-on-Grade 2 06JUN12 07JUN12 70
15560 Rebar for Slab-on-grade 4 08JUN12 13JUN12 70
15580 Pour Slab-on-Grade 3 14JUN12 18JUN12 70
15620 Wall Framing 12 19JUN12 05JUL12 70
15680 Roof Framing 6 03JUL12 11JUL12 70
15740 Install Plywood Roof Sheathing 5 12JUL12 18JUL12 70
15600 Form & Pour Mechanical & Electrical Pads 3 26JUL12 30JUL12 80
Exterior 16000 Exterior Framing 8 12JUL12 23JUL12 80
16020 Set Solatube Curbs 2 16JUL12 17JUL12 80
16080 Plywood Wall Sheathing 6 18JUL12 25JUL12 80
16060 Install Drain & Plumbing Risers 2 19JUL12 20JUL12 92
16100 Install Window Frames 12 24JUL12 08AUG12 106
16140 Insulation Board 3 26JUL12 30JUL12 89
16160 Install Exterior Door Frames 4 26JUL12 31JUL12 112
16220 Flashings & Sealants 6 26JUL12 02AUG12 90
16040 Set HVAC Units 2 31JUL12 01AUG12 80
2012 2013J F M A M J J A S O N D J F M A M J J A S O N D JFEB
Start Bldg. C Middle School Classroom
Bldg. C Middle School Classroom Duration
Bldg. C - Middle School Classroom Complete
Excavate Footings
Rebar Footings & Stem Walls
Form Footings & Stem Walls
Install Electrical Sleeves
Install Plumbing Sleeves
Install Mechanical Sleeves
Layout / Install Anchor Bolts
Pour Footings & Stem Walls
Strip Forms
Install Underslab Plumbing
Install Underslab Mechanical Piping
Install Underslab Electrical Conduits
Bkfl/Compact at Stem Walls
Vapor Barrier & Sand @ Slab-on-Grade
Rebar for Slab-on-grade
Pour Slab-on-Grade
Wall Framing
Roof Framing
Install Plywood Roof Sheathing
Form & Pour Mechanical & Electrical Pads
Exterior Framing
Set Solatube Curbs
Plywood Wall Sheathing
Install Drain & Plumbing Risers
Install Window Frames
Insulation Board
Install Exterior Door Frames
Flashings & Sealants
Set HVAC Units
Sheet 11 of 43
Sheet 12 of 43
ActivityID
ActivityDescription
SUBAOrigDurTarget 1Orig Dur
RemDur% Early
StartEarlyFinish
TotalFloat
16050 Set Switchgear 2 31JUL12 01AUG12 81
16260 Install Metal Roof 4 31JUL12 03AUG12 89
16400 Install Solatubes 4 06AUG12 09AUG12 127
16200 Glazing 5 09AUG12 15AUG12 107
16240 Lath & Flashing for Plaster 6 09AUG12 16AUG12 106
16280 Plaster 25 17AUG12 24SEP12 106
16380 Construct Mechanical / Electrical Enclosures 8 25SEP12 04OCT12 106
16340 Paint @ Exterior 5 05OCT12 11OCT12 106
Rough-ins 16500 Install MEP Hangers 3 19JUL12 23JUL12 70
16520 Layout & Install Top Track 2 24JUL12 25JUL12 70
16540 Insulation @ Roof Decks 4 26JUL12 31JUL12 70
16560 Interior Framing 10 26JUL12 08AUG12 73
16580 Rough-in Fire Sprinkler Mains 6 01AUG12 08AUG12 70
16600 Rough-in Overhead Plumbing 3 09AUG12 13AUG12 70
16660 Rough-in In-wall Plumbing 4 09AUG12 14AUG12 80
16640 Set Interior Door & Window Frames 6 09AUG12 16AUG12 80
16700 Rough-in In-wall Electrical 10 09AUG12 22AUG12 74
16680 R-I Overhead Mechanical Units, Piping & Ducts 12 14AUG12 29AUG12 70
16720 Rough-in Overhead Electrical Conduits 8 21AUG12 30AUG12 70
16740 Install In-wall Insulation 2 23AUG12 24AUG12 74
Interior Finishes 17020 Drywall 5 31AUG12 10SEP12 70
17040 Tape & Finish Drywall 8 03SEP12 14SEP12 70
17100 Prime Paint 4 13SEP12 18SEP12 70
17120 Set Panelboards 2 17SEP12 18SEP12 85
17160 Install T-Bar Grid 4 19SEP12 24SEP12 101
17220 Pull wires & Terminate 8 19SEP12 28SEP12 85
17240 Install Cabinetry & Casework 10 19SEP12 02OCT12 70
17840 Install Solatube Drops & Diffusers 4 25SEP12 28SEP12 105
17280 Install Fire Sprinkler Drops & Heads 5 25SEP12 01OCT12 104
17300 Install Mechanical Drops, Grills & Registers 6 25SEP12 02OCT12 103
17340 Install Lighting & L.V. Electrical Devices 8 01OCT12 10OCT12 97
17380 Install Tack Wall / Vinyl Wall Panels 3 03OCT12 05OCT12 75
17620 Install Sinks 4 03OCT12 08OCT12 109
17400 Hang Doors 5 03OCT12 09OCT12 70
17420 Interior Glazing 3 10OCT12 12OCT12 70
2012 2013J F M A M J J A S O N D J F M A M J J A S O N D JFEB
Set Switchgear
Install Metal Roof
Install Solatubes
Glazing
Lath & Flashing for Plaster
Plaster
Construct Mechanical / Electrical Enclosures
Paint @ Exterior
Install MEP Hangers
Layout & Install Top Track
Insulation @ Roof Decks
Interior Framing
Rough-in Fire Sprinkler Mains
Rough-in Overhead Plumbing
Rough-in In-wall Plumbing
Set Interior Door & Window Frames
Rough-in In-wall Electrical
R-I Overhead Mechanical Units, Piping & Ducts
Rough-in Overhead Electrical Conduits
Install In-wall Insulation
Drywall
Tape & Finish Drywall
Prime Paint
Set Panelboards
Install T-Bar Grid
Pull wires & Terminate
Install Cabinetry & Casework
Install Solatube Drops & Diffusers
Install Fire Sprinkler Drops & Heads
Install Mechanical Drops, Grills & Registers
Install Lighting & L.V. Electrical Devices
Install Tack Wall / Vinyl Wall Panels
Install Sinks
Hang Doors
Interior Glazing
Sheet 12 of 43
Sheet 13 of 43
ActivityID
ActivityDescription
SUBAOrigDurTarget 1Orig Dur
RemDur% Early
StartEarlyFinish
TotalFloat
17440 Install Acoustical Ceiling Panels 2 11OCT12 12OCT12 97
17480 Finish Paint 5 15OCT12 19OCT12 70
17540 Install Projection Screens / Projector Mounts 2 22OCT12 23OCT12 95
17560 Install Markerboards 2 22OCT12 23OCT12 95
17660 Finish Mechanical Controls 5 22OCT12 26OCT12 70
17680 Finish Electrical 5 22OCT12 26OCT12 70
17640 Polish Concrete Floor 5 22OCT12 26OCT12 92
17450 Install Door Hardware 5 11JAN13 17JAN13 38
17780 Touch-up Paint 3 18JAN13 22JAN13 38
Clean-up / Punchlist 19940 Start-up & Test Systems 10 29OCT12 09NOV12 70
19950 Commissioning 15 13NOV12 05DEC12 70
19960 Clean-Up Bldg. C 3 23JAN13 25JAN13 38
19980 Punchlist Bldg. C 10 23JAN13 05FEB13 38
Bldg. D - ClassroomMilestones 20000 Start Bldg. D Middle School Classroom 0 07MAY12 45
20010 Bldg. D Middle School Classroom Duration 161* 07MAY12 27DEC12 60
24990 Bldg. D - Middle School Classroom Complete 0 27DEC12 60
Foundations / Underground 20100 Excavate Footings 4 07MAY12 10MAY12 60
20120 Rebar Footings & Stem Walls 8 08MAY12 17MAY12 60
20160 Form Footings & Stem Walls 5 15MAY12 21MAY12 61
20180 Install Electrical Sleeves 2 18MAY12 21MAY12 62
20200 Install Plumbing Sleeves 2 18MAY12 21MAY12 62
20320 Install Mechanical Sleeves 2 18MAY12 21MAY12 62
20140 Layout / Install Anchor Bolts 4 18MAY12 23MAY12 60
20220 Pour Footings & Stem Walls 4 24MAY12 30MAY12 60
20240 Strip Forms 2 31MAY12 01JUN12 64
20300 Install Underslab Mechanical Piping 3 31MAY12 04JUN12 66
20260 Install Underslab Plumbing 5 31MAY12 06JUN12 60
20280 Install Underslab Electrical Conduits 6 05JUN12 12JUN12 60
Structure / Slab-on-Grade 20520 Bkfl/Compact at Stem Walls 3 04JUN12 06JUN12 64
20540 Vapor Barrier & Sand @ Slab-on-Grade 2 13JUN12 14JUN12 60
20560 Rebar for Slab-on-grade 4 15JUN12 20JUN12 60
20580 Pour Slab-on-Grade 3 21JUN12 25JUN12 60
2012 2013J F M A M J J A S O N D J F M A M J J A S O N D JFEB
Install Acoustical Ceiling Panels
Finish Paint
Install Projection Screens / Projector Mounts
Install Markerboards
Finish Mechanical Controls
Finish Electrical
Polish Concrete Floor
Install Door Hardware
Touch-up Paint
Start-up & Test Systems
Commissioning
Clean-Up Bldg. C
Punchlist Bldg. C
Start Bldg. D Middle School Classroom
Bldg. D Middle School Classroom Duration
Bldg. D - Middle School Classroom Complete
Excavate Footings
Rebar Footings & Stem Walls
Form Footings & Stem Walls
Install Electrical Sleeves
Install Plumbing Sleeves
Install Mechanical Sleeves
Layout / Install Anchor Bolts
Pour Footings & Stem Walls
Strip Forms
Install Underslab Mechanical Piping
Install Underslab Plumbing
Install Underslab Electrical Conduits
Bkfl/Compact at Stem Walls
Vapor Barrier & Sand @ Slab-on-Grade
Rebar for Slab-on-grade
Pour Slab-on-Grade
Sheet 13 of 43
Sheet 14 of 43
ActivityID
ActivityDescription
SUBAOrigDurTarget 1Orig Dur
RemDur% Early
StartEarlyFinish
TotalFloat
20660 Wall Framing 12 26JUN12 12JUL12 60
20680 Roof Framing 6 11JUL12 18JUL12 60
20740 Install Plywood Roof Sheathing 5 19JUL12 25JUL12 60
20600 Form & Pour Mechanical & Electrical Pads 3 02AUG12 06AUG12 70
Exterior 21000 Exterior Framing 8 19JUL12 30JUL12 70
21020 Set Solatube Curbs 2 23JUL12 24JUL12 70
21080 Plywood Wall Sheathing 6 25JUL12 01AUG12 70
21060 Install Drain & Plumbing Risers 2 26JUL12 27JUL12 82
21100 Install Window Frames 12 31JUL12 15AUG12 96
21140 Insulation Board 3 02AUG12 06AUG12 79
21160 Install Exterior Door Frames 4 02AUG12 07AUG12 102
21220 Flashings & Sealants 6 02AUG12 09AUG12 80
21040 Set HVAC Units 2 07AUG12 08AUG12 70
21050 Set Switchgear 2 07AUG12 08AUG12 71
21260 Install Metal Roof 4 07AUG12 10AUG12 79
21400 Install Solatubes 4 13AUG12 16AUG12 117
21200 Glazing 5 16AUG12 22AUG12 97
21240 Lath & Flashing for Plaster 6 16AUG12 23AUG12 96
21280 Plaster 25 24AUG12 01OCT12 96
21380 Construct Mechanical / Electrical Enclosures 8 02OCT12 11OCT12 96
21340 Paint @ Exterior 5 12OCT12 18OCT12 96
Rough-ins 21500 Install MEP Hangers 3 26JUL12 30JUL12 60
21520 Layout & Install Top Track 2 31JUL12 01AUG12 60
21540 Insulation @ Roof Decks 4 02AUG12 07AUG12 60
21560 Interior Framing 10 02AUG12 15AUG12 63
21580 Rough-in Fire Sprinkler Mains 6 08AUG12 15AUG12 60
21600 Rough-in Overhead Plumbing 3 16AUG12 20AUG12 60
21640 Set Interior Door & Window Frames 6 16AUG12 23AUG12 70
21660 Rough-in In-wall Plumbing 8 16AUG12 27AUG12 66
21700 Rough-in In-wall Electrical 10 16AUG12 29AUG12 64
21680 R-I Overhead Mechanical Units, Piping & Ducts 12 21AUG12 07SEP12 60
21720 Rough-in Overhead Electrical Conduits 8 28AUG12 10SEP12 60
21740 Install In-wall Insulation 2 30AUG12 31AUG12 64
Interior Finishes 22020 Drywall 5 11SEP12 17SEP12 60
2012 2013J F M A M J J A S O N D J F M A M J J A S O N D JFEB
Wall Framing
Roof Framing
Install Plywood Roof Sheathing
Form & Pour Mechanical & Electrical Pads
Exterior Framing
Set Solatube Curbs
Plywood Wall Sheathing
Install Drain & Plumbing Risers
Install Window Frames
Insulation Board
Install Exterior Door Frames
Flashings & Sealants
Set HVAC Units
Set Switchgear
Install Metal Roof
Install Solatubes
Glazing
Lath & Flashing for Plaster
Plaster
Construct Mechanical / Electrical Enclosures
Paint @ Exterior
Install MEP Hangers
Layout & Install Top Track
Insulation @ Roof Decks
Interior Framing
Rough-in Fire Sprinkler Mains
Rough-in Overhead Plumbing
Set Interior Door & Window Frames
Rough-in In-wall Plumbing
Rough-in In-wall Electrical
R-I Overhead Mechanical Units, Piping & Ducts
Rough-in Overhead Electrical Conduits
Install In-wall Insulation
Drywall
Sheet 14 of 43
Sheet 15 of 43
ActivityID
ActivityDescription
SUBAOrigDurTarget 1Orig Dur
RemDur% Early
StartEarlyFinish
TotalFloat
22040 Tape & Finish Drywall 8 12SEP12 21SEP12 60
22080 Ceramic Tile 6 18SEP12 25SEP12 107
22100 Prime Paint 4 20SEP12 25SEP12 60
22120 Set Panelboards 2 24SEP12 25SEP12 75
22160 Install T-Bar Grid 4 26SEP12 01OCT12 91
22220 Pull wires & Terminate 8 26SEP12 05OCT12 75
22240 Install Cabinetry & Casework 10 26SEP12 09OCT12 60
22840 Install Solatube Drops & Diffusers 4 02OCT12 05OCT12 95
22280 Install Fire Sprinkler Drops & Heads 5 02OCT12 08OCT12 94
22300 Install Mechanical Drops, Grills & Registers 6 02OCT12 09OCT12 93
22340 Install Lighting & L.V. Electrical Devices 8 08OCT12 17OCT12 87
22380 Install Tack Wall / Vinyl Wall Panels 3 10OCT12 12OCT12 65
22260 Install Sinks 3 10OCT12 12OCT12 100
22400 Hang Doors 5 10OCT12 16OCT12 60
22420 Interior Glazing 3 17OCT12 19OCT12 60
22450 Install Door Hardware 5 17OCT12 23OCT12 90
22440 Install Acoustical Ceiling Panels 2 18OCT12 19OCT12 87
22480 Finish Paint 5 22OCT12 26OCT12 60
22540 Install Projection Screens / Projector Mounts 2 29OCT12 30OCT12 85
22560 Install Markerboards 2 29OCT12 30OCT12 85
22620 Install Plumbing Fixtures 4 29OCT12 01NOV12 84
22660 Finish Mechanical Controls 5 29OCT12 02NOV12 60
22680 Finish Electrical 5 29OCT12 02NOV12 60
22640 Polish Concrete Floor 5 29OCT12 02NOV12 82
22760 Toilet Accessories 2 02NOV12 05NOV12 84
22780 Touch-up Paint 3 05NOV12 07NOV12 82
Clean-up / Punchlist 24940 Start-up & Test Systems 10 05NOV12 19NOV12 60
24960 Clean-Up Bldg. D 3 08NOV12 13NOV12 82
24950 Commissioning 15 20NOV12 12DEC12 60
24980 Punchlist Bldg. D 10 13DEC12 27DEC12 60
Bldg. E - ClassroomMilestones 25000 Start Bldg. E Middle School Classroom 0 07MAY12 45
25010 Bldg. E Middle School Classroom Duration 161* 07MAY12 27DEC12 60
29990 Bldg. E - Middle School Classroom Complete 0 27DEC12 60
2012 2013J F M A M J J A S O N D J F M A M J J A S O N D JFEB
Tape & Finish Drywall
Ceramic Tile
Prime Paint
Set Panelboards
Install T-Bar Grid
Pull wires & Terminate
Install Cabinetry & Casework
Install Solatube Drops & Diffusers
Install Fire Sprinkler Drops & Heads
Install Mechanical Drops, Grills & Registers
Install Lighting & L.V. Electrical Devices
Install Tack Wall / Vinyl Wall Panels
Install Sinks
Hang Doors
Interior Glazing
Install Door Hardware
Install Acoustical Ceiling Panels
Finish Paint
Install Projection Screens / Projector Mounts
Install Markerboards
Install Plumbing Fixtures
Finish Mechanical Controls
Finish Electrical
Polish Concrete Floor
Toilet Accessories
Touch-up Paint
Start-up & Test Systems
Clean-Up Bldg. D
Commissioning
Punchlist Bldg. D
Start Bldg. E Middle School Classroom
Bldg. E Middle School Classroom Duration
Bldg. E - Middle School Classroom Complete
Sheet 15 of 43
Sheet 16 of 43
ActivityID
ActivityDescription
SUBAOrigDurTarget 1Orig Dur
RemDur% Early
StartEarlyFinish
TotalFloat
Foundations / Underground 25100 Excavate Footings 4 07MAY12 10MAY12 60
25120 Rebar Footings & Stem Walls 8 08MAY12 17MAY12 60
25160 Form Footings & Stem Walls 5 15MAY12 21MAY12 61
25180 Install Electrical Sleeves 2 18MAY12 21MAY12 62
25200 Install Plumbing Sleeves 2 18MAY12 21MAY12 62
25320 Install Mechanical Sleeves 2 18MAY12 21MAY12 62
25140 Layout / Install Anchor Bolts 4 18MAY12 23MAY12 60
25220 Pour Footings & Stem Walls 4 24MAY12 30MAY12 60
25240 Strip Forms 2 31MAY12 01JUN12 64
25260 Install Underslab Plumbing 3 31MAY12 04JUN12 60
25300 Install Underslab Mechanical Piping 3 31MAY12 04JUN12 66
25280 Install Underslab Electrical Conduits 6 05JUN12 12JUN12 60
Structure / Slab-on-Grade 25520 Bkfl/Compact at Stem Walls 3 04JUN12 06JUN12 64
25540 Vapor Barrier & Sand @ Slab-on-Grade 2 13JUN12 14JUN12 60
25560 Rebar for Slab-on-grade 4 15JUN12 20JUN12 60
25580 Pour Slab-on-Grade 3 21JUN12 25JUN12 60
25660 Wall Framing 12 26JUN12 12JUL12 60
25680 Roof Framing 6 11JUL12 18JUL12 60
25740 Install Plywood Roof Sheathing 5 19JUL12 25JUL12 60
25600 Form & Pour Mechanical & Electrical Pads 3 02AUG12 06AUG12 70
Exterior 26000 Exterior Framing 8 19JUL12 30JUL12 70
26020 Set Solatube Curbs 2 23JUL12 24JUL12 70
26080 Plywood Wall Sheathing 6 25JUL12 01AUG12 70
26060 Install Drain & Plumbing Risers 2 26JUL12 27JUL12 82
26100 Install Window Frames 12 31JUL12 15AUG12 96
26140 Insulation Board 3 02AUG12 06AUG12 79
26160 Install Exterior Door Frames 4 02AUG12 07AUG12 102
26220 Flashings & Sealants 6 02AUG12 09AUG12 80
26040 Set HVAC Units 2 07AUG12 08AUG12 70
26050 Set Switchgear 2 07AUG12 08AUG12 71
26260 Install Metal Roof 4 07AUG12 10AUG12 79
26400 Install Solatubes 4 13AUG12 16AUG12 117
26200 Glazing 5 16AUG12 22AUG12 97
26240 Lath & Flashing for Plaster 6 16AUG12 23AUG12 96
2012 2013J F M A M J J A S O N D J F M A M J J A S O N D JFEB
Excavate Footings
Rebar Footings & Stem Walls
Form Footings & Stem Walls
Install Electrical Sleeves
Install Plumbing Sleeves
Install Mechanical Sleeves
Layout / Install Anchor Bolts
Pour Footings & Stem Walls
Strip Forms
Install Underslab Plumbing
Install Underslab Mechanical Piping
Install Underslab Electrical Conduits
Bkfl/Compact at Stem Walls
Vapor Barrier & Sand @ Slab-on-Grade
Rebar for Slab-on-grade
Pour Slab-on-Grade
Wall Framing
Roof Framing
Install Plywood Roof Sheathing
Form & Pour Mechanical & Electrical Pads
Exterior Framing
Set Solatube Curbs
Plywood Wall Sheathing
Install Drain & Plumbing Risers
Install Window Frames
Insulation Board
Install Exterior Door Frames
Flashings & Sealants
Set HVAC Units
Set Switchgear
Install Metal Roof
Install Solatubes
Glazing
Lath & Flashing for Plaster
Sheet 16 of 43
Sheet 17 of 43
ActivityID
ActivityDescription
SUBAOrigDurTarget 1Orig Dur
RemDur% Early
StartEarlyFinish
TotalFloat
26280 Plaster 25 24AUG12 01OCT12 96
26380 Construct Mechanical / Electrical Enclosures 8 02OCT12 11OCT12 96
26340 Paint @ Exterior 5 12OCT12 18OCT12 96
Rough-ins 26500 Install MEP Hangers 3 26JUL12 30JUL12 60
26520 Layout & Install Top Track 2 31JUL12 01AUG12 60
26540 Insulation @ Roof Decks 4 02AUG12 07AUG12 60
26560 Interior Framing 10 02AUG12 15AUG12 63
26580 Rough-in Fire Sprinkler Mains 6 08AUG12 15AUG12 60
26600 Rough-in Overhead Plumbing 3 16AUG12 20AUG12 60
26660 Rough-in In-wall Plumbing 4 16AUG12 21AUG12 70
26640 Set Interior Door & Window Frames 6 16AUG12 23AUG12 70
26700 Rough-in In-wall Electrical 10 16AUG12 29AUG12 64
26680 R-I Overhead Mechanical Units, Piping & Ducts 12 21AUG12 07SEP12 60
26720 Rough-in Overhead Electrical Conduits 8 28AUG12 10SEP12 60
26740 Install In-wall Insulation 2 30AUG12 31AUG12 64
Interior Finishes 27020 Drywall 5 11SEP12 17SEP12 60
27040 Tape & Finish Drywall 8 12SEP12 21SEP12 60
27100 Prime Paint 4 20SEP12 25SEP12 60
27120 Set Panelboards 2 24SEP12 25SEP12 75
27160 Install T-Bar Grid 4 26SEP12 01OCT12 91
27220 Pull wires & Terminate 8 26SEP12 05OCT12 75
27240 Install Cabinetry & Casework 10 26SEP12 09OCT12 60
27840 Install Solatube Drops & Diffusers 4 02OCT12 05OCT12 95
27280 Install Fire Sprinkler Drops & Heads 5 02OCT12 08OCT12 94
27300 Install Mechanical Drops, Grills & Registers 6 02OCT12 09OCT12 93
27340 Install Lighting & L.V. Electrical Devices 8 08OCT12 17OCT12 87
27380 Install Tack Wall / Vinyl Wall Panels 3 10OCT12 12OCT12 65
27620 Install Sinks 4 10OCT12 15OCT12 99
27400 Hang Doors 5 10OCT12 16OCT12 60
27420 Interior Glazing 3 17OCT12 19OCT12 60
27450 Install Door Hardware 5 17OCT12 23OCT12 90
27440 Install Acoustical Ceiling Panels 2 18OCT12 19OCT12 87
27480 Finish Paint 5 22OCT12 26OCT12 60
27540 Install Projection Screens / Projector Mounts 2 29OCT12 30OCT12 85
27560 Install Markerboards 2 29OCT12 30OCT12 85
2012 2013J F M A M J J A S O N D J F M A M J J A S O N D JFEB
Plaster
Construct Mechanical / Electrical Enclosures
Paint @ Exterior
Install MEP Hangers
Layout & Install Top Track
Insulation @ Roof Decks
Interior Framing
Rough-in Fire Sprinkler Mains
Rough-in Overhead Plumbing
Rough-in In-wall Plumbing
Set Interior Door & Window Frames
Rough-in In-wall Electrical
R-I Overhead Mechanical Units, Piping & Ducts
Rough-in Overhead Electrical Conduits
Install In-wall Insulation
Drywall
Tape & Finish Drywall
Prime Paint
Set Panelboards
Install T-Bar Grid
Pull wires & Terminate
Install Cabinetry & Casework
Install Solatube Drops & Diffusers
Install Fire Sprinkler Drops & Heads
Install Mechanical Drops, Grills & Registers
Install Lighting & L.V. Electrical Devices
Install Tack Wall / Vinyl Wall Panels
Install Sinks
Hang Doors
Interior Glazing
Install Door Hardware
Install Acoustical Ceiling Panels
Finish Paint
Install Projection Screens / Projector Mounts
Install Markerboards
Sheet 17 of 43
Sheet 18 of 43
ActivityID
ActivityDescription
SUBAOrigDurTarget 1Orig Dur
RemDur% Early
StartEarlyFinish
TotalFloat
27660 Finish Mechanical Controls 5 29OCT12 02NOV12 60
27680 Finish Electrical 5 29OCT12 02NOV12 60
27640 Polish Concrete Floor 5 29OCT12 02NOV12 82
27780 Touch-up Paint 3 05NOV12 07NOV12 82
Clean-up / Punchlist 29940 Start-up & Test Systems 10 05NOV12 19NOV12 60
29960 Clean-Up Bldg. E 3 08NOV12 13NOV12 82
29950 Commissioning 15 20NOV12 12DEC12 60
29980 Punchlist Bldg. E 10 13DEC12 27DEC12 60
Bldg. F - ClassroomMilestones 30000 Start Bldg. F Middle School Classroom 0 14MAY12 45
30010 Bldg. F Middle School Classroom Duration 161* 14MAY12 04JAN13 55
34990 Bldg. F - Middle School Classroom Complete 0 04JAN13 55
Foundations / Underground 30100 Excavate Footings 4 14MAY12 17MAY12 55
30120 Rebar Footings & Stem Walls 8 15MAY12 24MAY12 55
30160 Form Footings & Stem Walls 5 22MAY12 29MAY12 56
30180 Install Electrical Sleeves 2 25MAY12 29MAY12 57
30200 Install Plumbing Sleeves 2 25MAY12 29MAY12 57
30320 Install Mechanical Sleeves 2 25MAY12 29MAY12 57
30140 Layout / Install Anchor Bolts 4 25MAY12 31MAY12 55
30220 Pour Footings & Stem Walls 4 01JUN12 06JUN12 55
30240 Strip Forms 2 07JUN12 08JUN12 59
30260 Install Underslab Plumbing 3 07JUN12 11JUN12 55
30300 Install Underslab Mechanical Piping 3 07JUN12 11JUN12 61
30280 Install Underslab Electrical Conduits 6 12JUN12 19JUN12 55
Structure / Slab-on-Grade 30520 Bkfl/Compact at Stem Walls 3 11JUN12 13JUN12 59
30540 Vapor Barrier & Sand @ Slab-on-Grade 2 20JUN12 21JUN12 55
30560 Rebar for Slab-on-grade 4 22JUN12 27JUN12 55
30580 Pour Slab-on-Grade 3 28JUN12 02JUL12 55
30660 Wall Framing 12 03JUL12 19JUL12 55
30680 Roof Framing 6 18JUL12 25JUL12 55
30740 Install Plywood Roof Sheathing 5 26JUL12 01AUG12 55
30600 Form & Pour Mechanical & Electrical Pads 3 09AUG12 13AUG12 65
2012 2013J F M A M J J A S O N D J F M A M J J A S O N D JFEB
Finish Mechanical Controls
Finish Electrical
Polish Concrete Floor
Touch-up Paint
Start-up & Test Systems
Clean-Up Bldg. E
Commissioning
Punchlist Bldg. E
Start Bldg. F Middle School Classroom
Bldg. F Middle School Classroom Duration
Bldg. F - Middle School Classroom Complete
Excavate Footings
Rebar Footings & Stem Walls
Form Footings & Stem Walls
Install Electrical Sleeves
Install Plumbing Sleeves
Install Mechanical Sleeves
Layout / Install Anchor Bolts
Pour Footings & Stem Walls
Strip Forms
Install Underslab Plumbing
Install Underslab Mechanical Piping
Install Underslab Electrical Conduits
Bkfl/Compact at Stem Walls
Vapor Barrier & Sand @ Slab-on-Grade
Rebar for Slab-on-grade
Pour Slab-on-Grade
Wall Framing
Roof Framing
Install Plywood Roof Sheathing
Form & Pour Mechanical & Electrical Pads
Sheet 18 of 43
Sheet 19 of 43
ActivityID
ActivityDescription
SUBAOrigDurTarget 1Orig Dur
RemDur% Early
StartEarlyFinish
TotalFloat
Exterior 31000 Exterior Framing 8 26JUL12 06AUG12 65
31020 Set Solatube Curbs 2 30JUL12 31JUL12 65
31080 Plywood Wall Sheathing 6 01AUG12 08AUG12 65
31060 Install Drain & Plumbing Risers 2 02AUG12 03AUG12 77
31100 Install Window Frames 12 07AUG12 22AUG12 91
31140 Insulation Board 3 09AUG12 13AUG12 74
31160 Install Exterior Door Frames 4 09AUG12 14AUG12 97
31220 Flashings & Sealants 6 09AUG12 16AUG12 75
31040 Set HVAC Units 2 14AUG12 15AUG12 65
31050 Set Switchgear 2 14AUG12 15AUG12 66
31260 Install Metal Roof 4 14AUG12 17AUG12 74
31400 Install Solatubes 4 20AUG12 23AUG12 112
31200 Glazing 5 23AUG12 29AUG12 92
31240 Lath & Flashing for Plaster 6 23AUG12 30AUG12 91
31280 Plaster 25 31AUG12 08OCT12 91
31380 Construct Mechanical / Electrical Enclosures 8 09OCT12 18OCT12 91
31340 Paint @ Exterior 5 19OCT12 25OCT12 91
Rough-ins 31500 Install MEP Hangers 3 02AUG12 06AUG12 55
31520 Layout & Install Top Track 2 07AUG12 08AUG12 55
31540 Insulation @ Roof Decks 4 09AUG12 14AUG12 55
31560 Interior Framing 10 09AUG12 22AUG12 58
31580 Rough-in Fire Sprinkler Mains 6 15AUG12 22AUG12 55
31600 Rough-in Overhead Plumbing 3 23AUG12 27AUG12 55
31660 Rough-in In-wall Plumbing 4 23AUG12 28AUG12 65
31640 Set Interior Door & Window Frames 6 23AUG12 30AUG12 65
31700 Rough-in In-wall Electrical 10 23AUG12 07SEP12 59
31680 R-I Overhead Mechanical Units, Piping & Ducts 12 28AUG12 14SEP12 55
31720 Rough-in Overhead Electrical Conduits 8 04SEP12 17SEP12 55
31740 Install In-wall Insulation 2 10SEP12 11SEP12 59
Interior Finishes 32020 Drywall 5 18SEP12 24SEP12 55
32040 Tape & Finish Drywall 8 19SEP12 28SEP12 55
32100 Prime Paint 4 27SEP12 02OCT12 55
32120 Set Panelboards 2 01OCT12 02OCT12 70
32160 Install T-Bar Grid 4 03OCT12 08OCT12 86
2012 2013J F M A M J J A S O N D J F M A M J J A S O N D JFEB
Exterior Framing
Set Solatube Curbs
Plywood Wall Sheathing
Install Drain & Plumbing Risers
Install Window Frames
Insulation Board
Install Exterior Door Frames
Flashings & Sealants
Set HVAC Units
Set Switchgear
Install Metal Roof
Install Solatubes
Glazing
Lath & Flashing for Plaster
Plaster
Construct Mechanical / Electrical Enclosures
Paint @ Exterior
Install MEP Hangers
Layout & Install Top Track
Insulation @ Roof Decks
Interior Framing
Rough-in Fire Sprinkler Mains
Rough-in Overhead Plumbing
Rough-in In-wall Plumbing
Set Interior Door & Window Frames
Rough-in In-wall Electrical
R-I Overhead Mechanical Units, Piping & Ducts
Rough-in Overhead Electrical Conduits
Install In-wall Insulation
Drywall
Tape & Finish Drywall
Prime Paint
Set Panelboards
Install T-Bar Grid
Sheet 19 of 43
Sheet 20 of 43
ActivityID
ActivityDescription
SUBAOrigDurTarget 1Orig Dur
RemDur% Early
StartEarlyFinish
TotalFloat
32220 Pull wires & Terminate 8 03OCT12 12OCT12 70
32240 Install Cabinetry & Casework 10 03OCT12 16OCT12 55
32840 Install Solatube Drops & Diffusers 4 09OCT12 12OCT12 90
32280 Install Fire Sprinkler Drops & Heads 5 09OCT12 15OCT12 89
32300 Install Mechanical Drops, Grills & Registers 6 09OCT12 16OCT12 88
32340 Install Lighting & L.V. Electrical Devices 8 15OCT12 24OCT12 82
32380 Install Tack Wall / Vinyl Wall Panels 3 17OCT12 19OCT12 60
32620 Install Sinks 4 17OCT12 22OCT12 94
32400 Hang Doors 5 17OCT12 23OCT12 55
32420 Interior Glazing 3 24OCT12 26OCT12 55
32450 Install Door Hardware 5 24OCT12 30OCT12 85
32440 Install Acoustical Ceiling Panels 2 25OCT12 26OCT12 82
32480 Finish Paint 5 29OCT12 02NOV12 55
32540 Install Projection Screens / Projector Mounts 2 05NOV12 06NOV12 80
32560 Install Markerboards 2 05NOV12 06NOV12 80
32660 Finish Mechanical Controls 5 05NOV12 09NOV12 55
32680 Finish Electrical 5 05NOV12 09NOV12 55
32640 Polish Concrete Floor 5 05NOV12 09NOV12 77
32780 Touch-up Paint 3 13NOV12 15NOV12 77
Clean-up / Punchlist 34940 Start-up & Test Systems 10 13NOV12 28NOV12 55
34960 Clean-Up Bldg. F 3 16NOV12 20NOV12 77
34950 Commissioning 15 29NOV12 19DEC12 55
34980 Punchlist Bldg. F 10 20DEC12 04JAN13 55
Bldg. G- ClassroomMilestones 35000 Start Bldg. G Middle School Classroom 0 21MAY12 45
35010 Bldg. G Middle School Classroom Duration 161* 21MAY12 11JAN13 50
39990 Bldg. G - Middle School Classroom Complete 0 11JAN13 50
Foundations / Underground 35100 Excavate Footings 4 21MAY12 24MAY12 50
35120 Rebar Footings & Stem Walls 8 22MAY12 01JUN12 50
35160 Form Footings & Stem Walls 5 30MAY12 05JUN12 51
35180 Install Electrical Sleeves 2 04JUN12 05JUN12 52
35200 Install Plumbing Sleeves 2 04JUN12 05JUN12 52
35320 Install Mechanical Sleeves 2 04JUN12 05JUN12 52
35140 Layout / Install Anchor Bolts 4 04JUN12 07JUN12 50
2012 2013J F M A M J J A S O N D J F M A M J J A S O N D JFEB
Pull wires & Terminate
Install Cabinetry & Casework
Install Solatube Drops & Diffusers
Install Fire Sprinkler Drops & Heads
Install Mechanical Drops, Grills & Registers
Install Lighting & L.V. Electrical Devices
Install Tack Wall / Vinyl Wall Panels
Install Sinks
Hang Doors
Interior Glazing
Install Door Hardware
Install Acoustical Ceiling Panels
Finish Paint
Install Projection Screens / Projector Mounts
Install Markerboards
Finish Mechanical Controls
Finish Electrical
Polish Concrete Floor
Touch-up Paint
Start-up & Test Systems
Clean-Up Bldg. F
Commissioning
Punchlist Bldg. F
Start Bldg. G Middle School Classroom
Bldg. G Middle School Classroom Duration
Bldg. G - Middle School Classroom Complete
Excavate Footings
Rebar Footings & Stem Walls
Form Footings & Stem Walls
Install Electrical Sleeves
Install Plumbing Sleeves
Install Mechanical Sleeves
Layout / Install Anchor Bolts
Sheet 20 of 43
Sheet 21 of 43
ActivityID
ActivityDescription
SUBAOrigDurTarget 1Orig Dur
RemDur% Early
StartEarlyFinish
TotalFloat
35220 Pour Footings & Stem Walls 4 08JUN12 13JUN12 50
35240 Strip Forms 2 14JUN12 15JUN12 54
35300 Install Underslab Mechanical Piping 3 14JUN12 18JUN12 56
35260 Install Underslab Plumbing 5 14JUN12 20JUN12 50
35280 Install Underslab Electrical Conduits 6 19JUN12 26JUN12 50
Structure / Slab-on-Grade 35520 Bkfl/Compact at Stem Walls 3 18JUN12 20JUN12 54
35540 Vapor Barrier & Sand @ Slab-on-Grade 2 27JUN12 28JUN12 50
35560 Rebar for Slab-on-grade 4 29JUN12 05JUL12 50
35580 Pour Slab-on-Grade 3 06JUL12 10JUL12 50
35660 Wall Framing 12 11JUL12 26JUL12 50
35680 Roof Framing 6 25JUL12 01AUG12 50
35740 Install Plywood Roof Sheathing 5 02AUG12 08AUG12 50
35600 Form & Pour Mechanical & Electrical Pads 3 16AUG12 20AUG12 60
Exterior 36000 Exterior Framing 8 02AUG12 13AUG12 60
36020 Set Solatube Curbs 2 06AUG12 07AUG12 60
36080 Plywood Wall Sheathing 6 08AUG12 15AUG12 60
36060 Install Drain & Plumbing Risers 2 09AUG12 10AUG12 72
36100 Install Window Frames 12 14AUG12 29AUG12 86
36140 Insulation Board 3 16AUG12 20AUG12 69
36160 Install Exterior Door Frames 4 16AUG12 21AUG12 92
36220 Flashings & Sealants 6 16AUG12 23AUG12 70
36040 Set HVAC Units 2 21AUG12 22AUG12 60
36050 Set Switchgear 2 21AUG12 22AUG12 61
36260 Install Metal Roof 4 21AUG12 24AUG12 69
36400 Install Solatubes 4 27AUG12 30AUG12 107
36200 Glazing 5 30AUG12 07SEP12 87
36240 Lath & Flashing for Plaster 6 30AUG12 10SEP12 86
36280 Plaster 25 11SEP12 15OCT12 86
36380 Construct Mechanical / Electrical Enclosures 8 16OCT12 25OCT12 86
36340 Paint @ Exterior 5 26OCT12 01NOV12 86
Rough-ins 36500 Install MEP Hangers 3 09AUG12 13AUG12 50
36520 Layout & Install Top Track 2 14AUG12 15AUG12 50
36540 Insulation @ Roof Decks 4 16AUG12 21AUG12 50
36560 Interior Framing 10 16AUG12 29AUG12 53
2012 2013J F M A M J J A S O N D J F M A M J J A S O N D JFEB
Pour Footings & Stem Walls
Strip Forms
Install Underslab Mechanical Piping
Install Underslab Plumbing
Install Underslab Electrical Conduits
Bkfl/Compact at Stem Walls
Vapor Barrier & Sand @ Slab-on-Grade
Rebar for Slab-on-grade
Pour Slab-on-Grade
Wall Framing
Roof Framing
Install Plywood Roof Sheathing
Form & Pour Mechanical & Electrical Pads
Exterior Framing
Set Solatube Curbs
Plywood Wall Sheathing
Install Drain & Plumbing Risers
Install Window Frames
Insulation Board
Install Exterior Door Frames
Flashings & Sealants
Set HVAC Units
Set Switchgear
Install Metal Roof
Install Solatubes
Glazing
Lath & Flashing for Plaster
Plaster
Construct Mechanical / Electrical Enclosures
Paint @ Exterior
Install MEP Hangers
Layout & Install Top Track
Insulation @ Roof Decks
Interior Framing
Sheet 21 of 43
Sheet 22 of 43
ActivityID
ActivityDescription
SUBAOrigDurTarget 1Orig Dur
RemDur% Early
StartEarlyFinish
TotalFloat
36580 Rough-in Fire Sprinkler Mains 6 22AUG12 29AUG12 50
36600 Rough-in Overhead Plumbing 3 30AUG12 03SEP12 50
36640 Set Interior Door & Window Frames 6 30AUG12 10SEP12 60
36660 Rough-in In-wall Plumbing 8 30AUG12 12SEP12 56
36700 Rough-in In-wall Electrical 10 30AUG12 14SEP12 54
36680 R-I Overhead Mechanical Units, Piping & Ducts 12 04SEP12 21SEP12 50
36720 Rough-in Overhead Electrical Conduits 8 13SEP12 24SEP12 50
36740 Install In-wall Insulation 2 17SEP12 18SEP12 54
Interior Finishes 37020 Drywall 5 25SEP12 01OCT12 50
37040 Tape & Finish Drywall 8 26SEP12 05OCT12 50
37080 Ceramic Tile 6 02OCT12 09OCT12 97
37100 Prime Paint 4 04OCT12 09OCT12 50
37120 Set Panelboards 2 08OCT12 09OCT12 65
37160 Install T-Bar Grid 4 10OCT12 15OCT12 81
37220 Pull wires & Terminate 8 10OCT12 19OCT12 65
37240 Install Cabinetry & Casework 10 10OCT12 23OCT12 50
37840 Install Solatube Drops & Diffusers 4 16OCT12 19OCT12 85
37280 Install Fire Sprinkler Drops & Heads 5 16OCT12 22OCT12 84
37300 Install Mechanical Drops, Grills & Registers 6 16OCT12 23OCT12 83
37340 Install Lighting & L.V. Electrical Devices 8 22OCT12 31OCT12 77
37380 Install Tack Wall / Vinyl Wall Panels 3 24OCT12 26OCT12 55
37260 Install Sinks 3 24OCT12 26OCT12 90
37400 Hang Doors 5 24OCT12 30OCT12 50
37420 Interior Glazing 3 31OCT12 02NOV12 50
37450 Install Door Hardware 5 31OCT12 06NOV12 80
37440 Install Acoustical Ceiling Panels 2 01NOV12 02NOV12 77
37480 Finish Paint 5 05NOV12 09NOV12 50
37540 Install Projection Screens / Projector Mounts 2 13NOV12 14NOV12 75
37560 Install Markerboards 2 13NOV12 14NOV12 75
37620 Install Plumbing Fixtures 4 13NOV12 16NOV12 74
37660 Finish Mechanical Controls 5 13NOV12 19NOV12 50
37680 Finish Electrical 5 13NOV12 19NOV12 50
37640 Polish Concrete Floor 5 13NOV12 19NOV12 72
37760 Toilet Accessories 2 19NOV12 20NOV12 74
37780 Touch-up Paint 3 20NOV12 26NOV12 72
2012 2013J F M A M J J A S O N D J F M A M J J A S O N D JFEB
Rough-in Fire Sprinkler Mains
Rough-in Overhead Plumbing
Set Interior Door & Window Frames
Rough-in In-wall Plumbing
Rough-in In-wall Electrical
R-I Overhead Mechanical Units, Piping & Ducts
Rough-in Overhead Electrical Conduits
Install In-wall Insulation
Drywall
Tape & Finish Drywall
Ceramic Tile
Prime Paint
Set Panelboards
Install T-Bar Grid
Pull wires & Terminate
Install Cabinetry & Casework
Install Solatube Drops & Diffusers
Install Fire Sprinkler Drops & Heads
Install Mechanical Drops, Grills & Registers
Install Lighting & L.V. Electrical Devices
Install Tack Wall / Vinyl Wall Panels
Install Sinks
Hang Doors
Interior Glazing
Install Door Hardware
Install Acoustical Ceiling Panels
Finish Paint
Install Projection Screens / Projector Mounts
Install Markerboards
Install Plumbing Fixtures
Finish Mechanical Controls
Finish Electrical
Polish Concrete Floor
Toilet Accessories
Touch-up Paint
Sheet 22 of 43
Sheet 23 of 43
ActivityID
ActivityDescription
SUBAOrigDurTarget 1Orig Dur
RemDur% Early
StartEarlyFinish
TotalFloat
Clean-up / Punchlist 39940 Start-up & Test Systems 10 20NOV12 05DEC12 50
39960 Clean-Up Bldg. G 3 27NOV12 29NOV12 72
39950 Commissioning 15 06DEC12 27DEC12 50
39980 Punchlist Bldg. G 10 28DEC12 11JAN13 50
Bldg. H - Exercise RoomsMilestones 40000 Start Bldg. H - Excercise Rooms 0 29MAY12 45
40010 Bldg. H - Excercise Rooms Duration 234* 29MAY12 01MAY13 45
44990 Bldg. H - Excercise Rooms Complete 0 01MAY13 45
Foundations / Underground 40100 Excavate Footings 5 29MAY12 04JUN12 45
40120 Rebar Footings & Stem Walls 12 08JUN12 25JUN12 45
40160 Form Footings & Stem Walls 10 18JUN12 29JUN12 45
40180 Install Electrical Sleeves 2 28JUN12 29JUN12 46
40200 Install Plumbing Sleeves 2 28JUN12 29JUN12 46
40320 Install Mechanical Sleeves 2 28JUN12 29JUN12 46
40140 Layout / Install Anchor Bolts 3 28JUN12 02JUL12 45
40220 Pour Footings & Stem Walls 5 03JUL12 10JUL12 45
40240 Strip Forms 2 11JUL12 12JUL12 56
40260 Install Underslab Plumbing 10 11JUL12 24JUL12 45
40280 Install Underslab Electrical Conduits 12 18JUL12 02AUG12 45
Structure / Slab-on-Grade 40520 Bkfl/Compact at Stem Walls 4 13JUL12 18JUL12 56
40540 Vapor Barrier & Sand @ Slabs-on-Grade 3 03AUG12 07AUG12 45
40560 Rebar for Slabs-on-grade 6 08AUG12 15AUG12 45
40580 Pour Slabs-on-Grade 3 16AUG12 20AUG12 45
40660 Erect. Align & Weld-out Structural Steel 12 21AUG12 07SEP12 45
40620 Wall Framing 18 10SEP12 03OCT12 45
40680 Roof Framing 15 26SEP12 16OCT12 45
40740 Install Plywood Roof Sheathing 7 17OCT12 25OCT12 45
Exterior 41000 Exterior Framing 12 17OCT12 01NOV12 53
41020 Set Roof Curbs 2 19OCT12 22OCT12 62
41040 Set HVAC Units 2 23OCT12 24OCT12 71
41080 Plywood Wall Sheathing 8 25OCT12 05NOV12 57
41060 Install Drain & Plumbing Risers 3 26OCT12 30OCT12 64
2012 2013J F M A M J J A S O N D J F M A M J J A S O N D JFEB
Start-up & Test Systems
Clean-Up Bldg. G
Commissioning
Punchlist Bldg. G
Start Bldg. H - Excercise Rooms
Bldg. H - Excercise Rooms DurationBldg. H - Excercise Rooms Complete
Excavate Footings
Rebar Footings & Stem Walls
Form Footings & Stem Walls
Install Electrical Sleeves
Install Plumbing Sleeves
Install Mechanical Sleeves
Layout / Install Anchor Bolts
Pour Footings & Stem Walls
Strip Forms
Install Underslab Plumbing
Install Underslab Electrical Conduits
Bkfl/Compact at Stem Walls
Vapor Barrier & Sand @ Slabs-on-Grade
Rebar for Slabs-on-grade
Pour Slabs-on-Grade
Erect. Align & Weld-out Structural Steel
Wall Framing
Roof Framing
Install Plywood Roof Sheathing
Exterior Framing
Set Roof Curbs
Set HVAC Units
Plywood Wall Sheathing
Install Drain & Plumbing Risers
Sheet 23 of 43
Sheet 24 of 43
ActivityID
ActivityDescription
SUBAOrigDurTarget 1Orig Dur
RemDur% Early
StartEarlyFinish
TotalFloat
41100 Install Window Frames 8 02NOV12 14NOV12 55
41120 Install Storefronts 10 02NOV12 16NOV12 53
41140 Insulation Board 3 06NOV12 08NOV12 60
41160 Install Exterior Door Frames 4 06NOV12 09NOV12 57
41180 Install Roofing System 5 09NOV12 16NOV12 60
41220 Flashings & Sealants 6 09NOV12 19NOV12 67
41400 Install Solatubes 2 19NOV12 20NOV12 112
41200 Glazing 8 19NOV12 30NOV12 53
41240 Lath & Flashing for Plaster 8 19NOV12 30NOV12 53
41260 Install Metal Roof 8 19NOV12 30NOV12 60
41280 Plaster 25 03DEC12 08JAN13 53
41340 Paint @ Exterior 4 09JAN13 14JAN13 97
Rough-ins 41620 Rough-in Partition Track 3 10SEP12 12SEP12 97
41500 Install MEP Hangers 3 26OCT12 30OCT12 45
41520 Layout & Install Top Track 3 31OCT12 02NOV12 45
41540 Insulation @ Metal Decks 4 05NOV12 08NOV12 49
41560 Interior Framing 15 05NOV12 28NOV12 45
41580 Rough-in Fire Sprinkler Mains 6 09NOV12 19NOV12 49
41600 Rough-in Overhead Plumbing 3 20NOV12 26NOV12 49
41640 Set Interior Door & Window Frames 6 29NOV12 06DEC12 56
41660 Rough-in In-wall Plumbing 10 29NOV12 12DEC12 50
41680 R-I Overhead Mechanical Units, Piping & Ducts 12 29NOV12 14DEC12 47
41700 Rough-in In-wall Electrical 15 29NOV12 19DEC12 45
41720 Rough-in Overhead Electrical Conduits 10 06DEC12 19DEC12 47
41740 Install In-wall Insulation 2 20DEC12 21DEC12 45
Interior Finishes 42000 Plywood @ Electrical Room 2 24DEC12 26DEC12 77
42020 Drywall 10 24DEC12 08JAN13 45
42040 Tape & Finish Drywall 15 28DEC12 18JAN13 45
42080 Ceramic Tile 18 09JAN13 01FEB13 75
42100 Prime Paint 4 17JAN13 22JAN13 45
42120 Set Panelboards 2 21JAN13 22JAN13 61
42060 Install Moveable Partition Wall 2 21JAN13 22JAN13 65
42050 Veneer Plaster @ Hard Lid Ceilings 8 21JAN13 30JAN13 59
42160 Install T-Bar Grid 2 23JAN13 24JAN13 71
42240 Install Cabinetry & Casework 10 23JAN13 05FEB13 45
2012 2013J F M A M J J A S O N D J F M A M J J A S O N D JFEB
Install Window Frames
Install Storefronts
Insulation Board
Install Exterior Door Frames
Install Roofing System
Flashings & Sealants
Install Solatubes
Glazing
Lath & Flashing for Plaster
Install Metal Roof
Plaster
Paint @ Exterior
Rough-in Partition Track
Install MEP Hangers
Layout & Install Top Track
Insulation @ Metal Decks
Interior Framing
Rough-in Fire Sprinkler Mains
Rough-in Overhead Plumbing
Set Interior Door & Window Frames
Rough-in In-wall Plumbing
R-I Overhead Mechanical Units, Piping & Ducts
Rough-in In-wall Electrical
Rough-in Overhead Electrical Conduits
Install In-wall Insulation
Plywood @ Electrical Room
Drywall
Tape & Finish Drywall
Ceramic Tile
Prime Paint
Set Panelboards
Install Moveable Partition Wall
Veneer Plaster @ Hard Lid Ceilings
Install T-Bar Grid
Install Cabinetry & Casework
Sheet 24 of 43
Sheet 25 of 43
ActivityID
ActivityDescription
SUBAOrigDurTarget 1Orig Dur
RemDur% Early
StartEarlyFinish
TotalFloat
42220 Pull wires & Terminate 10 23JAN13 05FEB13 61
42840 Install Solatube Drops & Diffusers 4 25JAN13 30JAN13 75
42280 Install Fire Sprinkler Drops & Heads 5 25JAN13 31JAN13 74
42300 Install Mechanical Drops, Grills & Registers 5 25JAN13 31JAN13 74
42400 Hang Doors 6 06FEB13 13FEB13 45
42340 Install Lighting & L.V. Electrical Devices 8 06FEB13 15FEB13 63
42420 Interior Glazing 4 14FEB13 19FEB13 45
42450 Install Door Hardware 6 14FEB13 21FEB13 66
42440 Install Acoustical Ceiling Panels 2 18FEB13 19FEB13 63
42480 Finish Paint 6 20FEB13 27FEB13 45
42540 Install Markerboards 2 28FEB13 01MAR13 60
42740 Install Roof Ladder & Hatch 2 28FEB13 01MAR13 60
42560 Install Drinking Fountains 2 28FEB13 01MAR13 63
42640 Polish Concrete Floor 5 28FEB13 06MAR13 57
42620 Install Plumbing Fixtures 6 28FEB13 07MAR13 57
42660 Finish Mechanical Controls 7 28FEB13 08MAR13 48
42680 Finish Electrical 10 28FEB13 13MAR13 45
42760 Toilet Partitions & Accessories 2 08MAR13 11MAR13 57
42780 Touch-up Paint 3 14MAR13 18MAR13 52
Clean-up / Punchlist 44940 Start-up & Test Systems 10 14MAR13 27MAR13 45
44960 Clean-Up Bldg. H 3 19MAR13 21MAR13 52
44950 Commissioning 15 28MAR13 17APR13 45
44980 Punchlist Bldg. H 10 18APR13 01MAY13 45
Bldg. J - RestroomsMilestones 50000 Start Bldg. J Middle School Restroom 0 30APR12 89
50010 Bldg. J Middle School Restroom Duration 118* 30APR12 16OCT12 108
54990 Bldg. J - Middle School Restroom Complete 0 16OCT12 108
Foundations / Underground 50100 Excavate Footings 3 30APR12 02MAY12 89
50120 Rebar Footings & Stem Walls 4 03MAY12 08MAY12 89
50160 Form Footings & Stem Walls 3 08MAY12 10MAY12 89
50180 Install Electrical Sleeves 2 09MAY12 10MAY12 90
50200 Install Plumbing Sleeves 2 09MAY12 10MAY12 90
50320 Install Mechanical Sleeves 2 09MAY12 10MAY12 90
50140 Layout / Install Anchor Bolts 2 10MAY12 11MAY12 89
2012 2013J F M A M J J A S O N D J F M A M J J A S O N D JFEB
Pull wires & Terminate
Install Solatube Drops & Diffusers
Install Fire Sprinkler Drops & HeadsInstall Mechanical Drops, Grills & Registers
Hang Doors
Install Lighting & L.V. Electrical Devices
Interior Glazing
Install Door Hardware
Install Acoustical Ceiling Panels
Finish Paint
Install Markerboards
Install Roof Ladder & Hatch
Install Drinking Fountains
Polish Concrete Floor
Install Plumbing Fixtures
Finish Mechanical Controls
Finish Electrical
Toilet Partitions & Accessories
Touch-up Paint
Start-up & Test Systems
Clean-Up Bldg. H
Commissioning
Punchlist Bldg. H
Start Bldg. J Middle School Restroom
Bldg. J Middle School Restroom Duration
Bldg. J - Middle School Restroom Complete
Excavate Footings
Rebar Footings & Stem Walls
Form Footings & Stem Walls
Install Electrical Sleeves
Install Plumbing Sleeves
Install Mechanical Sleeves
Layout / Install Anchor Bolts
Sheet 25 of 43
Sheet 26 of 43
ActivityID
ActivityDescription
SUBAOrigDurTarget 1Orig Dur
RemDur% Early
StartEarlyFinish
TotalFloat
50220 Pour Footings & Stem Walls 3 14MAY12 16MAY12 89
50240 Strip Forms 2 17MAY12 18MAY12 94
50260 Install Underslab Plumbing 5 17MAY12 23MAY12 89
50280 Install Underslab Electrical Conduits 6 22MAY12 30MAY12 89
Structure / Slab-on-Grade 50520 Bkfl/Compact at Stem Walls 2 21MAY12 22MAY12 94
50540 Vapor Barrier & Sand @ Slab-on-Grade 2 31MAY12 01JUN12 89
50560 Rebar for Slab-on-grade 2 04JUN12 05JUN12 89
50580 Pour Slab-on-Grade 3 06JUN12 08JUN12 89
50660 Wall Framing 6 11JUN12 18JUN12 89
50680 Roof Framing 4 25JUN12 28JUN12 89
50740 Install Plywood Roof Sheathing 3 29JUN12 03JUL12 89
Exterior 51060 Install Drain & Plumbing Risers 2 19JUN12 20JUN12 119
51080 Plywood Wall Sheathing 2 29JUN12 02JUL12 111
51100 Install Window Frames 2 03JUL12 05JUL12 136
51160 Install Exterior Door Frames 2 03JUL12 05JUL12 138
51020 Set Solatube Curbs & Roof Hatch Curb 2 05JUL12 06JUL12 89
51240 Lath & Flashing for Plaster 3 06JUL12 10JUL12 138
51200 Glazing 5 06JUL12 12JUL12 136
51140 Insulation Board 2 09JUL12 10JUL12 108
51220 Flashings & Sealants 2 11JUL12 12JUL12 114
51180 Install Roofing System 4 11JUL12 16JUL12 108
51280 Plaster 25 13JUL12 16AUG12 136
51400 Install Solatubes 2 17JUL12 18JUL12 110
51260 Install Metal Roof 4 17JUL12 20JUL12 108
51380 Tile @ Drinking Fountains 4 20JUL12 25JUL12 153
51420 Install Drinking Fountains 2 17AUG12 20AUG12 137
51340 Paint @ Exterior 3 17AUG12 21AUG12 136
Rough-ins 51540 Insulation @ Roof Decks 2 05JUL12 06JUL12 89
51560 Interior Framing 3 05JUL12 09JUL12 90
51580 Rough-in Fire Sprinkler 2 09JUL12 10JUL12 89
51700 Rough-in In-wall Electrical 2 10JUL12 11JUL12 113
51660 Rough-in In-wall Plumbing 6 10JUL12 17JUL12 109
51680 R-I Overhead Mechanical Units & Ducts 3 11JUL12 13JUL12 89
51740 Install In-wall Insulation 2 18JUL12 19JUL12 109
2012 2013J F M A M J J A S O N D J F M A M J J A S O N D JFEB
Pour Footings & Stem Walls
Strip Forms
Install Underslab Plumbing
Install Underslab Electrical Conduits
Bkfl/Compact at Stem Walls
Vapor Barrier & Sand @ Slab-on-Grade
Rebar for Slab-on-grade
Pour Slab-on-Grade
Wall Framing
Roof Framing
Install Plywood Roof Sheathing
Install Drain & Plumbing Risers
Plywood Wall Sheathing
Install Window Frames
Install Exterior Door Frames
Set Solatube Curbs & Roof Hatch Curb
Lath & Flashing for Plaster
Glazing
Insulation Board
Flashings & Sealants
Install Roofing System
Plaster
Install Solatubes
Install Metal Roof
Tile @ Drinking Fountains
Install Drinking Fountains
Paint @ Exterior
Insulation @ Roof Decks
Interior Framing
Rough-in Fire Sprinkler
Rough-in In-wall Electrical
Rough-in In-wall Plumbing
R-I Overhead Mechanical Units & Ducts
Install In-wall Insulation
Sheet 26 of 43
Sheet 27 of 43
ActivityID
ActivityDescription
SUBAOrigDurTarget 1Orig Dur
RemDur% Early
StartEarlyFinish
TotalFloat
Interior Finishes 52020 Drywall 3 23JUL12 25JUL12 108
52040 Tape & Finish Drywall 5 24JUL12 30JUL12 113
52080 Ceramic Tile 10 26JUL12 08AUG12 108
52100 Prime Paint 2 31JUL12 01AUG12 113
52220 Pull wires & Terminate 3 31JUL12 02AUG12 119
52280 Install Fire Sprinkler Heads 2 02AUG12 03AUG12 145
52600 Install Solatube Diffusers 2 02AUG12 03AUG12 145
52340 Install Lighting & L.V. Electrical Devices 3 03AUG12 07AUG12 143
52400 Hang Doors 2 09AUG12 10AUG12 108
52450 Install Door Hardware 2 13AUG12 14AUG12 138
52480 Finish Paint 5 13AUG12 17AUG12 108
52740 Install Roof Ladder & Hatch 2 20AUG12 21AUG12 133
52660 Finish Mechanical Controls 5 20AUG12 24AUG12 108
52680 Finish Electrical 5 20AUG12 24AUG12 108
52620 Install Plumbing Fixtures 6 20AUG12 27AUG12 125
52760 Toilet Accessories 4 28AUG12 31AUG12 125
52780 Touch-up Paint 3 03SEP12 07SEP12 125
Clean-up / Punchlist 54940 Start-up & Test Systems 10 27AUG12 11SEP12 108
54960 Clean-Up Bldg. J 3 10SEP12 12SEP12 125
54950 Commissioning 15 12SEP12 02OCT12 108
54980 Punchlist Bldg. J 10 03OCT12 16OCT12 108
Bldg. K - RestroomsMilestones 55000 Start Bldg. K Middle School Restroom 0 14MAY12 79
55010 Bldg. K Middle School Restroom Duration 118* 14MAY12 30OCT12 98
59990 Bldg. K - Middle School Restroom Complete 0 30OCT12 98
Foundations / Underground 55100 Excavate Footings 3 14MAY12 16MAY12 79
55120 Rebar Footings & Stem Walls 4 17MAY12 22MAY12 79
55160 Form Footings & Stem Walls 3 22MAY12 24MAY12 79
55180 Install Electrical Sleeves 2 23MAY12 24MAY12 80
55200 Install Plumbing Sleeves 2 23MAY12 24MAY12 80
55320 Install Mechanical Sleeves 2 23MAY12 24MAY12 80
55140 Layout / Install Anchor Bolts 2 24MAY12 25MAY12 79
55220 Pour Footings & Stem Walls 3 29MAY12 31MAY12 79
2012 2013J F M A M J J A S O N D J F M A M J J A S O N D JFEB
Drywall
Tape & Finish Drywall
Ceramic Tile
Prime Paint
Pull wires & Terminate
Install Fire Sprinkler Heads
Install Solatube Diffusers
Install Lighting & L.V. Electrical Devices
Hang Doors
Install Door Hardware
Finish Paint
Install Roof Ladder & Hatch
Finish Mechanical Controls
Finish Electrical
Install Plumbing Fixtures
Toilet Accessories
Touch-up Paint
Start-up & Test Systems
Clean-Up Bldg. J
Commissioning
Punchlist Bldg. J
Start Bldg. K Middle School Restroom
Bldg. K Middle School Restroom Duration
Bldg. K - Middle School Restroom Complete
Excavate Footings
Rebar Footings & Stem Walls
Form Footings & Stem Walls
Install Electrical Sleeves
Install Plumbing Sleeves
Install Mechanical Sleeves
Layout / Install Anchor Bolts
Pour Footings & Stem Walls
Sheet 27 of 43
Sheet 28 of 43
ActivityID
ActivityDescription
SUBAOrigDurTarget 1Orig Dur
RemDur% Early
StartEarlyFinish
TotalFloat
55240 Strip Forms 2 01JUN12 04JUN12 84
55260 Install Underslab Plumbing 5 01JUN12 07JUN12 79
55280 Install Underslab Electrical Conduits 6 06JUN12 13JUN12 79
Structure / Slab-on-Grade 55520 Bkfl/Compact at Stem Walls 2 05JUN12 06JUN12 84
55540 Vapor Barrier & Sand @ Slab-on-Grade 2 14JUN12 15JUN12 79
55560 Rebar for Slab-on-grade 2 18JUN12 19JUN12 79
55580 Pour Slab-on-Grade 3 20JUN12 22JUN12 79
55660 Wall Framing 6 25JUN12 02JUL12 79
55680 Roof Framing 4 10JUL12 13JUL12 79
55740 Install Plywood Roof Sheathing 3 16JUL12 18JUL12 79
Exterior 56060 Install Drain & Plumbing Risers 2 03JUL12 05JUL12 109
56080 Plywood Wall Sheathing 2 16JUL12 17JUL12 101
56100 Install Window Frames 2 18JUL12 19JUL12 126
56160 Install Exterior Door Frames 2 18JUL12 19JUL12 128
56020 Set Solatube Mounts & Roof Hatch Curb 2 19JUL12 20JUL12 79
56240 Lath & Flashing for Plaster 3 20JUL12 24JUL12 128
56200 Glazing 5 20JUL12 26JUL12 126
56140 Insulation Board 2 23JUL12 24JUL12 98
56220 Flashings & Sealants 2 25JUL12 26JUL12 104
56180 Install Roofing System 4 25JUL12 30JUL12 98
56280 Plaster 25 27JUL12 30AUG12 126
56400 Install Solatubes 2 31JUL12 01AUG12 100
56260 Install Metal Roof 4 31JUL12 03AUG12 98
56380 Tile @ Drinking Fountains 4 03AUG12 08AUG12 143
56420 Install Drinking Fountains 2 31AUG12 03SEP12 127
56340 Paint @ Exterior 3 31AUG12 04SEP12 126
Rough-ins 56540 Insulation @ Roof Decks 2 19JUL12 20JUL12 79
56560 Interior Framing 3 19JUL12 23JUL12 80
56580 Rough-in Fire Sprinkler 2 23JUL12 24JUL12 79
56700 Rough-in In-wall Electrical 2 24JUL12 25JUL12 103
56660 Rough-in In-wall Plumbing 6 24JUL12 31JUL12 99
56680 R-I Overhead Mechanical Units & Ducts 3 25JUL12 27JUL12 79
56740 Install In-wall Insulation 2 01AUG12 02AUG12 99
2012 2013J F M A M J J A S O N D J F M A M J J A S O N D JFEB
Strip Forms
Install Underslab Plumbing
Install Underslab Electrical Conduits
Bkfl/Compact at Stem Walls
Vapor Barrier & Sand @ Slab-on-Grade
Rebar for Slab-on-grade
Pour Slab-on-Grade
Wall Framing
Roof Framing
Install Plywood Roof Sheathing
Install Drain & Plumbing Risers
Plywood Wall Sheathing
Install Window Frames
Install Exterior Door Frames
Set Solatube Mounts & Roof Hatch Curb
Lath & Flashing for Plaster
Glazing
Insulation Board
Flashings & Sealants
Install Roofing System
Plaster
Install Solatubes
Install Metal Roof
Tile @ Drinking Fountains
Install Drinking Fountains
Paint @ Exterior
Insulation @ Roof Decks
Interior Framing
Rough-in Fire Sprinkler
Rough-in In-wall Electrical
Rough-in In-wall Plumbing
R-I Overhead Mechanical Units & Ducts
Install In-wall Insulation
Sheet 28 of 43
Sheet 29 of 43
ActivityID
ActivityDescription
SUBAOrigDurTarget 1Orig Dur
RemDur% Early
StartEarlyFinish
TotalFloat
Interior Finishes 57020 Drywall 3 06AUG12 08AUG12 98
57040 Tape & Finish Drywall 5 07AUG12 13AUG12 103
57080 Ceramic Tile 10 09AUG12 22AUG12 98
57100 Prime Paint 2 14AUG12 15AUG12 103
57220 Pull wires & Terminate 3 14AUG12 16AUG12 109
57280 Install Fire Sprinkler Heads 2 16AUG12 17AUG12 135
57600 Install Solatube Diffusers 2 16AUG12 17AUG12 135
57340 Install Lighting & L.V. Electrical Devices 3 17AUG12 21AUG12 133
57400 Hang Doors 2 23AUG12 24AUG12 98
57450 Install Door Hardware 2 27AUG12 28AUG12 128
57480 Finish Paint 5 27AUG12 31AUG12 98
57740 Install Roof Ladder & Hatch 2 03SEP12 04SEP12 123
57660 Finish Mechanical Controls 5 03SEP12 11SEP12 98
57680 Finish Electrical 5 03SEP12 11SEP12 98
57620 Install Plumbing Fixtures 6 03SEP12 12SEP12 115
57760 Toilet Accessories 4 13SEP12 18SEP12 115
57780 Touch-up Paint 3 19SEP12 21SEP12 115
Clean-up / Punchlist 59940 Start-up & Test Systems 10 12SEP12 25SEP12 98
59960 Clean-Up Bldg. K 3 24SEP12 26SEP12 115
59950 Commissioning 15 26SEP12 16OCT12 98
59980 Punchlist Bldg. K 10 17OCT12 30OCT12 98
Bldg. L - Administration - Elementary SchoolMilestones 60000 Start Bldg. L - Elementary School Administration 0 16APR12 25
60010 Bldg. L - Elementary School Admin. Duration 238* 16APR12 26MAR13 81
64990 Bldg. L - Elementary School Admin. Complete 0 26MAR13 81
Foundations / Underground 60100 Excavate Footings 5 16APR12 20APR12 81
60120 Rebar Footings & Stem Walls 10 17APR12 30APR12 81
60160 Form Footings & Stem Walls 8 26APR12 07MAY12 81
60140 Layout / Install Anchor Bolts 5 02MAY12 08MAY12 81
60180 Install Electrical Sleeves 2 04MAY12 07MAY12 82
60200 Install Plumbing Sleeves 2 04MAY12 07MAY12 82
60320 Install Mechanical Sleeves 2 04MAY12 07MAY12 82
60220 Pour Footings & Stem Walls 5 09MAY12 15MAY12 81
2012 2013J F M A M J J A S O N D J F M A M J J A S O N D JFEB
Drywall
Tape & Finish Drywall
Ceramic Tile
Prime Paint
Pull wires & Terminate
Install Fire Sprinkler Heads
Install Solatube Diffusers
Install Lighting & L.V. Electrical Devices
Hang Doors
Install Door Hardware
Finish Paint
Install Roof Ladder & Hatch
Finish Mechanical Controls
Finish Electrical
Install Plumbing Fixtures
Toilet Accessories
Touch-up Paint
Start-up & Test Systems
Clean-Up Bldg. K
Commissioning
Punchlist Bldg. K
Start Bldg. L - Elementary School Administration
Bldg. L - Elementary School Admin. DurationBldg. L - Elementary School Admin. Complete
Excavate Footings
Rebar Footings & Stem Walls
Form Footings & Stem Walls
Layout / Install Anchor Bolts
Install Electrical Sleeves
Install Plumbing Sleeves
Install Mechanical Sleeves
Pour Footings & Stem Walls
Sheet 29 of 43
Sheet 30 of 43
ActivityID
ActivityDescription
SUBAOrigDurTarget 1Orig Dur
RemDur% Early
StartEarlyFinish
TotalFloat
60240 Strip Forms 3 16MAY12 18MAY12 88
60260 Install Underslab Plumbing 10 16MAY12 30MAY12 81
60280 Install Underslab Electrical Conduits 12 21MAY12 06JUN12 81
Structure / Slab-on-Grade 60520 Bkfl/Compact at Stem Walls 5 21MAY12 25MAY12 88
60540 Vapor Barrier & Sand @ Slabs-on-Grade 3 07JUN12 11JUN12 81
60560 Rebar for Slabs-on-grade 6 12JUN12 19JUN12 81
60580 Pour Slabs-on-Grade 3 20JUN12 22JUN12 81
60660 Erect. Align & Weld-out Structural Steel 15 25JUN12 16JUL12 81
60620 Wall Framing 18 17JUL12 09AUG12 81
60680 Roof Framing 12 02AUG12 17AUG12 81
60740 Install Plywood Roof Sheathing 8 20AUG12 29AUG12 81
Exterior 61050 Set Switchgear 2 25JUN12 26JUN12 106
61000 Exterior Framing 15 20AUG12 11SEP12 95
61020 Set Roof Curbs 4 22AUG12 27AUG12 96
61040 Set HVAC Units 2 28AUG12 29AUG12 111
61080 Plywood Wall Sheathing 10 29AUG12 13SEP12 99
61060 Install Drain & Plumbing Risers 2 30AUG12 31AUG12 106
61100 Install Window Frames 10 12SEP12 25SEP12 95
61120 Install Storefronts 10 12SEP12 25SEP12 95
61140 Insulation Board 3 14SEP12 18SEP12 99
61160 Install Exterior Door Frames 4 14SEP12 19SEP12 99
61180 Install Roofing System 6 19SEP12 26SEP12 99
61220 Flashings & Sealants 6 19SEP12 26SEP12 109
61200 Glazing 5 26SEP12 02OCT12 98
61240 Lath & Flashing for Plaster 8 26SEP12 05OCT12 95
61260 Install Metal Roof 10 27SEP12 10OCT12 99
61280 Plaster 25 08OCT12 09NOV12 95
61400 Install Solatubes 4 11OCT12 16OCT12 156
61340 Paint @ Exterior 4 13NOV12 16NOV12 159
Rough-ins 61500 Install MEP Hangers 3 30AUG12 03SEP12 81
61520 Layout & Install Top Track 4 04SEP12 11SEP12 81
61540 Insulation @ Metal Decks 4 12SEP12 17SEP12 83
61560 Interior Framing 20 12SEP12 09OCT12 81
61580 Rough-in Fire Sprinkler Mains 10 18SEP12 01OCT12 83
2012 2013J F M A M J J A S O N D J F M A M J J A S O N D JFEB
Strip Forms
Install Underslab Plumbing
Install Underslab Electrical Conduits
Bkfl/Compact at Stem Walls
Vapor Barrier & Sand @ Slabs-on-Grade
Rebar for Slabs-on-grade
Pour Slabs-on-Grade
Erect. Align & Weld-out Structural Steel
Wall Framing
Roof Framing
Install Plywood Roof Sheathing
Set Switchgear
Exterior Framing
Set Roof Curbs
Set HVAC Units
Plywood Wall Sheathing
Install Drain & Plumbing Risers
Install Window Frames
Install Storefronts
Insulation Board
Install Exterior Door Frames
Install Roofing System
Flashings & Sealants
Glazing
Lath & Flashing for Plaster
Install Metal Roof
Plaster
Install Solatubes
Paint @ Exterior
Install MEP Hangers
Layout & Install Top Track
Insulation @ Metal Decks
Interior Framing
Rough-in Fire Sprinkler Mains
Sheet 30 of 43
Sheet 31 of 43
ActivityID
ActivityDescription
SUBAOrigDurTarget 1Orig Dur
RemDur% Early
StartEarlyFinish
TotalFloat
61600 Rough-in Overhead Plumbing 6 02OCT12 09OCT12 83
61640 Set Interior Door & Window Frames 8 10OCT12 19OCT12 92
61680 R-I Overhead Mechanical Units, Piping & Ducts 12 10OCT12 25OCT12 83
61660 Rough-in In-wall Plumbing 12 10OCT12 25OCT12 84
61700 Rough-in In-wall Electrical 15 10OCT12 30OCT12 81
61720 Rough-in Overhead Electrical Conduits 12 17OCT12 01NOV12 83
61740 Install In-wall Insulation 4 31OCT12 05NOV12 81
Interior Finishes 62000 Plywood @ Electrical Room 2 06NOV12 07NOV12 120
62020 Drywall 12 06NOV12 26NOV12 81
62040 Tape & Finish Drywall 15 09NOV12 04DEC12 81
62080 Ceramic Tile 12 27NOV12 12DEC12 136
62120 Set Panelboards 2 05DEC12 06DEC12 104
62100 Prime Paint 4 05DEC12 10DEC12 81
62220 Pull wires & Terminate 10 07DEC12 20DEC12 104
62160 Install T-Bar Grid 4 11DEC12 14DEC12 120
62240 Install Cabinetry & Casework 15 11DEC12 02JAN13 81
62280 Install Fire Sprinkler Drops & Heads 6 17DEC12 24DEC12 124
62300 Install Mechanical Drops, Grills & Registers 6 17DEC12 24DEC12 124
62840 Install Solatube Drops & Diffusers 6 17DEC12 24DEC12 124
62340 Install Lighting & L.V. Electrical Devices 10 21DEC12 07JAN13 116
62380 Install Tack Wall / Vinyl Wall Panels 3 03JAN13 07JAN13 89
62400 Hang Doors 6 03JAN13 10JAN13 81
62440 Install Acoustical Ceiling Panels 2 08JAN13 09JAN13 116
62420 Interior Glazing 5 11JAN13 17JAN13 81
62450 Install Door Hardware 6 11JAN13 18JAN13 115
62480 Finish Paint 5 18JAN13 24JAN13 81
62560 Install Drinking Fountains 2 25JAN13 28JAN13 112
62540 Install Projection Screens / Projector Mounts 3 25JAN13 29JAN13 108
62740 Install Roof Ladder & Hatch 4 25JAN13 30JAN13 107
62620 Install Plumbing Fixtures 5 25JAN13 31JAN13 107
62660 Finish Mechanical Controls 6 25JAN13 01FEB13 83
62640 Install Flooring 6 25JAN13 01FEB13 105
62680 Finish Electrical 8 25JAN13 05FEB13 81
62760 Toilet Partitions & Accessories 2 01FEB13 04FEB13 107
62780 Touch-up Paint 3 06FEB13 08FEB13 103
2012 2013J F M A M J J A S O N D J F M A M J J A S O N D JFEB
Rough-in Overhead Plumbing
Set Interior Door & Window Frames
R-I Overhead Mechanical Units, Piping & Ducts
Rough-in In-wall Plumbing
Rough-in In-wall Electrical
Rough-in Overhead Electrical Conduits
Install In-wall Insulation
Plywood @ Electrical Room
Drywall
Tape & Finish Drywall
Ceramic Tile
Set Panelboards
Prime Paint
Pull wires & Terminate
Install T-Bar Grid
Install Cabinetry & Casework
Install Fire Sprinkler Drops & Heads
Install Mechanical Drops, Grills & Registers
Install Solatube Drops & Diffusers
Install Lighting & L.V. Electrical Devices
Install Tack Wall / Vinyl Wall Panels
Hang Doors
Install Acoustical Ceiling Panels
Interior Glazing
Install Door Hardware
Finish Paint
Install Drinking Fountains
Install Projection Screens / Projector Mounts
Install Roof Ladder & Hatch
Install Plumbing Fixtures
Finish Mechanical Controls
Install Flooring
Finish Electrical
Toilet Partitions & Accessories
Touch-up Paint
Sheet 31 of 43
Sheet 32 of 43
ActivityID
ActivityDescription
SUBAOrigDurTarget 1Orig Dur
RemDur% Early
StartEarlyFinish
TotalFloat
Clean-up / Punchlist 64940 Start-up & Test Systems 10 06FEB13 19FEB13 81
64960 Clean-Up Bldg. L 3 11FEB13 13FEB13 103
64950 Commissioning 15 20FEB13 12MAR13 81
64980 Punchlist Bldg. L 10 13MAR13 26MAR13 81
Bldg. M - KindergartenMilestones 65000 Start Bldg. M - Kindergarten 0 23APR12 25
65010 Bldg. M - Kindergarten Duration 239* 23APR12 03APR13 25
69990 Bldg. M - Kindergarten Complete 0 03APR13 25
Foundations / Underground 65100 Excavate Footings 5 23APR12 27APR12 25
65120 Rebar Footings & Stem Walls 10 26APR12 09MAY12 25
65160 Form Footings & Stem Walls 8 02MAY12 11MAY12 27
65180 Install Electrical Sleeves 2 10MAY12 11MAY12 28
65200 Install Plumbing Sleeves 2 10MAY12 11MAY12 28
65320 Install Mechanical Sleeves 2 10MAY12 11MAY12 28
65140 Layout / Install Anchor Bolts 5 10MAY12 16MAY12 25
65220 Pour Footings & Stem Walls 5 17MAY12 23MAY12 25
65240 Strip Forms 2 24MAY12 25MAY12 35
65260 Install Underslab Plumbing 10 24MAY12 07JUN12 25
65280 Install Underslab Electrical Conduits 12 01JUN12 18JUN12 25
Structure / Slab-on-Grade 65520 Bkfl/Compact at Stem Walls 5 29MAY12 04JUN12 35
65540 Vapor Barrier & Sand @ Slabs-on-Grade 3 19JUN12 21JUN12 25
65560 Rebar for Slabs-on-grade 5 22JUN12 28JUN12 25
65580 Pour Slabs-on-Grade 3 29JUN12 03JUL12 25
65660 Erect. Align & Weld-out Structural Steel 15 05JUL12 25JUL12 25
65620 Wall Framing 18 26JUL12 20AUG12 25
65680 Roof Framing 12 13AUG12 28AUG12 25
65740 Install Plywood Roof Sheathing 10 29AUG12 13SEP12 25
65600 Form & Pour Mechanical & Electrical Pads 3 25SEP12 27SEP12 33
Exterior 66000 Exterior Framing 15 29AUG12 20SEP12 33
66020 Set Roof Curbs 2 31AUG12 03SEP12 44
66080 Plywood Wall Sheathing 8 13SEP12 24SEP12 33
66060 Install Drain & Plumbing Risers 2 14SEP12 17SEP12 54
2012 2013J F M A M J J A S O N D J F M A M J J A S O N D JFEB
Start-up & Test Systems
Clean-Up Bldg. L
Commissioning
Punchlist Bldg. L
Start Bldg. M - Kindergarten
Bldg. M - Kindergarten Duration
Bldg. M - Kindergarten Complete
Excavate Footings
Rebar Footings & Stem Walls
Form Footings & Stem Walls
Install Electrical Sleeves
Install Plumbing Sleeves
Install Mechanical Sleeves
Layout / Install Anchor Bolts
Pour Footings & Stem Walls
Strip Forms
Install Underslab Plumbing
Install Underslab Electrical Conduits
Bkfl/Compact at Stem Walls
Vapor Barrier & Sand @ Slabs-on-Grade
Rebar for Slabs-on-grade
Pour Slabs-on-Grade
Erect. Align & Weld-out Structural Steel
Wall Framing
Roof Framing
Install Plywood Roof Sheathing
Form & Pour Mechanical & Electrical Pads
Exterior Framing
Set Roof Curbs
Plywood Wall Sheathing
Install Drain & Plumbing Risers
Sheet 32 of 43
Sheet 33 of 43
ActivityID
ActivityDescription
SUBAOrigDurTarget 1Orig Dur
RemDur% Early
StartEarlyFinish
TotalFloat
66120 Install Storefronts 5 21SEP12 27SEP12 88
66100 Install Window Frames 6 21SEP12 28SEP12 87
66140 Insulation Board 3 25SEP12 27SEP12 49
66160 Install Exterior Door Frames 4 25SEP12 28SEP12 87
66050 Set Switchgear 2 28SEP12 01OCT12 33
66040 Set HVAC Units 2 28SEP12 01OCT12 40
66180 Install Roofing System 6 28SEP12 05OCT12 49
66220 Flashings & Sealants 6 28SEP12 05OCT12 133
66200 Glazing 5 01OCT12 05OCT12 90
66240 Lath & Flashing for Plaster 8 01OCT12 10OCT12 87
66400 Install Solatubes 6 08OCT12 15OCT12 109
66280 Plaster 25 11OCT12 15NOV12 87
66380 Construct Mechanical / Electrical Enclosures 8 16NOV12 29NOV12 97
66340 Paint @ Exterior 5 30NOV12 06DEC12 97
Rough-ins 66500 Install MEP Hangers 3 14SEP12 18SEP12 25
66520 Layout & Install Top Track 5 19SEP12 25SEP12 25
66540 Insulation @ Metal Decks 4 26SEP12 01OCT12 26
66560 Interior Framing 10 26SEP12 09OCT12 25
66580 Rough-in Fire Sprinkler Mains 8 02OCT12 11OCT12 26
66640 Set Interior Door & Window Frames 6 10OCT12 17OCT12 41
66660 Rough-in In-wall Plumbing 12 10OCT12 25OCT12 33
66700 Rough-in In-wall Electrical 20 10OCT12 06NOV12 25
66600 Rough-in Overhead Plumbing 6 12OCT12 19OCT12 26
66680 R-I Overhead Mechanical Units, Piping & Ducts 12 22OCT12 06NOV12 26
66720 Rough-in Overhead Electrical Conduits 8 29OCT12 07NOV12 26
66740 Install In-wall Insulation 2 07NOV12 08NOV12 25
Interior Finishes 67000 Plywood @ Electrical Room 2 09NOV12 13NOV12 67
67020 Drywall 12 09NOV12 29NOV12 25
67040 Tape & Finish Drywall 20 15NOV12 14DEC12 25
67080 Ceramic Tile 12 30NOV12 17DEC12 84
67120 Set Panelboards 2 17DEC12 18DEC12 46
67100 Prime Paint 4 17DEC12 20DEC12 25
67220 Pull wires & Terminate 8 19DEC12 31DEC12 46
67160 Install T-Bar Grid 4 21DEC12 27DEC12 64
67240 Install Cabinetry & Casework 12 21DEC12 09JAN13 25
2012 2013J F M A M J J A S O N D J F M A M J J A S O N D JFEB
Install Storefronts
Install Window Frames
Insulation Board
Install Exterior Door Frames
Set Switchgear
Set HVAC Units
Install Roofing System
Flashings & Sealants
Glazing
Lath & Flashing for Plaster
Install Solatubes
Plaster
Construct Mechanical / Electrical Enclosures
Paint @ Exterior
Install MEP Hangers
Layout & Install Top Track
Insulation @ Metal Decks
Interior Framing
Rough-in Fire Sprinkler Mains
Set Interior Door & Window Frames
Rough-in In-wall Plumbing
Rough-in In-wall Electrical
Rough-in Overhead Plumbing
R-I Overhead Mechanical Units, Piping & Ducts
Rough-in Overhead Electrical Conduits
Install In-wall Insulation
Plywood @ Electrical Room
Drywall
Tape & Finish Drywall
Ceramic Tile
Set Panelboards
Prime Paint
Pull wires & Terminate
Install T-Bar Grid
Install Cabinetry & Casework
Sheet 33 of 43
Sheet 34 of 43
ActivityID
ActivityDescription
SUBAOrigDurTarget 1Orig Dur
RemDur% Early
StartEarlyFinish
TotalFloat
67280 Install Fire Sprinkler Drops & Heads 5 28DEC12 04JAN13 67
67840 Install Solatube Drops & Diffusers 7 28DEC12 08JAN13 65
67300 Install Mechanical Drops, Grills & Registers 8 28DEC12 09JAN13 64
67340 Install Lighting & L.V. Electrical Devices 8 02JAN13 11JAN13 62
67380 Install Tack Wall / Vinyl Wall Panels 3 10JAN13 14JAN13 32
67400 Hang Doors 6 10JAN13 17JAN13 25
67440 Install Acoustical Ceiling Panels 2 14JAN13 15JAN13 62
67420 Interior Glazing 4 18JAN13 23JAN13 25
67450 Install Door Hardware 5 18JAN13 24JAN13 61
67480 Finish Paint 5 24JAN13 30JAN13 25
67540 Install Projection Screens / Projector Mounts 2 31JAN13 01FEB13 55
67740 Install Roof Ladder & Hatch 2 31JAN13 01FEB13 55
67560 Install Drinking Fountains 2 31JAN13 01FEB13 58
67620 Install Plumbing Fixtures 4 31JAN13 05FEB13 54
67640 Install Flooring 6 31JAN13 07FEB13 51
67660 Finish Mechanical Controls 8 31JAN13 11FEB13 27
67680 Finish Electrical 10 31JAN13 13FEB13 25
67760 Toilet Partitions & Accessories 2 06FEB13 07FEB13 54
67780 Touch-up Paint 3 14FEB13 18FEB13 47
Clean-up / Punchlist 69940 Start-up & Test Systems 10 14FEB13 27FEB13 25
69960 Clean-Up Bldg. M 3 19FEB13 21FEB13 47
69950 Commissioning 15 28FEB13 20MAR13 25
69980 Punchlist Bldg. M 10 21MAR13 03APR13 25
Bldg. N - ClassroomMilestones 70000 Start Bldg. N - Elem. School Classroom 0 05JUN12 45
70010 Bldg. N - Elem. School Classroom Duration 172* 05JUN12 11FEB13 62
74990 Bldg. N - Elem. School Classroom Complete 0 11FEB13 62
Foundations / Underground 70100 Excavate Footings 5 05JUN12 11JUN12 62
70120 Rebar Footings & Stem Walls 10 06JUN12 19JUN12 62
70160 Form Footings & Stem Walls 6 14JUN12 21JUN12 63
70180 Install Electrical Sleeves 2 20JUN12 21JUN12 64
70200 Install Plumbing Sleeves 2 20JUN12 21JUN12 64
70320 Install Mechanical Sleeves 2 20JUN12 21JUN12 64
70140 Layout / Install Anchor Bolts 4 20JUN12 25JUN12 62
2012 2013J F M A M J J A S O N D J F M A M J J A S O N D JFEB
Install Fire Sprinkler Drops & Heads
Install Solatube Drops & Diffusers
Install Mechanical Drops, Grills & Registers
Install Lighting & L.V. Electrical Devices
Install Tack Wall / Vinyl Wall Panels
Hang Doors
Install Acoustical Ceiling Panels
Interior Glazing
Install Door Hardware
Finish Paint
Install Projection Screens / Projector Mounts
Install Roof Ladder & Hatch
Install Drinking Fountains
Install Plumbing Fixtures
Install Flooring
Finish Mechanical Controls
Finish Electrical
Toilet Partitions & Accessories
Touch-up Paint
Start-up & Test Systems
Clean-Up Bldg. M
Commissioning
Punchlist Bldg. M
Start Bldg. N - Elem. School Classroom
Bldg. N - Elem. School Classroom DurationBldg. N - Elem. School Classroom Complete
Excavate Footings
Rebar Footings & Stem Walls
Form Footings & Stem Walls
Install Electrical Sleeves
Install Plumbing Sleeves
Install Mechanical Sleeves
Layout / Install Anchor Bolts
Sheet 34 of 43
Sheet 35 of 43
ActivityID
ActivityDescription
SUBAOrigDurTarget 1Orig Dur
RemDur% Early
StartEarlyFinish
TotalFloat
70220 Pour Footings & Stem Walls 4 26JUN12 29JUN12 62
70240 Strip Forms 2 02JUL12 03JUL12 66
70300 Install Underslab Mechanical Piping 3 02JUL12 05JUL12 68
70260 Install Underslab Plumbing 5 02JUL12 09JUL12 62
70280 Install Underslab Electrical Conduits 6 06JUL12 13JUL12 62
Structure / Slab-on-Grade 70520 Bkfl/Compact at Stem Walls 3 05JUL12 09JUL12 66
70540 Vapor Barrier & Sand @ Slab-on-Grade 4 16JUL12 19JUL12 62
70560 Rebar for Slab-on-grade 5 20JUL12 26JUL12 62
70580 Pour Slab-on-Grade 3 27JUL12 31JUL12 62
70660 Wall Framing 15 01AUG12 21AUG12 62
70680 Roof Framing 8 15AUG12 24AUG12 62
70740 Install Plywood Roof Sheathing 5 27AUG12 31AUG12 62
70600 Form & Pour Mechanical & Electrical Pads 3 14SEP12 18SEP12 72
Exterior 71000 Exterior Framing 10 27AUG12 11SEP12 72
71020 Set Solatube Curbs 3 29AUG12 31AUG12 73
71060 Install Drain & Plumbing Risers 2 03SEP12 04SEP12 86
71080 Plywood Wall Sheathing 6 04SEP12 13SEP12 72
71100 Install Window Frames 12 12SEP12 27SEP12 98
71140 Insulation Board 3 14SEP12 18SEP12 81
71160 Install Exterior Door Frames 4 14SEP12 19SEP12 104
71220 Flashings & Sealants 6 14SEP12 21SEP12 82
71040 Set HVAC Units 2 19SEP12 20SEP12 72
71050 Set Switchgear 2 19SEP12 20SEP12 73
71260 Install Metal Roof 4 19SEP12 24SEP12 81
71400 Install Solatubes 4 25SEP12 28SEP12 121
71200 Glazing 5 28SEP12 04OCT12 101
71240 Lath & Flashing for Plaster 8 28SEP12 09OCT12 98
71280 Plaster 25 10OCT12 14NOV12 98
71380 Construct Mechanical / Electrical Enclosures 8 15NOV12 28NOV12 98
71340 Paint @ Exterior 5 29NOV12 05DEC12 98
Rough-ins 71500 Install MEP Hangers 4 03SEP12 10SEP12 62
71520 Layout & Install Top Track 3 11SEP12 13SEP12 62
71540 Insulation @ Roof Decks 4 14SEP12 19SEP12 62
71560 Interior Framing 10 14SEP12 27SEP12 65
2012 2013J F M A M J J A S O N D J F M A M J J A S O N D JFEB
Pour Footings & Stem Walls
Strip Forms
Install Underslab Mechanical Piping
Install Underslab Plumbing
Install Underslab Electrical Conduits
Bkfl/Compact at Stem Walls
Vapor Barrier & Sand @ Slab-on-Grade
Rebar for Slab-on-grade
Pour Slab-on-Grade
Wall Framing
Roof Framing
Install Plywood Roof Sheathing
Form & Pour Mechanical & Electrical Pads
Exterior Framing
Set Solatube Curbs
Install Drain & Plumbing Risers
Plywood Wall Sheathing
Install Window Frames
Insulation Board
Install Exterior Door Frames
Flashings & Sealants
Set HVAC Units
Set Switchgear
Install Metal Roof
Install Solatubes
Glazing
Lath & Flashing for Plaster
Plaster
Construct Mechanical / Electrical Enclosures
Paint @ Exterior
Install MEP Hangers
Layout & Install Top Track
Insulation @ Roof Decks
Interior Framing
Sheet 35 of 43
Sheet 36 of 43
ActivityID
ActivityDescription
SUBAOrigDurTarget 1Orig Dur
RemDur% Early
StartEarlyFinish
TotalFloat
71580 Rough-in Fire Sprinkler Mains 6 20SEP12 27SEP12 62
71600 Rough-in Overhead Plumbing 3 28SEP12 02OCT12 62
71640 Set Interior Door & Window Frames 6 28SEP12 05OCT12 72
71660 Rough-in In-wall Plumbing 8 28SEP12 09OCT12 68
71700 Rough-in In-wall Electrical 10 28SEP12 11OCT12 66
71680 R-I Overhead Mechanical Units, Piping & Ducts 12 03OCT12 18OCT12 62
71720 Rough-in Overhead Electrical Conduits 8 10OCT12 19OCT12 62
71740 Install In-wall Insulation 2 12OCT12 15OCT12 66
Interior Finishes 72020 Drywall 5 22OCT12 26OCT12 62
72040 Tape & Finish Drywall 8 23OCT12 01NOV12 62
72080 Ceramic Tile 6 29OCT12 05NOV12 113
72100 Prime Paint 4 31OCT12 05NOV12 62
72120 Set Panelboards 2 02NOV12 05NOV12 79
72160 Install T-Bar Grid 4 06NOV12 09NOV12 95
72220 Pull wires & Terminate 8 06NOV12 16NOV12 79
72240 Install Cabinetry & Casework 12 06NOV12 26NOV12 62
72840 Install Solatube Drops & Diffusers 4 13NOV12 16NOV12 99
72280 Install Fire Sprinkler Drops & Heads 5 13NOV12 19NOV12 98
72300 Install Mechanical Drops, Grills & Registers 6 13NOV12 20NOV12 97
72340 Install Lighting & L.V. Electrical Devices 8 19NOV12 30NOV12 91
72380 Install Tack Wall / Vinyl Wall Panels 3 27NOV12 29NOV12 67
72260 Install Sinks 3 27NOV12 29NOV12 102
72400 Hang Doors 5 27NOV12 03DEC12 62
72440 Install Acoustical Ceiling Panels 2 03DEC12 04DEC12 91
72420 Interior Glazing 3 04DEC12 06DEC12 62
72450 Install Door Hardware 5 04DEC12 10DEC12 92
72480 Finish Paint 5 07DEC12 13DEC12 62
72540 Install Projection Screens / Projector Mounts 2 14DEC12 17DEC12 87
72560 Install Markerboards 2 14DEC12 17DEC12 87
72620 Install Plumbing Fixtures 2 14DEC12 17DEC12 88
72660 Finish Mechanical Controls 5 14DEC12 20DEC12 62
72680 Finish Electrical 5 14DEC12 20DEC12 62
72640 Install Flooring 5 14DEC12 20DEC12 84
72760 Toilet Accessories 2 18DEC12 19DEC12 88
72780 Touch-up Paint 3 21DEC12 26DEC12 84
2012 2013J F M A M J J A S O N D J F M A M J J A S O N D JFEB
Rough-in Fire Sprinkler Mains
Rough-in Overhead Plumbing
Set Interior Door & Window Frames
Rough-in In-wall Plumbing
Rough-in In-wall Electrical
R-I Overhead Mechanical Units, Piping & Ducts
Rough-in Overhead Electrical Conduits
Install In-wall Insulation
Drywall
Tape & Finish Drywall
Ceramic Tile
Prime Paint
Set Panelboards
Install T-Bar Grid
Pull wires & Terminate
Install Cabinetry & Casework
Install Solatube Drops & Diffusers
Install Fire Sprinkler Drops & Heads
Install Mechanical Drops, Grills & Registers
Install Lighting & L.V. Electrical Devices
Install Tack Wall / Vinyl Wall Panels
Install Sinks
Hang Doors
Install Acoustical Ceiling Panels
Interior Glazing
Install Door Hardware
Finish Paint
Install Projection Screens / Projector Mounts
Install Markerboards
Install Plumbing Fixtures
Finish Mechanical Controls
Finish Electrical
Install Flooring
Toilet Accessories
Touch-up Paint
Sheet 36 of 43
Sheet 37 of 43
ActivityID
ActivityDescription
SUBAOrigDurTarget 1Orig Dur
RemDur% Early
StartEarlyFinish
TotalFloat
Clean-up / Punchlist 74940 Start-up & Test Systems 10 21DEC12 07JAN13 62
74960 Clean-Up Bldg. N 3 27DEC12 31DEC12 84
74950 Commissioning 15 08JAN13 28JAN13 62
74980 Punchlist Bldg. N 10 29JAN13 11FEB13 62
Bldg. P - ClassroomMilestones 80000 Start Bldg. P - Elem. School Classroom 0 05JUN12 45
80010 Bldg. P - Elem. School Classroom Duration 161* 05JUN12 25JAN13 45
84990 Bldg. P - Elem. School Classroom Complete 0 25JAN13 45
Foundations / Underground 80100 Excavate Footings 4 05JUN12 08JUN12 45
80120 Rebar Footings & Stem Walls 8 06JUN12 15JUN12 45
80160 Form Footings & Stem Walls 5 13JUN12 19JUN12 46
80180 Install Electrical Sleeves 2 18JUN12 19JUN12 47
80200 Install Plumbing Sleeves 2 18JUN12 19JUN12 47
80320 Install Mechanical Sleeves 2 18JUN12 19JUN12 47
80140 Layout / Install Anchor Bolts 4 18JUN12 21JUN12 45
80220 Pour Footings & Stem Walls 4 22JUN12 27JUN12 45
80240 Strip Forms 2 28JUN12 29JUN12 49
80300 Install Underslab Mechanical Piping 3 28JUN12 02JUL12 51
80260 Install Underslab Plumbing 5 28JUN12 05JUL12 45
80280 Install Underslab Electrical Conduits 6 03JUL12 11JUL12 45
Structure / Slab-on-Grade 80520 Bkfl/Compact at Stem Walls 3 02JUL12 05JUL12 49
80540 Vapor Barrier & Sand @ Slab-on-Grade 2 12JUL12 13JUL12 45
80560 Rebar for Slab-on-grade 4 16JUL12 19JUL12 45
80580 Pour Slab-on-Grade 3 20JUL12 24JUL12 45
80660 Wall Framing 10 25JUL12 07AUG12 45
80680 Roof Framing 6 08AUG12 15AUG12 45
80740 Install Plywood Roof Sheathing 5 16AUG12 22AUG12 45
80600 Form & Pour Mechanical & Electrical Pads 3 30AUG12 03SEP12 55
Exterior 81000 Exterior Framing 8 16AUG12 27AUG12 55
81020 Set Solatube Curbs 2 20AUG12 21AUG12 55
81080 Plywood Wall Sheathing 6 22AUG12 29AUG12 55
81060 Install Drain & Plumbing Risers 2 23AUG12 24AUG12 67
2012 2013J F M A M J J A S O N D J F M A M J J A S O N D JFEB
Start-up & Test Systems
Clean-Up Bldg. N
Commissioning
Punchlist Bldg. N
Start Bldg. P - Elem. School Classroom
Bldg. P - Elem. School Classroom Duration
Bldg. P - Elem. School Classroom Complete
Excavate Footings
Rebar Footings & Stem Walls
Form Footings & Stem Walls
Install Electrical Sleeves
Install Plumbing Sleeves
Install Mechanical Sleeves
Layout / Install Anchor Bolts
Pour Footings & Stem Walls
Strip Forms
Install Underslab Mechanical Piping
Install Underslab Plumbing
Install Underslab Electrical Conduits
Bkfl/Compact at Stem Walls
Vapor Barrier & Sand @ Slab-on-Grade
Rebar for Slab-on-grade
Pour Slab-on-Grade
Wall Framing
Roof Framing
Install Plywood Roof Sheathing
Form & Pour Mechanical & Electrical Pads
Exterior Framing
Set Solatube Curbs
Plywood Wall Sheathing
Install Drain & Plumbing Risers
Sheet 37 of 43
Sheet 38 of 43
ActivityID
ActivityDescription
SUBAOrigDurTarget 1Orig Dur
RemDur% Early
StartEarlyFinish
TotalFloat
81100 Install Window Frames 12 28AUG12 14SEP12 81
81140 Insulation Board 3 30AUG12 03SEP12 64
81160 Install Exterior Door Frames 4 30AUG12 04SEP12 87
81220 Flashings & Sealants 6 30AUG12 10SEP12 65
81040 Set HVAC Units 2 04SEP12 07SEP12 55
81050 Set Switchgear 2 04SEP12 07SEP12 56
81260 Install Metal Roof 4 04SEP12 11SEP12 64
81400 Install Solatubes 4 12SEP12 17SEP12 102
81200 Glazing 5 17SEP12 21SEP12 82
81240 Lath & Flashing for Plaster 6 17SEP12 24SEP12 81
81280 Plaster 25 25SEP12 29OCT12 81
81380 Construct Mechanical / Electrical Enclosures 8 30OCT12 08NOV12 81
81340 Paint @ Exterior 5 09NOV12 16NOV12 81
Rough-ins 81500 Install MEP Hangers 3 23AUG12 27AUG12 45
81520 Layout & Install Top Track 2 28AUG12 29AUG12 45
81540 Insulation @ Roof Decks 4 30AUG12 04SEP12 45
81560 Interior Framing 10 30AUG12 14SEP12 48
81580 Rough-in Fire Sprinkler Mains 6 07SEP12 14SEP12 45
81600 Rough-in Overhead Plumbing 3 17SEP12 19SEP12 45
81660 Rough-in In-wall Plumbing 5 17SEP12 21SEP12 54
81640 Set Interior Door & Window Frames 6 17SEP12 24SEP12 55
81700 Rough-in In-wall Electrical 10 17SEP12 28SEP12 49
81680 R-I Overhead Mechanical Units, Piping & Ducts 12 20SEP12 05OCT12 45
81720 Rough-in Overhead Electrical Conduits 8 27SEP12 08OCT12 45
81740 Install In-wall Insulation 2 01OCT12 02OCT12 49
Interior Finishes 82020 Drywall 5 09OCT12 15OCT12 45
82040 Tape & Finish Drywall 8 10OCT12 19OCT12 45
82080 Ceramic Tile 6 16OCT12 23OCT12 92
82100 Prime Paint 4 18OCT12 23OCT12 45
82120 Set Panelboards 2 22OCT12 23OCT12 60
82160 Install T-Bar Grid 4 24OCT12 29OCT12 76
82220 Pull wires & Terminate 8 24OCT12 02NOV12 60
82240 Install Cabinetry & Casework 10 24OCT12 06NOV12 45
82840 Install Solatube Drops & Diffusers 4 30OCT12 02NOV12 80
82280 Install Fire Sprinkler Drops & Heads 5 30OCT12 05NOV12 79
2012 2013J F M A M J J A S O N D J F M A M J J A S O N D JFEB
Install Window Frames
Insulation Board
Install Exterior Door Frames
Flashings & Sealants
Set HVAC Units
Set Switchgear
Install Metal Roof
Install Solatubes
Glazing
Lath & Flashing for Plaster
Plaster
Construct Mechanical / Electrical Enclosures
Paint @ Exterior
Install MEP Hangers
Layout & Install Top Track
Insulation @ Roof Decks
Interior Framing
Rough-in Fire Sprinkler Mains
Rough-in Overhead Plumbing
Rough-in In-wall Plumbing
Set Interior Door & Window Frames
Rough-in In-wall Electrical
R-I Overhead Mechanical Units, Piping & Ducts
Rough-in Overhead Electrical Conduits
Install In-wall Insulation
Drywall
Tape & Finish Drywall
Ceramic Tile
Prime Paint
Set Panelboards
Install T-Bar Grid
Pull wires & Terminate
Install Cabinetry & Casework
Install Solatube Drops & Diffusers
Install Fire Sprinkler Drops & Heads
Sheet 38 of 43
Sheet 39 of 43
ActivityID
ActivityDescription
SUBAOrigDurTarget 1Orig Dur
RemDur% Early
StartEarlyFinish
TotalFloat
82300 Install Mechanical Drops, Grills & Registers 6 30OCT12 06NOV12 78
82340 Install Lighting & L.V. Electrical Devices 8 05NOV12 15NOV12 72
82380 Install Tack Wall / Vinyl Wall Panels 3 07NOV12 09NOV12 50
82260 Install Sinks 3 07NOV12 09NOV12 85
82400 Hang Doors 5 07NOV12 14NOV12 45
82420 Interior Glazing 3 15NOV12 19NOV12 45
82450 Install Door Hardware 5 15NOV12 21NOV12 75
82440 Install Acoustical Ceiling Panels 2 16NOV12 19NOV12 72
82480 Finish Paint 5 20NOV12 28NOV12 45
82540 Install Projection Screens / Projector Mounts 2 29NOV12 30NOV12 70
82560 Install Markerboards 2 29NOV12 30NOV12 70
82620 Install Plumbing Fixtures 4 29NOV12 04DEC12 69
82660 Finish Mechanical Controls 5 29NOV12 05DEC12 45
82680 Finish Electrical 5 29NOV12 05DEC12 45
82640 Install Flooring 5 29NOV12 05DEC12 67
82760 Toilet Accessories 2 05DEC12 06DEC12 69
82780 Touch-up Paint 3 06DEC12 10DEC12 67
Clean-up / Punchlist 84940 Start-up & Test Systems 10 06DEC12 19DEC12 45
84960 Clean-Up Bldg. P 3 11DEC12 13DEC12 67
84950 Commissioning 15 20DEC12 11JAN13 45
84980 Punchlist Bldg. P 10 14JAN13 25JAN13 45
Bldg. Q - RestroomsMilestones 85000 Start Bldg. Q Elem. School Restroom 0 05JUN12 64
85010 Bldg. Q Elem. School Restroom Duration 118* 05JUN12 21NOV12 88
89990 Bldg. Q - Elem. School Restroom Complete 0 21NOV12 88
Foundations / Underground 85100 Excavate Footings 3 05JUN12 07JUN12 64
85120 Rebar Footings & Stem Walls 4 08JUN12 13JUN12 64
85160 Form Footings & Stem Walls 3 13JUN12 15JUN12 64
85180 Install Electrical Sleeves 2 14JUN12 15JUN12 65
85200 Install Plumbing Sleeves 2 14JUN12 15JUN12 65
85320 Install Mechanical Sleeves 2 14JUN12 15JUN12 65
85140 Layout / Install Anchor Bolts 2 15JUN12 18JUN12 64
85220 Pour Footings & Stem Walls 3 19JUN12 21JUN12 64
85240 Strip Forms 2 22JUN12 25JUN12 69
2012 2013J F M A M J J A S O N D J F M A M J J A S O N D JFEB
Install Mechanical Drops, Grills & Registers
Install Lighting & L.V. Electrical Devices
Install Tack Wall / Vinyl Wall Panels
Install Sinks
Hang Doors
Interior Glazing
Install Door Hardware
Install Acoustical Ceiling Panels
Finish Paint
Install Projection Screens / Projector Mounts
Install Markerboards
Install Plumbing Fixtures
Finish Mechanical Controls
Finish Electrical
Install Flooring
Toilet Accessories
Touch-up Paint
Start-up & Test Systems
Clean-Up Bldg. P
Commissioning
Punchlist Bldg. P
Start Bldg. Q Elem. School Restroom
Bldg. Q Elem. School Restroom Duration
Bldg. Q - Elem. School Restroom Complete
Excavate Footings
Rebar Footings & Stem Walls
Form Footings & Stem Walls
Install Electrical Sleeves
Install Plumbing Sleeves
Install Mechanical Sleeves
Layout / Install Anchor Bolts
Pour Footings & Stem Walls
Strip Forms
Sheet 39 of 43
Sheet 40 of 43
ActivityID
ActivityDescription
SUBAOrigDurTarget 1Orig Dur
RemDur% Early
StartEarlyFinish
TotalFloat
85260 Install Underslab Plumbing 5 22JUN12 28JUN12 64
85280 Install Underslab Electrical Conduits 6 27JUN12 05JUL12 64
Structure / Slab-on-Grade 85520 Bkfl/Compact at Stem Walls 2 26JUN12 27JUN12 69
85540 Vapor Barrier & Sand @ Slab-on-Grade 2 06JUL12 09JUL12 64
85560 Rebar for Slab-on-grade 2 10JUL12 11JUL12 64
85580 Pour Slab-on-Grade 3 12JUL12 16JUL12 64
85660 Wall Framing 6 17JUL12 24JUL12 64
85680 Roof Framing 4 31JUL12 03AUG12 64
85740 Install Plywood Roof Sheathing 3 06AUG12 08AUG12 64
Exterior 86060 Install Drain & Plumbing Risers 2 25JUL12 26JUL12 99
86080 Plywood Wall Sheathing 2 06AUG12 07AUG12 91
86100 Install Window Frames 2 08AUG12 09AUG12 116
86160 Install Exterior Door Frames 2 08AUG12 09AUG12 118
86020 Set Solatube Mounts & Roof Hatch Curb 2 09AUG12 10AUG12 64
86240 Lath & Flashing for Plaster 3 10AUG12 14AUG12 118
86200 Glazing 5 10AUG12 16AUG12 116
86140 Insulation Board 2 13AUG12 14AUG12 88
86220 Flashings & Sealants 2 15AUG12 16AUG12 94
86180 Install Roofing System 4 15AUG12 20AUG12 88
86280 Plaster 25 17AUG12 24SEP12 116
86400 Install Solatubes 2 21AUG12 22AUG12 90
86260 Install Metal Roof 4 21AUG12 24AUG12 88
86380 Tile @ Drinking Fountains 4 24AUG12 29AUG12 133
86420 Install Drinking Fountains 2 25SEP12 26SEP12 117
86340 Paint @ Exterior 3 25SEP12 27SEP12 116
Rough-ins 86540 Insulation @ Roof Decks 2 09AUG12 10AUG12 64
86560 Interior Framing 3 09AUG12 13AUG12 65
86580 Rough-in Fire Sprinkler 2 13AUG12 14AUG12 64
86700 Rough-in In-wall Electrical 2 14AUG12 15AUG12 93
86660 Rough-in In-wall Plumbing 6 14AUG12 21AUG12 89
86680 R-I Overhead Mechanical Units & Ducts 3 15AUG12 17AUG12 64
86740 Install In-wall Insulation 2 22AUG12 23AUG12 89
Interior Finishes 87020 Drywall 3 27AUG12 29AUG12 88
2012 2013J F M A M J J A S O N D J F M A M J J A S O N D JFEB
Install Underslab Plumbing
Install Underslab Electrical Conduits
Bkfl/Compact at Stem Walls
Vapor Barrier & Sand @ Slab-on-Grade
Rebar for Slab-on-grade
Pour Slab-on-Grade
Wall Framing
Roof Framing
Install Plywood Roof Sheathing
Install Drain & Plumbing Risers
Plywood Wall Sheathing
Install Window Frames
Install Exterior Door Frames
Set Solatube Mounts & Roof Hatch Curb
Lath & Flashing for Plaster
Glazing
Insulation Board
Flashings & Sealants
Install Roofing System
Plaster
Install Solatubes
Install Metal Roof
Tile @ Drinking Fountains
Install Drinking Fountains
Paint @ Exterior
Insulation @ Roof Decks
Interior Framing
Rough-in Fire Sprinkler
Rough-in In-wall Electrical
Rough-in In-wall Plumbing
R-I Overhead Mechanical Units & Ducts
Install In-wall Insulation
Drywall
Sheet 40 of 43
Sheet 41 of 43
ActivityID
ActivityDescription
SUBAOrigDurTarget 1Orig Dur
RemDur% Early
StartEarlyFinish
TotalFloat
87040 Tape & Finish Drywall 5 28AUG12 03SEP12 93
87080 Ceramic Tile 10 30AUG12 14SEP12 88
87100 Prime Paint 2 04SEP12 07SEP12 93
87220 Pull wires & Terminate 3 04SEP12 10SEP12 99
87280 Install Fire Sprinkler Heads 2 10SEP12 11SEP12 125
87600 Install Solatube Diffusers 2 10SEP12 11SEP12 125
87340 Install Lighting & L.V. Electrical Devices 3 11SEP12 13SEP12 123
87400 Hang Doors 2 17SEP12 18SEP12 88
87450 Install Door Hardware 2 19SEP12 20SEP12 118
87480 Finish Paint 5 19SEP12 25SEP12 88
87740 Install Roof Ladder & Hatch 2 26SEP12 27SEP12 113
87660 Finish Mechanical Controls 5 26SEP12 02OCT12 88
87680 Finish Electrical 5 26SEP12 02OCT12 88
87620 Install Plumbing Fixtures 6 26SEP12 03OCT12 105
87760 Toilet Accessories 4 04OCT12 09OCT12 105
87780 Touch-up Paint 3 10OCT12 12OCT12 105
Clean-up / Punchlist 89940 Start-up & Test Systems 10 03OCT12 16OCT12 88
89960 Clean-Up Bldg. Q 3 15OCT12 17OCT12 105
89950 Commissioning 15 17OCT12 06NOV12 88
89980 Punchlist Bldg. Q 10 07NOV12 21NOV12 88
Bldg. R - RestroomsMilestones 90000 Start Bldg. R Elem. School Restroom 0 05JUN12 64
90010 Bldg. R Elem. School Restroom Duration 118* 05JUN12 21NOV12 88
94990 Bldg. R - Elem. School Restroom Complete 0 21NOV12 88
Foundations / Underground 90100 Excavate Footings 3 05JUN12 07JUN12 64
90120 Rebar Footings & Stem Walls 4 08JUN12 13JUN12 64
90160 Form Footings & Stem Walls 3 13JUN12 15JUN12 64
90180 Install Electrical Sleeves 2 14JUN12 15JUN12 65
90200 Install Plumbing Sleeves 2 14JUN12 15JUN12 65
90320 Install Mechanical Sleeves 2 14JUN12 15JUN12 65
90140 Layout / Install Anchor Bolts 2 15JUN12 18JUN12 64
90220 Pour Footings & Stem Walls 3 19JUN12 21JUN12 64
90240 Strip Forms 2 22JUN12 25JUN12 69
90260 Install Underslab Plumbing 5 22JUN12 28JUN12 64
2012 2013J F M A M J J A S O N D J F M A M J J A S O N D JFEB
Tape & Finish Drywall
Ceramic Tile
Prime Paint
Pull wires & Terminate
Install Fire Sprinkler Heads
Install Solatube Diffusers
Install Lighting & L.V. Electrical Devices
Hang Doors
Install Door Hardware
Finish Paint
Install Roof Ladder & Hatch
Finish Mechanical Controls
Finish Electrical
Install Plumbing Fixtures
Toilet Accessories
Touch-up Paint
Start-up & Test Systems
Clean-Up Bldg. Q
Commissioning
Punchlist Bldg. Q
Start Bldg. R Elem. School Restroom
Bldg. R Elem. School Restroom Duration
Bldg. R - Elem. School Restroom Complete
Excavate Footings
Rebar Footings & Stem Walls
Form Footings & Stem Walls
Install Electrical Sleeves
Install Plumbing Sleeves
Install Mechanical Sleeves
Layout / Install Anchor Bolts
Pour Footings & Stem Walls
Strip Forms
Install Underslab Plumbing
Sheet 41 of 43
Sheet 42 of 43
ActivityID
ActivityDescription
SUBAOrigDurTarget 1Orig Dur
RemDur% Early
StartEarlyFinish
TotalFloat
90280 Install Underslab Electrical Conduits 6 27JUN12 05JUL12 64
Structure / Slab-on-Grade 90520 Bkfl/Compact at Stem Walls 2 26JUN12 27JUN12 69
90540 Vapor Barrier & Sand @ Slab-on-Grade 2 06JUL12 09JUL12 64
90560 Rebar for Slab-on-grade 2 10JUL12 11JUL12 64
90580 Pour Slab-on-Grade 3 12JUL12 16JUL12 64
90660 Wall Framing 6 17JUL12 24JUL12 64
90680 Roof Framing 4 31JUL12 03AUG12 64
90740 Install Plywood Roof Sheathing 3 06AUG12 08AUG12 64
Exterior 91060 Install Drain & Plumbing Risers 2 25JUL12 26JUL12 99
91080 Plywood Wall Sheathing 2 06AUG12 07AUG12 91
91100 Install Window Frames 2 08AUG12 09AUG12 116
91160 Install Exterior Door Frames 2 08AUG12 09AUG12 118
91020 Set Solatube Mounts & Roof Hatch Curb 2 09AUG12 10AUG12 64
91240 Lath & Flashing for Plaster 3 10AUG12 14AUG12 118
91200 Glazing 5 10AUG12 16AUG12 116
91140 Insulation Board 2 13AUG12 14AUG12 88
91220 Flashings & Sealants 2 15AUG12 16AUG12 94
91180 Install Roofing System 4 15AUG12 20AUG12 88
91280 Plaster 25 17AUG12 24SEP12 116
91400 Install Solatubes 2 21AUG12 22AUG12 90
91260 Install Metal Roof 4 21AUG12 24AUG12 88
91380 Tile @ Drinking Fountains 4 24AUG12 29AUG12 133
91420 Install Drinking Fountains 2 25SEP12 26SEP12 117
91340 Paint @ Exterior 3 25SEP12 27SEP12 116
Rough-ins 91540 Insulation @ Roof Decks 2 09AUG12 10AUG12 64
91560 Interior Framing 3 09AUG12 13AUG12 65
91580 Rough-in Fire Sprinkler 2 13AUG12 14AUG12 64
91700 Rough-in In-wall Electrical 2 14AUG12 15AUG12 93
91660 Rough-in In-wall Plumbing 6 14AUG12 21AUG12 89
91680 R-I Overhead Mechanical Units & Ducts 3 15AUG12 17AUG12 64
91740 Install In-wall Insulation 2 22AUG12 23AUG12 89
Interior Finishes 92020 Drywall 3 27AUG12 29AUG12 88
92040 Tape & Finish Drywall 5 28AUG12 03SEP12 93
2012 2013J F M A M J J A S O N D J F M A M J J A S O N D JFEB
Install Underslab Electrical Conduits
Bkfl/Compact at Stem Walls
Vapor Barrier & Sand @ Slab-on-Grade
Rebar for Slab-on-grade
Pour Slab-on-Grade
Wall Framing
Roof Framing
Install Plywood Roof Sheathing
Install Drain & Plumbing Risers
Plywood Wall Sheathing
Install Window Frames
Install Exterior Door Frames
Set Solatube Mounts & Roof Hatch Curb
Lath & Flashing for Plaster
Glazing
Insulation Board
Flashings & Sealants
Install Roofing System
Plaster
Install Solatubes
Install Metal Roof
Tile @ Drinking Fountains
Install Drinking Fountains
Paint @ Exterior
Insulation @ Roof Decks
Interior Framing
Rough-in Fire Sprinkler
Rough-in In-wall Electrical
Rough-in In-wall Plumbing
R-I Overhead Mechanical Units & Ducts
Install In-wall Insulation
Drywall
Tape & Finish Drywall
Sheet 42 of 43
Sheet 43 of 43
ActivityID
ActivityDescription
SUBAOrigDurTarget 1Orig Dur
RemDur% Early
StartEarlyFinish
TotalFloat
92080 Ceramic Tile 10 30AUG12 14SEP12 88
92100 Prime Paint 2 04SEP12 07SEP12 93
92220 Pull wires & Terminate 3 04SEP12 10SEP12 99
92280 Install Fire Sprinkler Heads 2 10SEP12 11SEP12 125
92600 Install Solatube Diffusers 2 10SEP12 11SEP12 125
92340 Install Lighting & L.V. Electrical Devices 3 11SEP12 13SEP12 123
92400 Hang Doors 2 17SEP12 18SEP12 88
92450 Install Door Hardware 2 19SEP12 20SEP12 118
92480 Finish Paint 5 19SEP12 25SEP12 88
92740 Install Roof Ladder & Hatch 2 26SEP12 27SEP12 113
92660 Finish Mechanical Controls 5 26SEP12 02OCT12 88
92680 Finish Electrical 5 26SEP12 02OCT12 88
92620 Install Plumbing Fixtures 6 26SEP12 03OCT12 105
92760 Toilet Accessories 4 04OCT12 09OCT12 105
92780 Touch-up Paint 3 10OCT12 12OCT12 105
Clean-up / Punchlist 94940 Start-up & Test Systems 10 03OCT12 16OCT12 88
94960 Clean-Up Bldg. R 3 15OCT12 17OCT12 105
94950 Commissioning 15 17OCT12 06NOV12 88
94980 Punchlist Bldg. R 10 07NOV12 21NOV12 88
2012 2013J F M A M J J A S O N D J F M A M J J A S O N D JFEB
Ceramic Tile
Prime Paint
Pull wires & Terminate
Install Fire Sprinkler Heads
Install Solatube Diffusers
Install Lighting & L.V. Electrical Devices
Hang Doors
Install Door Hardware
Finish Paint
Install Roof Ladder & Hatch
Finish Mechanical Controls
Finish Electrical
Install Plumbing Fixtures
Toilet Accessories
Touch-up Paint
Start-up & Test Systems
Clean-Up Bldg. R
Commissioning
Punchlist Bldg. R
Sheet 43 of 43