SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 1 OF 29 PAGES
ARAVI OFFICE RENOVATION
01 11 00 SD-01 Preconstruction SubmittalsSubmittal RegisterPerformance Bond:Payment Bond:Liability BondStability BondElements Quality BondCorrect Equipment FunctioningBond
Project ScheduleTemporary FacilitiesPersonnel ListField Personnel QualificationsHealth and Safety PlanQuality Control (QC) PlanList of Proposed SubcontractorsList of Proposed Products
01 32 16.00 20 SD-01 Preconstruction Submittals1.2Construction schedule
Submittal Register01 33 00 SD-01 Preconstruction Submittals
1.6Submittal Register01 50 00 SD-01 Preconstruction Submittals
1.3Construction site plan01 74 19 SD-01 Preconstruction Submittals
1.6Waste Management Plan
SUBMITTAL REGISTERCONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:SCHEDULE DATES
CONTRACTORACTION
APPROVING AUTHORITY
ACTIVITY NO
TRANSMITTAL NO
SPEC SECT
DESCRIPTION
ITEM SUBMITTED
PARAGRAPH
#
CLASSIFICATION
GOVT OR A/E REVWR SUBMIT
APPROVALNEEDED
BY
MATERIALNEEDED
BY
ACTION CODE
DATEOF
ACTION
DATE FWDTO APPR
AUTH/
DATE RCDFROM
CONTR
DATE FWDTO OTHERREVIEWER
DATE RCDFROM OTHREVIEWER
ACTION CODE
DATEOF
ACTION
MAILEDTO
CONTR/
DATE RCDFRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 2 OF 29 PAGES
ARAVI OFFICE RENOVATION
01 74 19 SD-11 Closeout Submittals1.7Records
01 78 00 SD-03 Product Data1.7.1Warranty Management Plan1.7.5Warranty Tags3.8Final Cleaning1.5Spare Parts Data
SD-08 Manufacturer’s Instructions1.7.1Instructions
SD-10 Operation and MaintenanceData
3.7 G[Operation and MaintenanceManuals
SD-11 Closeout Submittals3.1 G[As-Built Drawings3.3 G[Record Drawings1.7.1As-Built Record of Equipment
and Materials3.6As-Built Record of Equipment
and Materials3.4Final Approved Shop Drawings3.5Construction Contract
Specifications2.3 G[Certification of EPA Designated
Items
SUBMITTAL REGISTERCONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:SCHEDULE DATES
CONTRACTORACTION
APPROVING AUTHORITY
ACTIVITY NO
TRANSMITTAL NO
SPEC SECT
DESCRIPTION
ITEM SUBMITTED
PARAGRAPH
#
CLASSIFICATION
GOVT OR A/E REVWR SUBMIT
APPROVALNEEDED
BY
MATERIALNEEDED
BY
ACTION CODE
DATEOF
ACTION
DATE FWDTO APPR
AUTH/
DATE RCDFROM
CONTR
DATE FWDTO OTHERREVIEWER
DATE RCDFROM OTHREVIEWER
ACTION CODE
DATEOF
ACTION
MAILEDTO
CONTR/
DATE RCDFRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 3 OF 29 PAGES
ARAVI OFFICE RENOVATION
01 78 00 2.4 G[Certification Of USDADesignated Items
3.9 G[Interim DD FORM 13543.9 G[Checklist for DD FORM 13543.9 GHigh Performance and
Sustainable Building (HPSB)Checklist
02 41 00 SD-01 Preconstruction Submittals1.2.1Demolition Plan1.2.1Deconstruction Plan1.9Existing Conditions
03 11 13.00 10 SD-03 Product Data1.2Design2.1Form Materials2.1.5Form Releasing Agents
SD-04 SamplesSample Panels
SD-06 Test Reports3.5Inspection
SD-07 CertificatesFiber Voids
03 20 00.00 10 SD-03 Product DataWelding
3.1.4.1Butt-SplicesMaterial
SD-06 Test Reports
SUBMITTAL REGISTERCONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:SCHEDULE DATES
CONTRACTORACTION
APPROVING AUTHORITY
ACTIVITY NO
TRANSMITTAL NO
SPEC SECT
DESCRIPTION
ITEM SUBMITTED
PARAGRAPH
#
CLASSIFICATION
GOVT OR A/E REVWR SUBMIT
APPROVALNEEDED
BY
MATERIALNEEDED
BY
ACTION CODE
DATEOF
ACTION
DATE FWDTO APPR
AUTH/
DATE RCDFROM
CONTR
DATE FWDTO OTHERREVIEWER
DATE RCDFROM OTHREVIEWER
ACTION CODE
DATEOF
ACTION
MAILEDTO
CONTR/
DATE RCDFRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 4 OF 29 PAGES
ARAVI OFFICE RENOVATION
03 20 00.00 10 MaterialTests, Inspections, andVerifications
SD-07 Certificates2.3Reinforcing Steel
Qualification of Steel BarButt-Splicers
03 30 00 SD-02 Shop Drawings1.6.2.1Fabrication Drawings1.6.2.2Formwork1.6.2.2Formwork1.6.2.1Special Construction1.6.2.3Reinforcing steel
SD-03 Product Data2.4.7Materials for curing concrete2.4.9Joint sealants2.4.8Joint filler2.4.1Cement2.4.1.1Portland Cement2.3.2Ready-Mix Concrete2.4.6Vapor barrier2.6Bonding Materials2.3.3Concrete Curing Materials2.5Reinforcement1.6.2.1Reinforcement Materials2.4.10Epoxy bonding compound
SUBMITTAL REGISTERCONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:SCHEDULE DATES
CONTRACTORACTION
APPROVING AUTHORITY
ACTIVITY NO
TRANSMITTAL NO
SPEC SECT
DESCRIPTION
ITEM SUBMITTED
PARAGRAPH
#
CLASSIFICATION
GOVT OR A/E REVWR SUBMIT
APPROVALNEEDED
BY
MATERIALNEEDED
BY
ACTION CODE
DATEOF
ACTION
DATE FWDTO APPR
AUTH/
DATE RCDFROM
CONTR
DATE FWDTO OTHERREVIEWER
DATE RCDFROM OTHREVIEWER
ACTION CODE
DATEOF
ACTION
MAILEDTO
CONTR/
DATE RCDFRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 5 OF 29 PAGES
ARAVI OFFICE RENOVATION
03 30 00 2.4.9.3Waterstops3.13.2Waterstops2.1.1Wood Forms2.4.11Biodegradable Form Release
AgentSD-04 Samples
1.6.5.1Slab finish sample2.4.9.3Dumbbell Type2.4.9.3Rubber2.4.9.3Polyvinylchloride (PVC)
SD-05 Design Data2.3.1mix design1.6.1.1Calculations
SD-06 Test Reports1.6.4.1Concrete mix design1.6.4.2Aggregates
Tolerance report3.11.2.3Compressive strength tests2.7.4Slump2.7.1Air Entrainment
SD-07 Certificates1.6.3.1Curing concrete elements1.6.3.3Finishing plan1.6.3.6Material Safety Data Sheets2.5.5Steel Bar
05 05 23 SD-03 Product Data
SUBMITTAL REGISTERCONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:SCHEDULE DATES
CONTRACTORACTION
APPROVING AUTHORITY
ACTIVITY NO
TRANSMITTAL NO
SPEC SECT
DESCRIPTION
ITEM SUBMITTED
PARAGRAPH
#
CLASSIFICATION
GOVT OR A/E REVWR SUBMIT
APPROVALNEEDED
BY
MATERIALNEEDED
BY
ACTION CODE
DATEOF
ACTION
DATE FWDTO APPR
AUTH/
DATE RCDFROM
CONTR
DATE FWDTO OTHERREVIEWER
DATE RCDFROM OTHREVIEWER
ACTION CODE
DATEOF
ACTION
MAILEDTO
CONTR/
DATE RCDFRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 6 OF 29 PAGES
ARAVI OFFICE RENOVATION
05 05 23 1.5Welding Procedure Qualifications1.5.5Welder, Welding Operator, and
Tacker Qualification1.5.6Inspector Qualification1.5.2Previous Qualifications1.5.3Pre-qualified Procedures
SD-06 Test Reports3.2Quality Control3.3.1Nondestructive Examination1.5.1Certified Welding Procedure
Specifications (WPS)1.5.1Certified Procedure Qualification
Records (PQR)1.5.1Certified Welder Performance
Qualifications (WPQ)05 12 00 SD-02 Shop Drawings
1.3.1Fabrication drawingsSD-03 Product Data
2.4Shop primer2.3.1Welding electrodes and rods
SD-07 Certificates2.1Steel2.2Bolts, nuts, and washers
Welding procedures andqualifications
05 50 13 SD-02 Shop Drawings
SUBMITTAL REGISTERCONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:SCHEDULE DATES
CONTRACTORACTION
APPROVING AUTHORITY
ACTIVITY NO
TRANSMITTAL NO
SPEC SECT
DESCRIPTION
ITEM SUBMITTED
PARAGRAPH
#
CLASSIFICATION
GOVT OR A/E REVWR SUBMIT
APPROVALNEEDED
BY
MATERIALNEEDED
BY
ACTION CODE
DATEOF
ACTION
DATE FWDTO APPR
AUTH/
DATE RCDFROM
CONTR
DATE FWDTO OTHERREVIEWER
DATE RCDFROM OTHREVIEWER
ACTION CODE
DATEOF
ACTION
MAILEDTO
CONTR/
DATE RCDFRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 7 OF 29 PAGES
ARAVI OFFICE RENOVATION
05 50 13 2.7structural steel door frames2.3Access doors and panels2.4Cover plates and frames
SD-03 Product Data2.3Access doors and panels2.4Cover plates and frames
Control-joint covers2.7Structural steel door frames
06 20 00 SD-02 Shop Drawings1.3Detail Drawings
SD-03 Product Data2.1.13Siding2.1.13.9Epoxy-Aggregate Panels2.1.13.7Wood
SD-04 SamplesWood for walls; Wood for decks;Siding
Wood Shingles2.1.13.9Moldings2.3Fascias and Trim
SD-07 Certificates1.4Certificates of grade
SUBMITTAL REGISTERCONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:SCHEDULE DATES
CONTRACTORACTION
APPROVING AUTHORITY
ACTIVITY NO
TRANSMITTAL NO
SPEC SECT
DESCRIPTION
ITEM SUBMITTED
PARAGRAPH
#
CLASSIFICATION
GOVT OR A/E REVWR SUBMIT
APPROVALNEEDED
BY
MATERIALNEEDED
BY
ACTION CODE
DATEOF
ACTION
DATE FWDTO APPR
AUTH/
DATE RCDFROM
CONTR
DATE FWDTO OTHERREVIEWER
DATE RCDFROM OTHREVIEWER
ACTION CODE
DATEOF
ACTION
MAILEDTO
CONTR/
DATE RCDFRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 8 OF 29 PAGES
ARAVI OFFICE RENOVATION
06 20 00 Certificates of complianceTreatements fo fungus, insectsand fire. The contractor shallcertified that the wood complieswith Enviromental managementplan.
07 21 16 SD-03 Product Data2.1Blanket Insulation2.1.2 SRecycled Content for Insulation
Materials2.2Sill Sealer Insulation2.4Vapor Retarder2.5Pressure Sensitive Tape2.6Accessories
SD-07 Certificates2.1.4 SIndoor Air Quality for Insulation
Materials2.6.1 SIndoor Air Quality for Adhesives
SD-08 Manufacturer’s Instructions3.3.1Insulation
07 44 56 SD-03 Product DataCementitious PanelsAccessories
SD-08 Manufacturer’s InstructionsManufacturers Instructions
SUBMITTAL REGISTERCONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:SCHEDULE DATES
CONTRACTORACTION
APPROVING AUTHORITY
ACTIVITY NO
TRANSMITTAL NO
SPEC SECT
DESCRIPTION
ITEM SUBMITTED
PARAGRAPH
#
CLASSIFICATION
GOVT OR A/E REVWR SUBMIT
APPROVALNEEDED
BY
MATERIALNEEDED
BY
ACTION CODE
DATEOF
ACTION
DATE FWDTO APPR
AUTH/
DATE RCDFROM
CONTR
DATE FWDTO OTHERREVIEWER
DATE RCDFROM OTHREVIEWER
ACTION CODE
DATEOF
ACTION
MAILEDTO
CONTR/
DATE RCDFRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 9 OF 29 PAGES
ARAVI OFFICE RENOVATION
07 44 56 SD-10 Operation and MaintenanceDataManufacturer maintenanceinstructions
07 92 00 SD-03 Product Data2.1Sealants2.2Primers2.3Bond breakers2.4Backstops
SD-07 Certificates3.3.6Sealant
08 11 16 SD-04 Samples1.5.1.1Finish sample
SD-08 Manufacturer’s Instructions2.1Doors and frames
08 14 00 SD-02 Shop Drawings2.1 G[Doors
SD-03 Product Data2.1 G[Doors2.1.2.2 SRecycled Content for Door Cores2.2Accessories2.3.7Water-resistant Sealer1.5Warranty2.1.6 G[Sound Transmission Class
Rating2.1.7 G[Fire Resistance Rating
SUBMITTAL REGISTERCONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:SCHEDULE DATES
CONTRACTORACTION
APPROVING AUTHORITY
ACTIVITY NO
TRANSMITTAL NO
SPEC SECT
DESCRIPTION
ITEM SUBMITTED
PARAGRAPH
#
CLASSIFICATION
GOVT OR A/E REVWR SUBMIT
APPROVALNEEDED
BY
MATERIALNEEDED
BY
ACTION CODE
DATEOF
ACTION
DATE FWDTO APPR
AUTH/
DATE RCDFROM
CONTR
DATE FWDTO OTHERREVIEWER
DATE RCDFROM OTHREVIEWER
ACTION CODE
DATEOF
ACTION
MAILEDTO
CONTR/
DATE RCDFRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 10 OF 29 PAGES
ARAVI OFFICE RENOVATION
08 14 00 SD-04 Samples2.1Doors2.3.6.4 G[Door Finish Colors
SD-06 Test Reports2.4Cycle-Slam2.4Hinge Loading Resistance
SD-07 Certificates1.3.1Certificates of Grade2.1.1 SCertified Sustainably Harvested
Stile and Rail Wood Doors2.1.2 SCertified Sustainably Harvested
Flush Wood Doors2.1.2.2 SIndoor Air Quality for
Particleboard and Agrifiber DoorCores
SD-11 Closeout Submittals1.5Warranty
08 51 13 SD-03 Product Data2.2Windows2.3.8.1Hardware2.3.3Fasteners1.9Window Performance2.5Mullions2.3.10Screens2.3.2Weatherstripping2.3.8Accessories
SUBMITTAL REGISTERCONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:SCHEDULE DATES
CONTRACTORACTION
APPROVING AUTHORITY
ACTIVITY NO
TRANSMITTAL NO
SPEC SECT
DESCRIPTION
ITEM SUBMITTED
PARAGRAPH
#
CLASSIFICATION
GOVT OR A/E REVWR SUBMIT
APPROVALNEEDED
BY
MATERIALNEEDED
BY
ACTION CODE
DATEOF
ACTION
DATE FWDTO APPR
AUTH/
DATE RCDFROM
CONTR
DATE FWDTO OTHERREVIEWER
DATE RCDFROM OTHREVIEWER
ACTION CODE
DATEOF
ACTION
MAILEDTO
CONTR/
DATE RCDFRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 11 OF 29 PAGES
ARAVI OFFICE RENOVATION
08 51 13 2.3.4AdhesivesSD-04 Samples
1.3.1.1Finish Sample1.3.1.2Window Sample
SD-10 Operation and MaintenanceData
2.2Windows08 60 45 SD-02 Shop Drawings
3.2Shop DrawingsSD-03 Product Data
2.1[Skylights][ and ][TranslucentPanels]
2.2.4Recycled Content for AluminumFraming Materials
2.4.3Energy Star Label for ResidentialSkylights
1.6WarrantySD-06 Test Reports
2.1Test ReportsSD-07 Certificates
2.5Systems1.4Qualifications
08 71 00 SD-03 Product Data2.1Hardware Items
SD-08 Manufacturer’s Instructions3.1Installation
SUBMITTAL REGISTERCONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:SCHEDULE DATES
CONTRACTORACTION
APPROVING AUTHORITY
ACTIVITY NO
TRANSMITTAL NO
SPEC SECT
DESCRIPTION
ITEM SUBMITTED
PARAGRAPH
#
CLASSIFICATION
GOVT OR A/E REVWR SUBMIT
APPROVALNEEDED
BY
MATERIALNEEDED
BY
ACTION CODE
DATEOF
ACTION
DATE FWDTO APPR
AUTH/
DATE RCDFROM
CONTR
DATE FWDTO OTHERREVIEWER
DATE RCDFROM OTHREVIEWER
ACTION CODE
DATEOF
ACTION
MAILEDTO
CONTR/
DATE RCDFRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 12 OF 29 PAGES
ARAVI OFFICE RENOVATION
08 71 00 SD-11 Closeout Submittals1.3.1Key Bitting
08 81 00 SD-01 Preconstruction SubmittalsInstallation
SD-02 Shop DrawingsGlass
1.3Glazing AccessoriesSD-03 Product Data
2.3.2Glazing Compound2.3.4Tape2.3.3.1Sealant
SD-05 Design Data2.3Setting and Sealing Materials3.2Glass Setting
08 87 23.13 SD-03 Product Data2.2Silver reflective Fragment
Retention Film3.3Cleaning
SD-04 Samples2.2Silver reflective fragment
Retention Film09 06 90 SD-04 Samples
2.2Color Schedule09 23 00 SD-03 Product Data
Data SheetSD-08 Manufacturer’s Instructions
SUBMITTAL REGISTERCONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:SCHEDULE DATES
CONTRACTORACTION
APPROVING AUTHORITY
ACTIVITY NO
TRANSMITTAL NO
SPEC SECT
DESCRIPTION
ITEM SUBMITTED
PARAGRAPH
#
CLASSIFICATION
GOVT OR A/E REVWR SUBMIT
APPROVALNEEDED
BY
MATERIALNEEDED
BY
ACTION CODE
DATEOF
ACTION
DATE FWDTO APPR
AUTH/
DATE RCDFROM
CONTR
DATE FWDTO OTHERREVIEWER
DATE RCDFROM OTHREVIEWER
ACTION CODE
DATEOF
ACTION
MAILEDTO
CONTR/
DATE RCDFRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 13 OF 29 PAGES
ARAVI OFFICE RENOVATION
09 23 00 2.7Ready-mix gypsum plaster09 26 00 SD-03 Product Data
2.1.4Gypsum base2.1.5Gypsum veneer plaster
09 29 00 SD-03 Product Data2.1.3Water-Resistant Gypsum
Backing Board2.1.1Gypsum Board2.1.7Accessories
SD-07 Certificates2.1Asbestos Free Materials
SD-08 Manufacturer’s InstructionsMaterial Safety Data Sheets
SD-10 Operation and MaintenanceDataManufacturer maintenanceinstructions
Waste ManagementSD-11 Closeout Submittals
2.1.1Gypsum BoardAdhesives
09 30 00 SD-02 Shop Drawings1.4Detail Drawings
SD-03 Product Data2.1Tile2.2Setting-Bed
SUBMITTAL REGISTERCONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:SCHEDULE DATES
CONTRACTORACTION
APPROVING AUTHORITY
ACTIVITY NO
TRANSMITTAL NO
SPEC SECT
DESCRIPTION
ITEM SUBMITTED
PARAGRAPH
#
CLASSIFICATION
GOVT OR A/E REVWR SUBMIT
APPROVALNEEDED
BY
MATERIALNEEDED
BY
ACTION CODE
DATEOF
ACTION
DATE FWDTO APPR
AUTH/
DATE RCDFROM
CONTR
DATE FWDTO OTHERREVIEWER
DATE RCDFROM OTHREVIEWER
ACTION CODE
DATEOF
ACTION
MAILEDTO
CONTR/
DATE RCDFRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 14 OF 29 PAGES
ARAVI OFFICE RENOVATION
09 30 00 2.4Mortar, Grout, and AdhesiveCertification
SD-04 Samples2.1Tile
AccessoriesMarble Thresholds
2.4GroutSD-07 Certificates
2.1Tile2.4Mortar, Grout, and Adhesive
09 65 00 SD-02 Shop Drawings2.17 G[Resilient Flooring and
AccessoriesSD-03 Product Data
2.17 G[Resilient Flooring andAccessories
2.13Adhesives2.1Vinyl Composition Tile2.1 SRecycled content for Vinyl
Composition Tile2.2Sheet Vinyl Flooring2.2 SRecycled content for Sheet Vinyl
Flooring2.5Luxury Vinyl Tile2.5 SRecycled content for Luxury Vinyl
Tile
SUBMITTAL REGISTERCONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:SCHEDULE DATES
CONTRACTORACTION
APPROVING AUTHORITY
ACTIVITY NO
TRANSMITTAL NO
SPEC SECT
DESCRIPTION
ITEM SUBMITTED
PARAGRAPH
#
CLASSIFICATION
GOVT OR A/E REVWR SUBMIT
APPROVALNEEDED
BY
MATERIALNEEDED
BY
ACTION CODE
DATEOF
ACTION
DATE FWDTO APPR
AUTH/
DATE RCDFROM
CONTR
DATE FWDTO OTHERREVIEWER
DATE RCDFROM OTHREVIEWER
ACTION CODE
DATEOF
ACTION
MAILEDTO
CONTR/
DATE RCDFRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 15 OF 29 PAGES
ARAVI OFFICE RENOVATION
09 65 00 2.3Rubber Tile2.4Rubber Sheet Flooring2.6Solid Vinyl Tile2.14Cement-Fiber Board2.9Wall Base2.11Stair Treads, Risers and
Stringers2.7Sheet Linoleum2.7 SRecycled content for Sheet
Linoleum2.7 SBio-based content for Sheet
LinoleumLinoleum Tile
SRecycled content for LinoleumTile
SBio-based content for LinoleumTile
2.8Cork Flooring2.8 SRecycled content for Cork
Flooring2.8 SBio-based content for Cork
FlooringSD-04 Samples
2.17 G[Resilient Flooring andAccessories
SD-06 Test Reports
SUBMITTAL REGISTERCONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:SCHEDULE DATES
CONTRACTORACTION
APPROVING AUTHORITY
ACTIVITY NO
TRANSMITTAL NO
SPEC SECT
DESCRIPTION
ITEM SUBMITTED
PARAGRAPH
#
CLASSIFICATION
GOVT OR A/E REVWR SUBMIT
APPROVALNEEDED
BY
MATERIALNEEDED
BY
ACTION CODE
DATEOF
ACTION
DATE FWDTO APPR
AUTH/
DATE RCDFROM
CONTR
DATE FWDTO OTHERREVIEWER
DATE RCDFROM OTHREVIEWER
ACTION CODE
DATEOF
ACTION
MAILEDTO
CONTR/
DATE RCDFRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 16 OF 29 PAGES
ARAVI OFFICE RENOVATION
09 65 00 3.3 G[Moisture, Alkalinity and BondTests
SD-07 Certificates2.1 SIndoor Air Quality for Vinyl
Composition Tile2.2 SIndoor Air Quality for Sheet Vinyl
Flooring2.3 SIndoor Air Quality for Rubber Tile2.4 SIndoor Air Quality for Rubber
Sheet Flooring2.5 SIndoor Air Quality for Luxury Vinyl
Tile2.6 SIndoor Air Quality for Solid Vinyl
Tile2.7 SIndoor Air Quality for Sheet
LinoleumSIndoor Air Quality for Linoleum
Tile2.8 SIndoor Air Quality for Cork
Flooring2.9 SIndoor Air Quality for Wall Base2.13 SIndoor Air Quality for Adhesives2.8 SCertified Sustainably Harvested
Cork FlooringSD-08 Manufacturer’s Instructions
3.2 G[Surface Preparation
SUBMITTAL REGISTERCONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:SCHEDULE DATES
CONTRACTORACTION
APPROVING AUTHORITY
ACTIVITY NO
TRANSMITTAL NO
SPEC SECT
DESCRIPTION
ITEM SUBMITTED
PARAGRAPH
#
CLASSIFICATION
GOVT OR A/E REVWR SUBMIT
APPROVALNEEDED
BY
MATERIALNEEDED
BY
ACTION CODE
DATEOF
ACTION
DATE FWDTO APPR
AUTH/
DATE RCDFROM
CONTR
DATE FWDTO OTHERREVIEWER
DATE RCDFROM OTHREVIEWER
ACTION CODE
DATEOF
ACTION
MAILEDTO
CONTR/
DATE RCDFRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 17 OF 29 PAGES
ARAVI OFFICE RENOVATION
09 65 00 3.1 G[InstallationSD-10 Operation and MaintenanceData
2.17 G[Resilient Flooring andAccessories
09 90 00 SD-02 Shop Drawings3.11Piping identification3.11stencil
SD-03 Product DataCertification
2.1Coating2.1Manufacturer's Technical Data
SheetsSD-04 Samples
1.9Color1.4.2Textured Wall Coating System1.4.3Sample Textured Wall Coating
System Mock-UpSD-07 CertificatesApplicator's qualificationsQualification Testing
SD-08 Manufacturer’s InstructionsApplication instructions
3.7.2Mixing1.7.2Manufacturer's Material Safety
Data Sheets
SUBMITTAL REGISTERCONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:SCHEDULE DATES
CONTRACTORACTION
APPROVING AUTHORITY
ACTIVITY NO
TRANSMITTAL NO
SPEC SECT
DESCRIPTION
ITEM SUBMITTED
PARAGRAPH
#
CLASSIFICATION
GOVT OR A/E REVWR SUBMIT
APPROVALNEEDED
BY
MATERIALNEEDED
BY
ACTION CODE
DATEOF
ACTION
DATE FWDTO APPR
AUTH/
DATE RCDFROM
CONTR
DATE FWDTO OTHERREVIEWER
DATE RCDFROM OTHREVIEWER
ACTION CODE
DATEOF
ACTION
MAILEDTO
CONTR/
DATE RCDFRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 18 OF 29 PAGES
ARAVI OFFICE RENOVATION
09 90 00 SD-10 Operation and MaintenanceData
2.1Coatings:09 96 00 SD-01 Preconstruction Submittals
1.3Material, Equipment and FixtureList
SD-03 Product DataHeat-Resistant Coatings
2.1Epoxy Coatings2.2Polyurethane Coatings
Chlorinated-Rubber CoatingsSD-04 Samples
1.3Color ChipsSD-07 Certificates
2.1Epoxy Coatings2.2Polyurethane Coatings
10 28 13 SD-03 Product Data2.1.2Finishes2.2Accessory Items
SD-04 Samples2.1.2Finishes2.2Accessory Items
SD-07 Certificates2.2Accessory Items
10 44 16 SD-02 Shop Drawings2.1Fire Extinguishers
SUBMITTAL REGISTERCONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:SCHEDULE DATES
CONTRACTORACTION
APPROVING AUTHORITY
ACTIVITY NO
TRANSMITTAL NO
SPEC SECT
DESCRIPTION
ITEM SUBMITTED
PARAGRAPH
#
CLASSIFICATION
GOVT OR A/E REVWR SUBMIT
APPROVALNEEDED
BY
MATERIALNEEDED
BY
ACTION CODE
DATEOF
ACTION
DATE FWDTO APPR
AUTH/
DATE RCDFROM
CONTR
DATE FWDTO OTHERREVIEWER
DATE RCDFROM OTHREVIEWER
ACTION CODE
DATEOF
ACTION
MAILEDTO
CONTR/
DATE RCDFRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 19 OF 29 PAGES
ARAVI OFFICE RENOVATION
10 44 16 Accessories2.4Cabinets2.5Wall Brackets
SD-03 Product Data2.1Fire Extinguishers
Accessories2.5Wall Brackets
SD-04 Samples2.1Fire Extinguisher2.5Wall Brackets
AccessoriesSD-07 Certificates
2.1Fire Extinguishers2.1Manufacturer's Warranty with
Inspection Tag12 36 00 SD-02 Shop Drawings
2.3Fabrication3.1Installation Drawings
SD-03 Product DataIn situ polishedGranite materialcomponents
TileSD-04 Samples
2.3Countertop2.3Backsplash,
Bronce Counter top joints
SUBMITTAL REGISTERCONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:SCHEDULE DATES
CONTRACTORACTION
APPROVING AUTHORITY
ACTIVITY NO
TRANSMITTAL NO
SPEC SECT
DESCRIPTION
ITEM SUBMITTED
PARAGRAPH
#
CLASSIFICATION
GOVT OR A/E REVWR SUBMIT
APPROVALNEEDED
BY
MATERIALNEEDED
BY
ACTION CODE
DATEOF
ACTION
DATE FWDTO APPR
AUTH/
DATE RCDFROM
CONTR
DATE FWDTO OTHERREVIEWER
DATE RCDFROM OTHREVIEWER
ACTION CODE
DATEOF
ACTION
MAILEDTO
CONTR/
DATE RCDFRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 20 OF 29 PAGES
ARAVI OFFICE RENOVATION
12 36 00 Manufacturer's Standard ColorCharts
2.2Filler MaterialSD-08 Manufacturer’s InstructionsManufacturer's Instructions
22 00 00 SD-02 Shop Drawings3.6.1Plumbing System
SD-03 Product Data2.4Fixtures2.4.2Flush valve urinals2.4.3Flush tank water closets
Wall hung lavatories2.4.4Countertop lavatories
Kitchen sinksService sinksWater heatersShower Faucets
3.6.1Plumbing SystemSD-06 Test Reports
3.6Tests, Flushing and DisinfectionSD-07 Certificates
1.3Materials and Equipment2.1.1Bolts
SD-10 Operation and MaintenanceData
3.6.1Plumbing System
SUBMITTAL REGISTERCONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:SCHEDULE DATES
CONTRACTORACTION
APPROVING AUTHORITY
ACTIVITY NO
TRANSMITTAL NO
SPEC SECT
DESCRIPTION
ITEM SUBMITTED
PARAGRAPH
#
CLASSIFICATION
GOVT OR A/E REVWR SUBMIT
APPROVALNEEDED
BY
MATERIALNEEDED
BY
ACTION CODE
DATEOF
ACTION
DATE FWDTO APPR
AUTH/
DATE RCDFROM
CONTR
DATE FWDTO OTHERREVIEWER
DATE RCDFROM OTHREVIEWER
ACTION CODE
DATEOF
ACTION
MAILEDTO
CONTR/
DATE RCDFRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 21 OF 29 PAGES
ARAVI OFFICE RENOVATION
23 00 00 SD-02 Shop Drawings1.4.5Detail Drawings
SD-03 Product DataAir Vents, Penthouses, andGoosenecks
Ceiling Exhaust FansAir Handling Units
2.10.1Room Fan-Coil UnitsTest ProceduresDiagrams
SD-06 Test Reports3.8Performance Tests
SD-08 Manufacturer’s Instructions3.2Manufacturer's Installation
Instructions3.9.2Operation and Maintenance
TrainingSD-10 Operation and MaintenanceData
3.9.1Operation and MaintenanceManuals
23 07 00 SD-03 Product DataPipe Insulation Systems
SD-08 Manufacturer’s InstructionsPipe Insulation Systems
23 23 00 SD-02 Shop Drawings
SUBMITTAL REGISTERCONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:SCHEDULE DATES
CONTRACTORACTION
APPROVING AUTHORITY
ACTIVITY NO
TRANSMITTAL NO
SPEC SECT
DESCRIPTION
ITEM SUBMITTED
PARAGRAPH
#
CLASSIFICATION
GOVT OR A/E REVWR SUBMIT
APPROVALNEEDED
BY
MATERIALNEEDED
BY
ACTION CODE
DATEOF
ACTION
DATE FWDTO APPR
AUTH/
DATE RCDFROM
CONTR
DATE FWDTO OTHERREVIEWER
DATE RCDFROM OTHREVIEWER
ACTION CODE
DATEOF
ACTION
MAILEDTO
CONTR/
DATE RCDFRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 22 OF 29 PAGES
ARAVI OFFICE RENOVATION
23 23 00 2.3Refrigerant Piping SystemSD-03 Product Data
2.3Refrigerant Piping System3.5Refrigerant Piping Tests3.4Demonstrations3.1Verification of Dimensions
SD-06 Test Reports3.5Refrigerant Piping Tests
SD-10 Operation and MaintenanceData
1.5Maintenance3.4Operation and Maintenance
Manuals23 81 00.00 20 SD-02 Shop Drawings
2.5.2Field-assembled refrigerantpiping
1.4.2Control system wiring diagramsSD-03 Product Data
2.2Air conditioners2.5Refrigerant piping and
accessories2.3Coatings for finned tube coils
SD-06 Test Reports3.8.3Start-up and initial operational
testsSD-08 Manufacturer’s Instructions
SUBMITTAL REGISTERCONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:SCHEDULE DATES
CONTRACTORACTION
APPROVING AUTHORITY
ACTIVITY NO
TRANSMITTAL NO
SPEC SECT
DESCRIPTION
ITEM SUBMITTED
PARAGRAPH
#
CLASSIFICATION
GOVT OR A/E REVWR SUBMIT
APPROVALNEEDED
BY
MATERIALNEEDED
BY
ACTION CODE
DATEOF
ACTION
DATE FWDTO APPR
AUTH/
DATE RCDFROM
CONTR
DATE FWDTO OTHERREVIEWER
DATE RCDFROM OTHREVIEWER
ACTION CODE
DATEOF
ACTION
MAILEDTO
CONTR/
DATE RCDFRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 23 OF 29 PAGES
ARAVI OFFICE RENOVATION
23 81 00.00 20 2.1Room air conditioners2.2Air conditioners2.5Refrigerant piping and
accessoriesSD-10 Operation and MaintenanceData
2.1Room air conditioners2.2Air conditioners
SD-11 Closeout Submittals1.4.4Posted operating instructions
26 05 00.00 40 SD-01 Preconstruction Submittals2.1Material, Equipment, and Fixture
ListsSD-03 Product Data
2.1.1Conduits and Raceways2.1.3Wire and Cable3.2.1.9Splices and Connectors2.1.4Switches2.1.5Receptacles2.1.6Outlets, Outlet Boxes, and Pull
Boxes2.1.8Circuit Breakers2.1.7Panelboards2.1.9Lamps and Lighting Fixtures2.1.12Dry-Type Distribution
Transformers
SUBMITTAL REGISTERCONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:SCHEDULE DATES
CONTRACTORACTION
APPROVING AUTHORITY
ACTIVITY NO
TRANSMITTAL NO
SPEC SECT
DESCRIPTION
ITEM SUBMITTED
PARAGRAPH
#
CLASSIFICATION
GOVT OR A/E REVWR SUBMIT
APPROVALNEEDED
BY
MATERIALNEEDED
BY
ACTION CODE
DATEOF
ACTION
DATE FWDTO APPR
AUTH/
DATE RCDFROM
CONTR
DATE FWDTO OTHERREVIEWER
DATE RCDFROM OTHREVIEWER
ACTION CODE
DATEOF
ACTION
MAILEDTO
CONTR/
DATE RCDFRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 24 OF 29 PAGES
ARAVI OFFICE RENOVATION
26 05 00.00 40 SD-06 Test Reports3.3Continuity Test3.3Phase-Rotation Tests3.3Insulation Resistance Test
SD-07 Certificates1.4Certification
SD-08 Manufacturer’s InstructionsPart 2Manufacturer's Instructions
26 05 19.00 10 SD-03 Product Data3.1Installation Instructions
SD-06 Test Reports3.2Tests, Inspections, and
Verifications26 05 71.00 40 SD-02 Shop Drawings
3.1Protective DevicesSD-03 Product Data
2.2Enclosures2.3Circuit Breakers3.1Control Devices2.7Indicating Instruments
SD-06 Test Reports3.2Dielectric Tests3.2Final Test Reports
SD-08 Manufacturer’s Instructions3.1Protective Devices
SUBMITTAL REGISTERCONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:SCHEDULE DATES
CONTRACTORACTION
APPROVING AUTHORITY
ACTIVITY NO
TRANSMITTAL NO
SPEC SECT
DESCRIPTION
ITEM SUBMITTED
PARAGRAPH
#
CLASSIFICATION
GOVT OR A/E REVWR SUBMIT
APPROVALNEEDED
BY
MATERIALNEEDED
BY
ACTION CODE
DATEOF
ACTION
DATE FWDTO APPR
AUTH/
DATE RCDFROM
CONTR
DATE FWDTO OTHERREVIEWER
DATE RCDFROM OTHREVIEWER
ACTION CODE
DATEOF
ACTION
MAILEDTO
CONTR/
DATE RCDFRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 25 OF 29 PAGES
ARAVI OFFICE RENOVATION
26 05 71.00 40 SD-10 Operation and MaintenanceData
2.3Circuit Breakers26 09 23.00 40 SD-03 Product Data
2.1.1Photoconductive Control Devices3.1Installation Drawings2.1.1Light-Sensitive Control Devices
Lighting Contactor2.2.2Photocell Switch2.2.3Occupancy Sensors1.3Motion Sensors
SD-06 Test Reports3.2System Operation Tests
26 20 00 SD-02 Shop Drawings2.14Panelboards2.4Busway2.24Wireways
Raceway3.1.10.1Marking strips
SD-03 Product Data2.13Receptacles2.14.3Circuit breakers2.11Switches2.15Enclosed circuit breakers2.20.3Grounding Busbar2.25Surge protective devices
SUBMITTAL REGISTERCONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:SCHEDULE DATES
CONTRACTORACTION
APPROVING AUTHORITY
ACTIVITY NO
TRANSMITTAL NO
SPEC SECT
DESCRIPTION
ITEM SUBMITTED
PARAGRAPH
#
CLASSIFICATION
GOVT OR A/E REVWR SUBMIT
APPROVALNEEDED
BY
MATERIALNEEDED
BY
ACTION CODE
DATEOF
ACTION
DATE FWDTO APPR
AUTH/
DATE RCDFROM
CONTR
DATE FWDTO OTHERREVIEWER
DATE RCDFROM OTHREVIEWER
ACTION CODE
DATEOF
ACTION
MAILEDTO
CONTR/
DATE RCDFRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 26 OF 29 PAGES
ARAVI OFFICE RENOVATION
26 20 00 SD-06 Test Reports3.5.2600-volt wiring test3.5.5Grounding system test
SD-09 Manufacturer’s FieldReports
2.27.1Transformer factory tests26 24 16.00 40 SD-02 Shop Drawings
2.1.1Detail Drawings2.1.1Outline Drawings
SD-03 Product Data1.3Panelboards2.1.1Panelboards
SD-06 Test Reports3.2Continuity Tests3.2Insulation Tests
SD-07 Certificates1.4Statements
SD-08 Manufacturer’s Instructions1.3Panelboards2.1.1Panelboards
26 51 00 SD-03 Product DataLED lighting fixturesLED lamps
2.7Lighting contactor2.8Photocell switch2.10LED Exit signs
SUBMITTAL REGISTERCONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:SCHEDULE DATES
CONTRACTORACTION
APPROVING AUTHORITY
ACTIVITY NO
TRANSMITTAL NO
SPEC SECT
DESCRIPTION
ITEM SUBMITTED
PARAGRAPH
#
CLASSIFICATION
GOVT OR A/E REVWR SUBMIT
APPROVALNEEDED
BY
MATERIALNEEDED
BY
ACTION CODE
DATEOF
ACTION
DATE FWDTO APPR
AUTH/
DATE RCDFROM
CONTR
DATE FWDTO OTHERREVIEWER
DATE RCDFROM OTHREVIEWER
ACTION CODE
DATEOF
ACTION
MAILEDTO
CONTR/
DATE RCDFRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 27 OF 29 PAGES
ARAVI OFFICE RENOVATION
26 51 00 LED Emergency lightingequipment
2.12Occupancy sensorsSD-06 Test Reports
3.2Operating test27 10 00 SD-02 Shop Drawings
1.6.1.1Telecommunications drawings1.6.1.2Telecommunications Space
DrawingsSD-03 Product Data
2.4Telecommunications cabling2.5.6Patch panels2.6Telecommunications
outlet/connector assemblies2.5.3Equipment support frame
SD-06 Test Reports3.5.1Telecommunications cabling
testingSD-07 Certificates
1.6.2.1Telecommunications Contractor1.6.2.3Manufacturer Qualifications1.6.3Test plan
SD-10 Operation and MaintenanceData
1.10.1Telecommunications cabling andpathway system
SUBMITTAL REGISTERCONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:SCHEDULE DATES
CONTRACTORACTION
APPROVING AUTHORITY
ACTIVITY NO
TRANSMITTAL NO
SPEC SECT
DESCRIPTION
ITEM SUBMITTED
PARAGRAPH
#
CLASSIFICATION
GOVT OR A/E REVWR SUBMIT
APPROVALNEEDED
BY
MATERIALNEEDED
BY
ACTION CODE
DATEOF
ACTION
DATE FWDTO APPR
AUTH/
DATE RCDFROM
CONTR
DATE FWDTO OTHERREVIEWER
DATE RCDFROM OTHREVIEWER
ACTION CODE
DATEOF
ACTION
MAILEDTO
CONTR/
DATE RCDFRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 28 OF 29 PAGES
ARAVI OFFICE RENOVATION
27 10 00 SD-11 Closeout Submittals1.10.2Record Documentation
28 31 74.00 20 SD-03 Product DataFire Smoke Detectors
SD-08 Manufacturer’s InstructionsSmoke detector
SD-11 Closeout Submittals1.6.2.1System as-built drawings
33 11 00 SD-03 Product Data2.1.1Piping Materials2.1Water distribution main2.2Water service line
Corporation stops2.1.2.2Valve boxes2.2.2.2Valve boxes
SD-06 Test Reports2.2.2.4Disinfection
SD-07 Certificates2.1Water distribution main2.2Water service line
Displacement Type MetersCompound Type Meters
SD-08 Manufacturer’s Instructions1.3Delivery, storage, and handling
Installation33 16 15 SD-02 Shop Drawings
SUBMITTAL REGISTERCONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:SCHEDULE DATES
CONTRACTORACTION
APPROVING AUTHORITY
ACTIVITY NO
TRANSMITTAL NO
SPEC SECT
DESCRIPTION
ITEM SUBMITTED
PARAGRAPH
#
CLASSIFICATION
GOVT OR A/E REVWR SUBMIT
APPROVALNEEDED
BY
MATERIALNEEDED
BY
ACTION CODE
DATEOF
ACTION
DATE FWDTO APPR
AUTH/
DATE RCDFROM
CONTR
DATE FWDTO OTHERREVIEWER
DATE RCDFROM OTHREVIEWER
ACTION CODE
DATEOF
ACTION
MAILEDTO
CONTR/
DATE RCDFRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 29 OF 29 PAGES
ARAVI OFFICE RENOVATION
33 16 15 3.6 GTank InstallationSD-03 Product Data
2.1System Description3.1Foundations
SD-06 Test Reports3.6Tank Installation3.7.2Testing of Valves and Piping
SD-07 Certificates2.1System Description3.1Foundations
33 30 00 SD-01 Preconstruction SubmittalsExisting Conditions
SD-02 Shop Drawings1.4.1Drawings2.3.1Precast concrete manhole2.3.3.1Frames, covers, and gratings
SD-03 Product Data2.1Pipeline materials
SD-06 Test Reports2.4Reports
SD-07 CertificatesGaskets
SUBMITTAL REGISTERCONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:SCHEDULE DATES
CONTRACTORACTION
APPROVING AUTHORITY
ACTIVITY NO
TRANSMITTAL NO
SPEC SECT
DESCRIPTION
ITEM SUBMITTED
PARAGRAPH
#
CLASSIFICATION
GOVT OR A/E REVWR SUBMIT
APPROVALNEEDED
BY
MATERIALNEEDED
BY
ACTION CODE
DATEOF
ACTION
DATE FWDTO APPR
AUTH/
DATE RCDFROM
CONTR
DATE FWDTO OTHERREVIEWER
DATE RCDFROM OTHREVIEWER
ACTION CODE
DATEOF
ACTION
MAILEDTO
CONTR/
DATE RCDFRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)