PROJECTBRIEFSydney Water

Clarifier RefurbishmentBrolton Group partnered with Sydney

Water to refurbish Clarifier No 2 at Glenfield WRP

• Cleaned all internals• Addressed degradation of

concrete surfaces and joints• Cleaned and repainted all clarifier

components including bridge steelwork and trough

• Rectified leaks on inlet channel• Replaced drive & idler wheels, slip

rings and bearings on centre column• Refurbished motor and gearbox• Replaced scum beach and box• Restored operation to blocked

scum beach drain• Replaced failed manifold seals on

sludge rake arm• Replaced rubber scraper blades• Addressed corrosion issues

across the clarifier

www.brolton.com.au • [email protected] 02 9838 1311 • BRISBANE 07 3804 6566

Page 2: Sydney Water Clarifier Refurbishment - Brolton Group · • Restored operation to blocked scum beach drain • Replaced failed manifold seals on sludge rake arm • Replaced rubber

SKILLED DESIGNSEAMLESS ENGINEERING

www.brolton.com.au • [email protected] 02 9838 1311 • BRISBANE 07 3804 6566


Top Related